Loading...
CONSULTANT SERVICES PERTINENT TO PARKING NEEDS ASSESSMENT AND FEASIBILITY STUDY FOR DOWNTOWN CLEARWATER I I AGREEMENT FOR PROFESSIONAL SERVICES This AGREEMENT is made and entered into this ~ day of j)ocy. ,200 I, by and between the City of Clearwater, Florida (CITY) and Urbitran Associates, Inc. (CONSULTANT). WITNESSETH: WHEREAS the CITY desires to engage the CONSULTANT to perform professional services pertinent to such work in accordance with this Agreement; and WHEREAS the CONSULTANT desires to provide such professional services in accordance with this Agreement; and WHEREAS the CITY selected the CONSULTANT in accordance with the competitive selection process described in Section 287.055 ofthe Florida Statues, and based on information and representations given by the CONSULTANT in a proposal dated October I, 2001. NOW, THEREFORE, in consideration of the premises and the mutual benefits which will accrue to the parties hereto in carrying out the terms of this Agreement, it is mutually understood and agreed as follows: 1.0 Proiect Understanding: Urbitran Associates, Inc. (Urbitran) in association with Chance Management Advisors (CMA) understands that it is the desire of the City of Clearwater to complete a Parking Needs Assessment and Feasibility Study for Downtown Clearwater. It is also our understanding that the area of study will be bounded by Drew Street to the north, Myrtle A venue to the east, Chestnut Street to the south, and the Bayfront to the west. October, 2001 rA () 2 ..~. ,~, Iy-," " .> ." / (;) I I 2.0 Proiect Scope of Services The following is the phased approach for the project: 2.1 Phase lIProject Kick-Off Meeting We propose to start this by conducting one (1) project kick-off meeting with representatives of the City of Clearwater to clarify the objectives of this study, set milestone meetings, reconfirm the study area, interview key stakeholders identified by the City of Clearwater, and set protocol for establishing contacts, lines of communication and transfer and distribution of information. 2.2 Phase 2/Parking Supply and Demand Analysis After completion of the kick-off study a review of previous studies completed by the City of Clearwater and an update of relevant studies to accurately reflect the current utilization and projection of future demand will be completed. This will be accomplished by: 1. Verifying on-street and off-street parking demand within the study area (private and public sector). 2. Identifying turnover and parking duration characteristics of on-street and off- street parking within the study area (private and public sector). 3. Identifying and comparing the current parking demand with the present supply/utilization and determine deficit and surplus parking areas. 4. Identifying frequencies of illegal parking occurring within the study area. S. Identifying current and future parking generators in and around the study area and assessing their impact on existing and future parking inventory within the study area. 6. Conducting shopper, employee, and business owner parking surveys and gathering input from stakeholders identified by the City. 7. Conducting two (2) public workshop meetings to obtain valuable public input on parking issues, real or perceived, to gain consensus on parking alternatives and future decisions. 8. Meeting with the City of Clearwater representatives to review preliminary data. The data collected will be analyzed and synthesized to determine a comprehensive overview of the parking requirements needed to meet the goals for maintaining and enhancing economic growth in the study area. 2.3 Phase 3ffraffic Impact Analysis The traffic analysis will focus on identifying traffic operational issues and constraints as well as potential improvement opportunities in downtown Clearwater associated with the October, 2001 2 rA I I planned reconstruction and realignment of the Memorial Causeway Bridge connecting downtown Clearwater with Clearwater Beach. The resulting access changes to and from the new bridge can be expected to affect traffic circulation and operations on roadways and intersections in the vicinity of the bridge. Additionally, the new bridge will result in the realignment of Court and Chestnut Streets resulting in the elimination of parking lot #15 and reconfiguration of parking lot #22 near the County courthouse. We will approach the traffic study area as being a subset of the larger study area identified in the kick-off meeting to include the roadways and intersections that stand to be potentially affected by the planned road closures and realignment, and by the realignment of the bridge itself. Two traffic-related scenarios will be studied: 1. A "typical" summer weekday or weekend (Saturday or Sunday) scenario or, 2. An event-related scenario (such as the Jazz Holiday in mid-October or the Spring recess in March-April) on a weekday or weekend day As directed by the City of Clearwater at the initial project kick-off meeting, we will establish a traffic study area and identify the analysis scenario that best addresses the project issues and concerns. The baseline traffic condition will be established using a combination of existing data as well as new data to be collected. We will request and obtain all recent traffic data (counts, roadway inventory, signal timings, etc) from the city and determine their usability for this study vis-a.