1977-1981 SOUTHBEACH III 1977-1981 SOUTHBEACH III . >r,. '.f FEB 17 1981 P~,NING O.II:ARftlmNl1 February 12, 1981 Dennie P. Thompson, Eeq. 1253 Park Street Clearwater, Florida 33516 vi\'eJ U. S. Steel - Application for building permit. Dear Dennie: In response to your letter of thi. date relarding the application to construct a carport at South Beach Ill, I am writing th18 letter to conflrm th. agreement we reached today by telephone. It 18 not the City's intention to interpret Judie Driver'. dechion as limited to the property at 1480 Gulf Boulevard. Therefore, any application for a building permit on U. S. Steel property on Sand Key.auld be conaidered in light of the busiaee. zoning ... it exiated at the time of allllexation. Accordingly, I have notified Roy Ayres of thiB interpretation and he will direct that the permit for the carport be baued immediately. In diacueeing thie matter with Mr. Ayres he mentioned that he told Mr. Frank Felix of U. S. Steel that the City would be prepared to act on the application for a building permit on South Beach IV before this week i. over. Mr. Felix notified Mr. Ayres that U. S. Steel intende to amend its application for South Beach IV. Mr. Ayre8 r.eponded that the City would be pleased to allow an amendment, and conaequentiy no permit will be ieaued on the application pending U. S. Steel' a amendment. Any future applications will be reviewed for their compliance with health and aafety codea purauant to the normal City procedure.. Mr. Felix concurred that thia was ae U. S. Steel intended. Again, let me apologbe for any miauaderstanding that might have arben regarding this appllcation. I look. forward to receiving a written order from the court. Sincerely, G. I . ) c- -f LA:~... Li.J C.' "[(~i..( Frank X. Kowalaki Chief Aaaiatant City Attorney FXK:fa j cc:: Roy Ayre.; Dave Healey -- --- -- -,""F~- . . PLADDG DEl'AItTMENT February 25, 1980 Mr. Donald Simpson Project Engineer U. S. Steel Realty Development 200 St. Andrews Drive Be11eair, Florida 33516 Dear Don: This letter is in response to your request to construct carports on the property located at 1500 Gulf Boulevard, referred to as South Beach III. In accord with our conversation, this i. to advise that I have no objection to the i.suance of a permit for the row of carports located immediately north of and closest to the building, with the exception of the four we.terlu-most spaces and wall. With this exception, this row of carports is, for the most part, within the envelope within which structural location would be permitted based on water- front setback provisions. It should also be noted that the emergency generator, ifovver thirty (30) inches in height, would appear to need to be relocated or a variance sought. The portion of the four eaaternmost carports which project beyond the setback dimension i. inconsequential and, in my view, doe. not require that a variance be obtained in order to locate this installation. The second row of carports proposed to be situated north of the first tier above described rests entirely within the required waterfront setback area and cannot be permitted without authorization of a variance by the Board of Adjustment and Appeal on Zoning. If it is your desire to locate such additional carports, 1 recommend you make application for such variance. In fsirness to you, I should also point out that my position would be to oppose such variance as a major departure from the waterfront setback requirements that would appear to be without suffici.nt jU8tification to warrant variance. For your further information, in reviewing the file 8S to the i.suance of a permit for the South Beach III building at 1500 Gulf Boulevard, I find nothing that would exempt this site from the waterfront .etback section of the Zoning Ordinance. Since the waterfront provision has been in effect since Jun., 1974, I a. un.ble to determine why the site plan, which i8 the basls on which you are proceeding, wa. approved if, indeed, it was, in contradiction to the waterfront setback requirements. Specifically, such setback requirement. require that one sid.yard be ..lnt.ln.d open and unobstructed without parking unle.. 8uch parking is d.pressed three feet or more below the grade level of the adjoining stre.t. The site plan you left with me clearly contemplates parking .t grade on both the north and south ar.... - -----:y- -..' ~ . . Mr. Donald Simpson - 2 - February 2S, 1980 By copy of this letter I am notifyi~1 Building Director Roy Ayres of same and request he make the appropriate determination prior to any certificate of occupancy being issued. I trust this is responsive to your request. If you have further questions. please advise. Sincerely, David P. Healey, AICP Planning Director DPH:bd c.c. City Manager Anthony L. Shoemaker Roy J. Ayres, Building Director - .:...------- ~---.----- '. . . '3 , " ~ / CITY OF CLEARWATER I nterdepllrtment Correspondence Sheet TO: Mr. Ed. Blantonl Building Director /J _ ,f I c- FROM: Anthony L. Shoemakerl City Manage~~ COPIES: City Attorney and M. J. Paroby SUBJECT: Building Permit - 14 (.0 ~ U. S. Steel 144 Unit Condominium, -l-&(HT Gulf Blvd., South Beach III Condominium, Sand Key DATE: March 9, 1978 Attached is a copy of a memorandum dated January 26, 1978 from the City Attorney to W. E. Tripp, Assistant Building Director. in which the City Attorney determined that a building permit should be issued for' the subject project under the zoning then in effect at the time the application for permit was submitted. You are hereby authorized to issue a building permit on this properly with the conditions outlined by the City Attorney in his memo of January 26, 1978, and with the partial sewer allocation recommended by the Building Permit Review Committee at its meeting of February 8, 1978. Please assure that appropriate annotations relative to partial sewer allocations, etc., are made on the building permit. .' .~ ~ i . .ermit No. __n__n____nn___n _______________________ 19 _____ PLICATION FOR PERMIT TO BUILD, ALTER OR REMODEL IN CITY OF CLEARWATER PERMITS MUST BE ISSUED BEFORE WORK IS BEGUN PLUMBING, SEWAGE AND ELECTRICAL WORK MUST BE DONE BY CLEARWATER LICENSED CONTRACTORS, except where done by owner or for wagel. Complete plans and specifications of the proposed structure are made a part of this application. I hereby certify that this application, together with plans submitted herewith is a true representation of all facts concerning the erection of the proposed structure. It is understood that any deviation from information contained herein unless approved by the Building Inspector will render the permit issued on this aI2plication null and void. This proposed structure (alterations, repair work) does not violate any building restriction of the Zoning Ordinance, sub~ivision, plat or my deed. ' OWNER _~.?.?n~~~_~ ~~ _P_~~~J_~el!1~_n_!_Qj_v_t~j.9_'l__ Address n2.00__StL AI1QLeJtS _ Dxive--1-J3e3-1ealL _n ~_n _ __ __ CONTRACTOR n___ __~.?!l!~n_nn_________n_____ Address ___n_n_Same_______ _nn_nn________n _ ____nn ARCIDTECT J~_~l!1Pi_6!,11tG.h__8ulacK~Q!:L__________ Address n_Ja.kks.oD_vJJle_'---_fJ_a..._n__nnnn_nn_ n__n LOeA TION LOT nn ___nn______ BLOCK_nn_n___--- SUBDMSION n____n__n_ n_____________n__nn LOCATED AT No. ____3-5_00______ STREET __.Gu.1LR1\ld~nSou.th_______n___n__n___n_nn ZONING COST OF COMPLETED PROJECT __2.'---500--'-000___________ 0. Erect o Alter o Repair o Addition o Demolish o Other un__u___ gcCUPANCY fg A. Residential o B. Business o C. School o D. Institutional o E. Assembly o F. Storage o G. Industrial o H. Hazardous TYPE CONSTRUCTION o I Fireproof ~ 2 Fire.Resistant o 3 Heavy Timber o 4 Non.Combustible Frame o 5 Ordinary (CBS) o 6 Wood Frame o Single Resid~nce Q Duplex Resldenc~ ~ Multi,Family Residence o Business Building FOUNDATION o Concrete o Stem & Base o Monolithic 12(1 Piling o Other ___________h_____ ~R.EAS 200 000 Llvmg ______~_h___ Sq.Ft. Otl1er ---20.,-000. Sq. Ft. FEE ROOMS ~ Living [)I Dining ~ Kitchen ~ Bedrooms o Family Room o Florida Room ~ Baths o Garage - Carporte o Other _nn_nnnnn___ ROOFING o Compo. Shingles o Asbestos Shingles o Slate o Tile o Metal ~ Built-Up DRoll HEAT o Oil o Gas Cll Electric o Reverse Cycle AIR CONDITIONING ~ Yes o No SIGNS ~ On Site o Temporary o Commercial Adv. MISC. ~ Swimming Pool ~ Drive (Conc_) (Asph.) o Parking Area - ADDITIONAL INFORMA nON: __l4~L_-n2_hatb_.ap.ar1ments-- d___ - - -- ___n___n____ -iTJ)W~~llW~1ffi ----- _Thi Lbu Hdio9__ls_P"'-'_thaJDasieq>lan..