Loading...
FLD2009-02004 - 1154, 1160 Mandalay Point Rd - Gills Residence - DRWGS - April 21, 2009 BUilDING INFORMATION OCCUPANCY CLASSIFICATION: R-3 (RESIDENTIAL) TYPE OF CONSTRUCTION: V B (SPRINKLERED) HEIGHT: 34' - 0". (MEASURED TO MIDPOINT OF PITCHED ROOF) NUMBER OF FLOORS: 4 FOOTPRINT: 8,470 S.F. FLOOD ZONE INFORMATION 1154 & 1160 MANDALAY POINT ROAD CLEARWATER, FLORIDA 33767 PER FEDERAL EMERGENCY MANAGEMENT AGENCY (FEMA), THE SITE IS LOCATED WITHIN FLOOD ZONES "AE" (EL.12), "AE" (EL. 13), "VE" (EL.13), "VE" (EL.14), "VE" (EL. 15), "VE" (EL. 16), AND "VE" (EL. 17). (FLOOD INSURANCE RATE MAP COMMUNITY-PANEL NUMBER: 12103C0064G, MAP REVISED 9/3/2003). ELEVATIONS ARE REFERENCED TO NAV.D, 1988 DATUM. GEOTECHNICAL INVESTIGATION . GEOTECHNICAL INFORMATION PROVIDED BY: GULF COAST TESTING LABORATORY, INC SIGNED AND SEALED BY: RAMANUJA C. KANNAN, P.E. # 38688 DATED: 1/12/09 BOUNDARY AND TOPOGRAPHIC SURVEY SURVEY INFORMATION PROVIDED BY: GEORGE A. SHIMP II AND ASSOCIATES, INC. LB 1834 SIGNED AND SEALED BY: GEORGE A. SHIMP II, P.S.M # 2512 DATED: 2/2/09 UTiliTIES PROVIDERS ELECTRICITY PROGRESS ENERGY FLORIDA 100 CENTRAL AVENUE ST. PETERSBURG, FLORIDA 33701 TEL: (877) 372-8477 WATER AND SEWER CITY OF CLEARWATER UTILITIES DEPARTMENT 100 S. MYRTLE AVENUE CLEARWATER, FLORIDA 33756 TEL: (727) 562-4600 CABLE BRIGHT HOUSE NETWORKS 2114 DREW STREET CLEARWATER, FLORIDA 33765 TEL: (727) 329-5020 SITE AERIAL PHOTOGRAPH N.T.S, TELEPHONE VERIZON P.O. BOX 11328 ST. PETERSBURG, FLORIDA 33733 TEL: (800) 483-4000 GAS CLEARWATER GAS SYSTEM 400 NORTH MYRTLE AVENUE CLEARWATER, FLORIDA 33755 TEL: (727) 562-4900 FIRE (VIA HYDRANTS) CITY OF CLEARWATER FIRE DEPARTMENT 610 FRANKLIN STREET CLEARWATER, FLORIDA 33756 TEL: (727) 562-4334 SITE LOCATION MAP N.T.S. INDEX OF DRAWINGS SITE DATA TABLE SHEET No. SECTION 32, TOWNSHIP 28 S, RANGE 15 E CITY OF CLEARWATER, PINELLAS COUNTY, FLORIDA PARCEL ID # 32/28/15/54702/000/0140 & 32/28/15/54702/000/0160 CONTRACTOR SHALL CALL "SUNSHINE STATE ONE CALL" OF FLORIDA AT 1-800-432-4770 A MINIMUM OF 2 AND A MAXIMUM OF 5 BUSINESS DAYS PRIOR TO START OF CONSTRUCTION. OWNER: JAMES P. GILLS, III AND JOYCE P. GILLS 1160 MANDALAY POINT ROAD CLEARWATER, FLORIDA 33767 TEL: (727) 441-8845 TEL: (727) 871-2900 ENGINEER: HIGH POINT ENGINEERING, INC. 630 CHESTNUT STREET CLEARWATER, FLORIDA 33756 TEL: (727) 723-3771 FAX: (727) 723-7150 SURVEYOR: GEORGE A. SHIMP II AND ASSOCIATES, INC. 3301 DESOTO BOULEVARD, SUITE D PALM HARBOR, FLORIDA 34683 TEL: (727) 784-5496 FAX: (727) 786-1256 TREE INVENTORY: - BUTLER DESIGN GROUP, INC. 4203-46TH AVENUE NORTH ST. PETERSBURG, FL 33714 TEL: (727) 521-1684 FAX: (727) 527-7422 DESCRIPTION EXISTING ZONING: LDR & OS/R DEVELOPER: JAMES P. GILLS, III AND JOYCE P. GILLS 1160 MANDALAY POINT ROAD CLEARWATER, FLORIDA 33756 TEL: (727) 441-8845 TEL: (727) 871-2900 ARCHITECT: BEHAR DESIGN ASSOCIATES 103 ROGERS STREET CLEARWATER, FLORIDA 33761 TEL: (727) 488-9490 FAX: (727) 669-5575 CONTRACTOR: MONOGRAM BUILDERS INC. 521 S. MARTIN LUTHER KING JR. AVENUE CLEARWATER, FLORIDA 33756 TEL: (727) 446-7600 FAX: (727) 446-7668 LAND USE: RL&P USAGE: SITE AREA: DEVELOPABLE AREA: BUILDING FOOTPRINT AREA: PERCENTAGE OF SITE AREA: TOTAL DWELLING UNITS: DENSITY: SINGLE FAMILY RESIDENTIAL 108,700 S.F. (2.495 AC,) 34,255 S.F. (0.786 AC.) 11,600 S.F. 10.7% 2 2.54 UNITS PER ACRE FRONT (EAST): 34.8 FT. SIDE (NORTH): 9.1 FT. BUILDING SETBACKS 17.0 FT. SIDE (SOUTH): REAR (WEST): 301.3 FT. BUILDING HEIGHT: 20 FT. TOTAL IMPERVIOUS AREA: IMPERVIOUS SURFACE RATIO (I.S.R.): TOTAL PERVIOUS AREA: PERCENTAGE OF SITE AREA: 22,462 S.F. 0.206 86,238 S.F. 79,3% lANDSCAPE: BUSK AND ASSOCIATES 816 MYRTLE TERRACE NAPLES, FLORIDA 34103 TEL: (239) 263-7133 FAX: (239) 263-2751 OFF-STREET PARKING: 4 SPACES MINIMUM OFF-STREET PARKING CALCULATION: 1 DWELLING UNIT x 2 SPACES PER UNIT = 2 SPACES (1) FLEXIBLE DEVELOPMENT APPLICATION PROPOSED C-1 C-2 C-3 C-4 C-5A, C-58, C-5C C-6 L-1 A-1 A-2 A-3 CODE REQUIREMENTS LDR & OS/R LDR & OS/R RL&P RL&P SINGLE FAMILY RESIDENTIAL RESIDENTIAL LOW & PRESERVATION 108,700 S.F. (2.495 AC,) 34,255 S.F. (0.786 AC.) 8,470 S.F, 7.8% 20,000 SF (MIN) 1 1.27 UNITS PER ACRE 5 UNITS PER ACRE (MAX) 40.3 FT. 25 FT, 10.0 FT. 10 FT. 10.0 FT, 10 FT. 273.6 FT (1) 0.0 FT. FROM CCCL (1) 34.0 FT. 20FT. 30FT. 15,637 S.F. 0.144 93,063 S.F. 85,6% 0.60 (MAX) 40.0% (MIN) 4 SPACES 2 SPACES PER UNIT SUMMARY OF GROSS FLOOR AREAS: FIRST FLOOR = 8,470 SF SECOND FLOOR = 6,095 SF THIRD FLOOR = 5,145 SF FOURTH FLOOR = 1,700 SF TOTAL = 21,410 SF CONTENT SITE DEVELOPMENT DATA DEMOLITION PLAN SITE LAYOUT AND PARKING PLAN PAVING, GRADING & DRAINAGE PLAN UTILITIES PLAN UTILITIES DETAILS TREE INVENTORY PLAN GROUND LEVEL FLOOR PLAN ELEVATIONS ELEVATIONS @COPYRIGHT 2009 THIS DRAWING IS THE PROp,EiTf'~-ryl@1f'c?IN;r€l\JGINEERING,INC. UNDER NO CIRCUNSTANCES MAY THIS DRA~N;!}.B&:.B<E5>~UeED, PUBLISHED, ALTERED OR USED IN ANY WAY WITHOUT W~I\lE:.N.l\l,I~~~leTjflt-lfRQMl1IGH POINT ENGINEERING, INC. l:~i'~.r"'-'\/\ i,.;,,:,:-," ~ ) ,~, "" " , r'~ d,iJ' . 1 ~"'2\ r i'l __ _ ""'-"C, ' . ('~'''. .. "',~ .- ..,\'j..." , ('~l J\iv.. ...;~__i-~.... _ , ~'..A,W ~' ," .. ~.~ ';" _.. . : '.. ; 3 _I~ _0"1 58626 \~:. ;;Xo;~BRAl:JLlQ GRAJALEi ~:: /~' FL Registration No, 'r''. ~: ~ 0 ..Frofessional EngID""r.. _ ':, : Sign Date COPY OF THIS PL5\1\!.I~NQ:r W.A.Ir5)JN\-qSSSlft~!ii: SEALED AND DATED BY'THE PRlDF 'B&ONM. 'l5l\i!3'lfllEER' ~" .... tV... ~ "!.. 'I" _""- z o ~ Cl.. iY () en UJ Cl CJ) Z o CJ) 5> ill UJ~ ~ Cl >- ID -l c:5 0) .n e 0 co 0 ..- cb M C9 C9 C9 C9 0 0 [Q [Q [Q [Q :>-: :>-: :>-: 0 w [Q [Q z :>-: [Q Cl I- !;;: Cl Cl W W [Q U Cl Z Z w 6 w ~ ...., W C9 ~ U 0:: 0 ::::> en w a... 0:: en W :c a... a... ~ Cl Cl U <( <( ~ <( o ~ z w ~ C- O -.J W > W o W ~~ w - !zC/) o u w o z w o - C/) W ~ C/) .....I .....I ~- ~C.9 0:: a... <.9 Z ~ ill ill Z <.9 Z ill - i- Z .. o ~ = ~ .. = SHEET: C-1 o <( o 0::: I-f'.. z(O _f'.. OCV'> o-CV'> >-<( <(0 ...JO::: <(0 O...J zu. <( ~ ::EO::: W 01- (0<( ~S ~o::: ~<( LOW ~...J ~() " Z 0:: UJ UJ Z " Z UJ -I > () (0 I ~" _~ Z Q) Cll Z Q)-c ....- Z Ci5.2 <C "5 LL -I .EaSe.. l/)_ Q) Cll 0 c3~z o~<C ~C3 -I DEMOLITION NOTES TO CONTRACTOR 1, THE CONTRACTOR SHALL OBTAIN ALL REQUIRED PERMITS AS REQUIRED BY CITY / COUNTY, STATE AND FEDERAL LAW PRIOR TO COMMENCE OF DEMOLITION ACTIVITIES, 2. THE CONTRACTOR SHALL INSPECT BUILDINGS FOR ASBESTOS AND SITE FOR HAZARDOUS WASTE PRIOR TO DEMOLITION WORK, 3, THE CONTRACTOR SHALL MEET ALL SAFETY REGULATIONS REQUIRED BY FEDERAL, STATE AND LOCAL GOVERNMENT, 4, THE CONTRACTOR PERFORMING DEMOLITION, SHALL CONFORM TO THE REQUIREMENTS OF THE U.S, DEPARTMENT OF LABOR'S OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) RULES AND REGULATIONS FOR DEMOLITION SAFETY STANDARDS, 29 C,F,R" S,1926" SUBPART T, INCLUDING ALL SUBSEQUENT REVISIONS OR UPDATES TO THE STANDARDS AS ADOPTED BY THE DEPARTMENT OF LABOR AND EMPLOYMENT SECURITY (DLES), 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAKING A VISUAL INSPECTION OF THE SITE AND SHALL BE RESPONSIBLE FOR THE DEMOLITION AND REMOVAL OF ALL ABOVE AND BELOW GROUND EXISITNG IMPROVEMENTS THAT WILL NOT BE INCORPORATED WITH THE NEW IMPROVEMENTS. 6. THE CONTRACTOR SHALL DEMOLISH AND REMOVE IMPROVEMENTS WITHIN LIMITS OF CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IN WRITING OF ANY CONFLICTS OR DISCREPANCIES BEFORE PERFORMING ANY WORK IN THE CONFLICTING AREA, 7, THE CONTRACTOR SHALL ESTABLISH AND PROPERLY FLAG PROPERTY CORNERS AND PROPERTY LINES PRIOR TO DEMOLITION WORK. 8, THE CONTRACTOR SHALL DISPOSE ALL DEMOLITION MATERIALS AND DEBRIS IN ACCORDANCE WITH THE CITY / COUNTY REQUIREMENTS IN A SOLID WASTE DISPOSAL FACILITY APPROVED BY FD.E.P, AND THE CITY / COUNTY, 9. THE CONTRACTOR SHALL COORDINATE DEMOLITION WORK WITH NEIGHBORS THAT ARE AFECTED BY THE DEMOLITION WORK. 10, THE CONTRACTOR SHALL INSTALL EROSION CONTROL MEASURES AND TREE BARRICADES PRIOR TO DEMOLITION AND MAINTAIN DURING DEMOLITION, THE CONTRACTOR SHALL ERECT SILT FENCE AS SHOWN IN SITE CONSTRUCTION DETAILS SHEET, FAILURE TO INSTALL OR PROPERLY MAINTAIN THESE EROSION CONTROL MEASURES WILL RESULT IN ENFORCEMENT ACTION WHICH MAY INCLUDE CITATIONS, AS PROVIDED BY CHAPTERS 40D-4 AND 40D-40 FAC, INITIATION OF CIVIL PENALTY PROCEDURES PURSUANT TO SECTION 373,129, FAC. CAN RESULT IN A PENALTY NOT TO EXCEED $10,000 PER OFFENSE WITH EACH DATE DURING WHICH SUCH VIOLATION OCCURS CONSTITUTING A SEPARATE OFFENSE. 11, THE CONTRACTOR SHALL SAW-CUT EXISTING PAVEMENT WHERE NEW PAVEMENT IS TO BE ADDED OR EXISTING PAVEMENT TO BE ELIMINATED, 12, THE CONTRACTOR SHALL LOCATE ALL EXISTING UTILITIES PRIOR TO DEMOLITION AND IS RESPONSIBLE FOR THE DAMAGE OF ANY ON-SITE OR OFF-SITE UTILITIES THAT ARE NOT A PART OF THIS PROJECT OR ARE NOT IDENTIFIED TO BE REMOVED, 13, THE CONTRACTOR SHALL NOTIFY ALL UTILITY COMPANIES TO DISCONNECT THEIR FACILITIES PRIOR TO COMMENCE OF DEMOLITION ACTIVITIES. 14. THE CONTRACTOR SHALL COORDINATE THE REMOVAL / RELOCATION OF EXISTING UTILITIES WITH THE OWNER OF SAID UTILITY, UTILITIES SHALL INCLUDE, BUT NOT BE LIMITED TO, WATER, SEWER, GAS, CABLE TV, POWER AND TELEPHONE. 15. EXISTING IMPROVEMENTS ABOVE GROUND (E.G" PAVEMENT, CURBING, BUILDINGS, CONCRETE PADS, RETAINING WALLS, SIDEWALKS, POLES, SIGNAGE, ETC,) AND BELOW GROUND (E,G" SANITARY, STORM, WATER, GAS, CABLE, ELECTRIC, PHONE, ETC,) SHALL REMAIN UNLESS OTHERWISE NOTED, 16, ALL CAVITIES RESULTING FROM REMOVAL OF BUILDING FOUNDATIONS, TREES, UTILITIES, SIGNS, ETC. SHALL BE BACKFILLED WITH SUITABLE MATERIAL AND COMPACTED TO 95% OF MAXIMUM DENSITY FROM MODIFIED PROCTOR TEST PER ASTM D1557/ MSHTO T-180, 17, THE CONTRACTOR SHALL DISPOSE ALL LOOSE DEBRIS AND GARBAGE WITHIN THE PROJECT BOUNDARIES. ADJACENT PROPERTIES SHALL NOT BE ADVERSELY AFFECTED (E.G., SOIL EROSION, UTILITIES DISCONNECTION, TRAFFIC FLOW IMPEDANCE, NOISE, DUST, GARBAGE, ETC,) AND RIGHT-OF-WAY SHALL BE RESTORED WITH NEW SIDEWALK AND SOD AS REQUIRED, ~ - - - - - o o X w :2 LL o LL ~ ~ C) .,/P I'///- v/////////////////////////fi '//////- v/p I'///- if//; - -~ ",/ft ~ v////////////////////P ~-- - ~- - -- q//- ,//P ;//////////////////////- d//////////- <//,') -~ -- - - ~- -- - - ~ - - ~- - TREES TO BE REMOVED QUANITY 3 2 2 2 3 1 1 4 5 3 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 KEY )8( )8( )8( )8( )8( )8( )8( )8( )8( )8( )8( )8( )8( )8( )8( )8( )8( )8( )8( )8( )8( )( )( )( )( X COMMON NAME 7" SABAL PALM 8" SABAL PALM 9" SABAL PALM 10" SABAL PALM 12" SABAL PALM 14" SABAL PALM 9" COCONUT PALM 10" COCONUT PALM 11" COCONUT PALM 4",4",4" CHRISTMAS PALM 5",5",4" CHRISTMAS PALM 5",5",5" CHRISTMAS PALM 4" PYGMY DATE PALM 7" MONTGOMERY PALM 8",7" MONTGOMERY PALM 10" FOXTAIL PALM 16" TRIANGLE PALM 4",4",4",4" RECLlNATA PALM 7",6",5",5" RECLlNATA PALM 4",4",4",4" EUROPEAN FAN PALM 4",4" ROEBELlENII PALM 5",4" L1GUSTRUM TREE 5" ,5" YUCCA "SOFT LEAF" 8" WEEPING YOUPON HOLLY 11 ",8" WEEPING YOUPON HOLLY 6",7" SEA GRAPE ~- - - - ~- - - - ZONE VE (BH,= 13') if/fi ,///////////////////////////////P ,y/P .//p VIP (//fi F/// .////////////////////////////////fi //// -~ -- - -~ - -- -- ~- - ,1'/// r//P ~- - ZONE VE (BH.= 13') / / / / / / / / / / / / :'.PP;=:O).:Mf..:r 1; :. OC:... :-!Dr'~ D:= ::X:::;Y:~":(~ :::.' ~"\i~~ ''.f-JA n:f~ M(.',;;>,; G(;\',n;;:.I~,C'r(;::; 'ro "":::;~W'{ v'.!:~n-; c;r'{ G~: CUA:::V'/ATE::; ::c:::: Er.J".CT :3:2::; ;'.,:..;:) cC'Gf'.::';O~'( :;'::~:~>~ TG ;;:':/...~tr '.:W ~:.O?,~::~ Tf{:,::::':'" :~)~'.;, , / /' \ """ \~. , ' ~3/~ ~ '. '% ",:" , \\ \\1\ \ . \ ii; -= i (t q;-=-" 't "~r; ~ .~. ~ ' ~ (\j ... (.:.;r-,~/./..d,',E ~.?".j~J:.'.',' . (- I ,;,~ . ~,~" ;,LK.\l!.., ~ /~.' ' '~,. /'1.-1, '< ,;'f. !!1 ;J; SILT FENCE ,{w H ,.,.''' ".y; r "..' X "" " '~:;: ",t " ~ ~ . / .);..., ~',~'.:',;,i:;;'>~<'~;" {~.;' ,~~,'./ ,.c~"":,:,,,;'~'~;'" ~;\ ~f " ,.:;,,~ ',; ;,' 4'~~~I~~~K k'Y / 9-~ 9"l"';,/~~~ffi,W~~~I' tl;t\ \\\~ \ \ ,';,\!\ \ '"~ 4 f'ENCE ,'I" :;. .,.. ~--~'t., '" fj. / 4,\ m\ ~ ~ ,~, .' ........ ................. ,... ...'.... ..........' ..,'''' 'Zi' "6(, >;i. ,:. ~__'VW ',.1\ ~", _ "ii:' ~ ~~6"~""--';"""""'"--''''''''''''''''''''''''''''' ",~;,~:~::~,;.':>,~~;~:;:)~~:t:~.. .\..., .<. /." 7" (~;;., ,.,,\,',.~~~;-,' ,~" 5" 5~4" "x l\ m\ \ ,.yr" i:' \ ~ .....,...................., u;.,~:,r?:;CL);;i;?< '.; ',^'. X ,""'6/, .. ";-' ,'J, _ ' ,," ~: Hi< ~ ~ ,.......".,.................,.......... ;; X 7' ". ,," ,,/. ., I,"V' _ .. (/;'~' ,::~ ,h. ~;' ; , """, ,,:,;" 'V /, _. ,., .. i >l:, :~), '.X; 'i: ii :. ' ~~:. .,., ",} "-::,-,_"':;;;;:::::,~' ,::.,.' ::. -. 4",4",4")f- . i{~,.Mf. 'x .,J(- /" iil ,.,.........,-......,..,.,.............. ,-' ,___. ~., - .... ri ' , 7 ,. ~ j""J<." ...... "..~'" ,,<,,/.,..,. 'v.'......' ;'f' :;.,~,:;;ifii..1:Y'#,h,\,'~'~., ~.:.'-: '. 7",6",5",5" X}',\':fJ ~ "~,;.F \\'1 ,..............,.....,................................,' ~"': f:>/'''/'". ,~"<rf!';',.;' '. \ '.j, \ '-/ 7 >,' /. ""\~(;)V}l im ~ ~ ' , ',! : ,. . ( , ,./~"", ,_ "'"" 7"~~ 1Al4" ,,', '" S1u" "ii" ~ ~ i, . '..t...; ,r.. " ! 'i,./ , 3'"1.?J lIC, ..b' , " ~ ,,., S1l:PS , i llll ~ ~ ' . _ ',' / 7.,,! f;," ?;{6:' 6"e ), _ X.. ~11" M~ ~~PS 3Z .\ 77 / 0Y:\ @ ~ ~ c} ZONE AE _ _ ;~...<:<.::g;;fi"..~.",..:;:..~,>/., """ ,,"<< P ",' ~ ~\ ~ i0'" ; ':. ~\ \in ~ ~ " (BH.= 12') ;, ...............,....; ,/, ;<'X ' ,,~10 /f,..., / _. /.. ~ '" ~ """ ~ ~1k' ;,; ....---................,..,....'........ , ....' ' ' ~ X OC .,,:::.-- 16" ."-,, '~::_3.~ ~ '~_::,' 0. 'i~ "" ~ ~ ,., _ f" . , ' , X .", ' '. - /"- . ~ '='95 . -. .;n\ II! U\ '''' 4 ~ ~ # \' , , , ; .. ......,..........,..,..., '. ,.;, '<," ,:~; 7 \\{,. ! I /\ ' 1 c- "'..<~r)l(~BZ~:~ 'f,,) u; ,:;~~:.~ " y~,;,:"i,; x't ),~,i,,1~'S,~r'.~'i......=...,...................~%-g~~~~~~~~::~~~J~ "," . y 'j fr ITl/;, \; "':,,?:r. ~ ~~:~. ' " {~~~~~>> ;~"J 3,0 :~,.,.;~ '<? )\ ~i ~ ],.-----'t ,.~ v--- .,... .. '" ,'" ~ ". , _. _. ., , ., >~ X I {" 1 0" \~o,--r\l ~ ~\ ", ..5 ~,~ 3>> ~ " .... ..-- ~ ....~, " ,.....,.. ..... J--, ..d, ,'. ,',',' (, ",r'" ""'. ,,' ;.p,,', '.,;(, L" ,;, ,/,,^, <;.Y Jc:" ' .. \~ ~ \\"J \~.5:d , ..: \ ' ~j) , ;. "J ~ ",~,' . __ \t~, \lir ~., i \ ~ // p,<:; ';~;;:::~;;!:;~j:;i' ;.;,;;F>:;i,.:~J:~d;:i ';i~;;';:;~i~::: ;.;,;::c, '7"" ~f11' "lc(\"J rO-oL~\II~:. \5,~= \5')1.\.5 1""::;- --:> ,/.,' 0 ';;;. " w'V; mi ,% >/, ',LU'"<',w\',"{("<':>:;'{,,[,,:,,, ,'v.<,,;o,f'.cr "',."N'''; ~ ~".,I ~\. ~I\ ~~ 'CQ"c." '_~_ "':'l~~~ ~)o ~~ '3, ,.' . Il..~ ",. i': ~ '~'r' q"' ",.- ru U, ;;":. ~ / :lD"\\{j/HfE', l~~.. s~;J..;,.\ C\lLIl\\IlI~\h"'/.:; S~~ ~ ~~,!'