NORTH GREENWOOD CORRIDOR ENHANCEMENTS PROJECT PROJECT NORTH GREENWOOD CORRIDOR ENHANCEMENTS ITEM NO. DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT 1 Mobilization/Demobilization LS 1 2 T raffle Control LS 1 3 Clearing & Grubbing, Erosion Control, & Contractor Staking LS 1 4 20-inch DI, open cut LF 1400 5 20-inch Gate Valve and box EA 1 6 16-inch DI, open cut LF 1400 7 16-inch Gate Valve and box EA 3 8 8-inch DI, open cut LF 4823 9 8-inch C-900 PVC, open cut LF 1000 10 8-inch Gate Valve and box EA 13 11 Connect to Existing 30-inch on Drew SI. EA 1 12 Connect to Existing 20-inch on Seminole SI. EA 2 13 Jack and Bore 16" Steel Casing - RR Crossing LF 50 14 Jack and Bore 36" Steel Casing - Cleveland SI. LF 105 15 0.1 Fittings TON 17 16 4-inch 01, open cut LF 40 17 4-inch C-900 PVC, Directional Bore LF 1100 18 4-inch C-900 PVC, open cut LF 1100 19 4-inch Gate Valve and Box EA 11 20 4-inch restrained joint for PVC pipe EA 60 21 Blowoffs EA 2 22 Air Release Valves EA 11 23 Service Connections EA 42 24 Asphalt Patch SY 700 25 Asphalt Concrete Pavement Patch, 3.5-inch (2.5" PC-1 & 1" PC-3) SY 1821 26 Asphalt Concrete Pavement Patch, 2.5-inch (1.5" PC-1 & 1" PC-3) SY 481 27 Asphalt Concrete Pavement, 3-inch (2" PC-1 & 1" PC-3) SY 6680 28 Asphalt Driveway, 1.5-inch SY 159 29 Crushed Concrete Base Coarse, 10-inch SY 7175 30 Aggregate Base Coarse, 6-inch SY 159 31 Sod SY 4161 32 Utility Allowance LS 1 $ 100,000.00 $ 100,000.00 33 Pavement Removal SY 9538 34 Concrete Curb Removal LF 2873 35 Concrete Curb & Gutter Removal LF 554 36 Concrete Gutter Removal LF 455 37 Concrete Sidewalk Removal SY 2479 38 Concrete Driveway Removal SY 962 39 Asphalt Driveway Removal SY 56 40 Tree Removal EA 43 41 Drainage Structure Removal EA 4 42 Sewer Removal LF 98 43 Excavation, Roadway CY 2556 44 Fill, Roadway CY 461 45 Type B Stabilization, 12-inch SY 6798 46 Straight Curb LF 7666 47 Straight Curb, Modified LF 418 48 Valley Gutter LF 320 49 Concrete Driveway, 6-inch SY 704 50 Concrete Sidewalk, 4-inch SY 558 North Greenwood, Corridor Enhancement CLW 2038.01/NG-062600 Contract Forms CF-14 PROJECT NORTH GREENWOOD CORRIDOR ENHANCEMENTS 51 Concrete Sidewalk W/Brick Border, 4-inch SY 2191 52 Concrete Sidewalk Ramp, 4-inch SY 202 53 Concrete Bench Pad, 4-inch SY 25 54 Adjust Structure EA 14 55 Adj ust Water Valve EA 10 56 Adjust Cleanout EA 3 57 Concrete Header Curb, 12-inch LF 619 58 Concrete Brick Pavers SY 795 59 Concrete Base Coarse, 6-inch SY 795 60 Concrete Traffic Separator SY 2 61 Reconstruct Manhole EA 3 62 Reconstruct Drainage Inlet EA 1 63 Reconstruct Drainage Inlet, Single Wing EA 2 64 Reconstruct Drainage Inlet, Double Wing EA 1 65 Drainage Inlet Type J EA 1 66 FDOT Drainage Inlet Type 9 EA 2 67 FDOT Drainage Inlet Type 10 EA 6 68 15-inch RCP LF 170 69 Under Drain, 8-inch PVC LF 200 70 Conduit 4-inch with Pull Wire, Install (Communication) LF 3292 71 Conduit 2.5-inch with Pull Wire, Install (Electrical) LF 609 72 Conduit 2-inch with Irrigation Line, Furnish and Install (Irrigation) LF 780 73 Conduit 4-inch with Irrigation Line, Furnish and Install (Irrigation) LF 891 74 Schedule 80 PVC Conduit, 2-inch with Pull Wire (Electrical) LF 45 75 Schedule 40 PVC Conduit, 2-inch with Pull Wire (Electrical) LF 120 76 Irrigation System (Phase 1) LS 1 77 Landscaping (Phase 1) LS 1 78 Topsoil Backfill, 24-inch (At Medians) CY 810 79 Landscape Excavation, 24-inch (At Medians) CY 300 80 Site Furnishings (Bench and Litter) LS 1 81 Site Furnishings (Decorative Column) EA 4 82 Sign age EA 63 83 Relocate Sign EA 11 84 Xeriscape Sign EA 7 85 Pavement Markings, 6-inch LF 1295 86 Pavement Markings, 12-inch LF 53 87 Pavement Markings, 18-inch LF 54 88 Preparation, Installation and Management of Project Sign LS 1 BIDDER'S BASE BID SUB-TOTAL ALTERNATIVES 89 Neighborhood Entrance Gateways (4 Locations) LS 1 90 10% Contingency LS 1 BIDDERS'S TOTAL BASE BID PLUS ALTERNATIVE PLUS CONTINGENCY North Greenwood Corridor Enhancement CLW 2038.01/NG-062600 Contract Forms CF- ] 5 PROJECT: NORTH GREENWOOD COORIDOR ENHANCEMENTS (Ol-0029-EN) CONTRACTOR: BIDDER'S BASE BID TOTAL PLUS ALTERNATIVE BID PLUS CONTINGENCY (NUMBERS) BIDDER'S BASE BID TOTAL PLUS ALTERNATIVE BID PLUS CONTINGENCY (WORDS) THE BIDDER'S TOTAL ABOVE IS HIS TOTAL BID BASED ON HIS UNIT PRICES AND LUMP SUM PRICES AND THE ESTIMATED QUANTITIES REQUIRED. THIS FIGURE IS FOR INFORMATION ONLY AT THE TIME OF OPENING BIDS. THE CITY WILL MAKE THE TABULATION. FROM THE UNIT PRICES AND LUMP SUM PRICE BID. IF THERE IS AN ERROR IN THE TOTAL BY THE BIDDER, IT SHALL BE CHANGED AS ONLY THE UNIT PRICES AND LUMP SUM PRICE SHALL GOVERN . LIST OF DIRECTIONAL BORE SUB-CONTRACTORS Name Address Telephone No. 1. 2. 3. 4. END OF SECTION North Greenwood Corridor Enhancement CLW 2038.01/NG-062600 Contract Forms CF-16