______ n____m m. --- .- - - --1\1 ~~AY - . -6 1974~t!LI APPLICATION FOR CERTIFICATE OF OCCUPANCY BUILDING DEPARTMENT We, the und~rsigned owner(s) of the property described above, hereby c~rtifY that, _ " CI~Y of CLEARWATER 1. The descnption of the proposed use of property and type of constructIOn or alteration of eXistIng bu^Jing, together with the plans filed with the related application of building permit is a true representation of all facts concerning same. 2. No changes to said use of construction will be made without written lJermission of the Building Inspector. 3. The proposed use of land and the proposed construction or alteration does not violate any of the building and health laws and ordinances of tbe City of Clearwater, or restrictions imposed by plat or title deeds to said property. I/We, hereby, make application for a Certificate of Occupancy based on this application. It is understood, that as prescribed by Section 13 of Zoning Ordinance 627, and as amended. that no land, buildings erected or structures altered, may be occupied or used until a Certificate of Occupancy !hall have been Issued by the Building Inspector. phone Number _____A4.3.::D6.3.1____________ __~--~-L--~~-- ________________ ROBERT C QY'Nl' ~see.. A~ent.. Contractor . HIL , proJec~ tnglneer __US5-.Realty _ nev.eJopment._DiY_isi on_nun _ ____ n__ REGULAR CERTIFICATE OF OCCUPANCY Based on Application for Certificate of Occupancy dated _____h______Uh_ h__ _ n - __n____ -_ _ _ __ together with application for Building Permit and all written amendments thereto, a final or Regular Certificate of Occupancy Is hereby issued for the above described use, construction or alteration. Fjoal inspections by the Building Department were made on _n_n__n__u_n_n___.hn__un_ _ __ _n u_ . The building or proposed use of the building or land complies with all Building, Health and Zoning Laws of the City of Clearwater for the use and occupancy above described. . . The attention of present or future owners Is invited to the fact that subsequent changes in the use of the above described property or alterations of said building or buildings require a new application for a Building Permit and Certificate of Occupancy and the issuance of a new Certificate before such use or alteration can be legally made. Buildinl( Inspector . . J C I T Y o F CLEARWATER POST OFFICE BOX 474B CLEARWATER. FLORIDA 33518 January 19, 1978 PLANNING DEPARTMENT Mr. G. P. Willard Vice President Engineering and Construction United States Steel Realty Development Division 200 St. Andrews Drive Be11eair, Florida 33516 Dear Mr. Willard: In accord with our conversation this afternoon, this is to confirm the interpretation offered to you that under the provisions of Section 34.01 of the City Zoning Ordinance a community impact statement is required prior to the issuance of a building permit for a project whose combined development cost is estimated to exceed $500,000; and that such require- ment is applicable to the application by U.S. Steel for the building project identified as South Beach III referred to in previous correspondence as 1500 Gulf Boulevard on Sand Key. If we may be of assistance in reviewing the require- ments of this section of the Ordinance or the applicable procedure please advise. DPH:ms Sincerely, ~/~~ ~:i"~tp. Healey c:r Chief Planner/Current Planning Division CC: Ed Blanton, Director, Building Department Tom Bustin, City Attorney .,~ ., " ; c.., 0 F C LEA R W ATE R Int ctepartment Correspondence Sheet TO: u.s. S. Realty Development Corp. (File) FROM: Richard Griesinger, Asst. City Attorney COPIES: SUBJECT: . . " - ',"",', . 'Mr~Tripp,the'1s13t. Building'Director, called me todayat 2:45 p.m. and info~m,edrne.thatasa result of a meeting thathe had with George Buhmeyer, City.E'ir~M'arsha.l1, Don Simpson, representative. of U. 5.S., Jack Diamond, .U.S...S.'sarc:bitect, .andMohsen Kashmiry, U.S.S. 's engineer, they decided thatitwowd be possible to comply with the life safety code restrictions of-the, -Southern Standard Building Code. '10. 1973 there were more restrictive changes fuadeofthe Code - the life safety code - wmchpresented some problems for U. So S. The representa- tives oLU. S.S. stated that the blueprintS for the building at Sand Key will be finished by late December, 1977, or early January, 1978 in compliance with the life safety code Mr~ Tripp told nie that he believes this to .be a time.. .. ._J OF CLEARWATER Interdepartment Correspondence Sheet Building Dept.. Permit - U. S. S. Realty Development Corp. (File) TO: FROM: Richard Griesinger, Assistant City Attorney COPIES: SUBJECT: Septembe r 19, DATE: ,.vr7fi.n.ally agr~edhi..rW.ythatU. S. S. Realty was entitled to a building permit Hit complied~ththe SouthernStandard Building Code within six weeks. - ~This:rneetingwas held JUly 21, 1977. >",:,0- ;" - ,;-, : - - '''. . '" . ,. - '. ,. -. . .. . ,. ','. -. , '., .., ,'; '" '.". ..... .. . ............... . II1'A. . .ug...u. st,u.... S.S. Re~lty agre. ,edto.' the conditions of the. me;tin....~.......~...howev.er" ~I'~:S nO;.J1r;llJ~ 3th the Southern Standard Gode( Ii f'e s ~ f"e:;, I ~a.de . . '- -. .' , ....... ....... ..... ..' . ..'" .' '.-- -- Six weeks is up at the end of September, therefore, in s~~en ~eeks (Oct. 7) call Ed Blanton and let him take care of this. .. ''<1 \ '--(' ~ ", '.. . " ?e' .......~, Permit No. _________,____....__,___~.:: . _______________________ 19 ___~=-: APPLICATION FOR.: PERMIT TO BUILD, ALTER OR REMODEL IN CITY OF CLEARWATER ;._,. PERMITS MUST BE ISSUED BEFORE WORK IS BEGUN PLUMBING, SEWAGE AND ELECTRICAL WORK MUST BE DONE BY CLEARWATER LICENSED CONTRACTORS, except where done by owner or for wagel. Complete plans and specifications of the proposed structure are made a part of this application. I hereby certify that this application, together with plans submitted herewith Is a true representation of all facts concerning the erection of the proposed structure. It is understood that any deviation from information contained herein unless approved by the Building Inspector will !ender the permit issued on this a~plication null and void. This proposed structure (alterations, repair work) does not violate any building restriction of the Zoning Ordinance, subdivision, plat or my deed., ' OWl\'ER _~??_ _~~~_~~~_.P..~~~]-~~'!I~-~!-Qj-~i~i.9-f!-- Address __2.0CLS. t.._ AI1QLe1'LS _ Ltd. Y e-,--'~eJJJ~gj 1:. - ~--- - --- ~ CONTRACTOR _ ____ __?.P-.!I!~_______________________ Address _________Same_u - _u -------- -- u_____ - --- - ------- ARCHITECT J5.~l}1p~_6l:111G.tLEt--J.g~1<-~Q!L-----_---- Address ___Ja_cksQI1xi.1].e_~ _f]j~...____ ___u__~_______ --- --- LOCATION LOT ______u________ BLOCK___________--: SUBDMSION ______________u_____ __u______u__ ----- LOCATED AT No. ____J_~QO______ STREET __fiu.lf_.al'ld~_:-Sou.th--u-------..----u-------- ZON ING COST OF COMPLETED PROJECT __2.~500~QQO-"--------...u.----- -.----------.--.-- m Erect o Alter o Repair o Addition o Demolish o Other -----~----..------- gcCUPANCY rn A. Residential o B. Business o C. School o D. Institutional o E; ';sscmbly o F. Storage o G. Industrial o H. Haz.ardous TYPE CONSTRUCTION I;) 1 Fireproof ~ 2 Fire.Resistant o 3 Heavy Timber o 4 Non-Combustible Frame o 5 Ordinary (CBS) o 6 Wood Frame o Single Residence I;) Duplex Residence IlIl Multi.Family Residence (J Buslnes.soBlillding .' FOUNDATiON o Concrete o Stem 8< Base o Monolithic t'!:l Piling o ather ______uu___u___ ~R.EAS 200 000 Llvmg _u__,______ Sq.Ft. Ot~er u_2O.,.oo.o- Sq, Ft. FEE ROOMS ~ Living ~ Dining ~ Kitchen ~ Bedrooms o Family Room o Florida Room ~ Baths o Garage. Carporte D Other nU__uu_n_____ R_OOF U"G ~ _ . 