FIRST AMENDMENT TO AGREEMENT FOR ALLIGATOR CREEK IMPLEMENTATION PROJECTS PHASE II (L054) , I .., .... "';.. ~ ~ " AGREEMENT NO. 04CON000003 FIRST AMENDMENT TO AGREEMENT BETWEEN THE SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT AND CITY OF CLEARWATER FOR ALLIGATOR CREEK IMPLEMENTATION PROJECTS, PHASE" (L054) This FIRST AMENDMENT effective as of the 1 st day of November 2004 between the SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT, a public corporation of the State of Florida, whose address is 2379 Broad Street, Brooksville, Florida 34604-6899, for itself and on behalf of the Pinellas-Anclote River Basin Board, hereinafter collectively referred to as the "DISTRICT," and CITY OF CLEARWATER, a municipal corporation of the State of Florida, whose address is 112 South Osceola Avenue, Post Office Box 4748, Clearwater, Florida 33758-4748, hereinafter referred to as the "CITY." WITNESSETH: WHEREAS, the DISTRICT and the CITY entered into an Agreement dated October 14, 2003, for design, permitting, and construction of channel improvements, a treatment pond and bridge and culvert replacements; and WHEREAS, the parties hereto wish to amend the Agreement to increase the funding amount to include Fiscal Year 2005 funds. NOW THEREFORE, in consideration of the mutual terms, covenants and conditions contained herein, the parties hereby mutually agree to amend the original Agreement, dated October 14, 2003, as follows: 1. Paragraph 3, Funding, is hereby amended to increase PROJECT funding $3,000,000 by replacing the first three sentences in their entirety as follows: 3. FUNDING. The parties anticipate that the total cost of the PROJECT will be Five Million Dollars ($5,000,000). The DISTRICT agrees to fund PROJECT costs up to Two Million Five Hundred Thousand Dollars ($2,500,000) and will have no obligation to pay any costs beyond this maximum amount. The CITY agrees to fund PROJECT costs up to Two Million Five Hundred Thousand Dollars ($2,500,000) and will be responsible for all costs in excess of the anticipated total PROJECT cost. 2. Exhibit "B," Proposed Project Plan is hereby replaced in its entirety with Exhibit "B-1," Proposed Project Plan (Revised 11/01/04) attached hereto. 3. The terms, covenants and conditions set forth in the original Agreement, dated October 14, 2003, that have not been specifically amended herein, will continue in existence, are hereby ratified, approved and confirmed, and will remain binding upon the parties hereto. Page 1 of 2 ", . IN WITNESS WHEREOF, the parties hereto have executed this First Amendment on the day and year set forth next to their signatures below. SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT By; ~;( ~/ David L. Moore, Executive Director 'Z.-/S ~ Date CITY OF CLEARWATER By: See City Signature Page William B. Horne III, City Manager Date FIRST AMENDMENT TO AGREEMENT BETWEEN THE SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT AND CITY OF CLEARWATER FOR ALLIGATOR CREEK IMPLEMENTATION PROJECTS, PHASE III (L054) Page 2 of 2 DISTRICT APPROVAL INITIALS DATE ... LEGAL fJAL ll"IO ..0.... RISK MGMT N/A CONTRACTS ~ ~ RM DEPT DIR it c DEPUTY EXEC DIR , 1-[ .L/ GOVERNING BOARD N/A ~ Countersigned: -I~~ ~ E.li'nk V. Hibbard ' Mayor Approved as to form: AGREEMENT NO. 04CON000003 CITY OF CLEARWATER, FLORIDA By. ~~-:rr: William B. Horne II City Manager Attest: - '- '" :~ ~( t;~.. AGREEMENT NO. 04CON000003 EXHIBIT "B-1" PROPOSED PROJECT PLAN (Revised 11/01/04) Project Description This PROJECT involves the implementation of Best Management Practices (BMPs) and includes stormwater management infrastructure improvements, and consists of design, development of construction documents, construction permitting, contractor selection, construction engineering and inspection, and construction of the following BMPS: . Widening the channel from N.E. Coachman Road to Old Coachman Road; . Channel A Improvements from Old Coachman to US 19; . Larger Box Culverts at Solid Waste Transfer Station Entrance Road; . Off-Line Treatment Pond; . Solid Waste Transfer Station Culverts; . Old Coachman Road Bridge Replacement and Roadway Elevation; . Reconstruct Weir at Brighthouse Networks Field . Old Coachman Road Culvert Replacement; . Borrow Pit and Channel A Connection; and . Erosion Control Measures in Channel G, Scope of Work Key tasks to be performed by the CITY for each BMP: 1. Attend one meeting with the DISTRICT prior to beginning the BMP to discuss the approach, schedule and budget; 2. Provide engineering service to design, apply for permits, and prepare construction documents; 3. Provide the DISTRICT with one draft (60% level) and one final design report and construction documents for review; 4, Bid, select and hire a CONTRACTOR to complete the construction in accordance with the approved bid documents; 5, Provide construction engineering and inspection services during construction; 6. Monitor all phases of construction by means of survey, observations and materials testing to give reasonable assurance that the construction work will be performed in accordance with the approved plans and specifications set forth in the DISTRICT approved contract between the CITY and its CONTRACTOR; 7. Provide the DISTRICT with one copy of a summary of the construction quality assurance data, construction record drawings and permit related submittals; 8. Be responsible for any post-PROJECT reporting that may be required by the permitting agencies. Page 1 of 2 '. ,lo"t ' '. ~ ~. " The CITY will design and obtain permits for the Erosion Control Measures in Channel G without funding assistance from the DISTRICT. The DISTRICT will fund its share of the construction of Erosion Control Measures in Channel G. Project Deliverables The CITY will provide the following for each BMP: 1. One copy of a summary of the construction quality assurance data, construction record drawings and permit related submittals. 2. Contracts between the CITY and its CONSUL TANT(s) and CONTRACTOR(s). 3. One copy of the 60% completion level and final design report, drawings and construction documents. Project Budget Task Description DISTRICT CITY TOTAL Design Costs $ 250,000 $ 250,000 $ 500,000 Construction Costs $2,250,000 $2,250,000 $4,500,000 Project Total $2,500,000 $2,500,000 $5,000,000 Project Schedule Task Site Characterization Land Survey Geotechnical Surve Subsurface Uti!' Surve Prelimina Desi n Report 30% Construction Plans 60% Construction Plans Permit A plication Submittal 90% Construction Plans Final Construction Documents Biddin Phase Commence Construction Com lete Construction 09/15/04 1 0/08/04 12/17/04 07/30/04 12/15/04 03/16/05 04/04/05 06/01/05 08/03/05 10/05/05 02128/06 01/31/07 Page 2 of 2