.:~,3:>5:<rr.. .//. " '//~\ \;\':\ 3 \ :,:1// \\. v:=u;A"")"';"":"'):~:~i~~i::CG"'j';";'(',jC"():": ....y i 1:: , ) -:9- ~ 1, ..-- -.., ", 3 /" ~l\ \ llet:. \\\\&q , J..-"- ,~I-- ..b '5,"~ ~,: .~~ ':)" '/(~ / :\ \\~. ~/ ~ ,_,:: (TO BE REMOVED) /I e:;" ;.', ';; " ~\ f? ",-I-Rt:.S\1(C+-r>.sOllI\R~ ..~ \' --/. ~~~'4? ,...'0 ~ Ii ,,'1:1\ ;;f. ~ .% .,;, EXISTING *' X";;,'. nl II.. ,_ _ ~ a'S\.Q!l~'~ l.~"t:.~. ..' ~.:;>;'.~h'f\l\lll\~\~,..- .... 1.0" -- ''1l~:~r''~'" "(!,~ti, '/fP. :~ "';""'~"'~', RECLAIMED WATER METER /. . ",' L-- H e....i5 sP\"\ ..--' "! .'Cl'::l'ii' , ,. . __-- "r,'-' ~ t." Wk./ ' >\ _~, (TO BE REMOVED) "2 "";''''' ~;:!\!5 ~....."" -~:1' 3:3" ,'4i, ~0 ":.r ~ '';''tP' :,\ ,i,'," r.1L'qu' ,..';'\ c-J.\ 62 %~f.;, ...'" 0"1\%....C>-\.51~.I' .....L--'".... 4r' 11";' ".:1: ,~TV.4~ ~ %,., ~' GAs~bsJ~~%TION ." SJ.":" j t\ \.... " ;~-= \ 1\ ,,' 3 \ 1 \ ":,q' ~:1' ;<~'~ \. eu~' ~~ ',\ \\\\ ~ l '. \\ (TO BE REMOVED) x :-< '"~ ," , -+- ';< 'i' + ~,l., \ I' 2~j~ "_ iQ:t; t:l~..J '" \1\ -' "" ~ "~ ' , EXISTING ,. '.. .....:+,(_ ';;,~ .:' " -11 G~R~OR ~~ ~'"\ s-'" ~(" \,\\~ ~. ~ " i 3.7' X 6.7' CONC. PAD ,//( "\ ,t \ ". _ ~~I.~ .~~ ~,'a:r -S1~. ' nll\S~4~i'l \W-,' ~ 'J'J~!!'tj~i~' \\\\ ~ ~ ',~ (T~.~~,.R.~~OVED) X : '\ . ~ ~ ;~~ 55 I 1\ (.\... -:: 6. \J ,7 \ v' '" _ ':::;: ~ % ' : ,~""~,,.a'_'____'''''' .;. <:;;. I ~f'-'(.. \ ' ' i--f-W '" ." 1\ <'\..OO~' L_~ ~\..~ . . '. "'''' ";,."" ~ ~ . .' ..,....,...,.. ..OF'/,"...."... / . j " ....., )f\ 9>> \..(1.,," \', 'c'\..'~ \7, I" ", "'~WV' :\\; ~ "' ..,. :,;.'...;,..:..,':'.,,;,"../,'~:.:; ,...,!;o. "~' . '. ' "r-" "., Ii--:"'\... ~~ 0 ~ ,- 1 ~b.: w,",:'G:J . ''':;'~ Z ~ :. ",,- . ". '\ ' ;.- J-.-T"1 '52 I.... 00" .. '9' '14,~ /c:;:.:~ :: A:O~ ~ ~ ,;; /// '; \. 3 Lrr 1M ~1ti-\1 . ~1'1 11 "359 .,~ttj t~~~ ,\ /.W! ,.:./ ~ J' : .' ') , EXISTING ">, 1 ';';~~J~'';: ~~ ~~~ "' 5,7 1 ",~~r:9,.'~ "'''~, ~;, __ --:r. ,,;~,~/// \. ~6~~i:E~~~~~ ./;;:~' ?~ ;;:"".: ::;: r-:y~~ \til ;_ 1;' 1I1~ l~b... ..0 1~2-\-'1 ':i0.;. .~ //?: ~ :x: ,_.f .,.1 '\','::/!.-('" \ ~ ?'e:.!~ \ 9S -- U1 C"1 a2~ 1''''-'' ~ ~ ~<-:' ".< -,-- .~ / ~, . ' . ,'... . ........ , , oj .-,<.>8..... '" 2.1l '-"" 0; 94 ~ ><,: ,.--' .." h " ":.";' . "..,,;.... ~ ~ _,0.7 -. f\..OO\-. 1i 41 X "\\,, / ~ ~ EXISTING .' ", \.!-.J, I ,~ \ \7.2.---:.,. .?\~Cn"c,' ~f' nll\S~' e'5 ~;;. '", "\ / ~ ~. , .?,.; '-- ~ --- WATER METER ,... ...,,.,,. . 1\ [I}.J ~. '. \.' 'U\";-l~'" 0;:. " 6, ;;..0 - l~ ' ' :::~ / ~ ~\ ,..: ~ ':.(' ';!. ". . D 5 1.--:::-' ,~, ,?, ,,' ~~~ t:.\..'if . f Ii, : ,ij\V ~ t '. ,; ,.,..- (To BE REMOVED) " '"';.i- :, \.4."1 __ w.~ I. ,j . w.-.o I B ..+ , ....~.~ ~ vli"y//fi. ... '.' ,'...}4~ " 15 .;~ ' -' '];.....,0.. I I ~.:- U' '/. ',;;, ~ w//~ v~ , ./{'(' I" /:;... '::, ',:; 'r.:;', ..... / i. u I 1..L---J-\ U1. ;;'. .y/M .. ~, '~ ....~... ''',', """.';''';:.;;:\. /. 4"11I" 4" . 10" ?- "::;:~r.," J:! [ClI",-1-3:1-I--:" J;,", '1.c////////. ~ "., ~~ i;';-\ ..c-.'\I j '.:{' ~,,~::. ':. ~ J ~ ,cQ 6:5 k-- 7 ~ Ui 'l, . ~.,? 0 0.J/i.r/fi '~~ ,r- ~ \~ ", ...."'" . <.' ". ,r ., ..~. \~ ,4 ;~r..J\ '_' A-,. lIrJi?~~,:\ ,\l 'T,' ~ ~\.. .?;, . :, S't,?'hu "'~./ ,;;;U 6.0 ~.. I\.;:.?~"I -"" ~ u..;;.~ \ (,,::~' .f' ~ j::' ~' ......r.'''. ,",'.,' .' ".". .. ... .~ ?,," '. ,".'" .,. 9" ',"~ .3. _ ",0 '~~'"""1 ,. \ ". ,L.. "'~~ .---;> ...." ,,,/,--,,...;,(:..<,,,,,::,,,;C4,:,,.,"")~ U::"'f,,(,'{"':c,"',U.h..",.,; . ,';', '....\ ." 7..J~" '-../ ::; :--- ""., C,'<i~L~' , 7"1.' ,:\'),.r~:'k' ..'c ~ ..; //; .f"".,:.,"';o:",,,,,,,;(,,,"f,,:,,,cv:,,'c",i','."',"-:-:',:;-:'i',";" Y':<:" ~ B"\;j."".' 7 X.." ~~~~t 3, 12" -2,5C1l:\Ir>.LL~ '~i8" ~~"", BP '\,:...:~,\ Ii ~"~\':,\ C'H""(/";f":;'<';;::,~;,;;~:~:i<)~:~,;;;'::~~:;;;:':.i'(".,;'(:,\D,;:,'(, '{/"c. -<.,., 4" 4" 4" 6" 'f'" \\>/ ~ 1\llG coil, 5 '2>,;> ~ ~ '\ ''''- r' " ,', , '", 'f: ' , ',' F ~""\S --' N').' '" ". Y'A, .' ~,'Y ,,', X"..'~ \",\ " "'( .(,.t, '~' ~ ~o1\l1l1\:X-'II~" ",': ';~i \ ~/ ~'''u,,'1\ SILT FENCE ,; . 'v' 9" 1 \~. ) , 1 ~:J c/. ~ . .'l\' ~ ' Y. \W ~ t \:.; ; i ....................... '" q~'. \ 411 4" 111("" ~ 7 'J , ~ ~ ~ \m % ~ ,\ l , ',: , ,.:i' 1 ,,', \ \\\\ ~ ~ - : , ' ., " {,'f, , ,..,.. 7" ~ ..~l;~Z~ ~'9 . ~ i,: \':\\ ~ ~ ii' ':. \ ",(, " '. ' '4': .' ,..... <~V :>-;.< '. ': \\\': ~ \I "<~ il . ". EXISTING',;';'" ~ ~ ' .,.J '. ,",";'j7-'", ' ...: 10" ')., ^ ~ JJlI \ " \ Am ~ ~ - ~,).';, if ' RECLAIMED WATER METER' " v/p ,///0 .//////0,. {:', " "<', " of ',7:;, .. V 'r ,~7 f, \ ~;tt. n 'iW\ <.:- ~ ", ." \.....--.-- ................................... '" v/p ,///0 ,':2"" k4:>- ~ 1\1 : \ nv, ~ 3' ' h ,,;'-;',f, ',i'" " X ....-; r' )l. I J ., "" ~ < "'-- ...... .,./////. , ('.~ ";" '" ',;". ;. ~ ,:.:'" _ I I A!\~~ flQ(1i\1 . '\ \W\ ~ ~ " ..... ,////////////////////0 v/////.' ..,. -+- ". ..j,.7 ... ....__..,;" 1 I I 1\ "tl-" ~,\ ,. .' '" ~ ~, ............. ............ S _ ~ ~;P \, :r\,. ~.. ." \\ c.. \ \, '{~\ \\ ~ : ..............'S1L T FENCE 'WOOD -\- ',"" \ r.: I \ I ~ "i~i .. ,~ .:::-----'\ . LK \;\1 :; \ '~\ f-- --I--' ~ __ -- ~~ ,~t..,!\t':: .....' \ ;.. ,9" \ ZONE AE ':, \ \."\\ ~ L----'-- --- = ~',. '<W ~ ~ .... :.\ ' , '. \ __c..- ~ ~ r;;/ ~'V ^ ,> .k-'" ':';:, ,..J" ), (BJ.E.= 12') , . :v<.'V<.'00 ?Y:.-.. >..y)..' ,,"l';;'~. '6' f" -'" ""\1 : \ ' ., ~, .I~ 1 ~ ~ v ~ .i;jr.. \51- ", "G~:~..;;~G~:'O~, c:15> ',"',,' 3 :;",. !'\ ~_ "S:t\~\:~ 1\ ~z41 ~1/~11"8" "::\~\\ ~~ ~ ~T"\ ': .. '. """" ".. 171 - /:!..o '"I,l ~ · \ ' ' C ' u, ~'I \ 4 12J---. ." ... , ~ ,~':, \ ". .." ' " \' ..' I v; '5'~?~\ ',a ..,/ ~ -,'; W\\ " ;J., \.\-- SAW,CUT PAVEMENT PRloJ TO ,'. 10" X ~}~', 0 \..o~::~g:f~I7\7~~~:: ...-- ~ m:' \ \\\\ ., \ ...J /f \, REMOVE EXISTING HARDIlCe\',7:r, ',,'r':,', XV .c> \ ". . \ ", / \, .I~ ~ . :', "'~ ~~ \ Ji \~.:::" '/,.',.\" <I .-- \ J/ \r\~ J7l6 _~ \ ~: 9~'". ~, '~ '\: 'O'~ #y~"~\\! 3 \ ;,,', 'a. ~ \ V '" _-;\~ l2J ~~;. ,l~'" '\ \1\ ~ ~" ~ """ " , , J 4" 4" 4" 4" ~ f ~ .. -' ~ ~ '~ W:\ 5 ~ ~>. . ':-~~f~ 1/ , ], ~. .1 ~~~\ \~ ~ ~" '::;."'" ',,,; c: 1{)" e-i>.' ^' /~ 1 k- t\ ~'>~ ~~>. ,~, ''\ \\\\ ~ '.;, , '\'" ''0 \ ~ %~.\,' v ~\ 7 ~ b. b.' I ,/0, ;.: .A X,.) \G" . \'--, ~ 1.......- 1 i \ YARD DRAIN t ,;'~ -;;:, "~, \~t~ \ \ . , \ \ \ 3 ....1/'>. \ TOPELEV,=~5 ~;,~. ~\ ';Jj;; j;"::' ",k.~oa\ ..............,......':'v,,,"-,U-t<,,, ,'~!l'~ .~ ./ -r--. ~L-- .--'., IJ..l . ,,'. ,,' \;f, . :,;;; \ '" '}1 ..,!\ " ,2,'. ,. or , ,," ":9" \ .,,' ,,'f.- ~,,-c--' _ · ":<; ~--~" [I}-~,_\B~~\T'~~,., ':.\.. 1\ t \ ~t\~ ,." "~q, ",' "/" SPIl.I1. 7 ,. . . i"'" ", ../ I}\' W;', I J..:-- <7' ",', ,." '. ,,1.;,", r'uSJ'f.., ~.1 "'d" . _',L t!:..; ~IQ., ,\', ~~ J ' ,\' , ':'; '..,.'.. ,.)... ~ ZONE A ~ '" ~j ._# ", "d'" ~. ~ ' '" ...----.., ',..' \ /" _ ~v (BF - 13') ,-..-b .. 'j ~ -r-;>< " ,fie, \',\\ ~ ~ " .\ -----c; 1 0" ;';.:,)'~.\'.,\::' LV. ' , ,- ""';2" ~,__......' -- ~, . \Uk ',m \ ~ ~ ' :, , '" \,'1'" ~ .,$, 3 ,'..; I..',::~!'c;:.~.:;; 5" 5"11' " \ '(fN,:\ ~ \ '.' , """\ "j, 5~ 7 .<1"x" . '''>''''''_'__r:.:J!c~'~ , , '~, ,,-i,;: '; \Wi \ ~ \ ~ ' , ".,.. 4., , \ ", ,,';' ;":/::. .__'r~'- ~ ., ~ "\ '; .\% ~ ~ ,",' , om, ,....A..,. ~ ~ ' ,',11> ~ ~ . " APPROXIMATE . ',.. ~'n': __ "-,.. ' ,. \ i)(-\\':':. . ~ /.\ i Nr FLOOD ZONE LINE \"c;. ' . , · \':/'....,.: .~. " ..fiji "-',.. X <. \', \ '::,':.:. \ '} "",': .., 'i ....,:,.~. ";',.. ".;:~~,..p~"'- "'" SILHENCE) 7 7x""'\ \'it x 'If ': i'[ ". - - .., \ .... '{.'; r COASTAL CONSTRUCJlON " " CONTROL LINE 0' /__.\ i:1.;\ '.. , n~h .?Y,\. " '..:.'. ~..; X. k \\ . ,t \ ~ . /....;- \ ~ \ ~.%:. ~:W: / "~ 1 Q1. , ' .... ,..\....\\ /\~\" ); \ \ F![':i.D sr,x'~':'<~r~;~i':. C :,~~~';, 'f \'\'\, ,We \ \wi~ " . , ,,,. ',--" : \ , ',.., ..:J' \,\W\"';:' \ \t\\ '. .;c \ () i~\ f" ,_.,-~-,.... ,___n_'''' .,_u~..~ '.". . ........-~ X '.{/", ',; X '1(.;., 3 '~:I(;" X ,//p .y/// -- -- 3 A SOIL TRACKING PREVENTION DEVICE (STPD) SHALL BE CONSTRUCTED TO PREVENT OFFSITE TRACKING OF MUD. STPD SHALL BE CONSISTENT WITH FDOT STANDARD INDEX 106, - -~-- -- ,-~"..,'" ,-- I"~~ IMPORTANT NOTE TO CONTRACTOR r"~""'" --' ,-" "....; CONTRACTOR TO DESIGN MANAGEMENT OF TRAFFIC (M.O,T,) TO BE UTILIZED WHILE WORKING WITHIN MANDALAY POINT ROAD RIGHT-OF-WAY PER STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION DESIGN STANDARDS FOR DESIGN, CONSTRUCTION, MAINTENANCE AND UTILITY OPERATIONS ON THE STATE HIGHWAY SYSTEM INDEX 603- TWO WAY TWO LANE, WORK WITHIN THE TRAVEL WAY AND INDEX 660 - PEDESTRIAN CONTROL FOR CLOSURE OF SIDEWALKS. (LANE CLOSURES SHALL NOT OCCUR DURING THE PEAK HOUR PERIODS OF 7 TO 9 AM AND 4 TO 6 PM.) N w ~/l~ ----=-= ~ ~ I--- ~ ~ E s GRAPHIC SCALE 1"=20' I 40 I 20 I 10 ~~ o 20 DEMOLITION TABLE ITEM DESCRIPTION QJ IT] IT] o o o o REMOVE STRUCTURES AND FOUNDATIONS. REMOVE ASPHALT AND BASE. REMOVE CONCRETE PADS, SIDEWALKS AND PAVERS TO THE NEAREST EXPANSION JOINT, REMOVE WALL AND FENCE. REMOVE SANITARY STRUCTURES AND PIPES. REMOVE CURB TO NEAREST EXPANSION JOINT. REMOVE TREES AND SHRUBS. CLEARING AND GRUBBING NOTES 1, PRIOR TO SITE CLEARING AND GRUBBING, ALL TREES SHOWN TO REMAIN ON THE CONSTRUCTION PLANS SHALL BE PROTECTED IN ACCORDANCE WITH THE CITY / COUNTY TREE ORDINANCE AND DETAILS CONTAINED IN THESE PLANS, THE CONTRACTOR SHALL BE RESPONSIBLE TO KEEP THESE TREES IN GOOD CONDITION. NO TREES SHOWN TO REMAIN SHALL BE REMOVED WITHOUT WRITTEN APPROVAL FROM THE OWNER. 2. THE CONTRACTOR SHALL CLEAR AND GRUB THE SITE PRIOR TO CONSTRUCTION IN ACCORDANCE, WITH THE GEOTECHNICAL INVESTIGATION REPORT, COPIES OF THE GEOTECHNICAL INVESTIGATION REPORT ARE AVAILABLE THROUGH THE OWNER. ANY QUESTION REGARDING SITE PREPARATION REQUIREMENTS DESCRIBED IN THE GEOTECHNICAL INVESTIGATION REPORT ARE TO BE DIRECTED TO THE GEOTECHNICAL ENGINEERING COMPANY THAT PREPARE THE REPORT, c:r:: o co c:r:: <( 3, THE CONTRACTOR SHALL CLEAR AND GRUB, ONLY THOSE AREAS OF THE SITE NEEDED FOR I CONSTRUCTION, DISTURBED AREAS SHALL BE SEEDED, MULCHED, OR PLANTED WITH APPROVED LANDSCAPE MATERIAL IMMEDIATELY AFTER CONSTRUCTION, c:r:: 4, ALL DELETERIOUS SUBSURFACE MATERIAL (I.E. MUCK, PEAT, BURIED DEBRIS) SHALL BE W EXCAVATED IN ACCORDANCE WITH THESE CONSTRUCTION DOCUMENTS OR AS DIRECTED BY THE 1-<( GEOTECHNICAL ENGINEER. DELETERIOUS MATERIAL SHALL BE STOCKPILED OR REMOVED FROM THE SITE AS DIRECTED BY THE OWNER. EXCAVATED AREAS SHALL BE BACK FILLED WITH 3= APPROVED MATERIALS AND COMPACTED AS SHOWN ON THESE CONSTRUCTION DOCUMENTS, c:r:: CONTRACTOR SHALL BE RESPONSIBLE FOR ACQUIRING ANY PERMITS THAT ARE NECESSARY FOR <( REMOVING DELETERIOUS MATERIAL FROM THE SITE. W .-J5, UNLESS OTHERWISE DIRECTED, THE TOP 4" TO 6" OF SOIL REMOVED DURING CLEARING AND OGRUBBING SHALL BE STOCKPILED AT A SITE DESIGNATED BY THE OWNER TO BE USED FOR LANDSCAPING PURPOSED, 6. ONLY GRADING BY HAND IS PERMITTED WITHIN THE CANOPY / DRIP LINE OF TREES TO REMAIN, 7, CONTRACTOR SHALL PROVIDE EROSION CONTROL AND SEDIMENTATION BARRIER TO PREVENT SILTATION OF ADJACENT PROPERTY, STREETS, STORM SEWERS AND WATERWAYS, IN ADDITION, CONTRACTOR SHALL PLACE STRAW, MULCH OR OTHER SUITABLE MATERIAL IN AREAS WHERE CONSTRUCTION RELATED TRAFFIC IS TO ENTER AND EXIT SITE. IF, IN THE OPINION OF THE ENGINEER AND/OR CITY / COUNTY AUTHORITIES, EXCESSIVE QUANTITIES OF EARTH ARE TRANSPORTED OFF-SITE EITHER BY NATURAL DRAINAGE OR BY VEHICULAR TRAFFIC, THE CONTRACTOR SHALL REMOVE SAID EARTH TO THE SATISFACTION OF THE ENGINEER AND/OR CITY / COUNTY AUTHORITIES, 8. IF WIND EROSION BECOMES SIGNIFICANT DURING CONSTRUCTION, THE CONTRACTOR SHALL STABILIZE THE AFFECTED AREA USING SPRINKLING, IRRIGATION OR OTHER ACCEPTABLE METHODS, LEGEND - - PROPOSED PROPERTY LINE - - .~,,; r., (; EXISTING TREE TO REMAIN 4" )8( EXISTING TREE TO BE REMOVED PROPOSED EROSION CONTROL -~ / , ( ) , / - ." PROPOSED TREE BARRICADE v///md EXISTING ASPHALTIC PAVEMENT TO BE REMOVED EXISTING BUILDING TO BE REMOVED , . A ,A. ... A , llo., "'f'- . I:lo., ~ ~ A. ... A ,A" A. ,A ,A. ,..{- ~:~:: .~::~: .~..~~: .~'?: ~'~: ~.~ 3.:{,~:.;>~:.L .~.:~,,~ EXISTING CONCRETE TO BE REMOVED -- EXISTING PAVERS TO BE REMOVED ~ ~~ Ml~ y f'y'\'0 48 HOURS BEFORE YOU DIG "CALL SUNSHINE" 1-800-432-4770 ~",,-::,:::::::;::::'7.c.~ - _ @COPYRIGHT 2009 THIS DRAWING IS THE PRO~tf~~~\.~~# .k;,~Gtm:'e~tlll~. INC. UNDER NO CIRCUNSTANCES MAY THIS D~'YJI<l.G BE'RE5'QPj..1j:;~, l"~tiSJ;lF-p, ALTERED OR USED IN ANY WAY WITHOUT WRllJ~N ,wjflO~TION FRO'M}iIGl>j, POINT. ENGINEERING, INC. , f/ .,,-.. cor!>.::!.;[, ~ l"'r r... c r:. ":') ;:::, o"'lJo ......... 1': ~J,,_l\""6' ....'--'~.... ." .:-t ~;)7~_ - ~ -7 : -~ ~~ ~,~ ,. ,_(2 .?<..' 0"':: ,.... '2 tV v'" I' '.--j' - J t j... l ~~ '.- Q... r' .,J r.J ~ V" , 58626 ">aP~YklQ 'GRAJ.c;cEiS..9:~>':~';: FL Registration No, / '. ~ - ~PI1?fe$ion@;Eh~ineer ~.:.. "',...'~'" . Sign Date COPY OF THIS PLAN IS NQ;T ~Pt[l W~f';SS:S'IGN.Ei;):'S~fD AND DATED BY THE PROf.E..sSr~~~L!B~~:";"" .... z o i= C- o:: () en UJ Cl rJ) Z o en :> UJ UJD:: I- <( Cl >- [Xl <Jk <J<JK<< ~ ---l a J, o o ch o o Z l- t.) W ..., o 0::: 0.... z <( .....J a.. Z o - ..... - .....J o ~ ~W w !zO o t.) 19 Z 0::: ill ill Z 19 Z ill - P. Z ..... Q Q.. = ~ ..... = SHEET: m o co ...... c;:; o C9 co :>-: co o w Z C9 en w o ~- -- W I- <( o w => U) ~ w () Z W o - en w ~ en .....J .....J ~- ~(9 0::: 0.... !II ,~~- C-2 C9 co C9 co :>-: co o w 6 0::: 0.... 0.... <( C9 co :>-: lD Z ~ o :>-: co o w ~ t.) W I t.) o <( o ~ 1-"" ZCO "" 0('1') 0..('1') <( ~O -I~ <(0 0-1 ZLL <(~ ~W 01- CO<( ~S oc!S~ -q-<( LOW ~-I ~() ...... 0 C) ~~ Z MI"- d, d, 0:: C\I C\I W 1"-1"- W r::- r::- z LO C\I C\I ~ t:::..t:::.. C) ~ Q) ~ Z ol-LLW Z -I 5 <( :;::; () Ctl .t:! z .,g I '5 () <C W '0 I- "* 0 () W I.j:: rn 1:: \.J Q) () C) Z 0:: W W Z C) Z W -I > () to I ~C) .....