0 Compo. ShinglesOO D Asbestos Shingles D Slate o Tile D Metal [X Built-Up DRoll HEAT o Oil D Gas IX Electric D Reverse Cycle AIR CONDITIONtNG ~ Yes D No SIGNS ) ~ On Site o .Temporary .'0 o Commercial Adv. -MISC. ~. Swimming Pool ~. Drive (Conc.) (Asph.: o Parking Area - ADDITIONAL LNFORMA TION: __144___u2.hath..apa r.tmen ts__ ___u - -- ______.u ---- -ffi) ~~lli llW~1ffi -" -- - - - Ih j 5_.b.U j J li i.ng~j,S. - pJ!!:_ the. JDas_teqlaD____ - - - -- - - - - - - - - - - --- --me - - --1\1 ~~ AY - --6-'9 -74 ~ W ._____ _______________ ________ ______ _ ___ ________ __ ___ ___.___ _ _ _ __ _ _ . . _ .._ _ _ _ _ _ _ n .._ _ ____ _ __. .__ . ___.. __ _ _ _ ___ ___ APPLICATION FOR CERTIFICATE OF OCCUPANCY BUILDING OCPAOTHJ:'(d L l\.dlI...1. We, the undersigned owneds) of the property described above, hereby certify that, . . CITY of CLEARVJATER 1. The description of the proposed use of property and type of I'onstructlon or alteriltlon of existing bu~Jing, togl!'lher w;lh thc plans !lied with the related application of building permit is a lruc n:prcsentalion of all f.1cts concerning S.:ime. 2. No changes to said use of construction will be made without written iJermission of the Building Inspector. 3. The proposed use of land and the proposed construction or alteration does not violate any of the building and health laws and ordinances of the City of Clearwater, or restrictions imposed by plat or title deeds to said property. I/We; hl!'reby, makl!' applkation for a Certificate of Occupancy based on this application. It is undl!'rstood, that as prescribed by Section 13 of Zonin!: Ordinancl!' 627, and as amended. that no land. buildin!:s erected or structures nltl!'red. may be occupied or used unt.!.! :I Certlflc3tc cf Occupancy shall have becn 153ued by the BUilding Inspector. Phone Num ber __._A4J-:.Ofi3J..__________ __~_ c...L.\~ _ __ ____u_____u ROBERT C Q'R\Cl' 4~5ee.- AG..en,t.. Contrilctor . H1L , t'rOJeCL tnglneer' _._USs.._Realty _ Devel opment.Dtvis i on ___n_ _ _ ___ _____ REGULAR CERTIFICATE OF OCCUPANCY Based on Application for Certificate of Occupancy dated _____n_________u.. ___..___u_. __.. __ ___. to!:ether with 3pplicalion for Buddin!: Permit and all written amendments thereto, a finnl or Re!;ular Certilicate oC Occupanc)' Is hereby is~ued for the abu\'e described use, constructloll or alteratIon. F,nal inspections by the Building Department were made on _________________________._u__ nu ,__.u... The building or proposed use of the bullding or land (ompUl's with aU Building, Hl'ailh and Zoning Laws of the Cily or Clearwater, for the use and occupancy above described. The aUcnllon of present or future owner~ Is InvHed to the fact that subsl'qucnl chan~es in the use of the abo\'l' dcscrila'd property or alteraLlon! ol 8nld bulldlna or building! require a new appllcaLlon for a Dulldlng Permit and Certificate of Oecupnncy and the issuance of a ncw Certificate before such use or alteration can be legally made. --- ------- -- -- - ------ - -:-nuildl~~. i~;p~C'to~. ,"-", ., '; t:;i ((" {, 1'.\ ("\ ~~ ~ i,;\.;. J ~~ t r~~'~ r. o,~,.." l .:; . ;:00 s ~..." TtJ ~~. t: i~~ f" ;~, ; T .... ," " ,,,.. f _. .". v... · ~ J n~\ ('R'r",{ ___.il , t.......~ >-if' ...." ~-7lL . ..,,':;:.. - ~--".._.. -,,- ~~f iH D"" ... "..l . ."" , . ~...'~ LV r- ,;; l..A~, ~ ~;. i". rt ::: ;~, ,fIe) n CJ K f.' , , },,": 1:, .. __._.________.__.____. ___ _,_. in C'~~ ; !!~.... ,"", - ~ ~""" t . /'. ,,~. ,- ~"lr;t f r ~.. ..~ .~, t ;'~,~ J'}~ , ~. ::-.l :_~...::.:.,- .1i~ l'. r, t f__a\.. i-.;;:~},\ITS M'.:5T fi.E iSSUED E.2;:C~E W;)RK IS ~r=GUN r:;L'.:,W~;N~, f!ViAC:E t.N;) ELECTR1Cf..L V;,J;:':j( MUST BE OCNE 6Y CL!::AR'i"-;'A.TER L!CEN~ED COfHRACTORS, ~~~~.p~ wbl'J~!1 C..:H..... by C,\{r.iJf or {lJr \v;:/~eJ. C~~;:I.:.;.~f.<e v;:~7~5 cu~~j !:p~::f:~i~t;'':l:15 of t1'".e ~:0;:'()5ed Et~uC~llr"~ 2.:-e z:1a:e J p.:rt of :his e;;p[::;tica. I f.'.2re~./ {:f_~~i:' t:-:at tl'~lS ;p;.,:i(":l~i(,n, tr,se~";~(~: ,".itb p1:.n~ ~t1:llii:t~d teTe'~'~Lh is a true rt;-.r(~:,2~~:ati:)n of ;11 fac~ ~r""'"~-.,, :;"i: L-F-CL"'l(' of :bp p;-.}yc:s:.d s,rcJ:it;re. It is l..;.:)GC,.sL'o.j U,al any t.:Evi,:~.:'n from ;;,fc;-rr.3tw,. c,:,n'Lr;ed ~_.,j~"". ~'~~l ..~. , . - '.. ~... . - - .~ ";.~ T...-.,....,,' .~,.~ . .~._....... ,... ;, '_ . 'r, " ~h:- ....., 1.'..-,...~; ." -....j ~ ~r. r,CjPjT'1 u.;:~e:2:S (~r;~d'.o\'2d u~. tl":e 1:'.~llC.l~..:g ~l""::l,\:'ctcr \lUJ rC;)G~.;. ~...:t l"'tr:TI... L:,St,t:~ ()r~ l .u:~ .d~;';.h.c2..lCln n:,liJ ~..; \0,,:..1. ";;:S f:;i. :)-C:~t'd ~~l-~:'::t:'!.r{: (a:tt;;aticns, r{:p:;i_~r ~~~-.Drk) clO-es not vir.-.1a:e .:.:.r~y otli1:.iug rf:stj~~""ti(;n of tne Zc.~.j~g (~;,.ii;".2Dc.e1 S~.i'C'..._ii\.~$~'):\ p;~t ::,r n:~;: d~-~fd. (....'...,...-...=R. _ ~.S_S.. .~.2_c .1_t. '_-..l._ _D_c.'v. e__i_c_';~_J-:"'_i,_E:_'_it__Q_i_y_i.<;_' _';_o_n___ . ",. ,,- ?,-,r...;:: t ;'"ld Y'... "... Dr i p "011 ea' 1 _ _ _ __ _ - . _ _ _ .........:...:;:-e,.> .J.::'>I_.... .._C~;L~.:.:.l.:;.~_.-_.~'~-L_:...._,_.._J~__u. ce, )-:1'.H_.~_ CTCiR _. _ _ __ _ _. ~.:~'.~ __ _ __ _ _ ___ _____ _"_ _ __ ___ AGd:'ess A.T'; Ci-JlT.t:C T :~.::T:f'..:..J';,; :'.C_O _~, ).Q L;:~~Qi}_ __________ }:.,dd.?e5S Lv':/.>.Tim'l '':;;"''IQ - - - - - -_.- - .... ...,~j ~""' - - - - - - - - - - - - -.., -- - - - - -- - - - . _ __,J g~kscnvj.l J ,eS. Jla.____ h. BLOCK._______h____ SL'E!Jf\.'lSION _h______.. LO L H LOCA-;1:D AT :;0. h__15_Q(L_h_ ~T;HT _..fillL.BJ\ld..5o:.:th __. _U__'_ _____h__._h___, ZOI'\I~G COST (:F. CO:'l~::~J~'r.F:D PItO.TEeT __L_.l ~:~),,,GOD-,._______,__ ~ E:..~t -' 4.::.;'1" TYF'E CC1';~n,i.lCTISN ~ F~T>:';lroof 3: .; r;n'.!h:'~~:lnt :i H.ei:'.")' 7o:T,i.er .; ";;)r."C0r:-_:~,~!.:~~.le F:-.:.rue ;, C."C;:...7}' 'C35) _ e ~','oc.d r:-~~e ct e.;...:~l: l,c':;:::~[i , ' :'.I~:__,~.. :!It. G~.J'.t:r _.. '._ '.CO: :U'- :.A':Y r- ...~. r.: C' 1(;'''::;:: nl r-. f.lr.;lf: F.es.~::~ncr D:':;'Jf'- F.;:~; ::.ct":': e ~ :,~....1:i'~-c~.;j:.. Re~i~t~n.':'€- ?_l~jn~!;~ E:...:.::':....:.i , , -'~ ~. oJ. ;~f:;::'; (" S:.';-.:>-c,; :-; /0.. L~s,i"'~~,i~.,:",t.l .,' r ,.. '.!,G::... ~ .~~ L._ _~'~P'Q;::t... s: ~, Jr.'J\1.:~~'.:L 1.-,,' h.. : ~~,;,a ;.::':..",..;.! n.f-O'-'''':J':'~l.;:~.. "-' CD:,.cn.~'i' -, ~:fm !.- ~;E:'SC ~,::'-_j.o:i'J',o': ~.~~:~,~s ",2C.\~! ~ ~)DO c..~,~: ___~~;.,Q~;;_ ~:. F'~. 5~. f~, 7:: r-.:,;:g c.t:",c:r ~\.r)r) ITiC.i :'~..\.L- :,7\ F ~)f:?~~~.. T:C:~' 14~. -__2 bz.th .cp~t.tL;e.nts _ _ _ _ _. _ n _ r; i::; b ~: ~ 1 j_ ;_ G '; _ j,s . r.2 [ _ t (~ J' j:;:' 2 r ~. i a il.-> _ _ _ _ , :T:E "'~00"",5 ~ Li\.~:'l? v !:)iuinf ~ Kn:::tOn X .tor-~:-(,<,7Li H::AT " Oil Gao;. :x ::~jt; :-tr;~ -; F..f tc~r~! C'"~'::le r :.~..i:' 1-",'Jcm A:~ COI'tt:'17:C~i,~G 2) Yes :J 'ic, ~__ Fl :Jri,j; R,.:......r::; ~ E e ~ hs G~ja,s€' . C~ :-;,,)rtt' (";''';- --. 51 c; ~S ~ Or, 5itr = 7t.,=., ~(~;--a::-' l,( ::;.:D('~C~,:L . ,.;.. .""I...l.. ~OC;:jNG = C;r.:~'.;. Sr.::'~les = -;',-'~-~~~n os'~E=.~,- ~.-'!f'! ~:at;:a McSC '2 o"'.:"1m.:,;. ;'(..:.; ::s _Ire', e Cc:",r; .'.'p'... ~ :~3 -i.jn~ A.:-~;a ~ .;~ - :.',,':<1: Z L~,;~.".._ 0 F.~,:: f.... :t4 '-;':1 r? ~,c-:' -:r:'~ :-m..... ~ l '" I \ .,.: ..;...... ~ ~ \ \, , I r' '... . '-' , .. ' . , ~, j - ':: y --:.- ~ ~. ~', : : --. - '. -"" _. - . . "'--; . \ . .. " ..1 ,...., - ., ~ ..., i ..' . ....4.,.: . ~'; ,-~ ! !""_,: -". , ~ __.,-. :-...--, ':--1.. r- U..:XF.K i ;;<~H; D I i I; ......,. ,'''' A P ? L! CAT ~ i,j ;C:J R C E R";' , F i : t... TE 0 F v ( ~ ,,) P t....~ ': y ~:j ~ G ;! \: '.J -.-r ""., ,..,'., , .'. ". : :;:..l ~ ;'::. \1.-:, :.i:(> t..:.d':.~':'.;j.:~:!e::: ".'\l-.::er-:.7)'. nr t~;e ~;-O;-.,~.:'-:,y .:::(~-;.~)'!'.:; a:..u\':' ;,l't~'t...' (l':-!j'.. ., "P .,',.. :;..~ ~~~;c;':j~.1(,;~ ;-;{ ~j)€, i,."':7"";. r,,-,~'('-G u..... 0-' ;-f.,j': :T\ ~,;r0 ~....'lLr, L.....'. :e:,~;I.-d r"rr.~:[.:,:},.-'t.i;:::" l.._,'lC,-, p'.-~-'~.> ~: .,d,: ;": >rl ...: ~:'; ,:-~;..-!..)i~ :.'''' s..: 1.\'..,' ~.- ._ .' J ....al,:: ~ .... J"I'j ~~:..~:.f~.' ...~:~,..: i..-:E- ,~': ':c.:-n.~";"'L.:t,(j:-, ',..n b.,. ,,':.j~-, W.lr.