-vis the analysis periods (i.e., was the data collected during the appropriate time). We will also collect new data at critical intersections for example along Drew Street, Cleveland Street and Osceola Avenue. In addition, traffic conditions at selected critical locations, such as bridge access points will be videotaped for future reference and use throughout the study. Pertinent roadway features such as roadway widths; number of lanes, pavement markings will be verified in the field. Traffic flow maps will be prepared for the traffic analysis scenario showing turning movements at critical study intersections within the traffic study area. Capacity analyses will be performed to establish intersection capacities, levels of service and other appropriate measures of effectiveness for the baseline condition using standard practices, procedures and analysis tools. October, 2001 3 rfj I I Plans for the new bridge will be examined to identify the access modifications, planned roadway closures and/or reconfiguration and new bridge alignment. Based on the access changes and roadway modifications, we will identify potential alternate roadways to which traffic can be expected to shift either to access the new bridge or because of planned closures. In identifying alternate roadways, we will examine roadway and intersection capacity, adjacent uses and route directness. Traffic shifts will be quantified and the baseline traffic flow maps will be revised to reflect Future Traffic Conditions associated with the changes in access and roadway configuration. In addition to traffic impacts, the impacts of these modifications on parking will also be addressed. Based on the location and extent of potential traffic impacts, we will identify and recommend appropriate traffic mitigation strategies to improve traffic flow and reduce congestion. Among the types of improvements we will examine are roadway re-striping, signal timing changes, channelization, modification of traffic control devices, turn prohibitions and street direction changes. The effectiveness of these measures will be quantified and presented using the proposed traffic simulation model. In addition to vehicular capacity improvement measures, we will also identify the need for and effectiveness of the potential for traffic calming measures, improved signage, enhancements to pedestrian facilities, and improvements to transit facilities and emergency vehicle access. We will also investigate opportunities to incorporate pedestrian-friendly design features at the terminal points of Drew and Cleveland Streets that could provide an enhanced gateway treatment for Downtown Clearwater. As part of this phase, we will also examine previous report recommendations for a Park and Ride system linking beach parking with lesser used downtown parking areas through the use of a shuttle system. This evaluation will also include our recommendations on the feasibility of a light rail station for downtown to beach transit. Issues such as cost, methods of funding, usage, effectiveness, scheduling, and public acceptance of such systems will be reviewed. 2.4 Phase 4/Site(s) Selection Once we fully understand the magnitude of the parking demand inherent to a particular site or sites identified by Phase 2/Parking Demand and Supply Analysis we will be able to focus on site selection. Our first task will be to thoroughly understand the particular site, or sites, characteristics. This will enable us to gauge the massing potential and impacts on the adjacent October, 2001 4 (i> I I surroundings. We will examine the site's topography, property boundaries and immediate adjacent uses. From this study, we can begin to assess the opportunities for access and egress to a proposed facility and the possible traffic impacts. We will also conduct an analysis of major fatal flaw issues, which are essential to the viability of each concept. Our next task will be to begin to understand the dynamics of the property or parcels geometric layout. From this review, our staff will layout multiple design alternatives, which will function on the site. For example, we will determine whether a two bay or three bay garage is appropriate, or if angled parking is necessary to meet design criteria. We will also factor in the means of access between floors: sloping parking ramps, speed ramps, helical ramps, multiple garage entrances utilizing topographic site opportunities, the openness of the garage perimeter to avoid costly ventilation requirements and a host of other considerations. All of these factors and others are considered while laying out the simple single line diagrams of the structures. Once this work has been completed, our next major and critical consideration is the various structural systems most appropriate and cost effective to each particular site concept. Structural alternatives to be reviewed include: pre-cast concrete; cast-in-place concrete with or without post tensioning reinforcements; steel framed structure with cast- in-place decks; and proprietary systems, which maybe cost-effective to the geographic area. The preliminary structural system selection affects the parking layout and overall dimensions of the structure but need not be finalized at this time unless the site or design is very constrained and little flexibility exists, or the design is