~ Z Q) Ctl Z ~:2 U50Z '5 u: :5 c: ..: n .....Q)u.,. (f)..... Q) Ctl 0 t5~z offi<( ~C3 -I LEGAL DESCRIPTION 32/28/15/54702/000/0160 PARCEL 1 LOTS 16, 16A, 17, 17A, FIRST ADDITION TO MANDALAY POINT SUB" ACCORDING TO THE PLAT THEREOF RECORDED IN PLAT BOOK 20, PAGE 71, PUBLIC RECORDS OF PINELLAS COUNTY, FLORIDA, TOGETHER WITH ALL RIGHT, TITLE, AND INTEREST OF THE SELLER IN AND TO ACCRETED LANDS EXTENDING TO THE GILF OF MEXICO, PARCEL 2 NON-EXCLUSIVE EASEMENT FOR INGRESS, EGRESS, AND UTILITIES OVER THE TRACTS MARKED PALMER-HAYWARD RESERVED, ON THE PLATS OF MANDALAY POINT SUB" ACCORDING TO THE PLAT THEREOF AS RECORDED IN PLAT BOOK 20, PAGE 68, AND FIRST ADDITION TO MANDALAY POINT SUB" ACCORDING TO THE PLAT THEREOF AS RECORDED IN PLAT BOOK 20, PAGE 71, ALL OF THE PUBLIC RECORDS OF PINELLAS COUNTY, FLORIDA. PARCEL 3 BEGIN AT THE SOUTHWESTERLY CORNER OF LOT 16, FIRST ADDITION TO MANDALAY POINT SUB" ACCORDING TO THE PLAT THEREOF RECORDED IN PLAT BOOK 20, PAGE 71 OF THE PUBLIC RECORDS OF PINELLAS COUNTY, FLORIDA; THENCE S, 770-16'-00"W" ALONG THE WESTERLY EXTENSION OF THE SOUTHERLY BOUNDARY OF SAID LOT 16 AS A BASIS OF BEARINGS, TO A POINT ON THE MEAN HIGH WATER LINE OF THE GULF OF MEXICO; THENCE IN A NORTHERLY DIRECTION, MEANDERING THE MEAN HIGH WATER LINE OF THE GULF OF MEXICO, 121 FEET, MORE OR LESS, TO A POINT LOCATED S. 770-16'-00"W. OF THE NORTHWESTERLY CORNER OF LOT 17 OF SAID FIRST ADDITION TO MANDALAY POINT SUB,; THENCE N, 770-16'-00"E., TO THE NORTHWESTERLY CORNER OF SAID LOT 17; THENCE S, 190-11'-43"E" (S 120-44'-00"E" PLAT) ALONG THE WEST BOUNDARY OF SAID LOT 17, 60,24 FEET, (60.41 FEET, PLAT) TO THE SOUTHWEST CORNER OF SAID LOT 17; THENCE S 120-31'-18"E" (S, 120-44'-00"E., PLAT) ALONG THE WEST BOUNDARY OF SAID LOT 16, 59,85 FEET, (60,00 FEET, PLAT) TO THE SOUTHWEST CORNER OF SAID LOT 16, THE POINT OF BEGINNING, PARCEL 4 ALL OF THE UPLAND LYING EASTERLY OF THE EAST BOUNDARY OF LOTS 16AAND 17A, FIRST ADDITION TO MANDALAY POINT SUB" ACCORDING TO THE PLAT THEREOF RECORDED IN PLAT BOOK 20, PAGE 71 OF THE PUBLIC RECORDS OF PINELLAS COUNTY, FLORIDA, AND WESTERLY OF THE MEAN HIGH WATER LINE OF CLEARWATER HARBOR, BOUNDED ON THE NORTH BY THE EASTERLY EXTENSION OF THE NORTH BOUNDARY OF LOTS 17 AND 17A, AND BOUNDED ON THE SOUTH BY THE EASTERLY EXTENSION OF THE SOUTH BOUNDARY OF LOTS 16 AND 16A. LEGAL DESCRIPTION 32/28/15/54702/000/0140 LOT 14, 14A, 15 AND 15A, FIRST ADDITION TO MANDALAY POINT SUBDIVISION, ACCORDING TO THE PLAT THEREOF RECORDED IN PLAT BOOK 20, PAGE 71, PUBLIC RECORDS OF PINELLAS COUNTY, FLORIDA; ALSO ALL OF THE LAND BETWEEN THE EASTERLY PROJECTION OF THE NORTH AND SOUTH BOUNDARIES OF SAID LOTS, TO THE CHANNEL IN CLEARWATER BAY, AND THE WESTERLY PROJECTION OF SAID NORTH AND SOUTH BOUNDARIES, TO THE CHANNEL IN THE GULF OF MEXICO; ALSO, THE RIGHT TO USE OF THE TRACT MARKED "PALMER-HAYWARD, RESERVED" FOR ROADWAY PURPOSES; EXCEPT THAT THE WESTERLY 5 FEET OF THIS TRACT IS RETAINED FOR THE INSTALLATION AND MAINTENANCE OF WATER AND GAS MAIN, POWER LINES, AND OTHER PUBLIC UTILITY SERVICE. ( (:~~;...:}. - - -- ~ -- I o u X w :2 l.L o l.L ..--J :=J C) v///////////////////////////////P I'//-'- ,//P r//ft if//> '//ft if//> ~- - - -- ,/"/ 1: ;!.! i~i ~;{ i~: :~~. ...' .....~ {~ y~' ~~.. ~~; .:-:) ;;: rr ;~; :2 I / '., ....: I'. ',1 ~.jC:/. '::;~;"~7":.. - ~ - - - -- - (5. ' .3' \1 m........ GENERAL SAFETY NOTES 1. THESE CONSTRUCTION PLANS DO NOT INCLUDE THE NECESSARY COMPONENTS FOR CONSTRUCTION SAFETY IN ACCORDANCE WITH U,S. DEPARTMENT OF LABOR'S OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA), THE CONTRACTOR SHALL BE ENTIRELY RESPONSIBLE FOR MEANS, METHODS, PROCEDURES AND TECHNIQUES OF CONSTRUCTION SAFETY. 2. LABOR SAFETY REGULATIONS SHALL CONFORM TO THE PROVISIONS SET BY THE U,S, DEPARTMENT OF LABOR'S OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA), 3. DURING CONSTRUCTION, ALL SAFETY CONTROLS AND REGULATIONS ARE TO BE ENFORCED, THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SAFETY OF PEDESTRIANS AND WORKERS, 4, THE MINIMUM STANDARDS IN "THE STATE OF FLORIDA, MANUAL ON TRAFFIC CONTROL AND SAFE PRACTICES FOR STREET AND HIGHWAY CONSTRUCTION, MAINTENANCE AND UTILITY OPERATIONS" SHALL BE FOLLOWED FOR THE DESIGN, INSTALLATION, MAINTENANCE AND REMOVAL OF ALL TRAFFIC CONTROL DEVICES, WARNING DEVICES AND BARRIERS NECESSARY TO PROTECT THE PEDESTRIANS AND WORKMEN FROM HAZARDS WITHIN THE PROJECT LIMITS. 5, THE CONTRACTOR'S MAINTENANCE OF TRAFFIC PLAN SHALL BE SUBMITTED AND APPROVED BY APPLICABLE AGENCIES PRIOR TO START OF CONSTRUCTION, 6, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ITS EMPLOYEES AND SUB CONTRACTORS WITH ADEQUATE INFORMATION AND TRAINING TO ENSURE THAT THEY COMPLY WITH ALL APPLICABLE SAFETY REQUIREMENTS, CONTRACTOR SHALL REMAIN IN COMPLIANCE WITH ALL U.S, DEPARTMENT OF LABOR'S OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) REGULATIONS AS WELL AS THE ENVIRONMENTAL PROTECTION LAWS, 7, THE CONTRACTOR PERFORMING TRENCH EXCAVATION, IN EXCESS OF 5' FEET IN DEPTH, SHALL CONFORM TO THE REQUIREMENTS OF THE U,S, DEPARTMENT OF LABOR'S OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) RULES AND REGULATIONS FOR EXCAVATIONS SAFETY STANDARDS, 29 C,F,R., S,1926,650, SUBPART P, INCLUDING ALL SUBSEQUENT REVISIONS OR UPDATES TO THE STANDARDS AS ADOPTED BY THE DEPARTMENT OF LABOR AND EMPLOYMENT SECURITY (DLES). 8. TO COMPLY WITH THE UNDERGROUND FACILITY DAMAGE PREVENTION AND SAFETY ACT THE CONTRACTOR SHALL PROVIDE AT LEAST 48 HOURS NOTICE TO THE UTILITY COMPANIES, AFFILIATED OR NOT AFFILIATED TO THE "SUNSHINE STATE ONE CALL" OF FLORIDA CORPORATION, PRIOR TO CONSTRUCTION TO OBTAIN FIELD LOCATIONS AND/OR CLEARANCE OF EXISTING UNDERGROUND UTILITIES. -- ".C,i;;./\J~ 'i:!~ - -~ - - - - 273.6' ZONE VE (BJ,E.= 13') ~II ~ F., :;:' t"y):. ~,. '." .J 'f'~;'~~': .J........ ....h. ....... .... ..... . 'r f .,////////////// "', ...~ C?, :. " r:/"///////////fi /. ' ./. ;I'////P .' if;/- ;'/// \ ....p/ 1'//,,6 / / / / / / / / / COASTAL CONSTRUCTION CONTROL LINE I O.R. BOOK 11760, PGS 2687-2693 ---J ALSO BULKHEAD BOOK 2, PGS. 79-114 1 / ;- c{. I- ;-',.... . :", .';\ '2 :.J" ~? ~ ; / / Vi ~::/ ,.. " / r}. x ",r ." ';:; c;. ;;: ~~:' APPROXIMATE \ FLOOD ZONE L1N;--J ,.....,,.. L () T 1 t:: ;~, ',f"\ ',,~ / / / VISIBILITY TRIANGLE ~: (F :~~;"!: ; AI ~ V- ~/g N ' If) 't' , CO IR c:) o C'? 't' 01 :z I ~'.[)C':' :,.~''''(;/.:'::) 1 O~ c> (' t;.~ '...... .... / u~.nn.. _.n....__.n_~..... ..,.._u.... _...-~...; -- - i/i~~,;!:tJ;:i~' j\.. ". " ..,..,.. -: -; ,~ (~:~A;WJ~,iJ.' ..,' ~i,,?A'.A"A'\\ , - ).K..~~~}f>-iL:J ,.,. ," ,., Y..,\ \" " : \, \" ': : \ , . /'!.\ '",,"'" () : ',> \\f;;!F;ff)~ ..";\ " \ ~\\, '1 n" .(~: ~ ~'c'::: ", //..:::\: ' 'f~\ .... . ~,:~*:'~:""... ,,-;~...~,,:.~~. :o.? ',,';:"'~;:.:-:' .r '\ .~ .j: V:'= :' \\ \\ . ...uu...... ..n .............n.... ..... '.-....--... .-.._.-. .... ....... ..'UU ..........I....IU.." ZONE AE ., '1. " :.~~ .l;;/ ~~: \. '::;..~ .. "; ~ ,'.. ';., x~, .. ;,~:.,':~j.;~:. ': , :') .. '7" I /", \ .; -1 -::: t"'~ ,. ../ .... -;,-'.:) -'./ ..~ ~'. -:.: ..\. '(.\ :., ,7r',~" c '/'~ D(\,\S\I'1' "-"""7- (~(~~(\'\,\/>-'- R\,\G. '\5t.. ,'-NP. 2.BS., 000/0'\60 S(C' 2. /54702./ /2. /'\5 /lIRt./lIS 32. '\l\llL1l1I'lG 70 Sf OI"OSt.1l OOR",e,4 Sf t: RO\lI'l1l :COOR"'6~i~'5 Sf poo\.. MIO\l n~~~1l fLOO~~O' Sf $t. l'i\'ilC"'" \,:' ~:" l:-... ; ol1R'i CO\l~~~~~~~a') tt:\..," 16 p(\'\ sP />-C( 1.0\,\(0 Oc/>-I\O\'\/>-'- R(CR,,- v/p (//fi ,//fi ...-///. v////// #/P"///////////fi ,////////fi v/fi \ \--j (;">:/,;'j .:::/;/////S://///////////////P " 'F///: ,,-/P 'F///. -- ~ - - - ~ -- - - - - \- S'" c:j ,,;;:;:.'\-.}, - - - ~ - - _-"Ii ~ "';-7'.1"\ 'I." ,~?:~; ~.. ~ ~ - ( ;'f' .(/: ZONE VE (B.F.E,= 13') .....~ (~~ .:~ \ 2:~ I y~~!~'\ f':;;:;,\',5.::.::\;~tr v:.~~:'\ 4" fl. ".,. "';', '1- ,:.'.. /1- (:::/:...:. '" !! : ~.;. I', .s. ~ \ ~;) t~..\:) ():. ~... fLOOR St.COI'l1l, 6' -e') (t.L.'" . :"; 77"; :.r:):)":~ ,; '';:; ;"J:i ?''':O' 4 7"f,~ ~;. -;:':::r",: "~ :; ry/fl .qP .-- G:){.'; :..( ~ J)";' 1 -:.;;~ \ ~ . ~ G ,,~\..\.. Rt:i ~lll\ll ,~.~,~.....~.. ,~.~.~.~.. ~,.",'_.' ~~'''' ," .-;( 'I.J 'd:~:Q D ~ m>. , r "'~ '7 ,'r~ 1/////////////////////////////////0 .~...,.,\ ~~~..........-~.....,..-.. - - (~. I; \~3'~ \. \. ~:: ~.:, '" \: :~ \\ t~~~ " ' "- , ' ~~ t.'" ...:~~~~/~, .~",...... I'//fi v/P ~- - .~ 1'-': t.()"( ", ZONE AE (B.F.E.= 12') ..:;. z z -- - .~(t _.....: J 7'. "':'>";> iJ;~:~. O:"SIT'< 1.0\,\(DCS\0(\'\\\/>-'- G '\ 5t.. R"- R\'\ . ,'-NP. 2.BS.. 000/0'\40 S(C. 32., '\5/54702/ 32./2.B/ . ,.'(, ,t" ro'~' '. '../ ,,'.. ~..':"r,',J.\ ',: ~..'" ...., , ....1. . ... I" "':' :......,. (\. ?.(:' ':' .. :..C)T 14r, ('; () \ \ ".~~...~. ~(r !...J ,'. ! ;1" \..; (~". 1 0" .d, \ ,,~' .', v.-. ' ~., , *.\ :.. ,,~.'~ .,~,.~.' "'-':,~_."'~ ..,........ ~FJ' " ..~\ " ~I :. c.._...'!. ~:. :,.;:" . . 1- .~) (~" \) J..,;-.,~~<;-,=/>~ '2.C, ~:., .\.~ J:.. . ~', .r.. I.....) :o~' ~~~, " ' p(\'\ sP />-C( 1.0\,\(0 ~c />- \\O\'\/>-'- R(C,,"- ZONE AE (B.F.E.= 13') "'"/ . ':, j,. ". :; \ '. '7~' ( 11" C" /,"'./, I/.: (", ~j ';" !,::; ~.f : 1" APPROXIMA TE ~ FLOOD ZONE LINE \ /'; ',j ""," \ ( ,'~ 1 .~~ t ~- - -~ - - - - \ \~ COASTAL CONSTRUCTION \ CONTROL LINE '..\ I' .,\ 1~~:\ "1'" ':. '. ~ JI, ..t., ~ (~'Y " .,' f'::~ l/i .....~.~..,.. 'J..'Oi~\ \\ \\ .,....~...~. ~-~....~ ..~...,,~..~.~ r. r::I~) ~': ~'V:: .5 (,9' h,~, ! ,J.. :q:~7; 0::: o CD 0::: <( I 0::: W f- <( 5 0::: <( W -' U I......... N w E s GRAPHIC SCALE 1"=20' I 40 ~~ o 20 20 10 SITE DATA 1. SITE ADDRESS: 1154 & 1160 MANDALAY POINT ROAD CLEARWATER, FLORIDA 33767 2. PROPERTY AREA: 108,700 SF (2.495 AC) DEVELOPABLE AREA:34,255 SF (0.786 AC) 3. EXISTING ZONING: LLR & OSIR 4. EXISTING LAND USE: RL & P 5, BUILDING SETBACKS: FRONT (EAST) = 40.3 FT SIDE (NORTH) = 10.0 FT SIDE (SOUTH) = 10.0 FT REAR (WEST) = 273.6FT (0.0 FT TO CCCL) 6. BUILDING HEIGHT: 34' 7. SITE AREAS: TOTAL IMPERVIOUS AREA: TOTAL PERVIOUS AREA: TOTAL AREA: 15,637 SF (14.4%) 93,063 SF (85,6%) 108,700 SF (100%) 8. DENSITY = 1 SINGLE FAMILY 1 0,786 ACRES = 1.27 UNITS PER ACRE 9, OWNER: JAMES P. GILLS, III AND JOYCE P. GILLS 1160 MANDALAY POINT ROAD CLEARWATER, FLORIDA 33767 10, STORMWATER MANAGEMENT: EXEMPT. 11. FLOOD ZONE INFORMATION: ZONE "AE" (EL.12), "AE" (EL. 13), "VE" (EL.13), "VE" (EL.14), "VE" (EL. 15), 'VE" (EL. 16), AND "VE" (EL. 17). (FLOOD INSURANCE RATE MAP COMMUNITY-PANEL NUMBER: 12103C0064G, MAP REVISED 9/3/2003). ELEVATIONS ARE REFERENCED TO NAV.D, 1988 DATUM. 12. WASTE MANAGEMENT: TRASH RECEPTACLES 13. TOTAL PARKING PROVIDED: 4 SPACES IN GARAGE 14. TOTAL PARKING REQUIRED: 2 SPACES 1 DWELLING UNIT X 2 SPACES PER UNIT = 2 SPACES SITE PLAN NOTES 1, ALL POINTS AND MONUMENTS SHALL BE SURVEYED UPON MOBILIZATION TO VERIFY THEIR ACCURACY. ANY DISCREPANCIES DISCOVERED MUST BE BROUGHT TO THE ATTENTION OF THE ENGINEER IN WRITING PRIOR TO CONSTRUCTION, 2. MONUMENTS AND OTHER SURVEY CONTROL POINTS SHALL BE PROTECTED FROM DAMAGE AND DISTURBANCE. IF ANY CONTROL POINTS ARE DAMAGED OR DISTURBED, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE ENGINEER AND REPLACE THE CONTROL POINTS TO THEIR ORIGINAL CONDITION AT HIS OWN EXPENSE. 3, CONTRACTOR SHALL REFER TO THE ARCHITECTURAL PLANS FOR PRECISE BUILDING DIMENSIONS, 4. CONTRACTOR SHALL REFER TO THE ARCHITECTURAL PLANS FOR EXACT POINTS OF CONNECTION OF UTILITIES, 5, ALL DISTURBED AREAS ARE TO RECEIVE FOUR (4) INCHES OF TOP SOIL, SEED, MULCH AND WATER UNTIL A HEALTHY STAND OF GRASS IS ESTABLISHED, 6, THE SITE WORK FOR THIS PROJECT SHALL MEET OR EXCEED THE CITY OF CLEARWATER COMMUNITY DEVELOPMENT CODE, 7. ALL BOUNDARY AND TOPOGRAPHICAL INFORMATION SHOWN WAS TAKEN FROM TOPOGRAPHIC SURVEY BY GEORGE A, SHIMP II AND ASSOCIATES, INC, DATED 2/2/09. LEGEND - - -- PROPOSED PROPERTY LINE ~ wm: w;. w;. W/Z. W~ EXISTING PROPERTY LINE EXISTING LOT LINE 42' SETBACK DIMENSION EXISTING ASPHALTIC PAVEMENT NEW PAVERS v"\@ 48 HOURS . BEFORE YOU DIG "CALL SUNSHINE" 1-800-432-4770 z o i= 0- ~ c..> rJ) w Cl en z o en > w we::: ~ Cl >- III ---l a , LO <::) <::) cb <::) o Z I- U W ...., o c::: 0- z <( -.J 0.. CJ Z - ~ 0:: <( 0.. cd ..... ::::> o ~ -.J UJ ~..... w - !zoo o u 19 Z 0:: W W Z 19 Z w - ~ Z ..... o Q.. = ~ ..... = SHEET: 0> <::) co ...... cry <::) c.9 CD >= CD o w z c.9 en w o w !;( o W :::l en ~ w () Z W o - en w 0:: en -.J -.J .:-:- ~C.9 c::: 0- C-3 c.9 CD c.9 CD c.9 CD >= CD o w > o c::: 0- 0- c:( >= CD Z ~ o >= CD o w ~ U w :r: u o <( o 0:: 1-"- zc.o "- 0('1) 0..('1) >-<( <(0 ....JO:: <(0 O....J ZLL ~ 0::- W 01- c.o<( ~S ~o:: ooq<( LOW ~....J ~() ...... a (!) ::::~ z Cf:lf'o-- M M 0:: N N LlJ ~~ LlJ ~~ Z f'o--f'o-- - -- (!) a5~Z I- LL LlJ ....J e::( U Z I U LlJ .- o LlJ (!) (!) Z 0:: LlJ LlJ Z (!) Z LlJ ....J > U co ~(!) .....~ Z 0) co Z 0)'0 V>'~ Z "5 u: ::s .5lic.. (/)~ 0) co 0 n~Z alEe::( ~ C3 ....J GENERAL CONSTRUCTION NOTES IMPORTANT NOTES TO CONTRACTOR 1, THESE DRAWINGS SHALL NOT BE UTILIZED FOR CONSTRUCTION PRIOR TO OBTAIN THE PERMITS FROM THE CITY/COUNTY AND OTHER GOVERNMENTAL AND REGULATORY AGENCIES HAVING JURISDICTION OVER THE PROJECT, THE CONTRACTOR SHALL ASSURE THAT CONSTRUCTION IS IN ACCORDANCE WITH THE APPROVED DRAWINGS, 1, ALL POINTS AND MONUMENTS SHALL BE SURVEYED UPON MOBILIZATION TO VERIFY THEIR ACCURACY, ANY DISCREPANCIES DISCOVERED MUST BE BROUGHT TO THE ATTENTION OF THE ENGINEER IN WRITING PRIOR TO CONSTRUCTION, 2, MONUMENTS AND OTHER SURVEY CONTROL POINTS SHALL BE PROTECTED FROM DAMAGE AND DISTURBANCE. IF ANY CONTROL POINTS ARE DAMAGED OR DISTURBED, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE ENGINEER AND REPLACE THE CONTROL POINTS TO THEIR ORIGINAL CONDITION AT HIS OWN EXPENSE, 2, THE CONTRACTOR SHALL READ AND UNDERSTAND THE PERMIT AND INSPECTION REQUIREMENTS SPECIFIED BY THE VARIOUS GOVERNMENTAL AND REGULATORY AGENCIES, THE ENGINEER, AND THE ARCHITECT. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS PRIOR TO CONSTRUCTION, AND SCHEDULE ANY NECESSARY INSPECTIONS ACCORDING TO AGENCY INSTRUCTIONS. 3, ON-SITE FILL IS NOT ANTICIPATED FOR THE CONSTRUCTION OF THIS PROJECT, 3, UNLESS OTHERWISE SPECIFIED, ALL WORK PERFORMED SHALL COMPLY WITH THE ORDINANCES AND REGULATIONS OF THE GOVERNMENTAL AND REGULATORY AGENCIES HAVING JURISDICTION OVER THE PROJECT. ALL CONSTRUCTION MATERIALS, MEANS, METHODS, PROCEDURES AND TECHNIQUES SHALL CONFORM TO CITY/COUNTY CONSTRUCTION STANDARDS, FDOT "STANDARDS FOR DESIGN, CONSTRUCTION, MAINTENANCE AND UTILITY OPERATIONS ON THE STATE HIGHWAY SYSTEM" AND FDOT "SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION" LATEST EDITION. 4. THE INFORMATION PROVIDED IN THESE CONSTRUCTION DOCUMENTS IS SOLELY TO ASSIST THE CONTRACTOR IN ASSESSING AND EVALUATING THE NATURE AND EXTENT OF THE CONDITIONS WHICH MAY BE ENCOUNTERED DURING THE COURSE OF WORK. ALL CONTRACTORS ARE DIRECTED, PRIOR TO BIDDING, TO CONDUCT ANY OR ALL INVESTIGATIONS AS DEEMED NECESSARY TO ARRIVE AT THEIR OWN CONCLUSIONS REGARDING THE ACTUAL CONDITIONS THAT MAY BE ENCOUNTERED, AND UPON WHICH THEIR BIDS WILL BE BASED. 4, DEWATERING IS NOT ANTICIPATED FOR THE CONSTRUCTION OF THIS PROJECT, 5, ON-SITE BURNING IS NOT ANTICIPATED FOR THE CONSTRUCTION OF THIS PROJECT. 