-I~" \I. :.,tA,._ 3 :-:-." ;,"';: '/-lw L;'=" u;" L::,;,d ~~,;; ~L~: P? :-'-'.~I'''. :'.r-J r.:,;:,;:-c~ v:' :r.t C'~.' c=~ C':ld.:'.:a:..:!", G:" ~.,:...:-j'.-'~i'- i\.:, l:. C'S"r~:r;c::.'~ v~- ~-.':~~~)~;.r.y ~..:io~\.J ~:;:J. tt;,:~ ZlJ-T.:..::'" .:;;'~' ')~'".J. .\'~ r j :.t -... .:,;.: 1~ 1:., .....;!i':;f-E~~(, :! '..~,;j; ~s ;:~.....=~;t.JD-,j ':..:y S~C-':--;: ~: ... ,"-_ ,. r:r CH~;:~.il:-,~E' B;>,':..n !l.Q.' :.... f.':': :':~:rC c--:- U~i,;: ~::t:~ ~ :-.~-:lf,,-~~~ ~: C":~C:'pi,~:'~ L:,t~_~ .:i, ;:J~. ~, :. i: ,:,':'::21~__~__ .~ 1~\1 r.o.t ~ ~ I (: f I-.! C" l~_ ~; i,~:: ,:~ "f f= P 'I.I.-!:...:.J''''d''._.\ t( ,.-.:tLt:i' ... .:~ "\i' ;.<~,r~~ ;- (.. .:( i '.t. r. :. ~ ~_ ;: '... :-; :,,,. r i . --," :.... # ~;t -:. Jr '- . . . '...J . ~ :. ~ ~ ~-, ~ l"'- ",(.: ,.:y ;--..; 1::1~ ,,,,n: ;-.' ,... '\\c, ;'l';-:>y. r.'..", :,"i Iwl..~ ~,'., ~ :. ;.<)~., .J.; .:.;. (.'"~. ..5 ,~,,: .:~ _OT> r j. ~.: c:.~ ~.: .i!":: l:-. ,d.:-:~' eh.'("~t.";. -,,, e ::.rr: i.~.,:..J _ b~. ~:-.e .. '...Jc '-'j~ ~..i;.~Ct~,:-, :~,~-L::~L;:-(S _.,.., I ~ ,..~, - , ' -:..-,,"' \ r, '.J' <:> '-~, '... '-- . .~..:i?-.J;' " - - -"'-"" - ........~ _ ';J.' ---." r -- - "'- r -..., :.-.:,~.,'; ,^.'::;;' : C :::~.:':.~l~r r ~'::':. r<! ... r. L;", :,,' _, '=' c. ~ t. I . '9 1 n'~ '= r lSS Realty JS'IE'L:,;xert ::ivisisn___ .- _. --.,.--...----.------ ----..----.-- -----~-. ---.-. .. - --'-.-_'- .--....-.--, .-.-'-'-----.--...-- - "-"-_. _._- -"-_._,~..,_. ----_.._~.-.._._.-_..__._---_. --,.--.--.---.--.--.-- --, .-..----- -~._~---------.,_._- ---.-.. -,-..-----.--,,' "~.- -, --"--- ~EG:...:LAR CERTlFtCA iE CF OCCUP:~f~CY IL~f':: Co!"j /~;"J .~~~iC::' for Ct~~~!ltaH! o~ [)c:-:":';'dr,::f ::d~('C. __4 ___ B;.l':-;';';~ T'.~r~;!' ;:r~-:'!. ;}; ....;-;j.l~:1 Io:TIc'r,:.=n:r-:-ots :nl'rt~i.C. .. ~.DA; or n.f'~t.;.A:" d~~..';",b...'d ~5f, r.cr~~t~lJcLrQ 0: L::e!iUcr... '....101 i:lS;"-CU,O:-,s by' t:'lf B~idi;Jg' D~r4:1:1cnt \O.r7~ :nJl~t' C\D h___'__-"H.. ~.~.~e:hH v..:th cr.p"c.,tlo~ ~'Jr (c:-L!,catfi of ;J(,':l:):;",~.~V is 1 c~er'v i.<5\;<'d Ice: tJ;~ ;;!)"ie ~rr'f :--:...:Jid:....,t: "r ;.;-r'l~co~fd ~!.-e of t....t' tJuii.:Lr;g' C7' L:n.:; com;1U~s witt all BuiAdlr"~, :~ttl~h an;: :'~,:;c.;:-.; ~"'~ of e--,.c> C~t)' ot C:t'&.-i......tfr. f~~r ;.l;,.? ~H" ..i',:; c.:~':~~'.a::"l:::j' li.t.:;..o:- d~~j.cr::le'd~ Tr,!' .I:t~:1~;r,jn cf p:-rw-.,t or !utu.r. Qwnl'rS U in~.ite-rl ~O> ~;-"'t la-:t t.hJ~ J;.~:"sf>c:ut:nt ch.n~c; l.n t!":l' U;;f' of t1'le aoc),\t ~~~&('r~b1..'"~, r~=.;w("l~' 0: ~~.t....;II~;~;"1." G~ 'il'::' t'lu~:.1:r:1 c: t-~j(~4:'\~1 rl'~~~:' . Zit,,"' f;:'i)~;C'LC~ fer ~ B;';'~~lr, f'c:-=:;~ aed C.'r:~rl(".t(' of OC"::-~ri..r~c~ anc lr:,., l'~,~^r.r'r 0: .. !";~.'... ':l'r: (l;-R,~E ~L.~:-t!: IUCr. U~.e or aite:-J.l.;::::. car. ~ It,,;;U~ rr,~dt' ----~'......... ............ '~ F~16Jie'r:r l::!t;;.e':~or 35) ::to .. -'>.... ~ L '-"--+- L/' 0 A.p...-.9.Q... \ q ,-, ....... I... \~ ~~~~\ ~ ~ Y,u.'\.L...:;. V ~ ~ '3. , \ q 'T S '-LA- tL\J ~, ~\ ') .,.,_ 0- . >..,) ~ ~.. ~ ~.. 'c. l A~' ~ __Q _., OJ. \ .. ~J --\X ....\..u 'i .'0.. "'- ~, '-'-' r ~ ~ ~ ~-:'; ~- ~ ~ \ S , \ q II.. J ^'- ~- <L...- "-"--k, R 0 I.' +- C. ' \4-, \ I '1 ~,~. (' . " ..... '-- ~) "--J ~ \,.:b " l oJ" -...,.l ~~ ""-" "-<.l ""'-<- W """-t>-d L 21 L "- l':~,-.",~ ~ .~ l... ~'.s ~_ ~ I~ ~ .2.1 j;;lJ \-'~.",-- L~ c4-J ~ I'-/Y-c....hi j.. ~'<V. IS60,~ ~\ -l ~ ~ II..,,-- ;::..\, ""-''1 ~ "--\--J ' . s ~ ~ L ~. ohL~~~~t.:~\ I S',.AA.J " '5 \ ... \.j '----'- ' \ "-- ~'J k.u ..~ '2.111,['1'" I ~ ~ '~ l h..~ '\,\L..u/"_ - rv '-t ^-A-..>,./ ~ "i=Q., \ \)(. \ -- 'v\.-~~ ~ 'r ~ ~ L O-L-v ~ ~. o,~J ~ ~ L ~ ",l...LS;;.o..Q.u,.l't), .LA. ~"0 \.,., .'-'-"'^::-- ~__ "" \l..A.f '1l..\. S,S' R":,,,:, \ \) 'L~ '._ ~ -\-0 ~ ~-' ~ ~ '-' ,....;)" ~, .- 'S~. \ U. ~ IL.V''iL .L,.O ~ ~ 0 C.- '--<- ~ '---4 ~ .-\-c 0'.'-'-, ~ \ "I'1S ~ '-'> ~ +-0 <U<:.f>\'--<L, ~ ~ -'1-~~\ ~ ~/~~d.v S,'1,-/ .' ~E..~. R...O ,~, ~t....-.~t . . . \,/-'" -- I I Ii II II ,I ~. ! ~ err .l 'iiSS' USS Realty ~ Development Division of United States Steel Corporation /? \ FRANK E. FELIX, JR. PROJECT MANAGER 200 ST. ANDREWS DRIVE BEllEAIR. FLORIDA 33516 813/443-0631 August 16~ 1977 Mr. W. E. Tripp Assistant Building Director City of Clearwater Post Office Box 4748 Clearwater~ Florida 33518 Re: Building Permit South Beach III Sand Key~ Clearwater "':'/",:- ; '.,- ,,~.,. '. .,., 'If,; '-""-. ) .~~ ., '-)~J'\ri'o... ." ~ -"'!l ,;~:; Dear Mr. Tripp: In response to the discussions in our meeting with you on July 13 relative to the above captioned subject~ we offer the following com- mentsand information (please refer to your list of items numbered 1 through 18): 1. We will modify circuit in dining room so each apartment has two (2) 1500 watt appliance branch circuits serving receptables only in the kitchen arid dining room. 2. We are not using PVC inside structure. 3. We will provide available short circuit current at transformer bushings as provided by Florida Power Corp. We point out that in the past the Owner has worked directly with Florida Power Corp. to provide secondary service (conduit and cables) between transformer and busway cable tap box. 4. The design will be changed to meet the Federal Flood Control Law requirements. 5. It is our understanding that the design already complies with N.E.C. 6. This information is already shown on panel schedule. 7. We will add grounding details in addition to provision currently included in specifications. 8. This item will be included in our design during the rework of the documents. 9. We will conform with Article 336-3. . .''',', ,. ,i OJ 1 .l. ~uss Realty ~Development DlvIaIotI of Ualted Statio Stili ~tl.n Mr. w. E. Tripp August 16, 1977 Page Two 10. All panels are clearly identified by schedules on the drawings. 11. All load calculations will be provided to the Clearwater Elec- trical Inspection Department. We prefer these on our standard engineering calculation forms and not on the drawings. 12. This information is already shown on the drawings. 13. Service is via 4000 ampere busway (with reduced size where permitted by N~E.C.). In the past, Florida Power Corp. has provided service from transformer to busway cable tap box (refer to No.3, above). 14. Yes. 15. It is our interpretation that the fixtures in the parking area meet the code requirements. 16. All emergency systems are separately enclosed from normal sys- tems and, in our judgment, conform to Article 700 of the N.E.C. 17. Refer to HVAC and Plumbing equipment schedules. 18. We will be happy to review documents with appropriate officials prior to final release for construction. With reference to the City Fire Marshal's comments, we offer the following: A. We will add a fire alarm pull box. B. It is our opinion that the exit signage is adequate. We, there- fore, would like to discuss this further with Mr. Buhmeyer at his convenience. C. Wooden storage lockers in the garage area shall be constructed of pressure treated noncombustible material. D. A heat detector will be installed in the maintenance office at the parking level (see Sheet E-8). E. Door #19 on Sheet A-I shall be a 3Q door. F. The 2-1/2" valve in the stair towers will be installed 4' above floor level. G. Reference detail Alp-I, Sheet P-l. A gate valve will be added as required. ..l . "'"' A .1 " .J tij:S\USS Realty ~Development D/YIaIon of United States Stnl Corp.ulloA Mr. w. E. Tripp August 16, 1977 Page Three H. The structure will be redesigned to meet the requirements of the Southern Standard Building Code now in effect, Section 506. We trust that the above information is a full ~esponse to all items raised at our meeting on July 13. For your information, our engineers have advised that it will take"approx- imately six (6) weeks to modify the drawings per the City's requirements. Should you require any further information from us, please do not hesitate to call. DES/sab Sincerely, Q),g 5~ D. E. Simpson Project Engineer cc: Mr. E. Blanton Mr. G. Buhmeyer Mr. T. A. Bustin Ms. M. Lavallee Mr. D. P. Thompson .J .J IfiSS\ USS Realty ~ Development Division of United States Steel Corporation .. .. . I' FRANK E. FELIX, JR. PROJECT MANAGER 200 ST. ANDREWS DRIVE BELLEAIR. FLORIDA 33516 813/443-0631 August 16, 1977 -..