Loading...
SUPPLEMENTAL AGREEMENT NO 5 - SR60 MEMORIAL CAUSEWAY BRIDGE REPLACEMENT MEMORIAL CAUSEWAY BRIDGE REPLACEMENT DESIGN CITY OF CLEARWATER SUPPLEMENTAL AGREEMENT NO.5 ~ THIS SUPPLEMENTAL AGREEMENT, made and entered into this -1&- day of OuLo6.v-. , 2004, by and between the CITY OF CLEARWATER, an incorporated area in Pinellas County, Florida hereinafter called the CITY, and HDR ENGINEERING, INC., 2202 N. West Shore Boulevard, Suite 250, Tampa, Florida 33607-5755, hereinafter called the ENGINEER. WITNESSETH: WHEREAS, the CITY and the ENGINEER heretofore on October 21, 1994, entered into the original AGREEMENT and on December 20, 1995, July 20, 1998, October 11, 2000 and January 24, 2002 entered into SUPLEMENTAL AGREEMENT NO.1, 2, 3 and 4, whereby the CITY retained the ENGINEER to finish certain services in connection with SR60 Memorial Causeway Bridge Replacement; and WHEREAS, Section IX. Additional Engineering Services and paragraph I.B of Exhibit "BOO of the original AGREEMENT provided a mechanism for the ENGINEER to provide additional services as authorized by the CITY; and WHEREAS, the CITY has determined it appropriate for the ENGINEER to perform additional post design services for deign assistance and construction assistance for a new bridge, and that the ENGINEER be granted increased compensation as described below. WHEREAS, the CITY Commission by majority vote on 0 ~ 1 , 2004 approved this Supplemental Agreement and authorized execution of such; NOW THEREFORE, this Agreement witnesseth that for and in consideration of the mutual benefits to flow each to the other, the parties agree that the ENGINEER shall perform the additional post design services as described in EXHIBIT A of Supplemental Agreement No.2, which is attached hereto and made a part hereof, and that the ENGINEER shall receive for his services hereunder the increased maximum amount of $115.000.00 dollars as described in EXHIBIT B, attached hereto and made a part hereof and that the length of services for this work effort shall be extended to March 1, 2006. Except as hereby modified, amended, or changed all of the terms, conditions, billing procedures, and other administrative procedures of said Agreement and any supplements and amendments thereto shall remain in full force and effect. Page 1 of2 (Signature page for Supplemental Agreement No.5 between the City of Clearwater and HDR Engineering, Inc. re: Memorial Causeway Bridge) IN WITNESS WHEREOF, the parties hereto have caused these presents to be executed, the day and year first above written. Approved as to form: M~t~ttn~E;f Bryan D. Ruff ATTEST: &~Wryff:::tn 1) ...... .... ,.., . ~ QarnlIlIIIiOI\ DD112100 ~ ~ __~aa.aQQI CITY OF CLEARWATER, FLORIDA By: &f.~~-~-:zr William B. Home II City Manager Attest: HDR ENGINEERING, INC. By: dv~ L~OW Sr. Vice President 2202 N West Shore Blvd., Suite 250 Tampa, FL 33607 Page 2 of2 EXIDBIT "A" SCOPE OF SERVICES FOR THE CLEARWATER MEMORIAL CA USEW A Y BRIDGE FDOT REFERENCE FPN 257093-1-32-01 FAP BRF-1456(9) G:I.SCDPE\SCP-CLRW.wPD form on material acceptable to the Department. Plans shall be prepared totally by CADD O. Community Awareness Plan The Community Awareness Plan to be developed by the Consultant shall be in compliance with the Department's District Seven guidelines. VII. OPTIONAL SERVICES A. Optional Design Services Optional Design Services are intended to provide for revisions or additions which occur after the plans preparation has commenced and are essential to the objective of this scope of services and are of the same type of work as being provided. (Refer to Exhibit "B," Method of Compensation, for compensation provisions). Optional Design Services shall also include Phase n, Complete Construction Plans. Such Optional Services may include, but is not limited to, surveying, mapping, engineering, geotechnical or other related work. No work shall begin on these optional services until authorized in writing by the City. B. Optional Post Design Services Optional Post Design Services are intended to address changed conditions that occur following acceptance of final plans and are classified according to whether the services are required before or after construction letting - Design Assistance and Construction Assistance, respectively. Design Assistance consists of those Post Design services that may be required to maintain the integrity and usefulness of final design up through the letting of construction. Construction Assistance consists of those Post Design services that may be required to satisfactorily complete construction. These services are intended to deal with changed conditions or services not covered and are not intended for Consultant errors and/or omissions. I. Design Assistance At the option of the City, the Consultant shall perform additional services in the area of Design Assistance. (Refer to attached Exhibit "B," Method of Compensation, for compensation provision.) Services may include, but are not limited to: Survey Update, Plans Maintenance, and Expert Witness Testimony. a. Survey Update A-46 July 9, 1998 At the direction of the City, the Consultant shall perform additional field surveys required following plan completion and prior to