6, TEMPORARY SEEDING AND MULCHING MAY BE APPLIED TO COVER BARE SOIL AND TO PREVENT WIND EROSION, SOLID BOARD FENCES, BURLAP FENCES, CRATE WALLS, BALES OF HAY, AND SIMILAR MATERIAL CAN BE USED TO CONTROL AIR CURRENTS AND BLOWN DUST, BARRIERS PLACED AT RIGHT ANGLES TO PREVAILING WIND CURRENTS AT INTERVALS OF ABOUT 15 TIMES THE BARRIER HEIGHT ARE EFFECTIVE IN CONTROLLING WIND EROSION, IRRIGATION WITH WATER UNTIL THE SURFACE IS WET AND REPEATED AS NECESSARY CAN BE USED TO PREVENT WIND EROSION AND CONTROL BLOWN DUST. IF THIS METHOD IS TO BE EMPLOYED, THE CONTRACTOR SHALL CONSTRUCT A TEMPORARY GRAVEL ROCK ENTRANCE OR A SOIL TRACKING PREVENTION DEVICE (STPD) TO PREVENT OFFSITE TRACKING OF MUD ONTO LOCAL STREETS. STPD SHALL BE CONSISTENT WITH FDOT STANDARD INDEX 106. 5, THE CONTRACTOR SHALL BE RESPONSIBLE TO PERFORM A SITE RECONNAISSANCE PRIOR TO BIDDING THE WORK AND CONDUCT STUDIES, TESTS AND SURVEYS AS DEEMED NECESSARY TO MAKE THEIR OWN DETERMINATION AS TO THE ACTUAL SURFACE AND SUBSURFACE CONDITIONS EXISTING AT THE SITE, ACTUAL CONDITIONS THAT DIFFER FROM THOSE SHOWN ON THE CONSTRUCTION DOCUMENTS SHALL NOT CONSTITUTE GROUNDS FOR AMENDMENTS TO THE CONTACT PRICE. 6. IMMEDIATELY UPON MOBILIZING TO THE SITE, THE CONTRACTOR (ACCOMPANIED BY THE OWNER AND ARCHITECT) SHALL PERFORM A SURVEY OF THE ENTIRE PROJECT AREA. THE CONTRACTOR SHALL SURVEY IN DETAIL USING WRITTEN AND PHOTOGRAPHIC MEANS, BUILDING(S) AND SITE AREAS THAT ARE NOT IN A FIRST CLASS CONDITION (SURFACES THAT ARE UNBROKEN, NON-CRACKED, NON-RUSTING, WITHOUT CHIPS, WITHOUT SPLINTERS, OF TEXTURE MATCHING ITS SURROUNDING, WITH NEW APPEARING FINISHES, AND OPERATING AS ORIGINALLY DESIGNED OR INTENDED TO OPERATE) SPECIALLY THOSE THAT WILL REMAIN IN THEIR EXISITNG CONDITION AT THE END OF PROJECT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING TO THE OWNER A COMPLETE PROJECT IN FIRST CLASS CONDITION, MEETING INDUSTRY WIDE STANDARDS IN QUALITY AND PERFORMANCE (REGARDLESS OF WHETHER AN AREA IS SPECIFICALLY IDENTIFIED WITHIN THE DRAWINGS AND SPECIFICATIONS OR NOT) UNLESS A PARTICULAR AREA HAS BEEN DESCRIBED IN THE WRITTEN AND PHOTOGRAPHIC DETAILS. SHOULD DURING THE COURSE OF THE WORK, ANY AREA OF THE BUILDING(S) AND/OR UTILITIES AND/OR THE SITE BECOME DAMAGED AND THAT AREA WAS NOT SPECIFICALLY CALLED OUT TO BE A PART OF THE CONSTRUCTION, THE CONTRACTOR SHALL REPAIR AND/OR REPLACE THE DAMAGED AREA TO THE SATISFACTION OF THE ARCHITECT AND OWNER AT NO ADDITIONAL COST, 7, IF DURING CONSTRUCTION ACTIVITIES ANY EVIDENCE OF HISTORIC RESOURCES, INCLUDING BUT NOT LIMITED TO ABORIGINAL OR HISTORIC POTTERY, PREHISTORIC STONE TOOLS, BONE OR SHELL TOOLS, HISTORIC TRASH PITS, OR HISTORIC BUILDINGS FOUNDATION, ARE DISCOVERED, WORK SHALL COME TO AN IMMEDIATE STOP AND THE FLORIDA DEPARTMENT OF HISTORIC RESOUR.CES (STATE HISTORIC PRESERVATION OFFICE) AND PINELLAS COUNTY SHALL BE NOTIFIED WITHIN TWO WORKING DAYS OF THE RESOURCES FOUND ON THE SITE, 8. IF DURING CONSTRUCTION ACTIVITIES ANY EVIDENCE OF THE PRESENCE OF STATE AND FEDERALLY PROTECTED PLANT AND/OR ANIMAL SPECIES IS DISCOVERED, WORK SHALL COME TO AN IMMEDIATE STOP AND THE FLORIDA FISH AND WILDLIFE CONSERVATION COMMISSION (FFWCC), THE U.S. FISH AND WILDLIFE SERVICE (USFWS) AND PINELLAS COUNTY SHALL BE NOTIFIED WITHIN TWO WORKING DAYS OF THE PLANT AND/OR ANIMAL SPECIES FOUND ON THE SITE. - - ~ - - -~ - - - - - - ~ - - ,- o u X w 2 STORMWATER COLLECTION SYSTEM STRUCTURE SCHEDULE STRUCTURE TYPE OF GRATE ELEV. INV, ELEV, NUMBER STRUCTURE (FT) (FT) ST-1 WATER-TIGHT OUTFALL PIPE 0.80 ----- (OPENING THRU SEAWALL) ST-2 2')(2' YARD INLET 5.80 1.00 ST-3 2')(2' YARD INLET 6.50 1.30 ST-4 2')(2' YARD INLET 6.50 1.90 ST-5 CLEAN-OUT 7.30 2.10 ST-6 CLEAN-OUT 7.10 3.10 ST-7 CLEAN-OUT 6.60 2.25 ST-8 2')(2' YARD INLET 6.50 2.35 ST-9 2')(2' YARD INLET 6.50 2.95 ST-10 CLEAN-OUT 7.00 3.20 ,//p .///////////P.//////////////////P' '////. ;1'/// ,////. ,//P if//.- - ~- - ZONE VE (B.F,E.= 13') ////////////////////////////////P y/p if/fi -- - - ~ <;//p ~ - -~ - -- LL o ;////- t///////////////////////////fi' ,/P'; '////- LL ~ =:) C) r//P 4//- ;//P v////////////////////////////////' ,y'//- -- - r//fi v/p v/// -~ ry///- t/////////////////fi -- - STORMWA TER COLLECTION SYSTEM SEWER LINE SCHEDULE SEWER LOWER UPPER LENGTH SIZE & SLOPE LINE END END (FT) MATERIAL (%) 1 ST-1 ST-2 35 15" RCP 0.57 2 ST-2 ST-3 29 12" PVC 1,03 3 ST-3 ST-4 60 12" PVC 1.00 4 ST-4 ST-5 20 12" PVC 1.00 5 ST-5 ST-6 97 12" PVC 1.03 6 ST-2 ST-7 120 12" PVC 1,04 7 ST-7 ST-8 7 12" PVC 1.43 8 ST-8 ST-9 60 12" PVC 1,00 9 ST-9 ST-10 24 12" PVC 1.04 ~ - -- - - - ~ - - -- ~- - - - - ZONE VE (BJ,E.= 13') / / / / / / / / / / COASTAL CONSTRUCTION CONTROL L1NEJ O,R, BOOK 11760, PGS 2687-2693 ALSO BULKHEAD BOOK 2, PGS. 79-114 / / / INSTALL BRICK PAVERS PER THE CITY OF CLEARWATER STANDARDS AND SPECIFICATIONS, INDEX 113, PAGE 1. L~66R~~~t~N~ x X ~~.> "':'" r,v" i:i;;~:~';il~;~\, ,,/ ~ ::/2 v . QJ , If) '<t , co r ~ / '<t 12"PVCSDR26~. / C> / @:!: 1,0%.. ~:/ Z ,.<::r ". / . .,;,." ...:'i;;. \ . ~;.... ..'. :". :,.,.', 6" PVC SDR 26 @ :I: 1,0% (TYP,) '" "t':. }( '~6{, ~:~<}STJr...;c Dc;C;<. x . '. ? .: S1111G1 /, '2'''6' u~1C\\ ~)l., ",} . "'L (\\~..~ ll~'" ",~t:.. () :'r._.~"~ ,,'U~n ....~_, ... .. ,n.'U"'.-- " '~1'.. (:.,;'.,;C; L [ru,[\ 1 '~ :~ 10" ,.n~"''''U'''''' ..,10 J -- - 6" PVC SDR 26 : @:!: 1,0% (TYP.)! ZONE AE ' ,..______u,u.__.~~;~'l~~f~..~~'L--L..--,..m'...m--'--'..\ u.......___u......._~.J..~. . u~_u~...u~- 10.... ..,.".. ..,,_.J <>.. .~), ':';,;' '.;.-.'/ x x ',;~;.',r 12" PVC SDR 26 @:l:1.0% -?:~,. , ,r.... "'_" ;;.1; ..;.. " r,,;-:-:'- 1 -:~: ; ...., ,. "../ 6" PVC SDR 26 @:I: 1.0% (TYP,) X INSTALL BRICK PAVERS PER THE CITY OF CLEARWATER STANDARDS AND SPECIFICATIONS, INDEX 113, PAGE 1. .... ,::,:]/. .J( ::< V, '" X x,:,; ,;;(-: X,5,:, )r '12" PVC SOR 26 '3";', ' @:!::t.g% .'\'~, SCREEN TO BE INSTALLED AT END OF PIPE TO PREVENT SEALIFE FROM ENTERING PIPE (M.HW. EL = 0,60' NAVD 1988) '{/o'. '.; x 1&7.., ):: .{,/r.... Giy\r '.:.,.,...... "x Uf'I "'~\..\.. R~1 ~;ll;llG .,....,~.'\ ,//P '//// ,/////////////////////////////////0 '///.-' '//// if/fi ////- .':;. ..:-' 6" PVC SDR 26 @:!: 1,0% (TYP,) ....,-_.. x ~ ...;;, _ - 4' - \ ':cr::-.., \ () x~:::/ () ~ :~~: \ X '{.~.. '..... \ ':,J \ "l ?~~ :"'; C'; i 0" \ x C) ~(t \ !"-) ~":~. (:;9" \ /" ;';:;:' \ ".j ;u r'~ :'. ~;y~ ...:.;' ;,';\\", \, ,~. \2 ':-.v N _ \\" ~~~ "v.s. 0 :.}~ \ -Z \ \ .<~~" ..:.".. ...../ :/.12" PVC SDR 26 @:!:1,O% -~ - ZONE AE (BJ,E.= 12') -- .,:."(... ,~ .'" ~ ~:;! .;..~.. '-'i; ".,............ ..... d...r"~ ...,.,..,' c.... .........,~... : ~:DDD [)C~CK \ 1(t t..J r....r~..... x ......r', \ .1"..' , "'.', \ -;;,\ \, \ ~~..1:~~ . \ \" \ ,,rl' ..' '~\,;\ \ r.:)~ . /f~ ............, '~.r.~... ....... ..~,.,~... .}. ;J.hi: .:~f u'r} L.}'r y ~.~[.: r..:...../ 1 cr-: c-::.:..",,;' '....;.,, : x .........,............__.m... ~' ~:.:;;; :~u;y.~:.:. \\\ / ?,\,\J F' \}" j\~ .~~ APPROXIMA TE ~ \ \\ .,.~ FLOOD ZONE LINE \" " \.,\ ';i' ',,'I Z." --~~\ '\. " '-}. (:%- '., '1'"-; '!./; ~~.. ....'f. f~'f 'r' X 11'; () ~.. "f"..., ,~ /~", ~".) ZONE AE (B.F.E.= 13') , .:.~f.; i,)'~ 'i'z' ~ .J .': 1~' '.';'~ '1 "x.,:. , ~~d c\ i i.tt- '.,:. ':< tkf 1".<':) ". ....".. ":;/ x ':.;;, 'i 2" : : ",5". './ ~- - - \ \~ COASTAL CONSTRutJlON \ CONTROL LINE '0 C:'\ j;~t' " ('1[.:LD ~-- -- - .~? .....~~....... ~ .~ \ ~ q /".~1 1 q\ \ .-!:.....,....,~.\ \ ~ .......r..r~~ IMPORTANT NOTE TO CONTRACTOR ,.,.."...' .............,~'~..~ r::EL.D CONTRACTOR TO DESIGN MANAGEMENT OF TRAFFIC (M,O.T,) TO BE UTILIZED WHILE WORKING WITHIN MANDALAY POINT ROAD RIGHT-OF-WAY PER STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION DESIGN STANDARDS FOR DESIGN, CONSTRUCTION, MAINTENANCE AND UTILITY OPERATIONS ON THE STATE HIGHWAY SYSTEM INDEX 603- TWO WAY TWO LANE, WORK WITHIN THE TRAVEL WAY AND INDEX 660 - PEDESTRIAN CONTROL FOR CLOSURE OF SIDEWALKS, (LANE CLOSURES SHALL NOT OCCUR DURING THE PEAK HOUR PERIODS OF 7 TO 9 AM AND 4 TO 6 PM.) :;:. 'r~ ': '~:, :\i \ \ ~ :;' '.-~ i i \'~<~W;.;:, 12'~~ 0::: o m 0::: <C I 0::: W f- <C > 0::: <C W ~ U N w E s GRAPHIC SCALE 1"=20' I~ 40 20 10 0 20 LEADERSHIP IN ENERGY AND ENVIRONMENTAL DESIGN (LEED) NOTES 1. TO MINIMIZE CARBON FOOTPRINT, THE OWNER AND CONTRACTOR SHALL SELECT LOCAL MATERIALS FROM SUPPLIERS AND MANUFACTURES WITHIN 500 MILES OF THE PROJECT SITE. 2, TO REDUCE ENVIRONMENTAL IMPACT, THE OWNER AND CONTRACTOR SHALL USE SUSTAINABLE OR RECYCLED MATERIALS SUCH AS CRUSHED CONCRETE, RECYCLED AGGREGATE, RECLAIMED WOOD, ETC, 3. TO MITIGATE ENVIRONMENTAL IMPACT, THE OWNER AND CONTRACTOR SHALL SEND ANY CONSTRUCTION DEBRIS PRODUCED DURING DEMOLITION ACTIVITIES TO RECYCLING FACILITIES RATHER THAN LANDFILLS, 4, TO MINIMIZE POTABLE WATER USAGE AND CONSERVE GROUNDWATER, THE OWNER AND CONTRACTOR SHOULD INSTALL WHEN POSSIBLE, UNDERGROUND CISTERNS TO HARVEST RAINWATER TO BE USED AS SUPPLEMENTAL WATER FOR NEEDS OTHER THAN HUMAN CONSUMPTION. 5, TO REDUCE POLLUTED STORMWATER LEAVING THE SITE AND TO MAXIMIZE ON-SITE STORMWATER RETENTION, THE OWNER AND CONTRACTOR SHOULD USE WHEN POSSIBLE, PERMEABLE OR PERVIOUS PAVEMENT DESIGNED USING THE MIX-PROCESS METHOD DEVELOPED IN FLORIDA. LEGEND - - -- PROPOSED PROPERTY LINE ".f;t) EXISTING ELEVATION X 5,65 x PROPOSED ELEVATION ~ FLOW DIRECTION PROPOSED DRIVEWAY CENTER-LINE R.L. PROPOSED RIDGE-LINE ST PROPOSED STORM SEWER LINE PROPOSED EROSION CONTROL EXISTING ASPHAL TIC PAVEMENT ''V''n'Br/.'<{~-.g ~ ."". , , " ' . ../')'-7),," ',' F. . . [")0"(/.;'7)' 7),'/' t.<,~.. /.' . <->3"";"'(-<"<' /.;'f,-}{,;L ,- ~::rf.;'y)'.a.a:.B '. P ht2'.Y) ".7),-a.' t!'2::<>. " :.~,;::f:.' /:7.2; .... .~ "L.i:J:Z2 " NEW PAVERS ALL EXISTING AND PROPOSED ELEVATIONS ARE REFERENCED FROM NORTH AMERICAN VERTICAL DATUM (N.A.V.D.) 1988 ,. '" ... .-~'" " "'l 3 _11,09 ~ ~~::.:::.:.-.:.- -:. z o i= C- o:: u en w o CI) z o CI) :> w we::: ~ o >- co -l C3 , LO o o , <Xl o o Z I- U W ...., o a:: a... z <( .....J 0- W (9 <( Z - ~ o cd (9 Z - o <( 0:: (9 ... (9 Z - ~~ !zO- O u t9 Z 0:: W W Z t9 Z w - ~ z: ... o Q.. = ~ ... = SHEET: m o co ...... M o C9 CD ;>-: CD Cl W Z C9 en w Cl ~- - Li.j I- <( Cl W :::> U) ~ w () Z W o - en w ~ en .....J .....J ~- ~(!) a:: a... C-4 C9 CD C9 CD C9 CD ;>-: CD Cl W > o a:: a... a.. <( ;>-: CD Z ~ Cl ;>-: CD Cl w ::.:::: u w :I: U o <( o 0=: 1-1"'- zc.o I"'- OC"') a..C"') >-<( <(0 ...JO=: <(0 O...J Zu.. ~ 0=:- W 01- c.o<( ;::$ ~o=: ~<( LOW ~...J ~() ...... 0 C!) ~~ Z Mr-- ~ ~ 0::: N N UJ r-- r-- UJ r::- r::- z NN r-- r-- - -- C!) "'ffi~z I- u. UJ ...J <( () Z I () UJ I- o UJ C!) C!) Z 0::: UJ UJ Z C!) Z UJ ...J > () c.o ~C!) +-' ~ Z Q) co Z Q)-o c7>'~ Z :; u: :5 l:: ..: 0.. 1i)2 Q) co 0 c3~z om<( ~ U ...J GENERAL CONSTRUCTION NOTES GENERAL CONSTRUCTION NOTES 1, WHEN NECESSARY, THE CONTRACTOR SHALL COORDINATE AND SCHEDULE CONSTRUCTION ACTIVITIES WITH OTHER CONTRACTORS AND UTILITY COMPANIES (E,G., POWER, TELEPHONE, CABLE, GAS, ETC.), IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN THE REQUIRED PERMITS TO PERFORM WORK WITHIN PUBLIC EASEMENTS AND RIGHT-OF-WAY AND ENSURE THAT ALL PERMITS ARE APPROVED PRIOR TO CONSTRUCTION, 7, GEOTECHNICAL INVESTIGATION AND RECOMMENDATIONS WERE PREPARED BY OTHERS AND ARE USED SOLELY TO ASSIST CONTRACTORS IN ASSESSING THE NATURE AND EXTENT OF TESTING AND STUDIES REQUIRED TO MAKE THEIR OWN DETERMINATION AS TO THE ACTUAL SURFACE AND SUBSURFACE CONDITIONS EXISTING AT THE SITE. NO REPRESENTATION IS MADE OR GIVEN CONCERNING THE ACTUAL SURFACE AND SUBSURFACE CONDITIONS WHICH MAY BE ENCOUNTERED DURING THE COURSE OF WORK AND CONTRACTORS ARE FULLY RESPONSIBLE WHEN USING SAID INFORMATION, ALL CONTRACTORS ARE DIRECTED, PRIOR TO BIDDING, TO CONDUCT ANY OR ALL INVESTIGATIONS THEY MAY DEEM NECESSARY TO ARRIVE AT THEIR OWN CONCLUSIONS REGARDING THE ACTUAL CONDITIONS THAT MAY BE ENCOUNTERED, AND UPON WHICH THEIR BIDS WILL BE BASED, 2. THE CONTRACTOR SHALL USE THE BENCHMARK ELEVATION NOTED IN THE BOUNDARY AND TOPOGRAPHIC SURVEY TO REFERENCE ALL TEMPORARY BENCHMARKS, BASE LINES, GRADE POINTS AND PROPERTY MONUMENTS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REESTABLISH, IN THEIR ORIGINAL STATE, THE PROPERTY MONUMENTS DISTURBED OR DAMAGED DURING CONSTRUCTION. THE CONTRACTOR IS FULLY RESPONSIBLE TO VERIFY AND CORRELATE IN THE FIELD ALL BASE LINES, ELEVATIONS, AND DIMENSIONS SHOWN IN THESE PLANS, AND REPORT TO THE ENGINEER IN WRITING ANY ERROR, OMISSION, OR DISCREPANCY BEFORE PERFORMING ANY WORK, 3. THE CONTRACTOR SHALL BE RESPONSIBLE TO LOCATE AND MAKE ADJUSTMENTS OF ANY CONFLICT SHOWN OR NOT SHOWN IN THESE PLANS WITH OTHER EXISTING SITE IMPROVEMENTS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IN WRITING OF ANY CONFLICTS OR DISCREPANCIES BEFORE PERFORMING ANY WORK IN THE CONFLICTING AREA. 8. THE EXISTING UNDERGROUND UTILITY LINES SHOWN HEREON WERE TAKEN FROM DOCUMENTS FURNISHED BY OTHERS AND NOT FIELD VERIFIED. THE CONTRACTOR MUST USE SAID INFORMATION ONLY AS A GUIDE TO THE SUGGESTED LOCATION OF UNDERGROUND UTILITY SERVICES, INCLUDING BUT NOT LIMITED TO: POTABLE WATER LINES, SANITARY SEWER, STORM SEWER, GAS LINES, ELECTRICAL POWER, RECLAIMED WATER LINES, IRRIGATION LINES, TELEVISION CABLES, FIBER OPTIC CABLES, TELEPHONE CABLES, ALARM SYSTEM CABLES, SECURITY WIRING, SITE UNDERGROUND MECHANICAL, CONTROL SYSTEMS WIRING, SYSTEMS INCLUDING INSULATION, ETC. THE ENGINEER CANNOT GUARANTEE THE ACCURACY OF THE EXISTING UNDERGROUND UTILITY LINES NOR THAT ALL ARE SHOWN HEREON, THE CONTRACTOR SHALL DETERMINE THE SPECIFIC LOCATION AND CAREFULLY EXPOSE ALL UNDERGROUND UTILITY LINES IN COORDINATION WITH OWNER(S} TO THEIR SATISFACTION AND MAKE ADJUSTMENTS TO SAME IN THE EVENT THERE ARE CONFLICTS WITH NEW CONSTRUCTION, THE CONTRACTOR SHALL REPLACE OR REPAIR, PER SPECIFICATIONS, ANY AND ALL DAMAGED UNDERGROUND UTILITY SERVICES AS LISTED ABOVE AT NO ADDITIONAL COST. 4, THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE STAKE-OUT OF THE PROJECT SUCH AS BASE LINES, GRADES, SLOPES, UTILITY RELOCATIONS, OR ANY OTHER STAKE-OUT THAT MAY BE REQUIRED TO COMPLETE THE PROJECT IN ACCORDANCE WITH THE CONSTRUCTION DOCUMENTS AND SPECIFICATIONS, ANY AND ALL EXPENSES INCURRED FOR THIS WORK SHALL BE INCLUDED IN THE CONTRACT PRICE. ACTUAL CONDITIONS THAT DIFFER FROM THOSE SHOWN IN THESE PLANS SHALL NOT CONSTITUTE GROUNDS FOR AMENDMENTS TO THE CONTACT PRICE. 9. THE CONTRACTOR SHALL NOTIFY THE UTILITY INSPECTORS 5 DAYS BEFORE CONNECTING TO ANY UTILITY LINE. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO SUBMIT TO THE APPROPRIATE AGENCIES AT LEAST THREE (3) WEEKS PRIOR TO START OF CONSTRUCTION ALL REQUIRED SHOP DRAWINGS, CONTRACTOR'S LEGAL INFORMATION, STARTING DATE, SCHEDULE, MANAGEMENT OF TRAFFIC PLAN AND OTHER PERTINENT INFORMATION REQUIRED. ANY WORK PERFORMED WITHOUT PRESENCE OF THE AGENCY INSPECTOR, MAY BE SUBJECT TO REMOVAL AND REPLACEMENT AT THE CONTRACTOR'S EXPENSE. 