-I Mr. ~. E. Tripp Assistant Building Director City of Clearwater Post Office Box 4748 Clearwater, Florida 33518 'E~C~ f-.UG 17 1971. a.J:( A TrJRN ~,~j Re: Building Permit South Beach III Sand Key, Clearwater Dear Mr. Tripp: In response to the discussions in our meeting with you on July 13 relative to the above captioned subject, we offer the following com- mentsand information (please refer to your list of items numbered 1 through 18): 1. We will modify circuit in dining room so each apartment has two (2) 1500 watt appliance branch circuits serving receptab1es only in the kitchen arid dining room. 2. We are not using PVC inside structure. 3. We will provide available short circuit current at transformer bushings as provided by Florida Power Corp. We point out that in the past the Owner has worked directly with Florida Power Corp. to provide secondary service (conduit and cables) between transformer and busway cable tap box. 4. The design will be changed to meet the Federal Flood Control Law requirements. 5. It is our understanding that the design already complies with N.E.C. 6. This information is already shown on panel schedule. 7. We will add grounding details in addition to provision currently included in specifications. 8. This item will be included in our design during the rework of the documents. 9. We will conform with Article 336-3. , . .1 , Mr. W. E. Tripp August 16, 1977 Page Two ItiSS'USS Realty ~Development Dlvbloft of Unllld SuI.. Stl!oI ~llIon ." 10. All panels are clearly identified by schedules on the drawings. 11. All load calculations will be provided to the Clearwater Elec- trical Inspection Department. We prefer these on our standard engineering calculation forms and not on the drawings. 12. This information is already shown on the drawings. 13. Service is via 4000 ampere busway (with reduced size where permitted by N.E.C.). In the past, Florida Power Corp. has provided service from transformer to busway cable tap box (refer to No.3, above). 14. Yes. 15. It is our interpretation that the fixtures in the parking area meet the code requirements. 16. All emergency systems are separately enclosed from normal sys- tems and, in our judgment, conform to Article 700 of the N.E.C. 17. Refer to HVAC and Plumbing equipment schedules. 18. We will be happy to review documents with appropriate officials prior to final release for construction. With reference to the City Fire Marshal's comments, we offer the following: A. We will add a fire alarm pull box. B. It is our opinion that the exit signage is adequate. We, there- fore, would like to discuss this further with Mr. Buhmeyer at his convenience. C. Wooden storage lockers in the garage area shall be constructed of pressure treated noncombustible material. D. A heat detector will be installed in the maintenance office at the parking level (see Sheet E-8). E. Door #19 on Sheet A-I shall be a 3Q door. F. The 2-1/2" valve in the stair towers will be installed 4' above floor level. G. Reference detail Alp-I, Sheet P-l. A gate valve will be added as required. I ...1 :J .J ~uss Realty ~Development D1....an 01 United SUI.. Steel Co'\IOf3llon * . ~ Mr. w. E. Tripp August 16, 1977 Page Three H. The structure will be redesigned to meet the requirements of the Southern Standard Building Code now in effect, Section 506. We trust that the above information is a full ~esponse to all items raised at our meeting on July 13. For your information, our engineers have advised that it will takeapprox- imate1y six (6) weeks to modify the drawings per the City's'requirements. Should you require any further information from us, please do not hesitate to cal1. Sincerely, Q)~ 5~ DES/sab D. E. Simpson Project Engineer cc: Mr. E. Blanton Mr. G. :Buhmeyer Mr. T. A. Bustin Ms. M. Lavallee Mr. D. P. Thompson -erA .., .~ LAW OFFICES eJ RICHARDS, NODINE, GILKEY, F1TE, MEYER & THOMPSON, P. A. RICHARDS BUILDING IZS3 PARK STREET RALPH RICHARDS WILLIAM E.NODINE WILLIAM W. GILKEV JOHN D. FITE LARRV K. MEVER DENNIS P. THOMPSON JOHN E. SLAUGHTER. JR. EMIL G. PRATESI ..I. MARVIN GUTHRIE R. CARLTON WARD CLEARWATER, FLORIDA 33516 (613) .....3-3ZBI }j f'.;'~:7;1; r.:-. !f., ....:....._~..I..,~~ July 22, 1977 J U L: :.: ,iC; i~7" ~- -- .V 1-1 DAVID E. PLATTE c:..9J;:i: ATrO.RNE:1'j -~l Mr. Thomas A. Bustin City Attorney City Hall Clearwater, Florida Re: Building Permit Application Dated 5/6/74 Applicant: USS Realty Development Division Project Location: 1500 Gulf Boulevard Dear Mr. Bustin: This is just to update you as to subsequent developments to our meeting on July 13, 1977. U. S. Steel has been in contact with its architects and engineers in relation to the matters raised by the fire marshall and the electrical department at our meeting. I am sure that we will have no problem in resolving all matters to the satisfaction of the building department and fire marshall so that the building permit will be issued without further delay. I anticipate that within the next week a repre- sentative of U. S. Steel's architects will be in contact with appropriate officials at the building department. Very truly yours, c::l.. ..~/v~ Dennis P. Thompson DPT/mlb CC: Mr. Frank E. Felix, Jr. Ij i! , I 1\ , I \\ ~ . !..'m.' \eLZ -bjd,.,1 /) ?v;J ., 7 r.' 1 ; Y; , '/ . - . .' / . I\!' ~ . -y~ ... 1. ~/:J - i f/j2., .,-. ~;0Y7~' / .~ 1\ ~. 1 .. /7 . ,,-h7' P/ \ f2:-~' ..~~J LC~~~J/Ji2;/"c.L&! ~K . . ~-:C;/~i!/-r/Y'"1 1~-iZ;.-.v e;{c ,..t~!~ t F/J::-- :2? - ;.1 . ~ ! -~/ ~-r- , / i -...-/ :) , \ 1 I I I I I i I I 1 ! j I i .1 . l i , , e~ ,._~ el - - ,..J i ! i ; ~., kZ bd~: " ! /) - . ., r-- 1 II, '! . - - / - -. Ii' !" A-y~ _ --" - i -/J-?7 f1.v tb:. . /L47~.-'/ I, /: / _." /J -h7",' p/,- 1 a~~' , ---~-1-./J Lc-.e<.(-~/}L"J/IiU..C.L&/ U-/L-I.-'< -, 'y;j;/lf'-CiY--;:-/'-rl ;___UJY~~i &.A7 G{c' rJJ~~?r rtl-A pl/ / 2? ! () ! l I I I , I i J l , i . J ; 1 " II t) Ii 1 , . I : ! ! : i , """"--"-'- i : ; \ ,; (it /~ r___ ::c. I ~F;;-:"-- ..... \... - ,/' r ~,--..... /..- " ~-~ ---.......~.I~~ : "'. ./ . ')i~'.::.L: ~ ~ ~(_ ; _~-".-..i""~ \ ~ ~ ~ C"":) :~.8 -. -~~i <:( ~ '~~ -- ---'"_""4:::::l.' ~ ~ -" -~-.< ~:'<'~-~',,,,,, \,' ~~ ./ l..'~';\ ,~/ '- .--,', '0,' ~ :j;;,..-;:::;-,!\. '( VI' -____~ ~~ ~: ~~,," f ,,1 C I T Y BUILDING DEPARTMENT Dennis P. Thompson 1253 Park St. Clearwater, Fla. 33516 Dear Mr. Thompson: OF . CLEARWATER POST OFFICE BOX 4748 CLEARWATER, FLORIDA 33518 10 S. Missouri Ave. City Hall Annex June 30, 1977 RE: 1500 Gulf Blvd. A building permit was not issued for the location at 1500 Gulf Blvd. The building application and plans are still on file at our office of May 6, 1974. If you have any further question, please do not hesitate do call this office. SinCerelY'~_ ~ ...-:::.- j.f) /J .- ft/;. c: . W. E. Tripp Assistant Building Director ':~ ..