AGREEMENT AND BOND
":."~
,
I
I
AGREEMENT AND BOND
THIS AGREEMENT, by and between the CITY OF CLEARWATER,
FLORIDA, ,amtm.ici.pal.__c.orporation.L,he-reinafter-called . "CITY", and
HOLCOMB PlPE LIN'E, IN'CORPORATED, a Florida corporation,
hereinaft.er'.'~""C'ONTRACTOR" J
WIT N E SSE T H:
... .............-.- ......'....--...~.,-. --
That in consid&ratioo-of the mutual covenants endagre,e-
. ments ,herein contained, and in further considerat.iQI'l~.o.f,t.h.e-p.ermits
and privileges .granted "'hereunder.~ and the bond given for the faithful
performance hereof, the parties hereto mutually agree. as follows:
1. The Gity'he.reby grants to Contractor the ,permit, right
andprivilege'to'install and construct .,the following
Construct new manhole ineasem'ent of Block H Highland
Terrace Manor and 8 inch sanitary sewer running Easterly
between Lots 9 and 10,a.P..E.~o.ximately 160 feet to new ma.n~
hole, East side of Highla.nd Avenue.- --''-'-
2. Contractor' agrees. to submit.t.h~Lplans for the afore-
said work to the office of the City Engineer and receive approval
from said City Engineer before proceeding with the aforesaid work.
3. Contractor agrees to accomplish the work in an order
which shall be satisfactory to the City Engineer.
4. Contractor agrees th~t the earth excavation incidental
to the above described work shall be done by hand, and no machinery
or power-driven tools will be used in the accomplishment of the said
excavation, ..except-such-portions asmaybe_de~s:i.gn.a:t;edby.. theG :tt:.Y-
Engineer. Contractor further agrees to water-compact all trenches
during back-filling.
5~ Contractor shall be wholly responsible for the repair
and replacement of utilities and other damage caused by the accom-
plishment of the work as aforesaid and Contractor further hereby
covenants and agrees to replace paving removed or damaged by or Qe-
cause of the accomplishment of the aforesaid work, said paving to
1.;1 !
I
I
be of a type and quality equal to the paving so removed or damaged,
and performed in a manner satisfactory to the City Engineer, of the
City of Clearwater.
6. Contractor hereunto binds himself, his successors and
assigns to the faithful performance of this Agreement; and further
binds himself, his successors and assigns to the forfeiture of the
sum of One Thousand and no/l00 Dollars ($1,000.00)
to City in the event of Contractor's breach or default of any of
Contractor's covenants, agreements or obligations of Contractor here-
under. If all of the covenants, agreements or obligations of Con-
tractor hereunder be faithfully performed by said Contractor, then
this bond shall be null and void and of no effect.
( 15)
~days; provided, however, that this time for completion shall be
7.
The aforesaid work shall be accomplished within ~~~
extended by a period of time equal to any delays caused by strike,
riot, civil commotion, Acts of God, Governmental restrictions, or
natural calamity.
WITNESS the hands and seals of the parties hereto, this
/~~ay of Octobe~ , 1961.
Attest:
CITY OF CLEARWATER, FLORIDA
~.~
C?" lerk ::.
Asst.
and correct-
In the presence of:
9!/~~,~;~._~-
lJi:i. .
.~ oL.~.....~
-2-
~">-
.."
" ';".
'<!t<- -
I
,
AGREEMENT AND BOND
THIS AGREEMENT, by and between the CITY OF CLEARWATER,
FLORIDA, a mtmic.ipal,~orporation.L hereinafter. ,called "CITY", and
HOLCOMB PIPE LINE, INCORPORATED, a Florida corporation,
h'ereinaf:ter.~'nC'ONTR.ACTOR It J
WIT N E SSE T H:
- _,..-.__P_._. --... __,-.',.....,~.__ -
That in c.onsid&ratioo'-of the mutual covenants andagre,e-
ments,.herein--'contained, and in further consideratic>Il._oi'the--p.ermits
and privileges .granted v hereunder., and the bond given for the faithful
performance hereof, the parties hereto mutually agree as ,follows:
1. TheGity 'hereby grants to Contractor the . permit , right
andpri vilege to ..install and construct .,the following
Constr,uct manhole in present sanitary sewer line at the int,ersection
of South Madison and Par.k...St-reets, continuewH!L8inch sanita~y line
Easterly approxiIT1;ately ~33, feet to new, s.anitary manhole, ,thence
North approximately 217 feet in Alexander Avenu'e-to connect with
new manhole.
2. Contractor" agrees. to submit:the..:plans for the afore-
said work to the office of the City Engineer and receive approval
from said City Engineer before proceeding with the aforesaid work.
3. Contractor agrees to accomplish the work in an order
which shall be satisfactory to the City Engineer.