the start of construction due to a delay in construction contract letting, a change in criteria or any other condition which requires additional survey effort subsequent to plan completion. b. Plans Maintenance The Consultant shall perform engineering analyses and/or make revisions to original "on-shelf' tracings or special provisions, as requested by the City, to reflect changing conditions prior to letting. Whenever original tracings are changed, the Consultant shall submit to the Department one set of signed and sealed prints of the revised sheets. This requirement is an addition to any other reproduction and delivery instruction given by the Department in specific instances. c. Expert Witness Testimony The Consultant shall serve as an expert witness in legal proceedings such as land condemnation, if required by the City. 2. Construction Assistance The City may at its option, negotiate with the Consultant for certain Construction Assistance Services. Upon satisfactory completion of the negotiations, a Contract addendum shall be executed with the Consultant. In the event that an agreement cannot be reached between the City and the Consultant regarding the Optional Services, the City reserves the right to acquire professional engineering services in accordance with Section 287.055 Florida Statutes and DOT Procedures. (Refer to attached Exhibit "B," OptiOnal Services, for compensation provision.) Services may include, but are not limited to: Plans Update, Engineering Assist~nce, Expert Witness Testimony, and Review of Shop Drawings. a. Plans Update The Consultant shall be the custodian of the project tracings and shall be responsible for their upkeep during the construction period. At the concl usion of the construction, the Consultant, if requested by the City, shall revise the tracings to reflect as-built conditions based on marked up prints, drawings, and other data furnished to the Consultant. At the conclusion of construction or at the City's request, the Consultant shall return all tracings to the Department for its use and file. b. Engineering Assistance A-47 July 8, 1998 The Consultant shall provide to the City qualified representation during the construction phase to deal with issues concerning the intent and interpretation of the construction contract plans and documents prepared in the work. Should changed conditions be encountered in the field and when requested by the City, the Consultant shall respond in a timely manner with suitable engineering solutions that take into account the changed conditions. On site appearance of the Consultant shall be made during construction at the written request of the City or its designated representative. From time to time during construction the Consultant may be requested by the City or its designated representative to review contractor proposed field changes or to respond with a recommended solution to remedy particular field situations not covered by the plans and specifications. c. Expert Witness Testimony The Consultant shall serve as an expert witness in legal proceedings such as construction claims, if required by the City. d. Review of Shop Drawings The Consultant shall be responsible for the review of construction shop drawings. Shop drawing reviews shall be performed in accordance with the Shop Drawing Review Procedure. See Chapter 19, Florida Department of Transportation Structure Design Guidelines. VIII. V ALUE ENGINEERING The Consultant shall develop the design and plans package recognizing good value engineering practices employing value analysis as he deems necessary to support his conclusions as shown in the plans. IX. DESIGN DOCUMENT AnON A. Project Design Report To facilitate design and quality assurance/control reviews of the project, the Consultant shall commence a written Design Report at the onset of the services. A copy of this document shall be submitted to the Department within fourteen (14) calendar days of the receipt of Notice to Proceed. The purpose of the Wrinen Project Design Report is to provide the Department with a clear understanding of project objectives, design criteria, and procedural approaches. Also, this document assists the Consultant, as well as the Department, in assuring conformance to established criteria. A-48 July 8, 1998 1 . EXHIBIT B METHOD OF COMPENSATION ,.. ..... METHOD OF COMPENSATION The Consultant will be paid a Maximum Limiting Amount of$115.000.00. This amount will not be exceeded without a fully executed Supplemental Agreement. Billings shall be monthly at the rate schedule shown below. BILLING RATE SCHEDULE FOR POST DESIGN SERVICES Thru Dec. Thru Dec. Thru Dec. Job Classification 2004 2005 2006 Project Manager $161/hr. $ I 69/hr. $ 177/hr. Chief Engineer $ 178/hr. $187/hr. $ 196/hr. Sr. Engineer/Environmental $ 128/hr. $ 134/hr. $141/hr. Engineer $101/hr. $106/hr. $111/hr. Designer $ 87/hr. $ 91/hr. $ 96/hr. CADD Technician $ 70/hr. $ 73/hr. $ 77/hr. Clerical! Administrative $ 54/hr. $ 57/hr. $ 60/hr. These billing rates cover all labor costs including wages, salaries, fringe benefits, overhead and operating margin. Miscellaneous and direct out-of-pocket expenses will be billed monthly for the actual amount incurred. B-1