5. THE CONTRACTOR SHALL COORDINATE THE POINTS OF CONNECTIONS OF UTILITIES WITH DIFFERENT SUBCONTRACTORS. THE SITE CONTRACTOR SHALL BRING THE UNDERGROUND INFRASTRUCTURES (I.E. SANITARY SEWER, STORM SEWER, WATER LINES, FIRE LINES, ETC,) TO 5 FEET OUTSIDE THE BUILDING(S}, THE PLUMBING CONTRACTOR SHALL CONNECT AND MEET THE INVERT ELEVATIONS OF SAID UTILITIES, ANY UTILITY WORK PERFORMED WITHIN 5' OF THE BUILDING SHALL BE THE RESPONSIBILITY OF THE PLUMBING CONTRACTOR. ALL WORK SHALL COMPLY WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL CODE OF ORDINANCE REQUIREMENTS. 6. TOPOGRAPHIC SURVEY AND LEGAL DESCRIPTIONS WERE PREPARED BY OTHERS AND ARE SHOWN HEREIN ARE FOR INFORMATION PURPOSES ONLY. THE ENGINEER ASSUME NO RESPONSIBILITY FOR THEIR PREPARATION, COMPLETENESS NOR ACCURACY AND THE CONTRACTOR IS FULLY RESPONSIBLE WHEN USING SAID INFORMATION, PROPOSED LOCATIONS, ELEVATIONS, AND DIMENSIONS OF STRUCTURES AND OTHER SITE FEATURES ARE SHOWN IN ACCORDANCE TO THE SURVEY INFORMATION PROVIDED TO THE ENGINEER AT THE TIME OF THE PREPARATION OF THESE PLANS. THE CONTRACTOR SHALL VERIFY THE LOCATIONS, ELEVATIONS AND DIMENSIONS OF ALL EXISTING UTILITIES, STRUCTURES AND OTHER FEATURES AFFECTING THIS WORK PRIOR TO CONSTRUCTION. 10. DEVIATIONS TO THESE PLANS AND SPECIFICATIONS WITHOUT CONSENT OF THE ENGINEER OR THE OWNER MAY BE A CAUSE FOR THE WORK TO BE UNACCEPTABLE, VALUE ENGINEERING SHALL RECEIVE WRITTEN APPROVAL FROM THE ENGINEER AND THE OWNER. 11, WHEN NECESSARY, CONTRACTOR SHALL BE RESPONSIBLE FOR AN EASEMENT INSPECTION BY CITY/COUNTY ENGINEERING DEPARTMENT PRIOR TO CONCRETE POUR OF FOOTER/SLAB, CONTRACTOR SHALL STAKE ALL PROPERTY CORNERS AND EASEMENT LINES PRIOR TO EASEMENT INSPECTION. - - -~ - -- -- ~ -- -- ~ -- - ~- - -- ZONE VE (B.F,E.= 13') v/// if/7- 4/;" v/p o u X w :2 #/////////P~p ,/// if/fi ,//////////////////0 ~ _ _ ,//fi ~ -- LL o LL -1 :=J () <;.Q'/////////- __/////////////////fi F/ftp r//fi ////. #//////////////,//////////fi if/fi if//' #///0 ~ _ - d// ~ - - ,//p -~ - - ,///9 ,y"/.A F//.A if///////////////////////////////fi -- qP:' - -~ v/p v//; q/fi V/////////////////////- -- - ZONE VE (B.F.E.= 13') -- ~- - -- ~ - - -- - - ~- - -~ - - -- / / / / / / / / / / COASTAL CONSTRUCTION CONTROL LINE I O.R. BOOK 11760, PGS 2687-2693 ---J ALSO BULKHEAD BOOK 2, PGS, 79-114 / / :~::~P:::-O>. ~~'::f.':r ~;' :. OGA nDN 0:= ::X:S 'n:'.~(~ ~;., ::'\1'~~ "<({p" n:~~ ~'!:(.'.::'.; ~X:~.{r J:~/'.C: : O:{ -r (: \I:: ~;1.W,{ ~:'.':'n-: c: n" OJ: CU:u.:::V1/.. H::;: :: 0;::- f;j'.l',.cr :;:2:; :~}..;:) LC'CJ\: :o~.; ~'::;:;:G::~ TG ;;:Tf\::;:;"f ~):: CO:-.;~; r;~ uc'r:~):',; / ,~}:, x x "" (,.:,/. ...;~::' X":~\J\ FL~6~R~~~t~N~ '/1; 1.1/2" DOMESTIC WATER METER AND BACK FLOW PREVENTOR GAS CONNECTION TO BE CONSTRUCTED BY CLEARWATER GAS SYSTEM 35 LF:I: 1-1/2" PVC SCH 40 36" MIN, COVER ____.~~. ..___n,'H ." ..u_~~ / / ~~f'~ \ '. '~ '.,,'i" x: . ^I ~ '-' ~/~ C\J ' If) ~ , CO If} , If} 0 . (Y) ~ 01 :z 1 / ,~,~ 1Ct () cr:';ATE iNLET x r ()P f;.LE....! .~::: f~~ ,.34 {--\ t;.~ "'': ..../ ','" 1 'P' ~ji~V;"':, 2"' (.:'} / ~;Y / ?::~;, 1,1/2" TAP AND VALVE TO BE CONSTRUCTED BY CI1Y OF CLEARWATER (CHLORINE INJECTION POINT) , , .-,__~.n: ...~~.~.._.. .-,n_."~"- --..--~'. ,,}: ../1 ~, A;~" . ' 7" "'$1\I'IG) ..,~ "', /. ,/,,/ ~1C\\ E~' . / ,,/..., !./ ''f'(..(\\'*' .'A ~t" "'E-..J-..J~ . . ,'--,..,~ ~. (; ~, .C:'#',~ .if-P '7 ~ ~ \ /.' .~, ;;r}xi.:,.li;}:~;:;7;;j~.j7~:.:'~"""\-,-,-"""""..,."..,. '~(1'.. X 1 .~ .~ . "i ~v' .... ~ ,;,/,..........." "m.... .{~, \ s.:::)~;;;., ,.,"')" ',," ,....,X ~~ ',,,) "~\.J .... ";~~;\J\i' ',.:) __ \.', '~.I f)u~1'6.'.6".6.> ;\~, k::'~:~i;;~;:,>\, ',;". ',,~;:' ;/j) \:\\ X ~~' \\\ <t.. \ \ ',-. \\\\. .;;, "Y' ,y "'V ~;" X, '. ,,~A,:Y;'~' ?1 ~7;( '.{(~. X ;~~~~ \"'" 'I ~ ~ /.... ( ...:, ;.~, \. \........~...:, ~ \ . ~ :;.t: ..;.. '/' , :aa ',.-' 'r._ () .. r6;,.:fi~f~~~ ~ \ ,,:::;. v(.. ~ ,:;:, \ ' . ~ .... 6" \ {20 ~ ',' "?(../;""'" .... . ~ \ ~;\,.\" \. ~ ..'II X<.h;".,.;,:. . "'. ... f . '-.v.-\ \, .... ~//';pf(', ,', ~r~'''' 'i\ \ . .//-/~ v///fi ..~........ .' \ ~,', ,ty , 7,00 .." '.,;.,___;.',::;\.'.\,,/ ..' ,////////.//////J -;.. ';-.~~~)( r '.' \\'" \\'. x. ~::<}~~ 1'1:',.:G DC1Ck. !~,i",; P L [f -i \ ~ ...-_n"U ._..~~.u...,_,....u.__....n.'-' ..~ , \--........'.'--".."'---r'....'..--..'....-----.......-.." ! ZONE AE (B.F.E.= 12') ,u__..... .._-,..on.. ;__~..n...n_.. ,'?-;. >;;.... PROPOSED POTABLE WATER MAIN CONNECTION TO BUILDING. INSTALL TEMPORARY BLOW-OFF ASSEMBLY. SAMPLING POINT AT TEMPORARY BLOW-OFF (TYP.) (REFER TO ARCHITECTURAL AND PLUMBING PLANS FOR EXACT CONNECTION LOCATION), x /r..;';;~-.~.~---_.--;;!::~~~~~:~;;;~ ~'~;~:~i; r;~~~~t..~.;~;:~~~,.~~~~;~;: :;:~; ~~~~;~'l:~~"~~;'~;:~ :_. '.~:..:;.':~.f<'(v;~.-n~r=: GP.:3 :;:'(ST:;~,f: FOR E}.;...CT :~:;:E J',.~'~[; LCX:P:~:(i~'.; F'::;::C;;~ 1'0 ~~;rp.J~T G~ CC;~',J:;T:zU~:;n(;~.: ..,,;,?" /, ~ i: ,.... ,. '..../ ~""..~"..... I?ROPOSED SANITARY SEWER CLEAN OUT. AVERAGE WASTEWATER FLOW = 1,725 GPD, (REFER TO ARCHITECTURAL AND PLUMBING PLANS FOR EXACT CONNECTION LOCATION) 1" RECLAIMED WATER METER PROPOSED LIFT STATION ;.," / . '0}. ;-: j;'. .,( '-j. EI'I1\1.'( CO\l~~~~,,~:'2') (E\..'= \b X" x .".y" />.Rt:/>.S ~\llLl1I.NG Il Sf Ot>OSt:il LOOR"e ,47'5 Sf RO\lNil :LOOR",&,lli4'5 Sf nRC~~il fLOO~;~'Sf $(: />.i"\'lC"'\' .;.?-: x ,r,. 1\ ....r" r.....-~ ~_. ';-~~'i;':~ ';~:;:~~~:~':;~~~;~~;~~L:: ~j(:). v. . --.:.~ X X pOO\.. ~'ilO\lE .-:,~. .; :}';, -'(- "\..p.f'I'OO\.. 1 0 LF:I: 2" PVC SCH 80, 36' MIN. COVER .~(?- "" I 'KJ~ \,1.00 '/1:'" [' ,.,,'.., ,; l>< ~:;~;'\'~"""~SS;'\ :~\\ ~Jt~ \ '1- 40" ,I. ,-"..' ";,". /-> . \ /f ,:,'fi,f:\ ';~. y.\ I' '.~ ~, \"."% '..,'\', ~'tr ~~~\ \. , '~\rO "~'~ ': ...:: " .~::.. '..;',0..... ,;'; ~,..:.. \" ;f~:~,\s:////o ... ",X ; : . '-';"q/Y.//f. ''f v/p d//- v/////~7.!. if:,::fi';;"\ :~5,\.50 ~ ~ 12~~ "dODD I:n[~.. '{A'. X 'f'.. X ..::;. . , 965 LF:l:2' HDPE DR 11 (HEAVY DU1Y) , 36" MIN, COVER ....}=- fLOOR St:CONil, &' -e') (t:L.'" . X ...y,";;:' X ...~.,; ,~.P~:':':~Di(!"'-!J~.n: U'::Cr--,'f :~):": ~)~. ~:;.;::;'r :f'~G :;r, :"VC: q::C~Alt~-::::[: ~N'~.':-:= :::. ~~I.:'..:~',;, G(~~,.{f F:AG'1 (;:~ .~ (: ~/:; ::~:~ .{ ":~'IrH C: :"( 0:: GU;j\H~'!,.;f.~'r t~}< F~):::< :;XJ\G~r :3:21;. ;~.:..;:) t (,'G!\'r :(;~.; ::'::~;G:::. :'() g;-b.:;;'; OF (;C:r.;:;:r::<:..:C.::D~'.L ::< '{hr. X ,,~..~:. .,./p f//fi I..: ,/./p -///,;. ..~~ ,,//<'////o~ ~~". ,~~fi'ffi ~~::'<" ~50 ','. -..J"\..\.. ..,. \1.E1 ~\I'I\",G _..-~.....~. "y. ,,;"''': ;:-;: [;01--..1' ::} : ...~~. .-..,..~~~~ ........-. -~~ -~~.... ,////////////////////////////////fi .....x ~ ',', ~ .... -:r... ", - ~", - \ G "~~:> \ 12" () \ \ ',if. X A:",""\" '{f(.. .,./ \\ /';', \ ...----' ~{y,:\ l3~< COW' \ (../> p..\"tr.r': \ .".},:- X ',;, \r,',.;~;\,."\,,. \ CONTRACTOR TO USE DIRECTIONAL DRILLING TO INSTALL 965 LF - 2' HDPE DR 11 (HEAVY DU1Y) SANITARY FORCE U 1 (t MAIN TO EXISTING SANITARY SEWER MANHOLE LOCATED C~;9~ ''\'''\ ,. \ X.'" 'X" ^' M.' ~~':'~~:i"'':;;~~''i'~"'',i "'''""''; () 11 12' "1 , f~:' \ \ ?;~\t\ D 9' (,'~~~ ~S) ;. ,""J 0, . APPOO~:Arr \ \ . 11 ~~ .. g,:~,~;:~,#i~fY~' ," FLOOD ZONE LINE /\ fe, \\ x '~:" ,', 9' ~"'~;~,.. . ~ ,,::;' '{ \\ ,.;!:~::.tiIJ' I.!:S> ,.~~, ::2' - - - \ \~c~:STAL CONSTRUb~ON "\' CONTROL LINE '0' " \\ '\ \ n\ ',~~" ~ \ \ r"l 1q;;\ "":r--"" \. . r;:~ \ " 'n \( ...,~..,~;-',..~.;\ LIFT STATION CONTROL PANEL TO BE MOUNTED ON WALL. CONTROL PANEL SHALL INCLUDE A BATTERY BACK UP ALARM SYSTEM .....-.~ .\ \;-:\V" ~\ ~ \\ ~~; y,: 0 :::~, \ Z '''<\\ .'. ",;-' .~,..'" \ ........ "':,.:r x -- ~ ZONE AE (BJ.E.= 12') TWO (2) MYERS SUBMERSIBLE SOLID HANDLING PUMPS MODEL WHR7,21, 3/4 HP, 230 VOLT, 1,PHASE,1,750 RPM, (DESIGN FLOW = 25 GPM AT 25 FT TDH), IT IS THE RESPONSIBILl1Y OF THE SITElUTILl1Y CONTRACTOR TO VERIFY WITH THE GENERAL CONTRACTOR WHAT VOL TAGE AND PHASE POWER WILL BE SUPPLIED TO THE LIFT STATION, , ::: .:.~.. 'r."" EXISTING FIRE\HYDRANT, \ RESULTS OF FIRE rlYDRANT TEh PERFORMED ON\3.5-{)9 ARE: i, STATIC PRESSURE = 65 PSI, \ RESIDUAL PRESSl'IRE = 15 PSli, AT FLOW RATf.,1580 GPM \ ~1:;:'::! 0 Dm::< \ \,..", '. _ _ __.....~r~r...'. ".... , ....,:-:..1 ~-:. '/,; ...~...,,,.... .,r'" 1._) ~(t \ \ ....~..~ .~...,....... ..-_~r'- X r,r'......- ,;<.;, 'r'." .~..-..,~ -'f- S.i:8 ::)' U~: j L}'r y ..-..... ~'~E :.~:\! ] [:E E :.~:',~' j- "'" X. '. NEW TRANSFORMER ....., .y POWER CONNECTION TO BE CONSTRUCTED BY PROGRESS ENERGY ,/d (..\ 1'i~f '..., : ~ "', ~!' -.,,' -- ~- - f':~.: L;; .,.-.....~..~- \\ .~...~~.r,.. .....~,~.. ,~.....~ F:EL.D \\ . , \ ~: \ 'd~ \\\ ; cr: o m cr: <( I cr: W t- <( 5 cr: <( W -1 U N w E s GRAPHIC SCALE 1"=20' I 40 ~~ o 20 20 10 IMPORTANT UTILITY NOTES 1. ALL UTILITIES, INCLUDING INDIVIDUAL DISTRIBUTION LINES, SHALL BE INSTALLED UNDERGROUND PER SECTION 3-911 OF THE CITY OF CLEARWATER CODE. 2, PROPOSED WATER MAIN TO BE DEFLECTED OVER OR UNDER STORM AND SANITARY PIPE. WHEN WATER MAIN IS ABOVE SANITARY SEWER A 6" MINIMUM VERTICAL CLEARANCE (12" PREFERRED) IS REQUIRED, WHEN WATER MAIN IS BELOW SANITARY SEWER AND LESS THAN 12" CLEARANCE, BOTH THE SEWER AND THE WATER MAIN SHALL BE CONSTRUCTED OF DUCTILE IRON PIPE (D.I.P,) 10' FROM EACH SIDE OF CROSSING. (D,I.P, IS NOT REQUIRED FOR STORM SEWERS IF IT IS NOT AVAILABLE IN THE SIZE PROPOSED), 3. WATER AND SEWER LATERALS ARE TO BE ADJUSTED TO MAINTAIN 6" MINIMUM VERTICAL CLEARANCE (12" PREFERRED) WITH ALL OTHER UTILITIES. 4. SOD ALL AREAS IN EXISTING RIGHTS-OF-WAY DISTURBED BY CONSTRUCTION, 5. THE CONTRACTOR IS TO COORDINATE ALL WORK WITHIN, BUT NOT LIMITED TO, CITY OF CLEARWATER RIGHTS-OF-WAY WITH UTILITY COMPANIES IN ORDER TO PREVE~ DAMAGE TO UTILITY LINES AND THE MAKING OF ADJUSTMENTS TO SAME, IF REQUIRED, 6. THE CONTRACTOR SHALL VERIFY LOCATIONS AND DEPTHS OF EXISTING WATER AND SEWER LINES PRIOR TO BEGINNING CONSTRUCTION, 7, THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL ROAD CROSSING AND/OR UTILITY PERMITS. 8. ADJUSTING MANHOLE TOPS TO MATCH GRADE AND SLOPE OF THE FINISH PAVING SHALL BE INCLUDED IN THE RESPECTIVE CONTRACT UNIT PRICE FOR MANHOLES, PAYMENT OF WHICH WILL CONSTITUTE FULL COMPENSATION FOR THE CONSTRUCTION AND COMPLETION OF THE MANHOLE, AND NO ADDITIONAL PAYMENT WILL BE ALLOWED OR MADE FOR ADJUSTING MANHOLE TOPS, 9. BENDS SHALL BE INSTALLED IN FORCE MAIN AND/OR WATER MAIN TO AVOID UNFORESEEN CONFLICTS WITH EXISTING OR PROPOSED STRUCTURES. 10. THE JOINT DEFLECTION METHOD SHALL BE USED WHERE PRACTICAL IN LIEU OF INSTALLING BENDS, 11. UNDERGROUND WATERMAINS AND HYDRANTS MUST BE COMPLETED AND IN-SERVICE PRIOR TO BUILDING CONSTRUCTION. 12, THE LOCATION OF ALL TEMPORARY BLOWOFF'S AND SAMPLE POINTS MUST MEET PINELLAS COUNTY'S HEALTH DEPARTMENT REQUIREMENTS, 13, THE CITY OF CLEARWATER, AT THE APPLICANT'S EXPENSE, WILL REMOVE/RELOCATE ANY/ALL WATER METERS THAT HAVE TO BE RELOCATED AS PART OF THIS DEVELOPMENT INCLUDING RECLAIMED WATER METERS, (NO METERS SHALL BE LOCATED WITHIN ANY , IMPERVIOUS AREAS.) 14, THE CITY OF CLEARWATER WILL PROVIDE WATER MAIN TAP, SET THE WATER METER AND A B.F.P.D. (BACK FLOW PREVENTOR DEVICE), APPLICANT IS RESPONSIBLE FOR ALL ASSOCIATED FEES AND ALL OTHER INSTALLATION FEES. 15, ALL SANITARY SEWER LINE EXTENSIONS TO CONFORM TO CITY OF CLEARWATER STANDARDS. LEGEND - - -- PROPOSED PROPERTY LINE ~EX.\Nt-.A~ EXISTING WATER MAIN WM PROPOSED WATER MAIN ~EX,FJ:.;r-,.~= EXISTING SANITARY SEWER LINE SAN PROPOSED SANITARY SEWER LINE PROPOSED STORM SEWER LINE ~ST~ ALL EXISTING AND PROPOSED ELEVATIONS ARE REFERENCED FROM NORTH AMERICAN VERTICAL DATUM (N.A.V,D,) 1988 @COPYRIGHT2009 ..~. \ \ \y ~~{;'- () ., 48 HOURS BEFORE YOU DIG "CALL SUNSHINE" 1-800-432-4770 58626 3-ll-0Cf ~.,;;- z o i= c.. iY () en UJ o C/) Z o C/) :> w UJ~ I- <l: o >- CD -l a I Ll) o o rb o en o 00 ..- c;, o (!) l:C :>-: l:C Cl W Z (!) en w Cl ~- - o Z l- t.) W ., o 0:: c... Iii I- <( Cl W ::::> U) ~ z <( .....I a.. C/) w - ..... - .....I - g..... !z::> o t.) w () Z W o - en w ~ en ...J ...J .:-:- ~(9 0:: c... (9 z a: w w z (9 z w - p. Z .... o Q.. = ~ .... = SHEET: C-5A (!) l:C (!) l:C :>-: l:C Cl w e5 0:: c... c... <( (!) l:C :>-: l:C Z ~ Cl :>-: l:C Cl W ~ t.) W I t.) o <C o c:: 1-1'- ztO I'- oC") a..C") >-<( <(0 ...JC:: <Co O...J ZLL ~~ oW tO~ ~~ o(jC:: .q<( LOW ~...J ~() ..- 0 (!) :::::~ z ('t) I'- ~~ 0:: C\I C\I W I'- I'- W r:- r:- z C\IC\1 I'- I'- - -- (!) ~~z I- LL W ....J <( () Z I () W ~ o W (!) I (!) Z 0:: W W Z (!) Z W ....J > () (0 ~(!) .. ~ z Q) CI:l Z Q)1:l V)'g Z S u: ::s Ea5'Q. c/).. Q) CI:l 0 t5~z 018<( ~ u ....J - - -- ~RECTIONAl DRilLING CONSTRUCTION NOTES - - 1. CONTRACTOR TO CONTACT CITY OF CLEARWATER UTILITIES AT LEAST FORTY-EIGHT (48) HOURS BEFORE EACH OF THE FOLLOWING ACTIVITIES: A) THE SET UP OF A DRILLING PIT, B) THE START OF DRILLING OPERATION, C) THE INSTALLATION OF SERVICE PIPE. UPON COMPLETION OF THE PILOT HOLE PHASE OF THE OPERATION, A COMPLETE SET OF AS-BUILT RECORDS SHALL BE SUBMITTED IN DUPLICATE TO THE ENGINEER. THESE RECORDS SHALL INCLUDE COPIES OF THE PLAN AND PROFILE DRAWING, AS WELL AS DIRECTIONAL READINGS RECORDED DURING THE DRILLING OPERATION. "". "",..... ....,...,........ ...,............, 2. THE DRAWINGS SHOW EXISTING UTILITIES THAT ARE BELIEVED TO BE NEAR THE DIRECTIONAL DRILL ALIGNMENT. THERE IS NO GUARANTEE THAT THESE UTILITIES ARE LOCATED AS SHOWN OR THAT OTHER UTILITIES MAY NOT BE PRESENT, THE CONTRACTOR IS TO FIELD LOCATE EXISTING UTILITIES IN ADVANCE OF THE WORK SO AS NOT TO DELAY WORK AND AVOID CONFLICT OR DISRUPTION OF UTILITY SERVICES. 3, THE CONTRACTOR SHALL PROVIDE MAINTENANCE OF TRAFFIC PLANS, IN ACCORDANCE WITH APPROVED TRAFFIC AND SAFETY REQUIREMENTS, ERECT APPROPRIATE BARRIERS, WARNING LIGHTS, AND SIGNS, PAINTED WITH APPROVED COLORS, WARNINGS, AND GRAPHICS TO ENSURE ADEQUATE WARNING TO MOTORIST AND THE PUBLIC. 4, ALL HDPE AND PVC PIPE INSTALLED SHALL BE LAID WITH TWO INSULATED 10 GAUGE SOLID STRAND COPPER WIRE FOR LOCATION PURPOSES. 