specifically related to the expansion of an existing garage; in which case it is very likely the existing structural system will be utilized. Upon preliminary selection of the structural system, approximate column grid locations will be developed. This along with vertical grade change (ramps and slopes) within the garage will be reviewed to determine where pedestrian stairs, elevators, and security factors will be considered. All these factors will be reviewed in the concept designs supplied by our team. 2.5 Phase 5/Feasibility of Additional Parking Facilities The feasibility of constructing additional parking garages will be based not only on the parking needs assessment, but also on the City of Clearwater's financial condition and ability to absorb the cost of additional facilities. In this task we will perform the following: 1. The areas of parking deficiency will have been identified and confirmed in Phase 2. These areas will be compared with vacant properties available for garage construction, or properties that the City could purchase as construction sites. October, 2001 5 tIJ I I Certain sites identified in the Downtown Clearwater: Our Downtown master plan will be verified for feasibility. The sites will be. discussed with the City as this analysis proceeds. 2. Estimated construction costs will be developed, using team expertise tempered by Florida typical design standards and costs. Desired operating characteristics will be discussed with the City, and then operating costs will be estimated. Available City financing methods will be discussed, and interest rates and amortization periods established. Any special considerations (e.g., debt cap, City bond ratings, required reserves, etc.) will be identified through discussions with City representatives. Once these issues have been resolved, debt service will be calculated. 3. Parking rates for projected facilities will be developed, based upon existing rate structures in the area of the sites and the City's typical rate increase patterns. Revenues will be projected for at least five years, as will expenses. 4. Up to three (3) pro forma will be developed for potential garage sites. Each pro forma will be based upon a set of assumptions about revenues, operating expenses, financing and debt service, and facility use. The assumptions will accompany each pro forma so that the City may understand how figures were established, and use the pro forma later if assumptions change. 5. A determination of the feasibility of each project will be made in conjunction with the City. If each garage must stand alone in terms of being financially self- supporting, this will be evident from the pro forma. If, however, feasibility is based upon the ability of the entire parking system to be self-sufficient, or if the City is interested in subsidizing a certain garage because of potential economic development benefits, the discussion must be widened to establish "feasibility". The financial analysis described above will be a forecast of how a potential garage would perform financially, but the feasibility of it being constructed may be a decision that is based on additional variables important to the City. 6. An implementation plan for constructing any additional facilities will be developed, illustrating any property that must be purchased, an estimated schedule for development, and the financial performance of the facilities. 2.6 Phase 6/Parking Management Plan Ideally, a parking management plan should make full use of empirical parking performance indicators, scientifically gathered and measured against industry standards, in order to properly assess existing conditions. This approach ensures that the appropriate strategies are applied to observed conditions or programmatic deficiencies. October, 2001 6 t.P I I For example, without definite knowledge of violation capture rates for overtime parking infractions, sampled parking turnover indicators and average durations may lead to improper conclusions about the appropriateness of the surveyed regulations. Likewise, inappropriate conclusions regarding parking policies may be reached without a proper assessment of the many factors that contribute to an area's "parking equilibrium". These factors include the on and off-street parking prices, the ticket fine and penalty structure, and the relative effectiveness of ticket processing and collection program strategies. The following outline identifies study elements contained within this phase of the project. Off-Street Parking 1. Review current off-street parking operational hours as they relate to peak and non-peak parking demand periods. (Demand periods obtained through a sampling of turnover and duration in identified areas in the downtown business district). 2. Review current occupancy rates. 3. Review of rate structures, including the feasibility of "special event" parking rates versus free parking. 4. Review staffing levels and determine effectiveness. 5. Review and evaluate existing revenue control equipment and procedures. 6. Review any current merchant validation parking programs and evaluate feasibility of new programs. 7. Evaluate the loss of current parking inventory caused by the new Memorial Causeway Bridge alignment (Lot #22 & #15). 8. Evaluate the feasibility of shared parking usage with downtown religious institutions and other private and public sector parking inventories. 