~~ LAW OFFICES RICHARDS, NODINE, GILKEY, FITE, MEYER & THOMPSON, P. A. RICHARDS BUILDING laS3 PARK STRE:E:T REC!::1\1=D RALPH RICHARDS WILLIAM E:.NODINE: WILLIAM W. GILKE:Y .JOHN O. FITE: LARRY K. ME:YE:R DENNIS P. THOMPSON .JOHN E:. SLAUGHTE:R, .JR. EMIL. G. PRATESI .J. MARVIN GUTHRIE: R. CARLTON WARD CLEARWATER, FLORIOA 33516 J,li v'- l~'- 7 (BI3) 443-3aBI C.I.TY i~ 7':' .:>:~ Z"'~ _~~~ July 1, 1977 ... DAVID E:. PLATTE: CERTIFIED-RETURN RECEIPT REQUESTED Ms. Marybeth Lavallee Assistant City Attorney P. O. Box 4748 Clearwater, FL 33518 Re: Building Permit Application Dated 5/6/74 Applicant: USS Realty Development Project Location: 1500 Gulf Boulevard Dear Ms. Lavallee: I am enclosing a copy of a letter received from Mr. W. E. Tripp, Assistant Building Director, which is self-explanatory, and a copy of the captioned application which Mr. Tripp enclosed. In view of Mr. Tripp's statement, we must reiterate our demand that the permit be immediately issued. If this permit is not issued by Friday, July 8, 1977, or unless reasons are advanced that sufficiently explain the City's position to our satisfaction, we will have no hesitancy but to initiate other steps to procure the permit. Very truly yours, Dennis P. Thompson DPT /mlb Ene. CC: Mr. Frank E. Felix, Jr. -'~ --. . June 2.7, 1977 Dennis P. Thompson, Esq. Richards, Nodine, Gilkey, Fite, Meyer 8t Thompson 12.53 Park Street Clearwater. Florida 33516 Dear Mr. Thompson: Re: Building Permit Application dated 5/6/74 Applicant: USS Realty Development Project Location: 1500 Gulf Boulevard This is in response to your letter of June 2.2., 1977 in which you request that the City issue a second permit under the application filed by your client. As I have previously advised, such a permit cannot be issued. You requested that a meeting be scheduled to discuss this matter further. Please contact my secretary and schedule a time which will be convenient for you. With reference to the documents you have re- quested, please be advised that any certified Minutes must be requested from the Clerk's Office. A copy of the building permit can be procured from the Building Department. Other documents requested by you in paragraphs nos. 3 and 4 have not yet been compiled. I will attempt to locate such documents and advise you of their location. Very truly yours. Marybeth Lavallee Assistant City Attorney ML:s8 . - l.AW OFFICES RICHARDS, NODINE, GILKEY, FITE, MEYER & THOMPSON, P. A. RICHARDS SUI LOtNG 12S3 PARK STREET RALPH RICHARDS WILLIAM E. NODINE: WILLIAM W. GILKEY JOHN D. FITE ~ARRY K. MEYER DENN'S P. THOMPSON JOHN E. SLAUGHTER, JR. EM'~ G, PRATES' .J. MARVIN GUTHRIE R. CAR~TON WARD CLEARWATER, FLORIDA 33516 (813) .....3-328. Ih?c'::{~'').2'L June 22, 1977 JUi"! '-"J - . c..0 If"\""~ .4;,1/U DAVID E. P~ATTE '~:rx · ""., . .<\ZlQBlL~li Ms. Marybeth Lavallee Assistant City Attorney P. O. Box 4748 Clearwater, FL 33518 Re: Building Permit Application Dated 5/6/74 Applicant: USS Realty Development Project Location: 1500 Gulf Boulevard Dear Ms. Lavallee: This firm represents the applicant for the captioned building permit and we are writing in response to your letters of May 9 and June 6, 1977, in an attempt to procure the immediate issuance of that permit. Prior to writing this letter, we have reviewed the following documentation and correspondence relating to our client's appli- cation: 1. Application for permit signed by Robert C. Hill, Project Engineer, USS Realty Development Division. 2. Letter of June 13, 1975, signed by Michael J. Paroby, Assistant City Manager. 3. Letter dated January 15, 1976, to Robert C. Hill from E. Blanton, Building Director. 4. Letter dated February 3, 1976, to USS Realty Develop- ment Division from E. Blanton, Building Director. 5. Letter dated February 17, 1976, to Frank Felix, Project Manager from Michael J. Paroby, Assistant City Manager. 6. Letter dated April 22, 1977, to Ed Blanton, Building Director, from D. E. Simpson, Project Engineer. 7. Letter dated May 9, 1977, to D. E. Simpson, Project Engineer, from Marybeth Lavallee. . . Ms. Marybeth Lavallee Page 2 June 22, 1977 8. Letter dated May 25, 1977, to Marybeth Lavallee from Frank E. Felix, Jr. 9. Letter dated June 6, 1977, to Frank E. Felix, Jr. from Marybeth Lavallee. The only reference I can find in the above documents which corresponded in time to any action by the City is Mr. Paroby's letter of June 13, 1975, in which he said, among other things, about the meeting of June 11, 1975: liThe Building Permit Review Committee decided, subject to the City Attorney's review and concurrence, that a building permit be issued. . . . Your building plans are now being reviewed by appropriate City Departments." All other and subsequent correspondence, I am sure you agree, are only recollections and explanations of past actions; they in no way attempt to make any official determinations. ' On the other hand, while you may disagree, we cannot believe that the letter of June 13, 1975, quoted above, constitutes advice that a building permit has been issued or that the letter itself constitutes the issuance of a building permit. That letter, as indicated, states that there are two conditions precedent to the issuance of a building permit, namely, the City Attorney's review and concur- rence and review by appropriate City Departments. My client has not been advised that either of the conditions had occurred. At one meeting, attended by Messrs. Felix, Blanton, and Bustin, among others, I understand that Mr. Bustin indicated that he did not know whether or not his office had ever reviewed the matter and Mr. Blanton indicated that his department had not approved the building plans. Our client requests that the building permit captioned above immediately be issued. Please advise the undersigned when it can be picked up. In the absence of such issuance, we request the opportunity to meet with you at an early date and discuss this matter further in an attempt to avoid litigation. In addition, we request that we be provided immediately with the following docu- ments: 1. Certified minutes of the Building Permit Review Committee meeting of June 11, 1975. 2. Copy of building permit issued by the City of Clearwater as a result of the captioned applica- tion. '" . . Ms. Marybeth Lavallee Page 3 June 22, 1977 3. Correspondence, memoranda, or other notations showing the City Attorney's review of and concurrence with the action of the Building Permit Review Committee taken with respect to the captioned application. 4. Correspondence, memoranda, or other notations reflecting review of the captioned application by l1appropriate CitY,Departments" as referred to in the June 13, 1975, letter. If you have any questions concerning this, do not hesitate to call me. Very truly yours, O~ P.;J{,"--/- Dennis P. Thompson DPT/mlb CC: Mr. Frank E. Felix, Jr. . . June 6, 1977 Frank E. Felix, Jr. Project Manager USS Realty Development ZOO St. Andrews Drive Belleair, Florida 33516 Dear Mr. Felix: Re: Building Permit Application dated 5/6/74 Applicant: USS Realty Development Project Location: 1500 Gulf Blvd. This is in response to your letter of May %5, 1977. Please be advised that the City of Clearwater does not concur with your conclusion that another building permit should be grant~d to USS Realty Development. As I had indicated in my letter of May 9, 1977, USS Realty was previously granted a permit, and, USS Realty allowed that permit to expire. USS Realty then appeared before the Building Permit Review Committee to discuss the possibility of issuing another permit under the original application. You were told at that time that another application would have to be filed. That decision was confirmed in a letter from Ed Blanton to you dated February 17, 1976. No new application has been received to date. In the light of these facta, your position that another permit should be issued is untenable. Very truly yours, M&yybetb Lavallee Assistant City Attorney ML/km ,. . . tUSS\ USS Realty ~ Development Division of United States Steel Corporation , FRANK E. FELIX, JR. PROJECT MANAGER 200 ST. ANDREWS DRIVE BELLEAIR, FLORIDA 33516 813/443-0631 May 25, 1977 Ms. Marybeth Lavallee Assistant City Attorney City of Clearwater P. O. Box 4748 Clearwater, FL 33518 ~~.:~~l~-~~I). ~ d,'1 ')'/ '~~ii -,1 i:'. '1. ;,..