5, ALL PERSONNEL SHALL BE FULLY TRAINED IN THEIR RESPECTIVE DUTIES AS PART OF THE DIRECTIONAL DRILLING CREW AND IN SAFETY, EACH PERSON MUST HAVE AT LEAST TWO YEARS DIRECTIONAL DRILLING EXPERIENCE. A COMPETENT AND EXPERIENCED SUPERVISOR REPRESENTING THE CONTRACTOR AND DRILLING SUBCONTRACTOR SHALL BE PRESENT AT ALL TIMES DURING THE ACTUAL DRILLING OPERATIONS, A RESPONSIBLE REPRESENTATIVE WHO IS THOROUGHLY FAMILIAR WITH THE EQUIPMENT AND TYPE WORK TO BE PERFORMED, MUST BE IN DIRECT CHARGE AND CONTROL OF THE OPERATION AT ALL TIMES, IN ALL CASES THE SUPERVISOR MUST BE CONTINUALLY PRESENT AT THE JOB SITE DURING THE ACTUAL DIRECTIONAL BORE OPERATION. THE CONTRACTOR AND SUBCONTRACTOR SHALL HAVE A SUFFICIENT NUMBER OF COMPETENT WORKERS ON THE JOB AT ALL TIMES TO INSURE THE DIRECTIONAL BORE IS MADE IN A TIMELY AND SATISFACTORY MANNER, PERSONNEL WHO ARE UNQUALIFIED, INCOMPETENT OR OTHERWISE NOT SUITABLE FOR THE PERFORMANCE OF THIS PROJECT SHALL BE REMOVED FROM THE JOBSITE AND REPLACED WITH A SUITABLE PERSON, ...,.......,......,....... 6. WORK SITE AS INDICATED ON DRAWINGS, WITHIN RIGHT-OF-WAY, SHALL BE GRADED OR FILLED TO PROVIDE A LEVEL WORKING AREA. NO ALTERATIONS BEYOND WHAT IS REQUIRED FOR OPERATIONS ARE TO BE MADE. CONTRACTOR SHALL CONFINE ALL ACTIVITIES TO DESIGNATED WORK AREAS, 7. ENTIRE DRILL PATH SHALL BE ACCURATELY SURVEYED WITH ENTRY AND EXIT STAKES PLACED IN THE APPROPRIATE LOCATIONS WITHIN THE AREAS INDICATED ON DRAWINGS, IF CONTRACTOR IS USING A MAGNETIC GUIDANCE SYSTEM, DRILL PATH WILL BE SURVEYED FOR ANY SURFACE GEO-MAGNETIC VARIATIONS OR ANOMALIES. EXISTING UTILITIES SUCH AS PROGRESS ENERGY UNDERGROUND POWER CABLES, CLEARWATER GAS SYSTEM GAS MAIN, VERIZON COMMUNICATION CABLES, CITY OF CLEARWATER WATER MAIN AND RECLAIMED WATER MAIN AND ARE BELIEVED TO BE WITHIN THE 5' UTILITY EASEMENT AND NEAR THE DIRECTIONAL DRILL ALIGNMENT. THERE IS NO GUARANTEE THAT THESE UTILITIES ARE LOCATED AS SHOWN OR THAT OTHER UTILITIES MAY NOT BE PRESENT, THE CONTRACTOR IS TO FIELD LOCATE EXISTING UTILITIES IN ADVANCE OF THE WORK SO AS NOT TO DELAY WORK AND AVOID CONFLICT OR DISRUPTION OF UTILITY SERVICES. 8. CONTRACTOR SHALL PLACE SILT FENCE BETWEEN ALL DRILLING OPERATIONS AND ANY DRAINAGE, WETLAND, WATERWAY OR OTHER AREA DESIGNATED FOR SUCH PROTECTION BY CONTRACT DOCUMENTS, STATE, FEDERAL AND LOCAL REGULATIONS. ADDITIONAL ENVIRONMENTAL PROTECTION NECESSARY TO CONTAIN ANY HYDRAULIC OR DRILLING FLUID SPILLS SHALL BE PUT IN PLACE, INCLUDING BERMS, LINERS, TURBIDITY CURTAINS AND OTHER MEASURES, CONTRACTOR SHALL ADHERE TO ALL APPLICABLE ENVIRONMENTAL REGULATIONS. FUEL OR OIL MAY NOT BE STORED IN BULK CONTAINERS WITHIN TWO HUNDRED (200) FEET OF ANY WATER-BODY OR WETLAND. 9, CONTRACTOR SHALL ADHERE TO ALL APPLICABLE STATE, FEDERAL AND LOCAL SAFETY REGULATIONS AND ALL OPERATIONS SHALL BE CONDUCTED IN A SAFE MANNER. SAFETY MEETINGS SHALL BE CONDUCTED AT LEAST WEEKLY WITH A WRITTEN RECORD OF ATTENDANCE AND TOPIC SUBMITTED TO ENGINEER. ...................... 10, PIPE SHALL BE WELDEDIFUSED TOGETHER IN ONE LENGTH, IF SPACE PERMITS. PIPE WILL BE PLACED ON PIPE ROLLERS BEFORE PULLING INTO BORE HOLE WITH ROLLERS SPACED CLOSE ENOUGH TO PREVENT EXCESSIVE SAGGING OF PIPE. 11. PILOT HOLE SHALL BE DRILLED ON BORE PATH WITH NO DEVIATIONS GREATER THAN FIVE PERCENT OF DEPTH OVER A LENGTH OF ONE HUNDRED (100) FEET, IN THE EVENT THAT PILOT DOES DEVIATE FROM BORE PATH MORE THAN FIVE PERCENT OF DEPTH IN ONE HUNDRED (100) FEET, CONTRACTOR SHALL NOTIFY ENGINEER AND ENGINEER MAY REQUIRE CONTRACTOR TO PULL-BACK AND RE-DRILL FROM THE LOCATION ALONG BORE PATH BEFORE THE DEVIATION, 12. IN THE EVENT THAT A DRILLING FLUID FRACTURE, INADVERTENT RETURNS OR RETURNS LOSS OCCURS DURING PILOT HOLE DRILLING OPERATIONS, CONTRACTOR SHALL CEASE OPERATIONS AND SHALL DISCUSS CORRECTIVE OPTIONS WITH THE ENGINEER, WORK SHALL THEN PROCEED ACCORDINGLY, 13. UPON APPROVAL OF THE PILOT HOLE LOCATION BY THE ENGINEER, THE HOLE ENLARGENING OR BACK REAMING PHASE OF THE INSTALLATION SHALL BEGIN, THE BOREHOLE DIAMETER SHALL BE INCREASED TO ACCOMMODATE THE PULL-BACK OPERATION OF THE REQUIRED SIZE OF PE PIPE. THE TYPE OF BACK REAMER TO BE UTILIZED IN THIS PHASE SHALL BE DETERMINED BY THE TYPES OF SUBSURFACE SOIL CONDITIONS THAT HAVE BEEN ENCOUNTERED DURING THE PILOT HOLE DRILLING OPERATION. THE REAMER TYPE SHALL BE AT THE CONTRACTOR'S DISCRETION WITH THE FINAL HOLE DIAMETER BEING A MAXIMUM OF TWENTY (20) PERCENT LARGER THAN THE OUTSIDE DIAMETER OF THE PRODUCT PIPE BEING INSTALLED IN THE BOREHOLE. ,....,......,.......... 14. THE OPEN BOREHOLE MAY BE STABILIZED BY MEANS OF BENTONITE DRILLING SLURRY PUMPED THROUGH THE INSIDE DIAMETER OF THE DRILL PIPE AND THROUGH OPENINGS IN THE REAMER. THE SLURRY WILL ALSO SERVE AS AN AGENT TO CARRY THE LOOSE CUTTINGS TO THE SURFACE THROUGH THE ANNULUS OF THE BOREHOLE, THESE CUTTINGS AND BENTONITE SLURRY ARE TO BE CONTAINED AT THE EXIT HOLE OR ENTRY SIDE OF THE DIRECTIONAL BORE IN PITS OR HOLDING TANKS. THE SLURRY MAY BE RECYCLED AT THIS TIME FOR REUSE IN THE HOLE OPENING OPERATION OR IT SHALL BE HAULED BY THE CONTRACTOR TO AN APPROVED DUMP SITE AND PROPERLY DISPOSED, A COMPLETE LIST OF ALL DRILLING FLUID ADDITIVES AND MIXTURES TO BE USED IN THE DIRECTIONAL OPERATION WILL BE SUBMITTED TO THE ENGINEER ALONG WITH THEIR RESPECTIVE MATERIAL SAFETY DATA SHEETS, 15, IN THE EVENT THAT PIPE BECOMES STUCK, CONTRACTOR SHALL NOTIFY ENGINEER, ENGINEER, OWNER, ANDIOR THE MAINTAINING AGENCY SHALL DISCUSS OPTIONS AND THEN WORK WILL PROCEED ACCORDINGLY. 16. THE MAXIMUM PULL (AXIAL TENSION FORCE) EXERTED ON THE PIPELINE SHALL BE MEASURED CONTINUOUSLY AND LIMITED TO THE MAXIMUM ALLOWED BY THE PIPE MANUFACTURER WITH AN APPROPRIATE FACTOR OF SAFETY (Oi!: 2.0) SO THAT THE PIPE OR JOINTS ARE NOT OVERSTRESSED. 17. THE CONTRACTOR SHALL CEASE PULL-BACK OPERATIONS IF THE PIPE IS DAMAGED AND SHALL REMOVE THE PRODUCT PIPE FROM THE BORE AND REPAIR THE PIPE USING THE MANUFACTURER'S RECOMMENDED PROCEDURE OR REPLACE THE DAMAGED PIPE BEFORE RESUMING INSTALLATION. 18, DAMAGE TO THE PRODUCT PIPE RESULTING FROM MANUFACTURER DEFECTS, INSTALLATION, CONTACT GROUTING, OR GROUTING OF THE ANNULUS IS THE RESPONSIBILITY OF THE CONTRACTOR, INCLUDING COSTS FOR REPLACEMENT AND LABOR AND MATERIALS. 19. EXCESS PIPE SHALL BE REMOVED AND THE BORE HOLE ASSOCIATED WITH THIS EXCESS PIPE SHALL BE FILLED WITH FLOWABLE FILL OR GROUT, UNLESS THE AREA OF THE EXCESS PIPE IS EXCAVATED AND BACKFILLED AS PART OF THE TIE-IN OPERATIONS, 20, TO CONFIRM NO DAMAGE TO THE PIPE, UPON COMPLETION OF PULL-BACK AND GROUTING, THE CONTRACTOR SHALL PERFORM THE FOLLOWING TEST ON THE COMPLETED PIPELINE: A SPHERE OR PIG, ONE INCH LESS IN DIAMETER THAN THE INTERNAL DIAMETER OF THE PRODUCT PIPE, WHICH IS CAPABLE OF ALLOWING WATER TO PASS THROUGH IT, COMPLETE WITH A PULLING CABLE ON EITHER SIDE OF SPHERE OR PIG, SHALL BE PULLED THROUGH THE ENTIRE LENGTH OF THE PIPELINE, IF THE PIG OR SPHERE CANNOT PASS THROUGH THE PIPE, IT SHALL BE CONSIDERED COLLAPSED AND DAMAGED. 21, AFTER THE PRODUCT PIPE IS COMPLETELY PULLED THROUGH THE BOREHOLE, A SUFFICIENT RELAXATION PERIOD, IF RECOMMENDED BY THE PIPE MANUFACTURER, SHALL BE PROVIDED BEFORE THE FINAL PIPE TIE-IN, 22. THE CONTRACTOR SHALL CONDUCT A FINAL HYDROSTATIC TEST OF THE INSTALLED PIPE. CONTRACTOR SHALL TEST PIPE TO A PRESSURE OF 150 PSI FOR TWO HOURS. THE CONTRACTOR WILL REPAIR ANY DEFECTS DISCOVERED DURING THIS TEST, AND REPEAT UNTIL THE PIPE PASSES THE TEST, 23, FOLLOWING DRILLING OPERATIONS, CONTRACTOR WILL DEMOBILIZE EQUIPMENT AND RESTORE THE WORK-SITE TO ORIGINAL CONDITION, ANY NOTICEABLE SURFACE DEFECTS DUE TO THE DRILLING OPERATION SHALL BE REPAIRED BY CONTRACTOR, 24, CONTRACTOR SHALL MAINTAIN A DAILY PROJECT LOG OF DRILLING OPERATIONS AND A GUIDANCE SYSTEM LOG WITH A COPY GIVEN TO ENGINEER AT COMPLETION OF BORING, AS-BUILT DRAWINGS SHALL BE CERTIFIED AS TO ACCURACY BY CONTRACTOR. ~:EU) NTS ()\;::,?;\ " METALLIC LOCA TlNG WIRE ,. ,~? \'\\ r=' ~ ~ s~r FORCE MAIN .......,...- r- METALLIC LOCATING WIRE ~ / ~""- TRACER WIRE WILL BE ATTACHED . ~ PROPOSED FORCE MAIN.-/ TO THE LEADING END OF THE PIPE _ / _ PULLING HEAD AND SHALL EXTEND ~~~~~~~~~~~~~~~~~~~~'" EXTEND THE FULL LENGTH OF THE >>)>>)>>)>>)>>)>>)>>)>>)>>)>>)>>)>>)>>)>>)>>)>>)>>)>>)>>'>>>~ INSTALLED PIPE. :\'. ~ : : '\ ~ " NOTES: \\ 1, PIPE SHALL REQUIRE INSULATED METALLIC LOCATING WIRE (10 GAUGE COPPER) CAPABLE OF DETECTION BY A CABLE LOCATOR AND SHALL BE BURIED D/RECTL Y ABOVE THE CENTERLINE OF THE PfPE. 2. LOCATING WIRE SHALL TERMINATE AT THE TOP OF EACH VALVE BOX AND AIR RELEASE VALVE AND BE CAPABLE OF EXTENDING 12" ABOVE TOP OF BOX IN SUCH A MANNER SO AS NOT TO INTERFERE W/TH VAL VE OPERA TlON. 3, USE DUCT TAPE AS NECESSARY TO HOLD WIRE DIRECTL Y ON THE TOP OF THE PIPE. Y;, /~~ ~ ". , \~\ '. ~ ..~ " PIPE LOCATING WIRE DETAIL NTS :)' u r [L [ r y ....... \\ ,.... \\\ r", ;:'. "\\" ~*, ..\ '.,1 " :~ ..:\\\ \ '\ ) \\.-//' SE:R\/ICE: E::~:H'T ,............, N ~D 12" PLAN VIEW ................. CONC APPRON SURROUNDING BOX W/WIRE MESH (6 GAUGE 4",4" W.W.F.) '\ FITTING ...""...,,~~ ",.......~ ~~...,....' <~;. /, /, / PLASTIC STAND BOX 3/4" BALL VALVE OnOn n~no W/LOCKABLE OPERATOR ~#57 STONE 6" MINIMUM THICKNESS CORPORATION STOP 3/4" POLY-B COMPRESSION FITTING PROPOSED FORCE MAIN .,..........'. ............ ......-,........ .....~.~...... AI R RELEASE VALVE DET AI L .',....... ,,............. ..~.........'. ..........~...'. ..~,...r........- ............'. dr.'....... ......~.,.... ....,.............,# EXISTING UTILITIES SUCH AS PROGRESS ENERGY UNDERGROUND POWER CABLES, CLEARWATER GAS SYSTEM GAS w I 40 WIRE MESH (6 GAUGE 4"x 4" W,W,F.) B L- 24" TOP OF CONC APPRON TO BE FLUSH WITH PAVEMENT ~ '/, '/'- PLUG VALVE SECTION A-A VALVE BOX DETAIL NTS - - -- N E s GRAPHIC SCALE 1 "=20' 20 I 10 ~.~ o 20 CAST IRON COVER CONCRETE APPRON ':.t N 2" CONC APPRON ~ ::::> ~ X <( ~ N VALVE EXTENSION INSTALLED WITHIN GRADE MAIN lEGEND PROPOSED PROPERTY LINE =/ff/////////& EX, \N~,;1 ~ EXISTING WATER MAIN WM PROPOSED WATER MAIN W$ff/~ EX,:.;)A}--,;,~ EXISTING SANITARY SEWER LINE SAN PROPOSED SANITARY SEWER LINE PROPOSED STORM SEWER LINE ~ST~ ALL EXISTING AND PROPOSED ELEVATIONS ARE REFERENCED FROM NORTH AMERICAN VERTICAL DATUM (N.A.V.D.) 1988 48 HOURS BEFORE YOU DIG "CALL SUNSHINE" 1 800 432 4770 3~/Tf~c"'l z o i= a. ~ u en UJ Cl CI) Z o CI) ~ UJO::: ~ Cl >- III ...J a en .;, e 0 ex> 0 ..... I c;, ~ ~ ~ ~ ex> 0 0 CO CO CO CO 0 ;>.: ;>.: ;>.: w CO CO Z ;>.: CO Cl I- Cl I- <( W CO Cl W U Cl Z Z w 6 w ~ ...., w ~ ~ u c:: 0 :J en w 0- c:: U) W I 0- 0- ~ Cl Cl U <( z <C -.J a.. en UJ - I- - -.J - ~I- !z::) o u w () Z W o - en w 0:: en -.J -.J CONTRACTOR TO USE DIRECTIONAL DRILLING TO INSTALL 965 LF - 2" HDPE DR 11 (HEAVY DUTY) SANITARY FORCE MAIN TO EXISTING SANITARY SEWER MANHOLE LOCATED AT MAIN ACCESS GATE. INVERT ELEVATION AT EXISTING SANITARY SEWER MANHOLE = ,0,50 FT, .:-:- ~C.9 c:: 0- 19 Z a: w w Z 19 Z w - p... Z - = ~ = ~ - = SHEET: C-5B o <C o c::: I-f'.. ZCO f'.. OM a..M >-<C <cO ...JC::: <Co O...J ZLL ~ci W 01- CO<c ;:$ ~c::: ~<C LOW T"""...J T"""() ..... 0 (!) j::::~ Z (<)1"-- d, d, c:: NN W 1"--1"-- W r::- r::- z NN 1"--1"-- - -- (!) ~~Z I-u.w ..J <( () Z I (,) W I- o W (!) (!) Z c:: W W Z (!) Z W ..J > () (0 ~(!) _~ Z Q) ttl Z ~:2 cnoZ '5 u:: <( ..J .5ia.. 1/)- Q) ttl 0 t5~z om<( ~o ..J DIRECTIONAL DRilLING CONSTRUCTION NOTES 1. CONTRACTOR TO CONTACT CITY OF CLEARWATER UTILITIES AT LEAST FORTY-EIGHT (48) HOURS BEFORE EACH OF THE FOLLOWING ACTIVITIES: A) THE SET UP OF A DRILLING PIT, B) THE START OF DRILLING OPERATION, C) THE INSTALLATION OF SERVICE PIPE. UPON COMPLETION OF THE PILOT HOLE PHASE OF THE OPERATION, A COMPLETE SET OF AS-BUILT RECORDS SHALL BE SUBMITTED IN DUPLICATE TO THE ENGINEER. THESE RECORDS SHALL INCLUDE COPIES OF THE PLAN AND PROFILE DRAWING, AS WELL AS DIRECTIONAL READINGS RECORDED DURING THE DRILLING OPERATION. ..I..'........ ,-............. ,..,......,."..,.... 2. THE DRAWINGS SHOW EXISTING UTILITIES THAT ARE BELIEVED TO BE NEAR THE DIRECTIONAL DRILL ALIGNMENT. THERE IS NO GUARANTEE THAT THESE UTILITIES ARE LOCATED AS SHOWN OR THAT OTHER UTILITIES MAY NOT BE PRESENT, THE CONTRACTOR IS TO FIELD LOCATE EXISTING UTILITIES IN ADVANCE OF THE WORK SO AS NOT TO DELAY WORK AND AVOID CONFLICT OR DISRUPTION OF UTILITY SERVICES, 3. THE CONTRACTOR SHALL PROVIDE MAINTENANCE OF TRAFFIC PLANS, IN ACCORDANCE WITH APPROVED TRAFFIC AND SAFETY REQUIREMENTS, ERECT APPROPRIATE BARRIERS, WARNING LIGHTS, AND SIGNS, PAINTED WITH APPROVED COLORS, WARNINGS, AND GRAPHICS TO ENSURE ADEQUATE WARNING TO MOTORIST AND THE PUBLIC, 4, ALL HDPE AND PVC PIPE INSTALLED SHALL BE LAID WITH TWO INSULATED 10 GAUGE SOLID STRAND COPPER WIRE FOR LOCATION PURPOSES. 5. ALL PERSONNEL SHALL BE FULLY TRAINED IN THEIR RESPECTIVE DUTIES AS PART OF THE DIRECTIONAL DRILLING CREW AND IN SAFETY. EACH PERSON MUST HAVE AT LEAST TWO YEARS DIRECTIONAL DRILLING EXPERIENCE. A COMPETENT AND EXPERIENCED SUPERVISOR REPRESENTING THE CONTRACTOR AND DRILLING SUBCONTRACTOR SHALL BE PRESENT AT ALL TIMES DURING THE ACTUAL DRILLING OPERATIONS, A RESPONSIBLE REPRESENTATIVE WHO IS THOROUGHLY FAMILIAR WITH THE EQUIPMENT AND TYPE WORK TO BE PERFORMED, MUST BE IN DIRECT CHARGE AND CONTROL OF THE OPERATION AT ALL TIMES. IN ALL CASES THE SUPERVISOR MUST BE CONTINUALLY PRESENT AT THE JOB SITE DURING THE ACTUAL DIRECTIONAL BORE OPERATION. THE CONTRACTOR AND SUBCONTRACTOR SHALL HAVE A SUFFICIENT NUMBER OF COMPETENT WORKERS ON THE JOB AT ALL TIMES TO INSURE THE DIRECTIONAL BORE IS MADE IN A TIMELY AND SATISFACTORY MANNER, PERSONNEL WHO ARE UNQUALIFIED, INCOMPETENT OR OTHERWISE NOT SUITABLE FOR THE PERFORMANCE OF THIS PROJECT SHALL BE REMOVED FROM THE JOBSITE AND REPLACED WITH A SUITABLE PERSON, ...........,.. ,...,........,.. .,.......,..,....... 6. WORK SITE AS INDICATED ON DRAWINGS, WITHIN RIGHT-OF-WAY, SHALL BE GRADED OR FILLED TO PROVIDE A LEVEL WORKING AREA, NO ALTERATIONS BEYOND WHAT IS REQUIRED FOR OPERATIONS ARE TO BE MADE. CONTRACTOR SHALL CONFINE ALL ACTIVITIES TO DESIGNATED WORK AREAS, EXISTING UTILITIES SUCH AS PROGRESS ENERGY UNDERGROUND POWER CABLES, CLEARWATER GAS SYSTEM GAS MAIN, VERIZON COMMUNICATION CABLES, CITY OF CLEARWATER WATER MAIN AND RECLAIMED WATER MAIN AND ARE BELIEVED TO BE WITHIN THE 5' UTILITY EASEMENT AND NEAR THE DIRECTIONAL DRILL ALIGNMENT, THERE IS NO GUARANTEE THAT THESE UTILITIES ARE LOCATED AS SHOWN OR THAT OTHER UTILITIES MAY NOT BE PRESENT, THE CONTRACTOR IS TO FIELD LOCATE EXISTING UTILITIES IN ADVANCE OF THE WORK SO AS NOT TO DELAY WORK AND AVOID CONFLICT OR DISRUPTION OF UTILITY SERVICES. 