Loading...
HEADWORKS SCREENING AND GRIT REMOVAL IMPROVEMENTS - 05-0063-UT - ADMINISTRATIVE CHANGE ORDER # 1 & FINALh. ADMINISTRATIVE CHANGE ORDER # 1 & FINAL PROJECT: HEADWORKS SCREENING AND GRIT REMOVAL IMPROVEMENTS FOR THE NORTHEAST, MARSHALL STREET, AND EAST ADVANCED POLLUTION CONTROL FACILITIES (APCFS) CONTRACTOR: TLC Diversified, Inc 2719 17th Street East Palmetto, Florida, 34221 Date: November 3 2009 PROJECT NUMBER: 05-0063-UT PO REFERENCE NO.: ST 103999 DATE OF CONTRACT: 01/15/2008 CODE: 0376-96620-563800-535-000-0000 A 0315-96620-563800-535-000-0000 B 0315-96620-563800-535-000-0000 C SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT See attached sheet for decreases, increases, and additions to contract. STATEMENT OF CONTRACT AMOUNT ACCEPTED BY: ORIGINAL CONTRACT AMOUNT ADMINISTRATIVE CO #1 & FINAL NEW CONTRACT AMOUNT ATTEST: ( 1 r fl, $5,847,803.40 TLC (VERSIFIED, INC. ($2,737,614.40 $ 3,110,189.00 - AL) Thurston Lambers A, President -- Date: I a d °? Recommended B : /? tyF y r r? g Perry M pe Q Constru M n Manager Michael D. Quillen, P.E. City Engineer C?thia E. Goudeau, V11 C ty Clerk Date: I Z.oo CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA `I William B. Horne, II City Manager Page 2 of 4 Administrative Change Order #1 & Final Headworks Screening and Grit Removal Improvements for the NE, MS and East APCF ITEM DESCRIPTION A.7 Grit Removal From Influent Well, Mechanical Screen Channels and Mechanical Screen Channel up to Parschall Flume. A.9 5% Contingency on Total of Item A.1 through A.7 0 PLC Allowance A.11 Northeast APCF - Repair of existing slide gates i upstream and downstream of mechanical screens 1-6 Northeast APC Purchase and Install Aluminum Roll up door and railing (for opening north of mechanical screens) 1 LS $ 50,798.50 $ 0.79452 LS $ 25,000.00 $ ; 6 EA $ 6,105.00 0.90874223 LS $ 7,561.00 j - (11,680.00) (50,798.50) (19,863 ;00) (36,630.00) (6,871.00) to Channel Coating (Using Spectrashield) $ 7.00 1,955.00) -7 Concre 115. SY _ MARSHALL_ STREETAPCF "'-- --- ing 25 ,450.00) B•6 Troweable Non210 as g (manufas to Sewer uard ? - CY $ 98.00 -(Z -?-._ ... manufactured by I Sauereisen) _._ .... ? ..----- i$$ - ......(6,240.00) B.8 Grit Removal From Mechanical Screen --- 39 CY $ 160.00 Channels and Grit Influent and Effluent Channels ---- 13.1015% Contingency on Total of Item B.1 through 1 LS $ 107,918.05 ' $ (107,918.05) B. 1 Allowance ret APCF -Repair of existin 0.6221 , EA $ 6,105.00 1 $ ( (6,170.00) i B.11 21 I Marshall St - g slide -1 LS---- $ 25,0,.,, - ? 05.00) gates located in grit units upstream, downstream and bypass channel I F -Replacement of existing ?(36,600.00) II-3 Marshall Street APC 2' EA $ 18,300.00 $ slide gates located in grit units upstream, I downstream and bypass II-4 Concrete Channel Coating Using S ectrashield 275 SY $ 17.00 $ I _..... (4,675.00) EAST APCF n. 31 CY $ 160.00 $ (4,960.00) C.9 ChaRnelsoand Grit1 Influent and Effluent e_.... i _._......._. __.._? _.. _. Channels u to Parshall Flume CA 1 5% Contingency on Total of Item C.1 through 1 I LS $ 88,077,85 $ (88,077.85) C.9 LS $ 25,000.00 $ .(12,270.00) C.12 PLC Allowance , 0.4908 x111-2 East AOCI= _ Replacement of Existing Slide 31 EA $ 12,900.00 $ (38,700.00) Gates -Two Gates Upstream of Mechanical Screens and One Gate Downstream of Grit - Influent Channel III-3 Concrete Chanel Coating (Using Spectrashield) 320 SY 17.00 -- 1------ - .0.00) Sub-total (Decreases) PO Code A: $ (456,803.40) City PO # ST104208 City PO # ST104209 City PO # ST104210 City PO # ST10 221 ity PO # ST104308 U-040- JUU-uvUU I as .?ilVlrl 5 VII Vwfltl r LAMUL PkJ1%o1 d V ^ %4 ?. 