03/28/1985
,..-....
r.............
OFFICIAL
M I NUT E S
~
, ,
RESOURCE DEVELOPMENT COMMITTEE
City of Clearwater
March 28, 1985
,
"
Members Present:
Elizabeth S. Haeseker - Assistant City Manager/Chairman
",Nick Lewis - Fire Marshal
Paula Harvey - Director, Planning Department
Edward V. Bethel - Director, Building Inspection Department
,Keith Crawford - Director, Traffic Engineering Department
,Claude Howell - Civil Engineer, Utilities Department
Donald G.Beachler - Civil Engineer, Public Works Department
Ream Wilson - Director, Parks & Recreation Department
/
...~/'.
/
',,//
Meeting called to order by Chairman Haeseker at 9:05 a. m.
in the Operations Center Conference Room, City Hall Annex.
The minutes of the regular meeting of March 14, 1985 were
reviewed and approved as amended.
..
,.
Item #1 - Morton Plant Parking Garage - located on the South
Pinellas street, between Bay and Sheridan Avenues.
is a resubmission; plan originally reviewed by RDC
April 26, 1984.
Representatives
side of
This
on
,
c. : ,.............
, '.. ,,:.; larold Cobb - SKHHP
:.:,'':':-:6ouglas Dahlhauser - Morton Plant Hospital
: Bill Hayriie - SKHHP
Richard R. Follett - Landscape Architect
\" M~rq~ardt - Attorney for Morton Plant Hospital
'Revised' Final 5i te Plan
" N~ck Lewis - No comment.
,
,.
..-:.
"
Paula Harvey - Commented that, the City Commission had previously approved
the plan and advised that the conditions of approval at that time would be
c~rried 'forth on thi~ resubmission. For the record Mrs. Harvey repeated
these conditio~s - (l) Payment of open space impact fees he made prior to
certification of the final site plan, (2) that the improvements shown for
.,the widening of pinellas street will he the responsibility of the developer,
(3) fire hydrants must be prqvided as required by the Fire Marshal, (4) that
special steps be taken to protect the ravine area during construction (5)
and 'then the standard provi~ion regarding issuance of permits within six
months and project to be completed within two years. There was a condition
regarding the barrier wall on the East side of the property but because of
the new configuration made on the East side for parking this condition would
not now necessarily appply.
/ ..
;\,-
)., :
Ed Bethel - Comments attached. (Attachment fill. Would like a site light-
,'ing ~lan with final drawings.
~~ ,.
. :qeith Crawford '- advised the developer that we would prefer to have radius
driveways and ascertained that the median shown on site plan disappears on
the inside of the garage.
"'. C
3/28/85
,..-..,
,--.
RDC - 3/28/85
Page 2
r-)laude Upwell - commented originally an Energy Center was shown on plans -
. ,.~.ow understands this to be a parking garage only: satisfied with fire hy-
drant shown on south side as there is an existing main at Bay and Sheridan.
Hain not shown on plans and developer to consult with Utilities Department.
A 6~ extension has been added as .previously requested. Since dumpster for
the parking garage is not a major necessity it was agreed parking garage
could share nursing home dumpster.
Don Beachler - No comment.
Ream Wilson - See attachment U2, - - addresses open space fee requirement
which has been discussed with developer.
A lengthy discussion followed regarding sidewalk location. Keith Crawford
questioned why the sidewalks have been planned to be on hospital property
rather than on City property and further commented that there has been a
tendency for developers to locate sidewalks wherever it might be convenient
to them at the time they are pouring. Mrs. Haeseker also commented on the
meandering appearance of the walks as shown on the plan and questioned why
these are not in City right of way. The architect advised that their
primary concern was aesthetics and their desire to preserve the scenic ap-
pearance of the area. From a practical standpoint Keith Crawford cited
reasons why he preferred that sidewalks be properly located one foot from
the property line. Mrs. Heaseker supported Mr. Crawford and then called
~~ the Committee for comments. Don Beachler stated City's biggest con-
:~rn is liability and if Morton Plant provides City with easement so as to
'share in liability, he could see no problem with location of the walks on
the hospital property. Mr. Marquardt, attorney for Morton" Plant felt
that this would not be a problem but intended to research the matter further.
Paula Harvey commented that purely from an environmental standpoint and
',aesthetic concerns the Planning Department had no objection to the side-
. walks being on hospital property. Don Beachler informed the developer
that if they provided the City with an easement, it would be expected that
the hospital would assume full responsibility for maintaining the walks.
It was agreed that Mr. Marquardt would consult with the City Attorney to
work out any formal documentation required in location of sidewalks on the
hospital property.
