Loading...
PSP89-12, MISCELLANEOUS .~.- l .. " CITY OF CLEARWA.l.l! Interdepartment Corresponden TO: Cyndie Goudeau, City Clerk drM FROM: James M. Polatty, Jr., Director Planning & Development SUBJECT: Certification of Final Site Plan for Ultimar Phase II (A Residential Condominium Project) located at 1520 Gulf Boulevard (PSP 89-12) COPIES: See List Below DATE: May 13,1991 The Development Review Committee at it's meeting of September 27,1990 approved the above described Final Site Plan subject to the following conditions: 1) Siamese connection location shall be shown on the site plan, as required by the Fire Marshal, prior to certification. 2) Subject to the first three conditions (as modified for blanket easements and final building permit time change) on the handout by Utilities as follows: a. A Pinellas County Utilities Permit and Public Health Unit Permit, Ingress/Egress and a ten foot (10 ft.) Utilities Easement over proposed water mains, up to and including meters, backflow prevention devices and hydrants are required prior to the issuance of a fmal building permit. b. Backflow prevention devices must be installed by the City with applicable fees being paid by the owner. c. Prior to Site Plan Certification, the Dumpster Requirement Data Form must be completed and returned to the City Sanitation Division. 3) The language regarding the reverter clause in the two pedestrian easements shall be revised as required by Public Works, Parks & Recreation and the City Attorney. 4) If interior landscaping is required in accordance with the court settlement, it shall be shown on the site plan, as currently required by City Code, prior to certification. 5) A copy of the Beach renourishment plan and Army Corps of Engineer permit shall be submitted to Environmental Management. 6) Open space recreational fees shall be paid for Phase 2 prior to certification. 7) Subject to Planning and Development conditions as modified (with condition #2 specifying, except for the retention ponds and driveway entrance) in Phase 3, as follows: a. In accordance with the Court Settlement for this parcel, the site plan shall be revised as follows: a) The multi-level building envelope shall have maximum dimensions of 140 ft. X 240 ft. X 210 ft. in height (for building in Phase 2) b) There shall be a maximum of 360 residential dwelling units total for all phases of development on the site (with an additional 40 dwelling units permitted if transferred from Parcel IV, south side of Sand Key Sheraton; if the 40 units have been transferred, a copy of the document shall be submitted to the City prior to the fmal phase of the development). b. In approving the site plan for the first two phases of this development, the Development Review Committee is not approving the third phase, except for the retention ponds and driveway entrance, as it is being presented in a conceptual form at this time. c. The project shall be completed by the year 2006 as per the court settlement. 8. "No Tree Verification" form shall be submitted to Environmental Management. As conditions #1,4,6,7,and 8 have been met, please certify the attached plans/plats subject to conditions #2,3, and 5 listed above and distribute. JMPITHC ,v. . .~ cc: James M. Polatty, Jr., Director of Planning & Development'; Cecil Henderson, Engineering J. Terry Neenan, Gas Department Tom Miller, Environmental Ream Wilson, Parks & Recreation Director Don Meerians, Traffic Engineer Victor Chodora, Building Official Robert Brumback, Utilities Cyndie Goudeau, City Clerk Ray Wyland, Zoning Lou Hilton, Planner II (Memo Only) Developer/Project Sponsor (6) Please call Mr. Steve Baumann at 595-8915 to pick up the six (6) copies of the certified site plan .. cer8912b.tc .... .". DOCUMENT CONTROL SHEET DEVELOPMENT REVIEW COMMITTEE PROJECT/LOCATION: Amendment to the Certified Site Plan for Ultimar Phase III (A residential condominium project) located at 1520 Gulf Blvd. on Sand Key (PSP 89-12) DRC Meeting Date: July 23, 1992 1. JAMES M. POLATTY, JR., DIRECTOR OF PLANNING & DEVELOPMENT 2. VIC CHODORA, BUILDING OFFICIAL 3. DON MEERIANS, TRAFFIC ENGINEER 4. J. TERRY NEENAN, GAS DEPARTMENT 5. CECIL HENDERSON, ENGINEERING 6. TOM MILLER, ENVIRONMENTAL '7. REAM WILSON, PARKS & RECREATION DIRECTOR 8. JAMES GOODLOE, FIRE MARSHAL 9. SANDRA GLATTHORN, SENIOR PLANNER 10. LOUIS R. HILTON, PLANNER II, PLANNING & DEVELOPMENT 11. TED CLARKE, PLANNER II, LONG RANGE PLANNING 12. CYNTHIA ANDERSON, STAFF ASSISTANT III (CONTROL SHEET ONLY) Date received by Planning and Development Office: July 14, 1992 Date of distribution: July 17, 1992 Remarks: Third and final condo bldg. as per court ordered stipulation settlement. COPIES ARE ON FILE IN THE OFFICE OF PLANNING & DEVELOPMENT 07am8912.lrh