7. ENTIRE DRILL PATH SHALL BE ACCURATELY SURVEYED WITH ENTRY AND EXIT STAKES PLACED IN THE APPROPRIATE LOCATIONS WITHIN THE AREAS INDICATED ON DRAWINGS, IF CONTRACTOR IS USING A MAGNETIC GUIDANCE SYSTEM, DRILL PATH WILL BE SURVEYED FOR ANY SURFACE GEO-MAGNETIC VARIATIONS OR ANOMALIES, 8, CONTRACTOR SHALL PLACE SILT FENCE BETWEEN ALL DRILLING OPERATIONS AND ANY DRAINAGE, WETLAND, WATERWAY OR OTHER AREA DESIGNATED FOR SUCH PROTECTION BY CONTRACT DOCUMENTS, STATE, FEDERAL AND LOCAL REGULATIONS, ADDITIONAL ENVIRONMENTAL PROTECTION NECESSARY TO CONTAIN ANY HYDRAULIC OR DRILLING FLUID SPILLS SHALL BE PUT IN PLACE, INCLUDING BERMS, LINERS, TURBIDITY CURTAINS AND OTHER MEASURES. CONTRACTOR SHALL ADHERE TO ALL APPLICABLE ENVIRONMENTAL REGULATIONS, FUEL OR OIL MAY NOT BE STORED IN BULK CONTAINERS WITHIN TWO HUNDRED (200) FEET OF ANY WATER-BODY OR WETLAND. 9, CONTRACTOR SHALL ADHERE TO ALL APPLICABLE STATE, FEDERAL AND LOCAL SAFETY REGULATIONS AND ALL OPERATIONS SHALL BE CONDUCTED IN A SAFE MANNER. SAFETY MEETINGS SHALL BE CONDUCTED AT LEAST WEEKLY WITH A WRITTEN RECORD OF ATTENDANCE AND TOPIC SUBMITTED TO ENGINEER, .........,...,......,. 10. PIPE SHALL BE WELDEDIFUSED TOGETHER IN ONE LENGTH, IF SPACE PERMITS. PIPE WILL BE PLACED ON PIPE ROLLERS BEFORE PULLING INTO BORE HOLE WITH ROLLERS SPACED CLOSE ENOUGH TO PREVENT EXCESSIVE SAGGING OF PIPE, 11. PILOT HOLE SHALL BE DRILLED ON BORE PATH WITH NO DEVIATIONS GREATER THAN FIVE PERCENT OF DEPTH OVER A LENGTH OF ONE HUNDRED (100) FEET, IN THE EVENT THAT PILOT DOES DEVIATE FROM BORE PATH MORE THAN FIVE PERCENT OF DEPTH IN ONE HUNDRED (100) FEET, CONTRACTOR SHALL NOTIFY ENGINEER AND ENGINEER MAY REQUIRE CONTRACTOR TO PULL-BACK AND RE-DRILL FROM THE LOCATION ALONG BORE PATH BEFORE THE DEVIATION. 12. IN THE EVENT THAT A DRILLING FLUID FRACTURE, INADVERTENT RETURNS OR RETURNS LOSS OCCURS DURING PILOT HOLE DRILLING OPERATIONS, CONTRACTOR SHALL CEASE OPERATIONS AND SHALL DISCUSS CORRECTIVE OPTIONS WITH THE ENGINEER, WORK SHALL THEN PROCEED ACCORDINGLY. 13. UPON APPROVAL OF THE PILOT HOLE LOCATION BY THE ENGINEER, THE HOLE ENLARGENING OR BACK REAMING PHASE OF THE INSTALLATION SHALL BEGIN. THE BOREHOLE DIAMETER SHALL BE INCREASED TO ACCOMMODATE THE PULL-BACK OPERATION OF THE REQUIRED SIZE OF PE PIPE, THE TYPE OF BACK REAMER TO BE UTILIZED IN THIS PHASE SHALL BE DETERMINED BY THE TYPES OF SUBSURFACE SOIL CONDITIONS THAT HAVE BEEN ENCOUNTERED DURING THE PILOT HOLE DRILLING OPERATION. THE REAMER TYPE SHALL BE AT THE CONTRACTOR'S DISCRETION WITH THE FINAL HOLE DIAMETER BEING A MAXIMUM OF TWENTY (20) PERCENT LARGER THAN THE OUTSIDE DIAMETER OF THE PRODUCT PIPE BEING INSTALLED IN THE BOREHOLE. ..........-' , f: NOTES: 1";L.E ,.,,,'''''''' ...,......,... ............. ~.;Cr~\:' [CC .....,.~.....,. ............. ,.,.......... ........."'......... CONTRACTOR TO USE DIRECTIONAL DRILLING TO INSTALL 965 LF - 2" HDPE DR 11 (HEAVY DUTY) SANITARY FORCE MAIN TO EXISTING SANITARY SEWER MANHOLE LOCATED AT MAIN ACCESS GATE, INVERT ELEVATION AT EXISTING SANITARY SEWER MANHOLE = -0,50 FT, 14. THE OPEN BOREHOLE MAY BE STABILIZED BY MEANS OF BENTONITE DRILLING SLURRY PUMPED THROUGH THE INSIDE DIAMETER OF THE DRILL PIPE AND THROUGH OPENINGS IN THE REAMER. THE SLURRY WILL ALSO SERVE AS AN AGENT TO CARRY THE LOOSE CUTTINGS TO THE SURFACE THROUGH THE ANNULUS OF THE BOREHOLE. THESE CUTTINGS AND BENTONITE SLURRY ARE TO BE CONTAINED AT THE EXIT HOLE OR ENTRY SIDE OF THE DIRECTIONAL BORE IN PITS OR HOLDING TANKS. THE SLURRY MAY BE RECYCLED AT THIS TIME FOR REUSE IN THE HOLE OPENING OPERATION OR IT SHALL BE HAULED BY THE CONTRACTOR TO AN APPROVED DUMP SITE AND PROPERLY DISPOSED, A COMPLETE LIST OF ALL DRILLING FLUID ADDITIVES AND MIXTURES TO BE USED IN THE DIRECTIONAL OPERATION WILL BE SUBMITTED TO THE ENGINEER ALONG WITH THEIR RESPECTIVE MATERIAL SAFETY DATA SHEETS. 15, IN THE EVENT THAT PIPE BECOMES STUCK, CONTRACTOR SHALL NOTIFY ENGINEER. ENGINEER, OWNER, ANDIOR THE MAINTAINING AGENCY SHALL DISCUSS OPTIONS AND THEN WORK WILL PROCEED ACCORDINGLY. 16. THE MAXIMUM PULL (AXIAL TENSION FORCE) EXERTED ON THE PIPELINE SHALL BE MEASURED CONTINUOUSLY AND LIMITED TO THE MAXIMUM ALLOWED BY THE PIPE MANUFACTURER WITH AN APPROPRIATE FACTOR OF SAFETY (~2.0) SO THAT THE PIPE OR JOINTS ARE NOT OVERSTRESSED. 17. THE CONTRACTOR SHALL CEASE PULL-BACK OPERATIONS IF THE PIPE IS DAMAGED AND SHALL REMOVE THE PRODUCT PIPE FROM THE BORE AND REPAIR THE PIPE USING THE MANUFACTURER'S RECOMMENDED PROCEDURE OR REPLACE THE DAMAGED PIPE BEFORE RESUMING INSTALLATION. 18. DAMAGE TO THE PRODUCT PIPE RESULTING FROM MANUFACTURER DEFECTS, INSTALLATION, CONTACT GROUTING, OR GROUTING OF THE ANNULUS IS THE RESPONSIBILITY OF THE CONTRACTOR, INCLUDING COSTS FOR REPLACEMENT AND LABOR AND MATERIALS. 19. EXCESS PIPE SHALL BE REMOVED AND THE BORE HOLE ASSOCIATED WITH THIS EXCESS PIPE SHALL BE FILLED WITH FLOWABLE FILL OR GROUT, UNLESS THE AREA OF THE EXCESS PIPE IS EXCAVATED AND BACKFILLED AS PART OF THE TIE-IN OPERATIONS. 20, TO CONFIRM NO DAMAGE TO THE PIPE, UPON COMPLETION OF PULL-BACK AND GROUTING, THE CONTRACTOR SHALL PERFORM THE FOLLOWING TEST ON THE COMPLETED PIPELINE: A SPHERE OR PIG, ONE INCH LESS IN DIAMETER THAN THE INTERNAL DIAMETER OF THE PRODUCT PIPE, WHICH IS CAPABLE OF ALLOWING WATER TO PASS THROUGH IT, COMPLETE WITH A PULLING CABLE ON EITHER SIDE OF SPHERE OR PIG, SHALL BE PULLED THROUGH THE ENTIRE LENGTH OF THE PIPELINE. IF THE PIG OR SPHERE CANNOT PASS THROUGH THE PIPE, IT SHALL BE CONSIDERED COLLAPSED AND DAMAGED. 21. AFTER THE PRODUCT PIPE IS COMPLETELY PULLED THROUGH THE BOREHOLE, A SUFFICIENT RELAXATION PERIOD, IF RECOMMENDED BY THE PIPE MANUFACTURER, SHALL BE PROVIDED BEFORE THE FINAL PIPE TIE-IN. 22, THE CONTRACTOR SHALL CONDUCT A FINAL HYDROSTATIC TEST OF THE INSTALLED PIPE, CONTRACTOR SHALL TEST PIPE TO A PRESSURE OF 150 PSI FOR TWO HOURS. THE CONTRACTOR WILL REPAIR ANY DEFECTS DISCOVERED DURING THIS TEST, AND REPEAT UNTIL THE PIPE PASSES THE TEST. 23. FOLLOWING DRILLING OPERATIONS, CONTRACTOR WILL DEMOBILIZE EQUIPMENT AND RESTORE THE WORK-SITE TO ORIGINAL CONDITION. ANY NOTICEABLE SURFACE DEFECTS DUE TO THE DRILLING OPERATION SHALL BE REPAIRED BY CONTRACTOR. 24. CONTRACTOR SHALL MAINTAIN A DAILY PROJECT LOG OF DRILLING OPERATIONS AND A GUIDANCE SYSTEM LOG WITH A COPY GIVEN TO ENGINEER AT COMPLETION OF BORING, AS-BUILT DRAWINGS SHALL BE CERTIFIED AS TO ACCURACY BY CONTRACTOR. ......,....... .............,. .......,........... G r~: t-., t,.,j : T E ---.......... ~:/.. .,(".... .-............ ................-... rt:~;' () 67~ ;......... \ "'........."'; ........... ............. ~~t, 0) ......mm ~.)hJ S:Tj~ ...........,..... METALLIC LOCATING WIRE 1" MAX, HDPE FORCE MAIN r- METALLIC LOCATING WIRE ~ /~ f~ TRACER WIRE WILL BE ATTACHED ~ PROPOSED FORCE MAIN ~ TO THE LEADING END OF THE PIPE / _ PULLING HEAD AND SHALL EXTEND ~~~~~~~~~~~~~~~~~~~~, EXTEND THE FULL LENGTH OF THE >>~~~~~~~~~~~~~~~~~~~'>> INSTALLED PIPE. PIPE LOCATING WIRE DETAIL NTS N ~D 12" PLAN VIEW CONC APPRON SURROUNDING BOX W/WIRE MESH (6 GAUGE 4"x4" W.W,F,) '\ FITTING PLASTIC STAND BOX /~ /~ / 3/4" POLY-B COMPRESSION FITTING 3/4" BALL VALVE ononon~ nO W/LOCKABLE OPERATOR '-- #57 STONE 6" MINIMUM THICKNESS CORPORATION STOP PROPOSED FORCE MAIN AIR RELEASE VALVE DETAIL NTS .... \, ........, \, ....,.. APPROXIMATE LOCATION OF EXISTING SANITARY SEWER MANHOLE. PROPOSED 2" HDPE DR 11 (HEAVY DUTY) SANITARY FORCE MAIN INVERT ELEVATION = -0,50 FT, CONTRACTOR TO VERIFY WITH CITY OF CLEARWATER FOR EXACT SIZE AND LOCATION PRIOR TO START OF CONSTRUCTION, .,.~...".,.'''- ,..,.F_ r~, f~:~:. fL.-. 2,;:;'; S!~f'J: rAf(f :)f wE1~: f.f:!~NHGLE ";'''-'", : t)rVi ?:.:.~};. !?:\/ f-L.-, -.fj.47 ff' ::'VC; kri. ;:":\'. :::..~ ..0.:;6 (/,.!\ :;VC) :~. !:'N. fL ~~ ..G ~j2 {f;~ PVC) w 40 WIRE MESH (6 GAUGE 4"x 4" W,W,F.) B L- 24" TOP OF CONC APPRON TO BE FLUSH WITH PAVEMENT ~ ,,- ~, CAST IRON SCREW TYPE VALVE BOX ~ PLUG VALVE SECTION A-A VALVE BOX DETAIL NTS - - -- N E s GRAPHIC SCALE 111=20' 20 10 ~ o 20 COVER CONCRETE APPRON ;r N 2" CONC APPRON ~ ::::> ~ X <( ~ N VALVE EXTENSION INSTALLED WITHIN GRADE MAIN lEGEND PROPOSED PROPERTY LINE =,A'.W)M'.<Wm"~b} EX- 'Nt,/! ='ff.-W''= EXISTING WATER MAIN WM PROPOSED WATER MAIN W'ffff..1f"bYhYAW-=== EX. SAJ',J W.-W'~ff/ffb. EXISTING SANITARY SEWER LINE SAN PROPOSED SANITARY SEWER LINE PROPOSED STORM SEWER LINE ~ST~ ALL EXISTING AND PROPOSED ELEVATIONS ARE REFERENCED FROM NORTH AMERICAN VERTICAL DATUM (N.A.V.D.) 1988 48 HOURS BEFORE YOU DIG "CALL SUNSHINE" 1-800-432-4770 ....rrrJUrr~~.~ I':,--~ ':'0..--:<( " @COPYRIGHT 2009 z o i= ll.. ~ U C/) UJ Q C/) Z o C/) Gj UJ~ ~ Q >- [0 -l a 0> I ~ LO 0 0 ..- cb c;:s C9 C9 C9 C9 0 0 a::l a::l a::l a::l 0 :>: :>: :>: w a::l :z a::l a::l I- Cl >= Cl I- <( W a::l Cl W U Cl :z :z w 6 w ~ -.. w C9 ~ U 0:: 0 :::::> en w c... 0:: en w :c c... c... ~ 0 0 u <( z <( ....J c.. C/) w - ..... - ....J - g..... ~::> o u w () Z W o - en w Il: en -.J -.J " PIPE SHALL REQUIRE INSULA TED METALLIC LOCA TlNG WIRE (10 GAUGE COPPER) CAPABLE OF DETECTION BY A CABLE LOCATOR AND SHALL BE BURIED DIRECTL Y ABOVE THE CENTERLINE OF THE PIPE. 2, LOCATING WIRE SHALL TERMINATE AT THE TOP OF EACH VALVE BOX AND AIR RELEASE VALVE AND BE CAPABLE OF EXTENDING 12" ABOVE TOP OF BOX IN SUCH A MANNER SO AS NOT TO INTERFERE WITH VALVE OPERATION. 3, USE DUCT TAPE AS NECESSARY TO HOLD WIRE DIRECTL Y ON THE TOP OF THE PIPE. THIS DRAWING IS THrP ~J ~E H-'G~'r:~~N~I~G, INC. UNDER NO CIRCUNSTANCES MAY THIS ' W'B5"REPliOOOCCEI1,PU.Btl~D;.AL TERED OR USED IN ANY WAY WITHOUT WE: !,OT~a::TI:N F~: ~~~"'~:~NGINEERING, INC. t.. . ".. "Ow~ 5c6 Z 0,. . '. ,:; \.... . ", Q t , 8 '2';~t' _;'~: ,~ . :: fj" \:\~.l~/:: f/:~3-1g--o't 58626 \ '-. ~1(!f1G~~3~ .rj. FL Registration No, Tl"\ ~. \ st~~I~~ ' fII!/f' <"'.;'./ Sign Date f'",., c. ("\ 0)... .. ~.....' ~. COPY OF THIS PLAN IS NOT VAI/lIiUM.I!~ ~""ED;~EALED AND DATED BY THE PRQI'!;s!5fcfIllAh BNG R ( ;'-".......- .=-:- ~C.9 0:: c... <.9 Z a: w w Z <.9 Z w - i- :z: .. Q c.. = ~ .. = SHEET: C-5C Q <C o 0:: I-f'... ZCO f'... OM a..M <C ~Q ...JO:: <Co Q...J ZLL <C tV- ~u.. oW CO I- ~~ ~o:: .q-<C LOW ~...J ~t) ..- 0 C!) ~~ Z M,.... eJ,eJ,!!: NN W ,....,.... W r:::- r:::- z NN ,....,.... - -- C!) a5~Z I- u.. W --I <( () Z I () W I- o W C!) C!) Z !!: w w z C!) z W --I > () (0 leC!) _~ z ll) CO Z ll)-o c7>'g Z "5 u:: ~ c..:'^ 1;) 2 u.. ll) CO Cl t5~z o~<( ~ C3 --I CUSTOM PACKAGED """':,;(i;;;;;:~l';'::"" .;-.;::::f:.:.... ';-,.;.lW'~ ,';'~$~-<<. >>,.../~.---_..:.::?::::.:..-_ .,':::',.. "~..~.'''ff%Jt.. """~... ....:.,... ............ - . .. -........-. '-"':::':" - -', ....:.:.:... .... ...." ...:..:..:::::~:::::;;.. " ' ,....:;~!~::::::::::.... ..... ..... ..... ....- ....:-:::::;:.....::::;::.:.... PUMP 940-3309 FURNISH AND INSTALL A COMPLETE PRE-PACKAGE CUSTOM PUMP & CONTROL PUMP STATION AS DESCRIBED BELOV SPECIFICA TIDNS DESIGN CONDITIONS MODEL VHR7 -21 3/4 H.P, VOLT 230 SINGLE PHASE DISCHARGE 20 IMPELLER RECESSED TDH 25 GPM 25 PUMP - SERVICE DISCONNECT~ THE PUMP SHALL BE SUBMERSIBLE TYPE MOTOR, THE PUMP SHALL BE SUSPENDED IN THE BASIN BY T'WO (2) l' GUIDE RAILS AND QUICK DISCONNECT LIFT OUT MOUNTING ASSEMBL Y. MOTOR THE PUMP MOTOR SHALL BE OF THE SUBMERSIBLE TYPE RATED FOR 3/4 HORSEPO'WER AT 1750 RPM. MOTOR SHALL BE SINGLE PHASE, 230 VOLT, 60 HERTZ. SINGLE PHASE MOTORS SHALL BE OF THE CAPACITOR START TYPE. THE STATOR 'WINDING SHALL BE THE OPEN TYPE 'WITH CLASS A INSULATION RATED FOR 105' C MAXIMUM OPERATING TEMPERATURE, THE 'WINDING HOUSING 'WILL BE FILLED 'WITH CLEAN DIELECTRIC OIL THAT 'WILL LUBRICATE BEARINGS, SEALS AND TRANSFER HEAT FROM THE 'WINDINGS TO THE OUTER SHELL. THE MOTOR STATOR IS TO BE PRESSED INTO THE MOTOR HOUSING FOR OPTIMUM CONCENTRICITY AND ALIGNMENT, AND MAXIMUM HEAT TRANSFER, THE MOTOR SHALL BE CAPABLE OF OPERATING OVER FULL RANGE OF PERFORMANCE CURVE 'WITHOUT OVERLOADING MOTOR AND CAUSING ANY OBJECTIONAL NOISE DR VIBRATION. THE MOTOR SHALL HAVE T'WO BEARINGS TO SUPPORT THE ROTOR) AN UPPER BALL BEARING TO ACCOMMODATE THRUST LOADS AND A LO'WER BALL BEARING TO TAKE RADIAL LOADS. BALL BEARINGS SHALL BE DESIGNED FOR A LB-10 LIFE (50,000 HOURS). A HEAT SENSOR THERMOSTAT AND OVERLOAD SHALL BE ATTACHED TO THE TOP END OF THE MOTOR 'WINDINGS AND SHALL STOP THE MOTOR IF THE MOTOR 'WINDING TEMPERATURE REACHES 200' F. THE HIGH TEMPERATURE SHUTOFF 'WILL CAUSE THE PUMP TO CEASE OPERATION, SHOULD A CONTROL FAILURE CAUSE THE PUMP TO RUN IN A DRY 'WET 'WELL, THE THERMOSTAT SHALL RESET AUTOMATICALLY 'WHEN THE MOTOR COOLS TO A SAFE OPERATING TEMPERATURE, SEAL CHAMBER THE MOTOR SHALL BE PROTECTED BY ROTARY SHAFT SEAL. THE SEAL SHALL HAVE CARBON I CERAMIC I SILICON SEAL FACES DIAMOND LAPPED TO A TOLERANCE OF ONE LIGHT BAND. METAL PARTS AND SPRINGS FOR SEALS SHALL BE STAINLESS STEEL, AN ELECTRICAL SENSING PROBE SHALL BE MOUNTED IN THE SEAL CHAMBER TO DETECT ANY 'WATER LEAKAGE PAST THE LO'WER SEAL. PUMP IMPELLER THE PUMP IMPELLER SHALL BE OF THE RECESSED TYPE TO PROVIDE AN OPEN UNOBSTRUCTED PASSAGE THROUGH THE VOLUTE FOR THE GROUND SOLIDS. THE IMPELLER SHALL BE CONSTRUCTED OF CAST IRON AND SHALL HAVE PUMP OUT VANES ON THE BACK SIDE OF THE IMPELLER TO KEEP SOLIDS FROM LO'WER SEAL AND REDUCE PRESSURE AT THE SEAL FACES. IMPELLER SHALL BE THREADED ONTO THE STAINLESS STEEL SHAFT, PUMP & MOTOR CASTINGS ALL IRON CASTING SHALL BE OF HIGH TENSILE CAST IRON AND SHALL BE PROPERLY CLEANED, PRE-TREATED 'WITH CHROMIC RINSE, AND PAINTED 'WITH A HIGH QUALITY ENAMEL PAINT. ALL PUMP COMPONENTS THAT ARE NOT CAST IRON DR STAINLESS STEEL SHALL BE GAL V ANIZED DR PAINTED 'WITH BAKED-ON EPOXY. ALL FASTENERS SHALL BE #302 STAINLESS STEEL. VET VELL SHALL BE A FILAMENT 'WOUND FIBERGLASS BASIN USING A COMMERCIAL GRADE OF GLASS FIBER HAVING A COUPLING AGENT 'WHICH 'WILL PROVIDE A SUITABLE BOND BET'WEEN THE GLASS REINFORCEMENT AND THE RESIN, THE LAMINATE SHALL CONSIST OF AN INNER SURFACE, AN INTERIOR LAYER, AND AN EXTERIOR LAYER OF LAMINATE BODY, THE INNER SURFACE SHALL BE FREE OF CRACKS AND CRAZING 'WITH A SMOOTH FINISH. SOME 'WAVINESS IS PERMISSIBLE AS LONG AS THE SURFACE IS SMOOTH AND FREE OF PITS, BET'WEEN 0,010 AND 0,020 INCHES OF RESIN-RICH SURFACE SHALL BE PROVIDED. THE BASIN SHALL BE PROVIDED 'WITH AN ANTI-FLOATATION RING TO PREVENT RISING, VALVE BOX SHALL BE CPC MODEL VB3242 FIBERGLASS VALVE BOX 'WITH U.S. FOUNDRY APS-150 ALUMINUM VALVE BOX COVER, VAL VE BOX SHALL BE PRE -PLUMBED USING ALL SCHEDULE 80 PVC PIPING AND FITTINGS, AND SHALL INCLUDE T'WO (2), 2' SCHEDULE 80 PVC BALL CHECK VALVES, AND THREE (3), 2' SCHEDULE 80 PVC GATE VALVES. (ONE (1) 2' GATE VALVE IS SUPPLIED AS AN EMERGENCY PUMP-OUT), PVC PIPING IN VAL VE BOX, AND 'WET 'WELL SHALL BE CONNECTED AND HELD IN PLACE BY CPC MODEL 32 RESILIENT MOUNT SEALING SYSTEM TO COMPENSATE FOR POSSIBLE UNEVEN SETTLING OF BASIN DR VALVE BOX. SYSTEM SHALL BE PRESSURE TESTED AT 150 P.S.I. PRIOR TO SHIPMENT. ALUMINUM HATCH COVERS SHALL BE FABRICATED FROM 1/4' ALUMINUM DIAMOND PLATE AND BUILT TO 'WITHSTAND A LOAD OF 150 LB. P.S.F. AND SHALL BE MANUFACTURED BY U.S. FOUNDRY, HALLIDAY, DR EQUAL. STAINLESS STEEL BOLTS, NUTS AND HINGES - LOCKING STAPLE. FLOATS SHALL BE ANCHOR SCIENTIFIC S30NO ROTO-FLOATS DR EQUAL. ACCESSORIES -- STAINLESS STEEL UPPER GUIDE BRACKETS -- STAINLESS STEEL GUIDE RAILS -- STAINLESS STEEL CABLE RACK -- STAINLESS STEEL LIFT CABLES ANTI-FLOATATION CONCRETE IS RECOMMENDED TO PREVENT FLOATATION OF THE FIBERGLASS BASIN. THE FOLLO'WING LISTS THE CUBIC FEET REQUIRED PER FOOT OF BASIN DEPTH. BASIN DIAMETER 24' 30' 36' 48' 60' CUBIC FEET OF CONCRETE REQUIRED PER FOOT OF BASIN DEPTH 2.0 3.5 5.0 8.5 12.0 For Complete Technical Assistance Call: Custom Pump & Controls, Inc. 6034 Jet Port Industrial Blvd. Tampa FL 33634 TEL: (813) 886-6255 FAX: (813) 886-3508 -il - - CUSTOM LOCKABLE "DEP" CONTROL PANEL AND GENERATOR RECEPTICLE TO BE MOUNTED ON WALL. SUPPLIER". CONTROL PANEL SHALL INCLUDE A BATTERY BACK UP ALARM SYSTEM .