9. Identify and evaluate seasonal fluctuations in parking demand. On-Street Parking (Parking Meter Program) 1. Review current parking meter equipment, inventory, and placement. 2. Review hours of operation of on-street parking meters. 3. Review on-street parking rate structures and time limits. 4. Review loading zone policies and provide recommendations for future use. 5. Review current on-street parking operational hours as they relate to peak and non- peak parking demand periods. (Demand periods are obtained through a sampling of turnover and duration in identified areas. Parking Enforcement 1. Review existing parking enforcement policies (i.e. free parking for "special events") and procedures. October, 2001 7 riJ I I 2. Review staffing levels and determine effectiveness of performance. 3. Review feasibility of centralizing administrative oversight of enforcement duties to Parking System from Police Department 4. Review the current methods of parking meter enforcement to include the hours and days of patrols, the number of enforcement officers deployed, the type of summons issuance equipment being utilized, and the overall effectiveness of the operation 5. Evaluate any additional enforcement efforts such as booting, towing, or scoffiaw programs. 6. Review the type of equipment currently in use, and evaluate its effectiveness and reliability. 7. Assess the method of coin collection, security procedures for coin handling, and controls in place for tracking the assignment and safeguarding of vault and upper housing keys Parking Administration We will evaluate the existing organizational structure as it relates to service delivery to include: 1. All revenue and expenses. 2. A review of cashiering procedures and policies. 3. A review of cash collection procedures and existing security measures. 4. Examination of existing management software to determine the effectiveness in providing data in an acceptable format, and report generating capability. 5. A review of the number of employees and level of responsibility. 6. A review of public service hours of operation and staffing levels. 7. A review of the City's web site for information regarding downtown parking information and make recommendations. 8. A review of special event operating procedures and provide recommendations. 9. Overall operational expenses 10. Revenue and incentive programs 11. Number of employees 12. Competitive entities (private and other parking operators) 13. Equipment and software 14. Maintenance efforts 15. Privatization levels and opportunities 16. Level of customer satisfaction with service levels currently provided One (1) site meeting will be required to investigate and review the conditions and systems listed in this phase. October, 2001 8 f; I I 2.7 Phase 7/Draft Report Upon completion oftasks one (1) through five (5) our team will produce six (6) copies of our draft report which fully outlines our findings. Our report format will be submitted in 8 Y2 X 11 format containing full color graphs, charts, photographs, renderings, and/or schematic designs. 2.8 Phase 8/Final Report and Presentation After delivery of our draft report to the City of CleaIWater, we will meet with City of CleaIWater officials to gather their input and comments regarding all aspects of the report to date. After receiving this valuable input, our team will incorporate the required changes to produce and deliver our final report and presentation. 3.0 Proiect Schedule and Team Members: 3.1 Project Schedule Based on approval of this agreement by the City of CleaIWater City Commission on November 1,2001, completion of this project will be as follows: Phase l/Project Kick-Off .......................... 10 days Phase 2/Parking Supply and Demand Analysis. 45 days Phase 3/Traffic Impact Analysis . . .. . . . . . . . . . . ... 45 days Phase 4/Site Selection 45 days Phase 5/Feasibility 60 days Phase 6/Parking Management .................... 90 days Phase 7/Draft Report 150 days Phase 8/Final Report 160 days October, 2001 9 fIJ I I 3.2 Team Members Team Members assigned to CITY project by the CONSULTANT shall not be removed from the project until alternate personnel acceptable to the CITY are approved in writing by the CITY. Team members are identified as: . Richard Matarangelo, Project Manager . Brian Bartholomew, Deputy Project Manager . Barbara Chance, Principal (Chance Management Advisors) . Michael Horodniceanu, Principal-in-Charge . Atma Sookram, Senior Traffic Engineer . David Sampson, Transit 4.0 Client Responsibilities It is expected that the City of Clearwater will be responsible for the following: 1. Provide access to areas required for any necessary inspection or survey. 2. Provide all available parking information available and applicable record drawings, specifications, and other relevant data (preferably in electronic format). 3. Designate a representative, or representatives to act on the behalf of the City of Clearwater for this project. 