4. Contractor agrees th~t the earth excavation incidental
to the above described work shall be done by hand, and no machinery
or power-driven tools will be used in the accomplishment of the said
. excav-ati.on, except--suchportiortsas._Irla.y_~b~_ge$~@gt,eci_ by-j:,!1~_Ci ty
Engineer. Contractor further agrees to water-compact all trenches
during back-filling.
5. Contractor shall be wholly responsible for the repair
and replacement of utilities and other damage caused by theacco!!1'"
plishment of the work as aforesaid and Contractor further hereby
covenants and agrees to replace paving removed or damaged by or ge-
cause of the accomplishment of the aforesaid work, said paving to
I
,
be of a type and quality equal to the paving so removed or damaged,
and performed in a manner satisfactory to the City Engineer, of the
City of Clearwater.
6. Contractor hereunto binds himself, his successors and
assigns to the faithful performance of this Agreement; and further
binds himself, his successors and assigns to the forfeiture of the
sum of
Two Thousand and no/ 100 Dollars ($2,000.00)
to City in the event of Contractor's breach or default of any of
Contractor's covenants, agreements or obligations of Contractor here-
under. If all of the covenants, agreements or obligations of Con-
tractor hereunder be faithfully performed by said Contractor, then
this bond shall be null and void and of no effect.
7. The aforesaid work shall be accomplished within thirty
(30) days; provided, however, that this time for completion shall be
extended by a period of time equal to any delays caused by strike,
riot, civil commotion, Acts of God, Governmental restrictions, or
natural calamity.
October
, 1961.
WITNESS the hands and seals of the parties hereto, this
,/ A
/" t:L day of
Attest:
_ ____,.c ~_
Approvea .as to f-Gt'ffi .and.:correct-
ness:~.... ,.,.
"~
- '., <
, -
.. . _ w-
- -
~ttorn-. -
~
In the presence of:
.-ft-L.~fi-7/?Llz-..-
D~~
CITY OF CLEARWATER, FLORIDA
~~~,
-2-
,""" " ~
'-
I
,
AGREEMENT AND BOND
THIS AGREEr~NT, by and between the CITY OF CLEARWATER, FLORIDA,
a municipal corporation, hereinafter called "CITY," and
HOLCOMB PIPE LINE, INCORPORATED --/ t
hereinafter called NCONTRACTOR,"i
'/
,'Ij); ,. '(1'~! (",( /
[/
~'-" ~ -")
/
W I TN E SSE T H:
----------
That in consideration of the mutual covenants and agreements
herein contained, and in further consideration of the permits and
privileges granted hereunder, and the bond given for the faithful
performance hereof, the parties hereto mutually agree as follows:
1. The City hereby grants to Contractor the permit, right
and privilege to install and construct the following:
Construct storm line and replace paving east
side of Missouri west along Pierce Street
Parkway across Franklin Circle and NE to
catch basin on Lincoln.
2. Contractor agrees to submit the plans for the aforesaid
work to the office of the City Engineer and receive approval from
said City Engineer before proceeding with the aforesaid work.
3. Contractor agrees to accomplish the work in an order
which shall be satisfactory to the City Engineer.
4. Contractor agrees that the earth excavation incidental
to the above described work may be done by machinery or power driven
tools, except such portion as may be designated by the City Engineer
which shall be done by hand labor. Contractor further agrees to
water-compact all trenches during back-filling.
5. Contractor shall be wholly responsible for the repair
and replacement of utilities and other damage caused by the accom-
plishment of the work as aforesaid and Contractor further hereby
covenants and agrees to replace paving removed or damaged by or
because of the accomplishment of the aforesaid work, said paving to
-1-
... ' *
I
,
be of a type and quality equal to the paving so removed or damaged,
and performed in a manner satisfactory to the City Engineer, of the
City of Clearwater.
6. Contractor hereunto binds himself, his successors and
assigns to the faithful performance of this Agreement; and further
binds himself, his successors and assigns to the forfeiture of the
sum of Six Hundred Dollars ($600.00)
to City in the event of Contractor's breach or default of any of
Contractor's covenants, agreements or obligations of Contractor here-
under. If all of the covenants, agreements or obligations of
Contractor hereunder be faithfully performed by said Contractor, then
this bond shall be null and void and of no effect.
fifteen
7. The aforesaid work shall be accomplished within nnn
illi days; providedt however, that this time for completion shall be
extended by a period of time equal to any delays caused by strike,
riot, civil commotion, Acts of God, GoVernmental restrictions, or
natural calamity,
WITNESS the hands and seals of the parties hereto, this ~
day o~, ""-Y~~,~J'
Att.e$t: ' '~ ", ' (/
1962-
.,
CITY OF CLEARWATER~ FLORIDA
~
.. " '.. .
. .-
v ~'A,
-'~'" .~,. ,.,' ..~,,/
~ er.~.::-<:. -
'//
Approved as to form and correct-
ness~.
~ ~
cr'tyl'::::::J. orney
countersi~
~isbt;
In the presence of:
vt.
---------~_._-------- . "---.-
, f~
...~ -~
'-
-a~L.
Con
"
.....
-2-