Loading...
FLD2009-08030 - 900 OSCEOLA AVE N #27 - CLEARWATER BASIN MARINA (2)FLD2009-08030 900 N OSCEOLA AVE 27 CLEARWATER BASIN MARINAI PLANNER OF RECORD: S K ATLAS # 277B ZONING: D LAND USE: CBD RECEIVED: 08/27/2009 INCOMPLETE: COMPLETE: MAPS PHOTOS STAFF REPORT: DRC CDB: CLW CoverSheet MEMORANDUM TO: Community Development Board FROM: A. Scott Kurleman, Planner III RE: Continued item from 11/17/09 CDB meeting. DATE: December 8, 2009 At the November 17, 2009 CDB meeting, the board approved case FLD2009-08030 and requested that staff present of list of Conditions of Approval at the December 15, 2009 CDB meeting for their consideration. Attached are the Conditions of Approval. CONDITIONS OF APPROVAL FLD2009-08030 (900 N Osceola Ave) 1. That, prior to the issuance of any permits, a vehicular access easement for emergency vehicle access to the southwest ingress/egress area be provided for the life of the marina project and be obtained from the City of Clearwater; 2. That, prior to the issuance of any permits, the final plat for PLT2004-00012 be approved by City Council and recorded; 3. That, prior to the issuance of any permits, a cross access agreement be granted to Clearwater Bay Marina Lot 1 from Clearwater Bay Marina Lot 2, to the satisfaction of the owner of Lot 1 so as to provide access to Lot 1 from Osceola Avenue only and be recorded and a copy be provided to the City; 4. That, prior to issuance of a Certificate of Occupancy, all chainlink fences be removed from the site; 5. That, prior to issuance of a Certificate of Occupancy, both emergency access points be gated with a knox box and signed accordingly and only be accessed for emergency vehicles; 6. That, all pilings be removed or completely screened from adjacent properties and rights-of-ways with landscaping as approved by the Planning Department within one year from the issuance of a Certificate of Occupancy; 7. That, should the pilings remain, they are made safe according to OSHA or other applicable standards prior to the issuance of a Certificate of Occupancy; 8. That, prior to the issuance of any permits, the retaining wall on the north side be repaired to prevent any further erosion; 9. That, prior to the issuance of a Certificate of Occupancy, all vehicular and golf cart accesses be improved with an acceptable all weather paving material; 10. That, no fence other than the proposed decorative wrought iron fence be installed along Osceola Avenue; 11. That, prior to the issuance of any permits, all parking lot surfaces be redesigned to use interlocking pavers, bricks or other similarly textured materials for parking lot accents; 12. That, the transition area guidelines in the Old Bay character district are complied with when a residential component is proposed; 13. That, the ownership of the upland area of 3.55 acres and the submerged area of 1.55 acres not be divided; 14. That, prior to the issuance of a Certificate of Occupancy, there be a stipulation in all boat leases that the lease will expire 180 days after the submission of a building permit for any residential component on the upland property or the site will be reviewed as a mixed use project; 15. That live aboard vessels be prohibited; 16. That there be no fueling facilities, boat launching or dry storage of boats; 17. That the slips be limited for private recreational boats; 18. That no commercial boats, boat rentals, jet ski rentals, covered boatlifts, roof structures or vertical walls are permitted; 19. That no servicing of boats or motors is permitted; 20. That the landscape be installed per the approved landscape plan prior to the issuance of a Certificate of Occupancy; 21. That all signage be permitted separately and comply with the Downtown Design Guidelines; 22. That all fences be permitted separately and comply with the Downtown Design Guidelines; 23. That no additions or changes are permitted to the existing boat slips; and 24. That the sanitary sewage pump-out holding tank not be located over water. Resume A. Scott Kurleman 100 South Myrtle Avenue Clearwater, FL 33756 727-562-4553 scoff.kurlt;man(«;mvcletu•w~~ter.co~n PROFESSIONAL EXPERIENCE • Planner III • Planner II August 2008 to present June 2005 to August 2008 Regulate growth and development of the City in accordance with land resource ordinances and regulations related to community development. Landscape plan review including: conceptual, variance, and conditional use. Reviews and analyzes site plans and conducts field studies to determine the integrity of development plans and their compatibility with surroundings. Interdepartmental and zoning assistance. Respond as a City representative to citizens, City officials, and businesses concerning ordinances and regulations. Make recommendations and presentations at staff level at various review committees, boards, and meetings. • Land Resource Specialist City of Clearwater June 1996 to June 2005 Coordinates with City Legal Department to initiate legal proceedings for non-compliance with City land resource regulations. Landscape re-inspection program. Plans and directs program to ensure that plant material installed per the approved landscape plan remains in a healthy growing condition in perpetuity and restores deficient landscaped with new plant material. Certificate of Occupancy Inspection. Perform inspections with contractors, owners, and City departments to monitor the installation of required landscape material per an approved site plan. Process tree permits ensuring that regulations governing the removal criteria are followed. Provide technical tree evaluations for structural defects, hazards, proper pruning, and identification for trees on public and private properties. • Account Manager Cherry Lake Farms, IMG Enterprise, Inc. 1993 - 1996 Groveland, FL Supervised and managed existing territory accounts, while handling a strategic marketing plan. Planned and directed in-field inspection program for landscape architects, municipalities and private corporations. Prepared technical training modules for corporate employees and customers regarding arboricultural techniques related to trees. • Licensed Marketing Representative Allstate Insurance Company 1991 1993 Clearwater, FL Field inspections of insured structures. Policy service and account maintenance. • Store Manager William Natorp company, Inc. 1983 - 1991 Cincinnati, OH Managed a team of 20 sales people and sales associates in a landscape center. Responsible for teams of employees including but not limited to payroll, budgeting, sales, store and equipment maintenance, workplace safety, and advertising. Managed outdoor staff, merchandised and cared for all outdoor products. Responsible for all indoor staff and horticultural products. EDUCATION GRADUATE -Certificate: Community Development, UNIVERSITY OF SOUTH FLORIDA, TAMPA, FLORIDA. Currently pursuing. BS in Sustainability Management, ST. PETERSBURG COLLEGE, FLORIDA. Currently pursuing. BA in Business Administration, ST. LEO UNIVERSITY, ST. LEO, FLORIDA. Graduated July, 2002 Cum Laude. Major: Management AA in Business Administration, ST. PETERSBURG COLLEGE, FLORIDA. Graduated 1998. Major: Management. AS in Ornamental Horticulture, OHIO STATE UNIVERSITY, WOOSTER, Graduated 1984 Cum Laude. Major: Horticulture Technology with emphasis in Arboriculture. ISA, International Society of Arboriculture, Certified Arborist, FL-0414.