-r~j ~::>..' I 'Cl1X J\.1''TOR\.''lZ'Y Re: Building Permit Application Dated 5/6/74 Applicant: USS Realty Development Project Location: 1500 Gulf Blvd. Dear Ms. Lavallee: This is in response to your letter of May 9, 1977, which we received on May 17, 1977. Upon reviewing the history as it is shown in our files, Mr. Paroby ad- vised us by phone on June 13, 1975, that the City was going to review our application for building permit since Federal funding had been received and that the Marshall Street Sanitary Treatment Plant expansion was then underway. On June 13, we were notified by letter from Mr. Paroby that a building permit could be issued pending: (1) City Attorney's review of permit and concurrence with same and (2) review of our building plans by the various appropriate city departments. As time, transpired pending the above, we then received the City's letter of January 15. As of that date, the City's Building Department and Attorney had not reviewed our application nor concurred with the Building Permit Review Committee's recommendation to issue a permit. There then was further discussion and correspondence between us leading up to the last meeting we had with the City Attorney, the Head of the Building Department, the Planning Department and other City representa- tives. The date of this meeting was May 14, 1976 at which we specifically asked if the City Attorney or the Building Department had ever reviewed our request for application as was indicated and required in Mr.. Paroby's letter of June 13, 1975. Upon receiving an answer in the negative, we then requested that the City inform us once this administrative process had been fulfilled by the City. To date your offices have not responded to our above request. -,.. ,. , . . IflsS\ USS Realty ~ Development Division of United States St.el Corporation Ms. Marybeth Lavallee May 25, 1977 Page Two With the above history in mind, we are confident that your office will agree that a building permit should be granted to us. FEF / sab Very truly yours, ~Ftix~q: ".. . . l' May 9, 1977 D. E. Simpson, Project Engineer USS Realty Development 200 St. Andrews Drive Belleair, Florida 33516 Dear Mr. Simpson: Re: Building Permit Application dated 5/6/74 Applicant: USS Realty Development Project Location: 1500 Gulf Blvd. This is in response to your letter of April 22, 1977, regarding the above captioned building permit application. Our records reflect the following history with referlUlce to this application. On June 13, 1975, your project manager, Frank Felix, was zmtified that the requested building permit had been granted. On January 15, 1976, the Building Director notified Robert C. Hill, a representative of USS Realty Development, that the aformnentioned building permit had expired inasmuch a8 no one had attempted to pick it up for seven months. ,On February 11, 1976, Frank Felix appeared before the City's Building Permit Review Committee regarding the construction of the proposed 144-unit building at 1500 Gulf Blvd. The Committee notified Mr. Felix at that tim.e of the Comzr..i.ttee's position that the plans submitted in May, 1974, were invalid since the building permit had been allowed to expire. In addition, by letter dated February 17, 1976, Ed Blanton reiterated the basic issues covered in that meeting, to Mr. Felix. Inasmuch as our files reflect the above-described series of events relative to the application of USS Realty, it is clear that USS Realty is not entitled to another building permit until new plans are submitted. I. is also clear that the long-awaited building pennit of which you speak was granted to USS Realty in June, 1975, and was allowed to expire by your firm. seven m.onths later in January, 1976. .," ," , . D. E. Simpson, Project Engineer May 9, 1977 page two . If you have any questions regarding this matter, please do not hesitate to contact me. ML/lan Very truly yours, Ma.rybeth Lavallee Assistant City Attorney cc: M. paroby, As sistant City Manager E. Blanton, Building Official . i- f TO: . C.rt OF CLEARWATER Int. -'p!lrtment Corresponde"ce Sheet FROM: Mr. T. A. Bustin, City Attorney M. J. Paroby, Asst. City Mg[W11 COPIES: DATE: April 26, 1977 Request for Building Permit - 144 Units, 1500 S. Gulfview Blvd., Sand Key - U. S. S. Realty SUBJECT: Attached is a letter from D. E. Simpson, Project Engineer, U. S. Steel Realty Development, dated April 22, 1977 in which he requests a building per- mit for a 144 unit condominium at 1500 South Gulfyiew Boulevard on Sand Key. Also attached isa memorandum dated June 13, 1975 to Guy Kennedy, then Acting City Attorney, regarding this matter. Attached also is a letter dated June 13, 1975 to U. S. S. Realty, informing them that the Building Permit Review Conunittee had made a partial sewer allocation for this property in accordance with a policy approved by the City Commission. Because U. S. S. Realty did not respond to this letter (June 13, 1975) nor did it take any action to obtain a Building Permit based on this limited allocation~ the Building Director informed U. S. S. Realty by letter dated January 20, 1976 (attached) that the allocation by the Building Permit Review Committee had expired and their plans would be discarded if not picked up in 30 days. At the request of U. S. S. Realty, the Building Permit Review Committee had a discussion with Frank Felix, U. S. S. Realty, on February 11, 1976Q The results of this meeting were summarized in a letter to Mr. Felix dated February 17, 1976 (copy attached). This letter con,cluded that the sewer allocation to U. S. S. Realty and their application and plans had become invalid because of inaction by U. S. S. Realty. Please advise as to how we should respond to the April 22, 1977 letter from U. S. S. Realty. ~s;~~~~~ Arn ').~ ..-...,~ '-I~ ,-'0 ~,j/~_. CITY J,_""'::c",:,.~r2.Y -' - , ~ f: ... . . . fTO: , FROM: COP::=s: SUBJECT: DATE: " P~~Gb'\i " .. - .~.SSlst2.n~ C i 7'1' ~<~:la ~e~ C IT y 0 F C LEA R W ATE R i..:)artment Corr!!sponoe'-'c!! Shee' -:- ~~2~Ton - Building Di~e~tor~~' s. ~ . ::::<n~~-::' Zc~in~ E~fc~ce~e~~ G~~icer T D~i~ec St2tes Steel ?e~ltv DevelnD~ent ~~~~~ca~ion ~C~ 5uildi~g Permit, DaTe~ Mav 6, 1974. ~~Dril 25, 1977 Attached is the CODY or a lette~ from M~. -:- Si~Dson, P~oiect Engineer for UniTed States Steel Pealtv ~evelopment, which isself-explanatorv. As you know, t~e applicaTion was received b" this ~eDart~e~t on the date stated abC've. 'T'ne aDDlication >-72S su"j",i tTer: l:C the 5uildin~ Permit ~eview Board several l:imes, ,~ith no ~cTicn "'t?..keri. Since a reauest ror the I think the Cit" shculd buildin~ nerJ"".i T take action by lrl ~.,::iti~~ h2s nee!"! mace . - . ~n=o:!'""~:.2..nz t~"1e ;:::Ii"\~"'f'; r;:?""\- ~_ ..... L.. _ ..;... ~, _ ~ ~ _ of a decision, one ~~a" O~ anc~her. Please advise. EB:: ..A.ttacl:.rn.ent --1.' '- ,'J .;~. . . 11 . Febraary 17, 1976 .."ir. Frank Felix, Project l-.ianager U. .::i. 3teel i.ea! ':';state 0ivision 200 .:it. f' narev.rs Drive Belleair, Florida 33516 Dear lV~r. Felix: "Ihis letter is i:1 rega::-r3 cO y:)ur appearance or; -: ebru'ary 11. I 'f7b beiore the Cityl s .ouE~ing ?errrJ.: Review CO!T'_!'nittee to ciscuss and clarify certain , d' 1" t' .....' ,. 6 1Q-:-' b 'p ~ corresPor:-ence regarlng a1: a?? lca lon suor::"a_te~ on ..\..o.y , ,,~ y~. :J. .::iteel ii.ealty c.: .Deve!.o?:nen;: Livision, fer a buil-:ing ?errrJ.t to construct a 144-unit, 'Z-bath apartmentsl builcing at 150:) Gulf BOt!ieva::-d, South (Sand Key ).i"r:e ccrres?onc ence -=iscc.s se~ was r:-:y : et:er of Jc.ne 13, 1975 to you. an6 a 1eue~ fro:7c ~~r. LGwi"-' Blantor.. building .:Jirector, cated Januar\- 15. 1 ~76 to ~\..=. ::'~obe:-t ~. Bill ",'ho, 1 uncerstanc, recentl,:l' te~!":'1inatec b.is asso- ciatior. witn ~'ou!' organlZiltl.::r:. This letter is not intence.:5 tc: su.:r~rize our disc\.:ssior; oi over one houri s duration, but rather to reiterate the basi~is sues relating to the Comrritteel s position as expressed in the above corres?oncence. relative to the above- mentioned matter. 0n June 11.. 1975 the Builcin; .rerrni: :b..eview CC;:T~.:TJ.ttee, in cOn!armance '.vith guidelines estabiishec Dr the City Corr-,-~issic=-.. :o.c.thorize~ iesuance 0: a .:,.uild- ing permit with the sti?ulatiol1 t6at Cel"tificate s cf ':"'ccu-:-:.ancy wo\.:l~: be is sued only for Z5~~ of the units, ane when those \.::1its beca:T:e 75c,. occu:=iec.. then (,ertlllCaLeS of vccupancy fol" tne remaining units could be reauested. The grar:.ting of the remaining Ce::-tiiicates of C'ccu~ancy v.ouie he co~tingent u?on the capacity to serve being available at the .