~ CONTROL PANEL , 230V I 1PH I 60HZ u & CONTROLS, INC. <=:) STAINLESS STEEL- CABLE RACK 4' PVC VENTi~ <INSTALL ODOR CONTROL DEVICE> tL- TOP ELEV, = +6,50 FT 12' ~ r T'WO (2) 2'~'i CONDUITS T'WO (2) 2' CONDUIT HUBS INV. ELEV, = +3.00 FT ~ ] ~ 138' HIGH 'WATER ALARM ELEV.= -1.00 FT LAG PUMP ON ELEV.= -1.50 FT LEAD PUMP ON ELEV,= -2.00 FT PUMPS OFF ELEV.= -3.00 FT BOTTOM ELEV.= -5.00 FT WET WELL TO BE INSTALLED ONl 12-INCHES MINIMUM OF # 57 COARSE AGGREGATE PUMP PERFORMANCE CURVE 40 36 32 ~ 28 ~ WHR7- 1 ~ ~ ~ -~ ~ ~~~~ ~ ~~ ~ ~~ ~\ \ 1\ 24 20 ~ 16 12 8 4 o o 60 140 80 20 40 100 120 ~ c c SE'WAGE PUMP >.MDDEL' "H'7-21 ~'.~'.:.~ I- I- MANUFACTURER MYERS \ \ \ 160 180 'Ii '\ c u:: ca >>-;/ I" ~ >...1 -......:;./~ ~ 1'-.. -LW [!: ~ l/ I V ......-rr= "-J.':: I~ ] - K H - (:[ u:: ~~ ~~ /Ir I II "J.':::: ( II II EII9 II " PIL 24" ::::;r---... II ~ I I I I I ALARM BEACON ~ ~ o <P <J<JK <J<JK< ~ "- ~ U.S. FOUNDRY APS-150 ALUMINUM VALVE BOX COVER 'WI 24' x 34' ACCESS DOOR -l a .0 o o , co o U.S. FOUNDRY BPS-48 ALUMINUM HATCH COVER 'W I 24' x 36' ACCESS DOOR )/ II, ~~DRM II 24" ALARM HORN o crN PUMP NO, 1 PUMP NO, i <P o Z I- U W ...., o ~ a.. INSTALL 965 LF - 2" HDPE DR 11 (HEAVY DU1Y) FORCE MAIN TO EXISTING SANITARY SEWER MANHOLE LOCATED AT MAIN ACCESS GATE. INVERT ELEVATION AT EXISTING SANITARY SEWER MANHOLE = -0.50 FT, CONTRACTOR TO VERIFY WITH CITY OF CLEARWATER UTILITIES DEPARTMENT EXACT SIZE AND LOCATION OF SANITARY SEWER MANHOLE PRIOR TO START OF CONSTRUCTION. U.S. FOUNDRY BPS-48 ALUMINUM HA TCH COVER 'W I 24' x 36' ACCESS DOOR ~~STAINLESS STEEL Ii UPPER GUIDE II BRACKETS f:I --1 L- ST AINLESS STEE LIFT CABLES 36" 24' CPC MODEL 32 RESILIENT MOUNT SEA~EM ~~~~ :/' ~ [::v I ~ [2" PVC P- TRAP (HUBS ON BASIN & VALVE BOX P- TRAP FIELD MOUNTED & SUPPLIED BY CONTRACTOR) J=---u ] -4 2' SCHEDULE 80 PVC PIPING - -- PUMPS MUST BE MOUNTED ONTO A SLIDE RAIL SYSTEM TO PREVENT ENTRY INTO WET WELL "CONFINED" SPACE AS DEFINED BY OSHA l' STAINLESS GUIDE RAILS ~ FIBERGLASS BASIN 6 SRA-200 LIFT -OUT RAIL SYSTEM .)~ J?' Concrete Fillet with 1'1 RediD V (If Requlreal) Flelal Insto.lleal by Contro.ctor ~ ~ANTI-FLOATATION RING ~ CONCRETE BALLAST I WET WELL DEPTH = 11,50 FT CONCRETE = 3,62 CY (14.663 LB) ~~ ';f '*=* /.. .' .:'~ .,4 ..... -I -I 48' 54' WET WELL EQUIPMENT IMPELLER NUMBER RECESSED CATALOG NUMBER G,P.M. 25 WHR7-21 (3/4 HP, 1.750 RPM) 200 U.S, FOUNDRY APS-150 ALUMINUM VALVE BOX COVER 'WI 24' x 34' ACCESS DOOR o <P ~ ~ --.J ~ EMERGENCY PUMP-OUT NEMA RATED OUTDOOR ENCLOSURE 'WITH MATERIAL COMPOSITION AS SPECIFIED BELO'W ~ FRONT VIE'W __ 2' SCHEDULE 80 PVC GA TEl BALL VAL VE ~CP MODEL VB3242 FIBERGLASS VALVE BOX 36" lIE NOTE, CONTRACTOR TO FIELD VERIFY PHASE AND VOLTAGE - r "iJ"-..... .~..0 "V ~ ~"~~( 2" SCHEDULE 80 PVC GATEI BALL VALVE 2" SCHEDULE 80 PVC UNION 1YPE BALL CHECK VALVE CONCRETE FILLET (IF REQUIRED) SLOPING TO P- TRAP FIELD INSTALLED 8Y CONTRACTOR CONTROL PANEL INV. ELEV. -0.50 FT SPECIFICATIONS FOR DUPLEX TYPE CONTROL PANEL PROVIDE 12" MIN. OF COMPACTED SUBGRADE 95% OF AASHTO T-180 EACH PANEL SHALL CONTROL T'WO 3/4 HP. 230 VOL T. 1 PHASE. 60 Hz PUMPS, A NEUTRAL SHALL BE SUPPLIED TO THE PANEL FOR 120 VOLT CONTROL PO'WER. PANEL ENCLOSURE NOTES: 1, ALL UNDERGROUND (BURIED) FITTINGS TO BE MECHANICAL JOINT 1YPE WITH RESTRAINED JOINTS. RESTRAINING DEVICES SHALL BE MEGLUG OR APPROVED EQUAL. 2. ALL FITTINGS WITHIN WET WELL AND VALVE VAULT TO BE FLANGE END. PIPE SPOOL PIECES TO HAVE FABRICATED FLANGE ENDS. (NO FLANGE ADAPTER FITTINGS PERMITTED UNLESS SPECIFICALLY CALLED FOR). 3, ALL PVC PIPE AND FITTINGS TO BE SCHEDULE 80 UNLESS NOTED OTHERWISE, 4, THE PROPOSED FORCE MAIN IN THE RIGHT-OF-WAY SHALL HAVE A MAGNETIC LOCATING WIRE IN ACCORDANCE WITH CI1Y OF CLEARWATER STANDARDS. 5. ALL FORCE MAINS SHALL BE SUBJECT TO A HYDROSTATIC PRESSURE TEST OF 150 PSI FOR TWO HOURS. ALLOWABLE RATE OF LEAKAGE SHALL MEET FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION AND CI1Y OF CLEARWATER STANDARDS. ENCLOSURE SHALL BE NEMA 4X. FABRICATED FROM FIBERGLASS, OUTER DOOR SHALL HAVE HINGES AND MEANS FORPADLOCKING, ALL BOLTS, NUTS, LOCK 'WASHERS, AND MACHINE SCRE'WS SHALL BE STAINLESS STEEL. THE FOLLO'WING MAJOR COMPONENTS ARE REQUIRED, D MAIN BREAKER 3) PUMP BREAKERS 4) CONTROL CIRCUIT BREAKER 5) ALTERNATOR 6) HIGH LEVEL FLASHING ALARM LIGHT 7) HIGH LEVEL HORN ALARM 'WITH SILENCE - 'WHEN SILENCE LIGHT STAYS ON 8) NEMA RATED MOTOR STARTERS 'WITH OVERLOAD PROTECTION FOR ALL PO'WER LEGS 9) CAPACITORS AND START-RELAYS AS APPROVED FOR MYERS PUMPS ON SINGLE PHASE SYSTEMS. TYPICAL SEQUENCE OF OPERATION' ON RISE LEVEL' .=-: z W I- Z o U LO'WEST FLOAT 'WILL CLOSE CIRCUIT TO RELAY, LEAD PUMP ON FLOAT CLOSES TO BRING LEAD PUMP ON. IF LEAD DOES NOT RECEDE AND CONTINUES TO RISE, THE LAG FLOAT 'WILL CLOSE AND BRING ON THE LAG PUMP. FURTHER RISING OF LEVEL IN 'WET'WELL 'WILL CLOSE 4TH FLOAT (HIGH LEVEL> AND ACTIVATE THE HIGH LEVEL ALARM LIGHT AND HORNS, ON FALLING LEVEL' t9 Z a: ill ill Z t9 Z ill - p.. Z - o Q.. = ~ - = T,D,H. 25 FT ALL PUMPS 'WILL DE-ENERGIZE AT THE OPENING OF THE LO'WEST (OFF) FLOAT CONTROL CIRCUITRY 'WILL BE SUCH THAT NO FLOAT 'WILL DEPEND ON ANOTHER FLOAT FOR ITS CONTROL PO'WER, CONTROL PANEL SCHEMATICS, IN PLASTIC LAMINATE, IS TO BE AFFIXED TO THE INSIDE OF THE OUTER DOOR. ALL 'WIRING SHALL BE NUMBERED. IN THE EVENT THE PUMPS BEING FURNISHED REQUIRE SEAL FAILURE COMPONENTS AND INDICATION TO VALIDATE 'WARRANTY, THESE COMPONENTS SHALL BE FURNISHED AS REQUIRED. ALL COMPONENT LABELS SHALL BE OF THE LAZER PRINTED MYLAR PLASTIC LABELS. A 24 HOUR EMERGENCY TELEPHONE CONTACT SHALL BE DISPLAYED BY THE O'WNER, TOLERANCES REVISIONS CUSTOM PUMP & CONTROLS INC, JACKSONVILLE - TAMPA, FLORIDA (EXCEPT AS NOTED) NO. DATE BY DECIMAL SHEET: :t PUMP-FIBERGLASS LIFT STATION 2 FRACTIONAL 3 DRA'WN BY CADlInes CHK'D 3-25-93 DRA'WING NO. SCALE N,T.S. MA TERIAL + DATE ANGULAR 4 :t 5 TRACED C9315 MODIFIED REVISED 06-14-01 en ...J - ~ W Cl en w - ~ - ...J - ~ :::> a> !:2 CX) ..- M o CD lD ;>: lD CI W Z CD en w CI Iii I- <C CI w :::> en ~ w () Z W o - C/) w e::: C/) --.J --.J .=-:- ~C.9 ~ a.. II ,~-:lI!!!!- C-6 z o i= c.. C2 U CI) w o en z o (j) > W wO::: ~ o >- II] CD lD CD lD ;>: lD CI LlJ > o ~ a.. a.. <C ;>: lD Z ~ CI CD lD ~ CI LlJ ~ U LlJ I U o <C o ll: I-f'- ZID f'- 0('1') a.. ('I') >-<C <cO ~ll: <Co O~ ZLL ~ci W 01- ID<c ~S ~ll: ...q<C LOW T"""~ T"""() ..- 0 ......It) ........- ('I)...... , , ('I) ('I) NN ............ -- ............ ID NN ('I) !::::.!::::. ('I) -.: >< ...... (I) ttl N I-LL o Z c o :;:; ttl N 'i:: o .J:: - :J <( ..... o .$ ttl o Ij:: :e Q) u (!) Z 0:: w w Z (!) Z W ..J <( U Z I U W ~ o w (!) I (!) Z 0:: W W Z (!) Z W ..J > U CD I ~(!) _~ Z (l)ttl Z ~:2 cnoZ S u: ~ .5ia. 1/)- (I) ttl Cl B~z om<( ~U ..J N z 0 i= ll. i'i () CI) w Cl en z GRAPHIC SCALE 0 en 20 0 10 20 40 :> W ~ I I I we:: RmJO ~ Cl 1" 20' >- III o <( o ~ I- Z o D- >- <( ~ <( o z <( L TREE INVENTORY NOTES o u X w L LL o LL ~ :=J G ~ ~ ~ ~~ ~ 74 Wj~'O' J 75 -.~.}'S J 0? Z!, ~ 10' Tree Inventor '?'1~'O' 'Q.'O'O(. ~\(j?i- 'Oo'(,?i- ~, QJ.-.. s" r."" ~, Veltchla montgomeryana ~2' Cu Coccoloba uVlfera Ch Chamaerops humills Lc Llvlstona chlnensls Wb Wodyetla blfurcata Iv Ilex vomltOrla pendula ZONE ~o(C>. (jO~ Coconut Palm Pygmy Date Palm Christmas Palm Montgomery Palm Triangle Palm Senegal Date Palm Sea Grape European Fan Palm Chinese Fan Palm Foxtail Palm Weeping Youpon Holly Tree BUTLER I nve nto ry by: DESIGN GROUP, INC 4203 46TH AVE. N. ST. PETERSBURG, FL. 33714 PH 727-521 -1 684, FAX: 727-527-7422, E-MAIL:BDG10TAMPABAY.RR.COM DRAWN BY: RON BELKO ISA CERTIFICATION # FL-5802A DESIGNED/CHECKED BY: CHUCK BUTLER ISA CERTIFICATION # FL-1235A z <C ....J a.. >- 0:: o ..... z w > z - w w go:: !z..... o u w () Z UJ o - C/) UJ 0::: C/) ....J ....J cc ---l 0 a en .;, c:> OJ c:> co c:> ..- cb M C) C) C) C) CC c:> c:> CD CD CD CD <( ;>.: ;>.: ;>.: 0 w CD CD :z ;>.: CD Cl I- Cl I I- <( W CD Cl W U Cl :z :z w > w ~ 0 ., w C) ~ u c:::: 0 :::::l en w a.. CC c:::: (J) w :::c a.. a.. !:!2 Cl Cl U <( W \- <( 3: CC <( W .-J U TREE INVENTORY NUMBER Japanese Privet Cabbage Palmetto Ravenala madaga5carlen515 T ravlers Tree ..:-;- ~C.9 c:::: a.. <.9 Z 0:: ill ill Z <.9 Z ill - P. Z ... Q a.. = ~ ... = SHEET: L.1 o <( o 0:: 1-"" ztO "" 0('1) 0..('1) <( ~O .....10:: <(0 0.....1 ZLL ~~ W 01- to<( ~S ~o:: .q-<( LOW ~.....I ~() .... o ~ a:l o I.j: ~ Q) () ...... 0 (9 ~~ Z '? I';- IV' C") C") u... C\I C\I W r-- r-- W ;:::-;:::-Z C\IC\1 r-- r-- - -- (9 a5~Z I-LLW ...J <( () Z I () W I- o W (9 I (9 Z 0:: W W Z (9 Z W ...J > () co ~(9 _~ Z Q) a:l Z l!?3:! Ci50Z S u:: :5 .5~a.. 1/)_ Q)coQ c3~Z om<( ~ C3 ...J I --- - - - - , - - - COASTAL CONTROL LINE - - - - - 120'.9 1/8" -' - - - - - - - -. . . --- N ---.- --- --- --- A>... _ _ --- --- --- CLEARWATER HARBOR - - - - . - --- --- --- 5> ~ .... --- - - ------ --- --- - - -----------------------------------', -----------~~~~ VE (EL. 13) ~-------------i ~~---~~------------ZONEAEqEl:~}-- -. - - ~ ____ - - ~ -ZEROCLEA-----------, SEPTIC DRAIN FIELD I l l' ~ - - - RANCI~.__r:PICAl AT C..9"-~ AL CON~O.!:.. LINE _ _ _ _ ~ i - ~ I I L---~-';;;-~SiA ~ I ~~"I\.i~'i~ljI~i!i.,.l [ - - - - - L.... C....ON.,.J::tO,1 I 1t!!,",,,,,,,""";,'''1 - - - - - ~NI: il I L. .... II I \.- .... I I '(; . I I I I - - - - - - - --- - - --- -- -'- -- - -- --- EXI8nNG SEAWALL --- --- -- --- -- --- -I I I I I I I I l " " " " --- I I LAP POOL .-- I I I I I I I ( I J POClL.... I POOL ABOVE I I I I L________________________ I I --1 =~ =J =J 1------, , , , , 1 , GARAGE ENTRY PROPOSED RESIDENCE IllI r-~~--~ I / ..7 r I I I l I I ~OTOR COURT ~ I I I L , " \ 1_____ ^ / " / " ,---- , 1 , , I , , , , , , ----- GARAGE OJ " " ''] I II I I II I I I I ,---- , 1 I I , ---- -.- - - -- STORAGE I I I I I I .1 -r----I- l ) --. ~ -- RETAINING WALL DRIVE 10'.0" 108'.8" MANDALA Y POINT ROAD - - - - - - --- - - --- - - ----- --- --- --- - - - ---- - - -- ----- - - - - . ----- - - - --- --- - - - - - ~ - ~ GROUND FLOOR PLAN ~ l!r-ll.(f - - ~ - -- -- -- -- --- .J .............. ~ ~ U o . ~ C~ .c~ CD ..Q 2657 AUGUSTA DRIVE S. CLEARVVATER,FL~33761 T. 7274889490 F. 7276695575 '11II_ .......2I'all'.IHIICfIIIY OFIBWl....-oc:M.INC..ANDMAYMDf . &IE) OI..-.oaucID wmtOUJ MII'fIM .......IICM......-oc:M..1NC. ENGIteR SEAL PROJECT 1I1lE: ~ p:.l ~~ 00 ~ ~~ ~ rT' ~ ~~ ~~ S~ ~~ \0 ~ ~ ISSUED DRAWIN& lOG ~ DAlE: ITEM: ~ ~ ~ ~ ~ ~ ~ ~ ~ P~o: GILLS DRAWING TITLE: GROUND FLOOR ISSUE [WE: FEBRUARY 2, 2009 SIET Al.0 NOT RELEASED FOR CONS'I'RUCTION I~'--~~--"- I' HEV.54'-01l TOP. OF ROOF ~ ""'"'~~~:~~~~~..'~~~i~~~;:=-r:"=;~'~ ELEV. 46'~611 MID" OF ROOF 5LEV. 40'-811 THilRD FLOOR ~ ELEV, 30'-0" SECOND FLOOR ~ ? HEV, , 6'-8" FIRST FLOOR ELEV, , 3'-0" BASE FLOOD EL. (FEMA) ELEV. T-O" GARAGE LEVEL ~ ~ ~ ""-'~"''''T''''''''''''"'''--'''''' ;c ;. .;",-"t~.'~*~l':'\~ti'''"'-':';'>'''''l't..f"''''''",;>~'~;<''' :'i'''''';>1~'r.1-,,~)t't _"",~~~_lII;!;>~~""",,>,?!,,,,g,,,,~",-=~""""'1l;b;o.~""~'",,,,_'!.o"".'N"""";'\'""~""~",,,,,~~,,,,,,,,,,_,_~~""""')'''')~"'''n~,,,,,,,,..,,,,,,_",,,,,,,,,,,~..'_'''''J~",~~"",,,~,_,,,"."',,_r'.,,.-;.,,,,,,_,,-"_' ".>",,,,,"~.r"""'~-_"'~"'''''''''''''''''''''"--'-''''_'''"'''''''''.__''_''''''''''~'<<>'''''''''''''''.'~<:.__.~._.... 'I>"' . _~"';,'''''''''_~H_.;."""".'"-,~.,,,-O;b'',,,,-,,,,,,,,",,__,,,,,,,,~,___,,~,_,,,,,,~,,,,,,,,w'''''''''''''........-."""_-<>,........., ."""",, ,. _", ..,-~. ~',' ...,..~. --~."".,,,,,,,,,~-.', .,.- ..~ .c," ;',-,"-.~.-....,.~_^.,""_,_.,_. ,."," , HEV.O'-O" WATER ~. EAST ELEVATION 1/811= 11.(11 HEV. 40'-8" THIRD FLOOR $ ELEV, 30'-0" SECOND FLOOR t..,}.A...... -$ $ ElEV, , 6'-811 FIRST flOOR ELEV, , 31-0" , i BASE FLOOD EL. I (FEMA) , " ElEV 7' 011 d,..,.,...."....'...' - -",",-~"~'- ;.'~' ._..,~-~-"... I '_. ._..... ........._ -- oJ ~AAAC[ I:[v{l-.. ... --$ I t-- -$ ElEV. 0'-0" WATER --1--- @ =':LEVATION -I I I i ~ ~ U o V) ~ < O~ ..c ~ (]) .0 2657 AUGUSTA DRIVE S. CLEARWATER, FL. 33761 T. 727 488 9490 F. 7276695575 THIS DRAWING, MEASURING 24" x 36". IS THE PROPERTY OF BeHAR DESIGN ASSOCIATeS INC.. AND MAY NOT BE USED OR REPRODUCED WITHOUT WRITTEN PERMISSION FROM BEHAR DESIGN ASSOCIATES. INC, ENGINEER SEAL PROJECT TITLE: ~ u ~ffi d8 doo ~ ~ O~ ~~ ~O O~ ~~ ~~ j~ <~ ~~ ~~ OU \.0 ~ ~ ISSUED DRAWING LOG ffi DA~ ITEM: PROJECT NO: DRAWING TITLE: GILLS EXTERIOR ELEVATION ISSUE DATE: FEBRUARY 2, 2009 SHEET A2.0 1 NOT RELEASED FOR CONSTRUCTION ._~--._---- -~-'- -$ -$ HEV. 541-011 TOP. OF ROOF -$- HEV. 461-6" MID. OF ROOF -$ ELEV.40'-811 THIRD FLOOR -$ ELEV, 301-011 SECOND FLOOR $ -$ HEV. 161-8" FIRST FLOOR ELEV. 131-011 BASE FLOOD EL. (FEMA) ELEV, 71-011 GARAGE LEVEL $ -$ ELEV.OI-OII WATER -$ ELEV, 541-011 TOP. OF ROOF -$ ELEV, 461-611 MID. OF ROOF $ ELEV.401-811 THIRD FLOOR ELEV, 301-011 SECOND FLOOR HEV, 16'-811 $ FIRST FLOOR ELEV, 13'-011 $ BASE FLOOD EL. (F E MA) ELEV. 7'-0" -$GARAGE LEVEL -$ ELEV. 01-0" WATER V) W < U o V) J.. V) O~ ..c ~ Q) .0 2657 AUGUSTA DRIVE S. CLEARWATER, FL. 33761 T. 727 488 9490 F. 7276695575 THIS DRAWING, MEASURING 24" x 36", IS THE PROPERTY OF 8BiAR DESIGN ASSOCIATES INC" AND /MY NOT BE USED OR REPRODUCED WITHOUT WRffiEN PERMISSION FROM BEHAR DESIGN ASSOCIATES, INC, ENGINEER SEAL ~ ~~~1~ ELEVATION PROJECT TITLE: ~ u ~ffi ~~ ~~ 000 ~ '9 f3 ISSUED DRAWING LOG It.., DATE: ITEM: L L__ L 6 L L /\ L-' L L PROJECT NO: DRAWING TITLE: ~< ~~ ~O O~ ~~ ~~" j~ <~ ~~ :E~ ou \0 ~ ~ GILLS EXTERIOR ELEVATION ISSUE DATE: FEBRUARY 2, 2009 SHEET (J;) ~/~~~ ELEV AnON A3.0 NOT RELEASED FOR CONSTRUCTION