Loading...
LAKE BELLEVUE BRANCH 6A STORMWATER MANAGEMENT PROJECT - 03-0030-EN - ADMINISTRATIVE CHANGE ORDER #1ADMINISTRATIVE CHANGE ORDER # 1 Date: August 07, 2009 PROJECT: Lake Bellevue Branch 6A Stormwater Management PROJECT NUMBER: 03-0030-EN Project PO REFERENCE NO.: ST 105380 CONTRACTOR: Caladesi Construction Company 1390 Donegan Rd. Largo, Florida 33771 DATE OF CONTRACT: Agril 15, 2009 CODE: 0315-96152-563700-539-000-0000 A 0315-92273-563700-541-000-0000 B 0376-96742-563800-533-000-0000 C 0376-96634-563800-535-000-0000 D SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT This Change Order adds new items. It results in an overall increase to the Contract Amount. STATEMENT OF CONTRACT AMOUNT ACCEPTED BY: ORIGINAL CONTRACT AMOUNT $1,662,525.45 Cal des Construc i n Company Adm. CO # 1 CM $14,375.00 NEW CONTRACT AMOUNT $1,676,900.45 By: (SEAL) Donald J. mrichs, President Date: ATTEST: CynthiffE' oudeau, C Clerk Date: 9- / - 0 o?rylr CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA C? William B. Horne, II City Manager Reco nded B ity of Clearwater Gary rohnson-, CGC ,? Public Services Director v r Michael D. Quillen, .E. City Engineer 00 Page 2 of 2 Administrative Change Order # 1 Re: Lake Bellevue Branch 6A Stormwater Management Project ITEM DESCRIPTION QUANTITY UNIT UNIT COST Additions for Stormwater Code A: 0315-96152-563700-539-000-0000 1226 Form & pour 6" reinforced 1 LS $1,200.00 concrete flume 1227 Cut and remove existing 15" CMP 1 LS $675.00 and headwall 1228 Furnish & Install Slope Protection 1 LS $9,700.00 Total additions Code A: Additions for Water Code C: 0376-96742-563800-533-000-0000 3015 Removal of existing 12" lead joint 1 LS $2,800.00 cast iron pipe and installation of new 12" DIP Total additions Code C: TOTAL COST $1,200.00 $675.00 $9,700.00 $11,575.00 $2,800.00 $2,800.00 Total additions to Contract: $14,375.00