Loading...
ALLIGATOR LAKE WETLAND CREATION AND STORMWATER TREATMENT PROJECT - 99-0020-EN - ADMINISTRATIVE CHANGE ORDER #1 ADMINISTRATIVE CHANGE ORDER # 1 PROJECT: Alligator Lake Wetland Creation & Stormwater Project Number: Project Date: November 17, 2008 99-0020-EN PO REFERENCE NO.: ST104566 CONTRACTOR: Ripa & Associates, Inc. 1409 Tech Blvd. Tampa, FL 33619 DATE OF CONTRACT: September 03, 2008 CODE: 0315-96137-563500-537-000-0000 (A) SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT See attached sheet for increases to contract. This Change Order adds eleven (11) days to the contract time. STATEMENT OF CONTRACT AMOUNT ACCEPTED BY: ORIGINAL CONTRACT AMOUNT $471,033.90 Adm. CO#1 $28,703.15 NEW CONTRACT AMOUNT $499,737.05 CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA eQ? ?- 4, 4William B. Horne, Il City Manager Ripa & Associates, Inc. By: (SEAL) Christopher M. Estep, Project Manager Date: _ rz Witnesses: I Re 4mendBy: City of Clearwater Gary A. Johnson CGC Public Services Director r Michael D. Quillen, P.E. City Engineer Date: L, (? ZCJO A 1 Page 2 of 2 Administrative Change Order #1 ITEM DESCRIPTION QUANTITY UNIT UNIT COST Increases for Code 0315-96137-563500-537-000-0000 Riprap Rubble (bank & shore 3.5 protection) 110 TONS 75.01 Additions for Code 0315-96137-563500-537-000-0000 3.10 Erosion Control Mats Phase 1 667 SY $7.05 East Slope 3.11 Erosion Control Mats Phase 2 1534 SY $7.05 South Slope 3.12 Erosion Control Mats Phase 3 700 SY $7.05 East Slope Net Total Increase to Code 0315-96137-563500-537-000-0000: TOTAL COST $8,251.10 $4,702.35 $10,814.70 $4,935.00 $28,703.15