4. Examine documents submitted by the Consultant and promptly render City of Clearwater input pertaining thereto to avoid unnecessary delays in the progress of the Consultant's work. 5. Provide all base maps in electronic format (Auto Cad 14 or later) if available. It is understood that the Consultant has the right to rely upon the accuracy and completeness of all data furnished to it. October, 2001 10 f{) I 5.0 Fees 5.1 Basic Fees I The above-described Scope of Services shall be delivered based on the following fee schedule: Phase l/Project Kick-Off Meeting Phase 2/Parking Supply and Demand Analysis ., ..... ........... Phase 3/Traffic Impact Analysis .... ..................... ......... Phase 4/Site Selection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Phase 5/F easibility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. Phase 6/Parking Management . . .. . .. . .. . .. . .. . . . . . . . . . . . . . .. . . . . . Phase 7/Draft Report ............................................. Phase 8/Final Report ............................................. PROJECT TOTAL ...........,......................................... 5.2 Payment $ 8,000 $20,000 $15,000 $15,000 $20,000 $10,000 $ 5,000 $ 5,000 $98,000 CONSULTANT shall bill CITY upon completion of each step as described in the 5.1 Basic fees. CITY agrees to pay after approval of the City Project Manager under the terms of the Florida Prompt Payment Act F.S. 218.70. 5.3 Additional Services Services requested of Urbitran or Chance Management Advisors, which are not described in the scope of services for this study, will be billed at the prevailing hourly rates attached, based on the specific professional discipline required. Any additional work requested, which is not in the scope of services covered under this agreement, must first be authorized in writing by the City of Clearwater before the start of any requested additional work can proceed. The Hourly Rate Schedule in effect for this agreement is our most current standard rates and is included with this proposal (Exhibit "A"). 11 rP October, 2001 I I 5.4 Reimbursables The following reimbursable expenses are included in this agreement: . Blueprints, computer prints for Parking Consultant's/Engineer's internal work . Travel and out-of-town related expenses (mileage, subsistence, hotel, etc.) . Long distance telephone calls . Photographs, reproductions, telecopier/fax services, courier services, and express materials The following reimbursable expenses are excluded from the expected reimbursable expenses related to this project and shall be billed to the City of Clearwater at actual cost plus 10% administrative fee should they be determined necessary by the City of Clearwater as the project progresses: . Other consultants, models, and special presentation materials . Fees and expenses for securing approvals from governing authorities . Blueprints and computer prints for approvals, other consultants, or public agencies 6.0 TERMINATION 6.1 The CITY, at its sole discretion may terminate this contract by gIvmg CONSULT ANT ten (10) days written notice of its election to do so and by specifying the effective date of such termination. The CONSULTANT shall be paid for its services through the effective date of such termination. Further, if CONSULTANT shall fail to fulfill any of its obligations hereunder, this contract shall be in default, the CITY may terminate the contract, and CONSULTANT shall be paid only for work completed. 7.0 INSURANCE REQUIREMENTS 7.1 Workers Compensation and Employers Liability. The CONSULTANT operates as an independent contractor and shall procure and maintain, for the life of this Agreement, Workers Compensation Insurance covering all employees with limits meeting all applicable state and federal laws. This coverage shall include Employers Liability with limits meeting all applicable state and federal laws. 7.2 General Liability. The CONSULTANT shall procure and maintain, for the life of this Agreement, General Liability Insurance. This coverage shall be on an "Occurrence" basis. Coverage shall include Premises and Operations; Independent Contractors; Products and Completed Operations and Contractual Liability. Coverage shall be no more restrictive than the latest edition of the October, 2001 12 ~ I I Commercial General Liability policies of the Insurance Services Office (ISO). This policy shall provide coverage for death, bodily injury, personal injury or property damage that could arise directly from the performance of this Agreement. The minimum limits of coverage shall be $500,000 per Occurrence Combined Single Limit for Bodily Injury Liability and Property Damage Liability. The CITY shall be included and identified as an Additional Insured under the policy/ certificate of insurance. 7.3 Business Automobile Liability. The CONSULTANT shall procure and maintain, for the life of the Agreement, Business Automobile Liability Insurance. The minimum limits of coverage shall be $500,000 per Occurrence Combined Single Limit for Bodily Injury Liability and Property Damage Liability. This coverage shall be an "Any Auto" type policy. Coverage shall be no more restrictive than the latest edition of the Business Automobile Practices of the Insurance Services Office (ISO). The CITY shall be included and identified as an Additional Insured under the policy/certificate of insurance. 7.4 Professional Liability Insurance. The CONSULTANT shall procure and maintain for the life of the Agreement, Professional Liability Insurance. This insurance shall provide coverage against negligent acts, errors or omissions by the CONSULTANT in the performance of this contract. The limits of coverage shall be $2,000,000. 