1 BLS $ 3,710.00 $ (3,710.00) 1 I LS - $ 11, 750.0 (11,750-00) 1 LS $ 11,150.00 $ (11,150.00) - ....... `--- 1 LS _$ .3,190.00-I $ 2,210-00 $ (13,190.00) (2,210.00) Sub-total (Decreases) - Sales Tax Savings - PO Code C:; $ (42,0.10.00) Total (Decreases) to the PO: $ (498,813.40 QTY UNIT COST TOTAL COST 731 CY $ 160.00 $ Page 3 of 4 Administrative Change Order #1 & Final Headworks Screening and Grit Removal Improvements for the NE, MS and East APCF ITEM DESCRIPTION QTY UNIT COST 992.00 1 LS $ 1,838,992.00 TOTAL COST $ (1,838,992.00) 1; LS $ 61,000.00 $ (61,00.00) City PO # ST104209 City PO # ST104210 City PO # ST104211 City PO # ST104306 __-_ ....___ T... '... City P T104308 PO # ST104006 PO # ST104208 ITEM DESCRIPTION QTY INCREASES FOR CODE A: 0376-96620-563800-535-000-0000 NORTHEAST ABU ?ncrete Channel Coating' (Using Sewerguard Trj - iA.5? C 0 EAST APCF 16.7 Concrete Channel Coating (Using Sewerguard T ITEM DESCRIPTION - 01y-ADDITIONS FOR CODE A: 0376-96620-563800-535-000-0000 NORTHEAST APCF 1 LS $ 195,000.00 ! $ (195,00.00) 1 LS $ 185,000.00 ! $ (185,000.00) ... I ._ 219,000.00 $ (2 .. 1 '', LS ? $ ... - 4,000,00_I $ .... (4,000.00) -.. 1 LS _ - $ 36,000.00 _1 $ (36,000.00) - Total (Decreases) OP ($2,538,992.00) Total (Decreases) to the Contract: $ (3,037,805.40) UNIT COST TOTAL COST - -- . "' 61.256.0 . 247 SY $ 24$.00 _ 205.00 , $ 6,765.00 33'' SY - Total Increases Code A: $68,021.00 UNIT COST TOTAL COST A-1 2. ' east Manual Barscreen North .00 1 $16, 1 LS 16,861.00 ._._ . _ ....._.--- r AA ...-- - ........ _ _ d.9 ? i ons Sludge Thickener Piping Modifcat ; _.... $31,58 ? 2.00 1 LS $31,582.00 - A-14 -- --- Misc Pipe Demo & Reconfiguration & _ _ -..._., _ _. -- - $4,560 1 A- A-15 .. . _. Bypass Extension & Bridge S, pport - ... LS_ 6.00 396.00 $1 'LS 1 A-16 ------- Rental Bypass Weekly _ $16'590.00 $5, 530 .00 3 WK - - A-1 7 Thickener Valves Additional 1 LS ? 794 . 00 $1 ,7 94.O T .__.. Pipe Future - Stub PVC _ ' LS 1 0 ?_ - --- ..... -- i - -----$716 0 . A-1 Air & Chlorine Piping A ° n _ 1 1 $4,387.00 $4,387.00 A-20 ' _ y and R nstallation Shed Demo and Rail Stairway ?_ 1 LS $2,287.00 $2,287.00 f Box Work Platform l I p Mob S - LS $6,651.00 ... $6,651.00 - A 22 ter Box Pump Rental Split ..-- ---.... 2; WK ___...-- ---, $4,731.50 ... _.__.. $9,463.00 .,...--- - , , Closed Cover Fiber Glass Gratin 1; IS $20,020.00 $20,020.00 A-24 LS Plank Grating Aluminum _._......__....-- - -- -- 61.00 -- -- A 25 . 6" Sludge Piping Replacement 1 .00! LS 2088000 _ $ $2 088.00 - - A-26 ns 1.061-- 2896.00 Roof Hand Rails, Warnin Cables & Si l LS 9 9 ' $12,896.00 ? MAR - -....,...... . _._ ., ....------- LL STREET APCF SHA .__ __ B-13 _ _ ' Replace Anchor Bolts as required 1.00 LS 49&000 498 ;00 _ 2 B-14 00'LS Classifier Pad 1.00 LS 4819.000 4819.000 $4 81 $4,819.00 9.0 B-15 Odor Control Modifications B-16 F & I Additional Stop- Gate B-17Aemove Steel Plates Lower Flume B-181, Revised Ramp & Paving B-191 Elevated Concrete Slab_ Repairs B-26,Westec B/C Interim C-14', Control Panel her C-156" Dia. Drain Line C-16 Odor Control Modifications C-17 Hopper Repairs C-18 Bollards -- - C-19 Electrical Conduits Modifications C-2G Unistrut Replacement C-21' Concrete Curb & Slab 1.00 ! LS 1.00 LS 1.00; LS_ 1.00, LS 1.00; LS 11,00; LS _.. L..._.._ 1.00', LS 2007.000 5603.000 5259.000 --- 4819.000 2847.000 8701.000 _ 3410.000 5656.000 Total Additions Code A: 1.00 LS 16731.000 $16,731.00 ..?. i.66: LS ---- - 000; 8 6 - $8,163.00 --. 1. 0 LS ! ? 9 _ ------ --- -000! 5 ----- $1.915.00 .-_ -......... 1.001S - ' 1 3387.000 $3,387.0 ? 1703.000] $1,703.00 1.00: LS . ...._._ _...__.... 4aoo.ooo $4,800.00 1.00 i LS _ $2,007.00 $5,603.00 $5,259.00- $4, 819.00 $2,847.00 $8, 701.00 $3,410.00 $5,656.00 $232,170.00 Total Net (Decreases), Increases and Additions to the PO: ($198,622.40) Total Net (Decreases), Increases and Addtions to the Contract: ($2,737,614.40