>'rarshall ~treet -=:-reatr:-cent Plant. In essence, this 25<;0 allocation meant that if yOt: ~rocee"'ec v"ith construction of the builC:ing and compieted it prior to sewer treatment: capacity being available to serve all units in the building, then those units ior which sewer treatment capa- city was not available would have to remain unoccupied until the expansion pro- gram. under way at the l'vIa.rshall Street plant made additional capacity available. Of course. it would not be within the province of the Comnittee or any City ofii- ciais to determine the feasibility or desirability of your company undertaking , r~ . . Page f.~ - .=e:)r'llary 17. 1976 Wu-. Frank Felix construction of the building on this basis. oowever, if it was your decision that it was ;lot feasible or desirable to proceeci ~-hn construction OD that oasis. the rratter could have been appealed to the City Commission. Since there was no action.in seven months DYYrour compa.ny to obtain tbebuild- ing permit on the basis described a.bove. nor was there an ap?eal to thf" City Commission. be allocation IT..arie by the .3uil::ing .E-ermit heview COm.r:1ittee was rescinr1ecl in coniorrr.ance with its monthiy builr:ing perrr..it review an~ allocation proces s. Consequently, the appiicatior.. ana 'Plans submitted by your firm on 1,~y 6, 1974 have become invalid. The Bui1cli:lg :t. ermit r.evie," I...ommittee is res,?onsible o!liv !'::/!" the allocation of builcir..~ .'~_I-2T.~::':..i~~ ~r=.SC-' ,_ =..._. :.:.: 3.'\.-ail;;"ble se,,'":-:::- :=~:..::::e::t c::..~ac~t?\.. .1.ss~..:..e= pertaining to zoning, CO?:;~->l.i~nce with City Co6~s, etc.. z:.re matters that should be acidres see to the :':'irector of the Plan.nin~ .:Je /2 n:nent. ",_r. raui bergman:-o, or to the ~ity Attorney. - _~. _'he-mas A. Dustl:_. Ii you aesire a.'":!\." acldiIic.::c.~ i,"!1':: rmatior:, or if .i co':1 De of further as sistance. 'dease let me knew. .:iincerely, lvlichaal ~i. Faroby Assistant City i...anager F 0:' O?erations cc - City i:.ttorney Building Permit Review Cornrn.ittee /"""- fff~ P.'l --. ./ ~\:.I'\ OFhr.: -~"""'-:.. /~~~~\. ,It"o....;./ \11 ~\\ c> '\ \ ~(.' "iIt.~/~ - - '- ~~ ~~ m... ,<~ \r-~',= .. i ~ ~f"l"'\ ~ ~_- .~.: "7::'" .~ --. ~\.\ , '>/1.,'; t:.'\."",1 ......;..~ATE~:~f",. ---".1"""";/ . . # CITY OF CLEAR'VATER BUILnIN~ DEPART~~ENT CITY HALL ANNEX 10 SOUTH MISSOURI AVENUE POST RECE1VCfjRWATER. FEB 9 1975 USR PRQJ a~ Cl.. w~ PLA. OFFICE BOX 4748 FLORIDA 33518 Februarv 3, 1975 U.S.S. Realty Development Division 1500 Gulf Boulevard South Clearwater Beach, ?lorida 33515 Attention: Mr. Felix: Dear Sir: This letter is to inform you that the City of Clearwater Building Permit Reviei-l Committee will neet in the Ci tv Hall Commission Conference Room, 112 South Osceola Street, Wednesday, ?ebruary 11, 1976 at 9:30 A.M. Your request concerning the property located 1500 Gulf Boulevard is included on the agenda for this meeting. ( If you, or a representative of U.S.S. Realty Develonment Division, can not be present, please contact this office. Verv trulv yours, C. -~.v..z::.-7 E. Blanton Building Director EB:fo BUILDING DEPARTMENT -if- PjrJy' !;z,!r;MpT ~uu.,'~;';{i;;{ /1' ._~ 2""/1/(76 t / )z;1 C I T Y 0 F C}/lY1fl-~cR~~/!- '. kl-I{ttt/Z . 402ft l/?ldtV!J' I B d.tvff~5' '-1 ~ l{,ttuL~-;:<<' b /J-rtr.(1 fr..,(/ R-tC-,\v-rO' CLE AjER. ~tR)lA 'J3 lc,-t. . . f: 1: ~-)~~ i?~ q :n..d{; rc"c~~ . 2 - - January 15~ _~76 . / .' t .,u~ .4~ ~AN .' 0 1976 "11 ~~/~-rr.A~YI. I ~ '" ~ ". '-!lvji- / y-lJ /18. U~ t.L ?-Ui....(/.....- ~SRPROJ MGR , . / ...L- ,CLW.FU.~ ~~ :1::1 ~o;:~ "(1 1<tu"- 7l?~~ · (k(l ~ /G-?ttJ /..:- .7 ....- Mr. Robert C. Hill D.S.S. Realty Development 1500 Gulf Boulevard South Clearwater. Florida 33515 Division Dear Mr. Hill: A decision on your application for 144 2-bath apartment~ located at 1500 Gulf Blvd. South, was reached at the June 1975 Building Review meeting. Approval fer building permit was recommended with a Certificate of Occup2ncy limited to 25% of the total units until the 25% has been 75io occupied. As you know, the City of Clearwater is under a partial building moratoriurr and each month a review board approves a limited number of applications. It is a policy of the review board that a condition of such approval is, that obtaining permits be pursued diligently, and that failure to take out the permit within thirty (30) days of notification will be cause fOT rescinding such approval. Since no action was taken by the applicant to obtain the allocated building permits, the allocation of the Building Permit Review Board has expired. Your documents will be held in the Building Department for thirty (30) days from the date of this letter and then discarded if you do not wish to retrieve them. Should you have any questions in regard to the above, please contact this office. Sincerely, {~~~ . Blanton Building Director /j TO: Mr. Guy Kennedy, ACe City Attorney ,ntipartm1tnt Corntspondence Sheet FROM: M. J. Paroby, Asst. City 7t(~ I COPIES: SUBJECT: Building Permit Review Committee Action - Re: U. S. S. Building Permit Reque:: DATE: June 13, 1975 '" On June 11. 1975 the Building Permit Review Committee considered a request from the U. S. Steel (U. S. S.) Realty for building permits for a high-ris e build- ing on Sand Key consisting of 144 units. This request was received by the Building Department about thirteen months ago. The Committee had deferred . the request since then b,ecause of the uncertainty regarding the status of the City's proposed expansion of the Marshall Street Sewer Treatment Plant. This project is now under way. The Committee was uncertain as to whether it should treat. the requ,est under grandfathering rules. or to consider the project under current restrictions pertaining to the 80-foot building height limitation and the current 28-unit density restriction. The proposed building exceeds both of these criteria which were not in effect when the plans were submitted. The Committee decided that, subject to your concurrence. certificates of occupancy would be issued for 25% of the units, and that additional certificates of occupancy could be requested when those 25% of the units were 75% occupied. The Committee could not issue 144 Certificates of Occupancy as there are not that many units available at the treatment plant. The action taken by the Committee is consistent with City Commission policy. and similar action has been taken in the past by the Committee for similar structures. I would apP,re.ciate having your opinion on this matter. ~ ..... . . CITY OF CLEARWATER '.'. PO S T 0 F F . C E BOX 474 8 CLEARWATER. FLORIDA 33518 June 13, 1975 PICOT B. Fl.OYD- CITY MANAGU Mr. Frank Felix, Project Manager U.S. Steel Real Estate Division 200 St. Andrews Drive ". Belleair . Clearwater, Florida 33516 Dear Mr. Felix: This letter is to confirm our telephone conversati.on of today, whereby I informed you of the action taken by the Building Permit Review Com- mittee at its meeting of Wednesday, June 11, 1975 pertaining to your company's request for a building permit for a planned apartm.ent build- ing on Sand Key. As you know, your building plans were submitted to the City Building ~epartment over a year ago, "The City took no action on the matter because of the uncertainty r I dating to the status of federal funding for the City1s planned expansion of the Marshall Street Sanitary Treatment ~lant. This facUity serves 5and Key and the plant does not presently . have the capacity to serve your proposed building. Federal'funding has been received and the expansion is now under way. The Building Permit Review Committee decided, subj ect to the City Attorney's review and concurrence, that a building perm.it be is sued but that Certificates of Occupancy would be issued only for 25% of the units. Further, when these units are 75% occupied, then Certificates of Occupancyfor the remaining units could be requested. The granting of the remaining Certificates of Occupancy would, of course, be contin- gent upon the capacity to serve being available at the Marshall Street Plant. Your building plans are now being reviewed by appropriate City V Departments. If you desire any additional information, please let me know. -~::-~ ~;{e Michael J. p~ Assistant City Manager For OperCi:-tions cc - Acting City Attorney and Building Department