NORTH GREENWOOD CORRIDOR ENHANCEMENTS PROJECT
PROJECT
NORTH GREENWOOD CORRIDOR ENHANCEMENTS
ITEM NO. DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT
1 Mobilization/Demobilization LS 1
2 T raffle Control LS 1
3 Clearing & Grubbing, Erosion Control, & Contractor Staking LS 1
4 20-inch DI, open cut LF 1400
5 20-inch Gate Valve and box EA 1
6 16-inch DI, open cut LF 1400
7 16-inch Gate Valve and box EA 3
8 8-inch DI, open cut LF 4823
9 8-inch C-900 PVC, open cut LF 1000
10 8-inch Gate Valve and box EA 13
11 Connect to Existing 30-inch on Drew SI. EA 1
12 Connect to Existing 20-inch on Seminole SI. EA 2
13 Jack and Bore 16" Steel Casing - RR Crossing LF 50
14 Jack and Bore 36" Steel Casing - Cleveland SI. LF 105
15 0.1 Fittings TON 17
16 4-inch 01, open cut LF 40
17 4-inch C-900 PVC, Directional Bore LF 1100
18 4-inch C-900 PVC, open cut LF 1100
19 4-inch Gate Valve and Box EA 11
20 4-inch restrained joint for PVC pipe EA 60
21 Blowoffs EA 2
22 Air Release Valves EA 11
23 Service Connections EA 42
24 Asphalt Patch SY 700
25 Asphalt Concrete Pavement Patch, 3.5-inch (2.5" PC-1 & 1" PC-3) SY 1821
26 Asphalt Concrete Pavement Patch, 2.5-inch (1.5" PC-1 & 1" PC-3) SY 481
27 Asphalt Concrete Pavement, 3-inch (2" PC-1 & 1" PC-3) SY 6680
28 Asphalt Driveway, 1.5-inch SY 159
29 Crushed Concrete Base Coarse, 10-inch SY 7175
30 Aggregate Base Coarse, 6-inch SY 159
31 Sod SY 4161
32 Utility Allowance LS 1 $ 100,000.00 $ 100,000.00
33 Pavement Removal SY 9538
34 Concrete Curb Removal LF 2873
35 Concrete Curb & Gutter Removal LF 554
36 Concrete Gutter Removal LF 455
37 Concrete Sidewalk Removal SY 2479
38 Concrete Driveway Removal SY 962
39 Asphalt Driveway Removal SY 56
40 Tree Removal EA 43
41 Drainage Structure Removal EA 4
42 Sewer Removal LF 98
43 Excavation, Roadway CY 2556
44 Fill, Roadway CY 461
45 Type B Stabilization, 12-inch SY 6798
46 Straight Curb LF 7666
47 Straight Curb, Modified LF 418
48 Valley Gutter LF 320
49 Concrete Driveway, 6-inch SY 704
50 Concrete Sidewalk, 4-inch SY 558
North Greenwood, Corridor Enhancement
CLW 2038.01/NG-062600
Contract Forms
CF-14
PROJECT
NORTH GREENWOOD CORRIDOR ENHANCEMENTS
51 Concrete Sidewalk W/Brick Border, 4-inch SY 2191
52 Concrete Sidewalk Ramp, 4-inch SY 202
53 Concrete Bench Pad, 4-inch SY 25
54 Adjust Structure EA 14
55 Adj ust Water Valve EA 10
56 Adjust Cleanout EA 3
57 Concrete Header Curb, 12-inch LF 619
58 Concrete Brick Pavers SY 795
59 Concrete Base Coarse, 6-inch SY 795
60 Concrete Traffic Separator SY 2
61 Reconstruct Manhole EA 3
62 Reconstruct Drainage Inlet EA 1
63 Reconstruct Drainage Inlet, Single Wing EA 2
64 Reconstruct Drainage Inlet, Double Wing EA 1
65 Drainage Inlet Type J EA 1
66 FDOT Drainage Inlet Type 9 EA 2
67 FDOT Drainage Inlet Type 10 EA 6
68 15-inch RCP LF 170
69 Under Drain, 8-inch PVC LF 200
70 Conduit 4-inch with Pull Wire, Install (Communication) LF 3292
71 Conduit 2.5-inch with Pull Wire, Install (Electrical) LF 609
72 Conduit 2-inch with Irrigation Line, Furnish and Install (Irrigation) LF 780
73 Conduit 4-inch with Irrigation Line, Furnish and Install (Irrigation) LF 891
74 Schedule 80 PVC Conduit, 2-inch with Pull Wire (Electrical) LF 45
75 Schedule 40 PVC Conduit, 2-inch with Pull Wire (Electrical) LF 120
76 Irrigation System (Phase 1) LS 1
77 Landscaping (Phase 1) LS 1
78 Topsoil Backfill, 24-inch (At Medians) CY 810
79 Landscape Excavation, 24-inch (At Medians) CY 300
80 Site Furnishings (Bench and Litter) LS 1
81 Site Furnishings (Decorative Column) EA 4
82 Sign age EA 63
83 Relocate Sign EA 11
84 Xeriscape Sign EA 7
85 Pavement Markings, 6-inch LF 1295
86 Pavement Markings, 12-inch LF 53
87 Pavement Markings, 18-inch LF 54
88 Preparation, Installation and Management of Project Sign LS 1
BIDDER'S BASE BID SUB-TOTAL
ALTERNATIVES
89 Neighborhood Entrance Gateways (4 Locations) LS 1
90 10% Contingency LS 1
BIDDERS'S TOTAL BASE BID PLUS ALTERNATIVE PLUS CONTINGENCY
North Greenwood Corridor Enhancement
CLW 2038.01/NG-062600
Contract Forms
CF- ] 5
PROJECT: NORTH GREENWOOD COORIDOR ENHANCEMENTS
(Ol-0029-EN)
CONTRACTOR:
BIDDER'S BASE BID TOTAL PLUS ALTERNATIVE BID PLUS CONTINGENCY
(NUMBERS)
BIDDER'S BASE BID TOTAL PLUS ALTERNATIVE BID PLUS CONTINGENCY
(WORDS)
THE BIDDER'S TOTAL ABOVE IS HIS TOTAL BID BASED ON HIS UNIT PRICES
AND LUMP SUM PRICES AND THE ESTIMATED QUANTITIES REQUIRED. THIS
FIGURE IS FOR INFORMATION ONLY AT THE TIME OF OPENING BIDS. THE
CITY WILL MAKE THE TABULATION. FROM THE UNIT PRICES AND LUMP SUM
PRICE BID. IF THERE IS AN ERROR IN THE TOTAL BY THE BIDDER, IT
SHALL BE CHANGED AS ONLY THE UNIT PRICES AND LUMP SUM PRICE SHALL
GOVERN .
LIST OF DIRECTIONAL BORE SUB-CONTRACTORS
Name
Address
Telephone No.
1.
2.
3.
4.
END OF SECTION
North Greenwood Corridor Enhancement
CLW 2038.01/NG-062600
Contract Forms
CF-16