7.5 Indemnify. The CONSULTANT agrees to defend, save and hold the CITY, its agents, assigns and employees, harmless from all claims or causes of action, including costs and attorney's fees, and all judgements whatsoever, involving personal injury, bodily injury, death, or property damage, arising out of any negligent act or omission, or the violation of any federal, state or local law or regulations by the CONSULT ANT, its subcontractors, agents, assigns, invitees or employees in connection with this Agreement. 7.6 Supplemental Provisions. The insurance coverages and conditions afforded by the above mentioned policies shall not be suspended, voided, canceled or coverage reduced except after thirty (30) days prior written notice by certified mail return receipt requested has been given to both the CITY Public Works Administration and Risk Management Offices of the CITY. October, 2001 13 iP I I Certificates of Insurance meeting the specific required insurance provIsIons specified within this Contract! Agreement shall be forwarded to both the CITY Public Works Administration and Risk Management Offices of the CITY and approved prior to the start of any work. After review, the Certificate will be filed with the City Clerk as a part of the official contract file. Receipt and acceptance of the CONSULT ANT Certificate of Insurance, or other similar document does not constitute acceptance or approval of amounts or types of coverages which may be less than required by this Agreement. In lieu of providing the CITY with copies of its insurance policies, the CONSULTANT agrees, with ten (to) days of a written request of the CITY, to make available for inspection and the taking of notes any original policy of insurance that is required by the terms of this Agreement. Any of the following CITY representatives will be permitted to inspect the policies on insurance: any member of the CITY'S legal staff or the CITY'S outside legal counsel, City Manager's staff, Risk Management staff, or the CITY COMMISSION. The policies of insurance to be produced will be made available at the offices of the CITY in Clearwater, Florida. 8.0 INTERESTS OF PARTIES CONSULTANT covenants that its officers, employees and shareholders have no interest and shall not acquire any interest, direct or indirect, which would conflict in any manner or degree with the performance of services required to be performed under this Agreement. 9.0 PROPRIETARY MATERIALS Upon termination of this Agreement, Consultant shall transfer, assign and make available to CITY or its representatives all property and materials in CONSULTANT'S possession belonging to or paid by the CITY. 10.0 ATTORNEYS FEES In the event that either party seeks to enforce this Agreement through attorney at law, then the parties agree that each party shall bear its own attorney fees and costs, and that jurisdiction for such an action shall be in a court of competent jurisdiction in Pinellas County, Florida. October, 2001 14 (P I I 11.0 STANDARD CONDITIONS This agreement shall bind the respective parties hereto and each and all of their heirs, and successors, and assigns. October. 2001 15 ~ I I Acceptance of the foregoing agreement and execution of acceptance of said agreement by the CITY as Client, and the Consultant, as evidenced by the signature by duly authorized officers or representatives of both parties in the space provided shall thereupon constitute the services agreement, effective upon execution of both parties. Brian J. Aungst Mayor-Commissio er CITY OF CLEARWATER, FLORIDA By: ~""B.~"lI: William B. Home II City Manager Approved as to form: Attest: ~,c~ e C. Hayman Assistant City Attorney ~,~'~'JIJdt; ~ (!bAh O~Cynth . Goudeau 1) City Clerk (Acceptance by CONSULT ANT) Witness Or Attest: Accepted and Executed at our N.Y., New York Office Date /I I/){ /0/ I I ~~ Michael F. Horodniceanu, Ph.D., P.E. President October, 2001 16 ~ I I EXHIBIT" A" URBITRAN ASSOCIATES, INC. SCHEDULE OF HOURLY RATES* Principal Associate Principal P~bngOperntionsAnwy~ Chief ArchitectJPlanner Senior ArchitectJPlanner ArchitectJPlanner (II) ArchitectJPlanner (I) Chief Landscape ArchitectJPlanner Senior Landscape ArchitectJPlanner Landscape ArchitectJPlanner (II) Landscape ArchitectJPlanner (I) Chief Trnffic Engineer/Planner Senior Trnffic Engineer/Planner Trnffic Engineer/Planner (il) Traffic Engineer/Planner (I) Chief Civil Engineer Senior Civil Engineer Civil Engineer (II) Civil Engineer (I) $200.00/hour $150.00/hour $ 125.00/hour $ 130.00/hour $ll5.00/hour $ 90.00/hour $ 75.00/hour $ 130.00/hour $115.00/hour $ 90.00/hour $ 75.00/hour $ 130.00/hour $115.00/hour $90.00/hour $75.00/hour $ 130.00/hour $115.00/hour $ 90.00/hour $ 75.00/hour October, 2001 1 I I EXHIBIT" A" URBITRAN ASSOCIATES, INC. SCHEDULE OF HOURLY RATES* (Continued) Chief Structural Engineer $130.00/hour Senior Structural Engineer $1 15.00/hour Structural Engineer (ll) $ 90.00/hour Structural Engineer (I) $ 75.00/hour Electrical Engineer $ 85.00/hour CADD Technician $ 60.00/hour Technical Typing $ 45.00/hour Technician/Surveyor $ 35.00/hour *Effective Through December 31, 2001 October, 2001 2 I I EXHIBIT "A" Chance Management Advisors Hourly Rate Schedule Principal $205.00/hour Senior Operations Consultant! $ 130.00/hour Project Manager Planner $ 85.00/hour Senior Analyst $ 80.00/hour Analyst $ 60.00/hour Support $ 50.00/hour October, 2001 3