MOTION: Paula Harvey moved to recommend approval of the ~inal site plan
for the Morton Plant Parking Garage based on the findings of this Committee
that the plan conforms with the design guidelines for site plan review sub-
ject to the following conditions:
Tpat payment of open space impact fees be made prior to certification
of the final site plan;
the improvement shown for the widening of pinellas Street will be the
respon~ibility of the de&~loper;
that special steps be taken to protect the ravine area during construction;
'J
that the driveway entrances be designed as required by the Traffic en-
gineer;
3/28/85
----------- ...._......._---~-.-
, ..-....
ROC - 3/28/85
Page 3
()
that the final location of the sidewalks be approved by the Public
Works:Oepartment;
.
that sidewalk easements be provided with the maintenance agreement to
be worked'out between the City Attorney and the attorney for the hospi-
tal with the approval of the Assistant City Manager;
and that requisite initial building permit be procured within six
months and the project completed within two years from the date of
issuance of tho permit.
The motion was seconded by Ream Wilson and carried unanimously.
2. Loehmann's Plaza - located at the Northwest corner of U. s. 19 and N.
E. Coachman Road.
Representatives:
Sandy Lloveras
Tom Radcliffe -
Lloveras Baur & stevens
II
!I
"
Preliminary Subdivision Plat
Prior to polling Committee members Mrs. Haeseker ascertained !~om'Mr~.Sa~dy
Lloveras that none of this property has been sold.
,/~ck Lewis - No comment
" : 'J
' '-Paula Harvey - Two comments - (1) Will have to show a 40 ft. drainage and
uiility easement a16ng U. s. 19 on the plat and (2) subdivision regulations
state must show whether selloffs or leases - must show the configurations
asout~p~rcels and identify them by lots.
Ed Bethel - No comments
Keith Crawford - Easement requirements to be shown on plan.
Claude Howell - Questioned whether water main easements have been granted.
Mr__LI?veras to check on this.
Don Beachler Questioned whether any structures over 20 ft. drainage ease-
,ment and was informed by Mr. L10veras that there was part of a building over
36", pipe.: Mr. Beachler requested that this part of easement be vacated. Mrs.
Haeseker commented that there have been prior communications on this and it
is the city's intent that only that part'of easement under a buildinq~bc_
vacated - not the entire easement.
Ream Wilson - No comment.
~...:._~MO~ION.: ..Pau~a_ Harvey recommended approval of the preliminary Subdivision
::'.' plat subject to the following changes being made on the preliminary plat:
,:': .<0, That the 40 ft.. drainage and utility easement be shown along U.. s.. 19;
that.the preliminary plat reflect any property divisions by selling or
3/28/85
, I
...-...
r"
ROC - 3/20/85
Pn90 4
r-joohmann' 0 Pllu:a' (continued)
HotionD ..
loaDing nnd that those properties be identified by indiv.idual lotsl
. that that part of the 20 ft. drainage and utility easement, where
thoro is a building over the easement, be vacated and maintained as
ft private easement.
Motion Bcconded by Ream Wilson'and carried unanimously.
3. 300 N. Belcher, Professional Building - located on the West side of
&olcher, approximately 375 ft. north of Drew street. Courtesy re-
viow.
Ropresentatives:
Bo Russ - Architectural Concepts Inc.
Dan Simmons- Johnson & Company
Preliminary Site Plan
Nick Lewis - commented the proposed one fire hydrant does not meet ~ity of
Clearwater requirements. Second hydrant needed preferably to be located
at south entrance where the island appears.
Paula Harvey - Planning Department has no comments.
<:)d Bethel - Would appreciate site lighting to be shown on final site plan.
See attachment #3 for Building Department comments.
Keith Crawford - only comment concerns dimensions of stalls. Should be
19 ft. long. Some are shown on plans as being only 18-1/2 :ft. '.lang_
Claude Howell - dumpster as shown on plans strictly for a roll-out dumpster
which will not serve the building. Will have to have a dumpster suitable
for truck access. Developer will meet with Mr. Howell to determine proper
location of dumpster. Also developer to consult with Utilities on size
of water meter - 2" not required - probably should be l-1/2".
Don Beachler - no comment.
Ream Wilson - Comments from Park & Recreation Department attached - see
attachment H4. Ream commented further that open space assessment fee to
be. paid prior to annexation.
"~~
:';,:'
;.:'1
.t,"
Keith Crawford discussed the driveway and parking and developer will have
to consult with Mike Kenton to be sure trees are not threatened by proximity
of driveway. Paula Harvey remarked that ample parking has been provided
..,.'...".l and a couple of parkinq spaces can be relinquished to help in tree preser-
vation. .
\,:.1
)~:'
, ,
~~ '.:c.
........
I";
'~i. '~'
't.. ,
Don Beachler advised that Public Works will inspect the sewer extension.
':};"
,.:
,.(
"h';..
.',,:
, .'
~ ~
~.~:
<',I
~,:. :fl"~rs. Haeseker informed developer that the City of Clearw~ter requires side-
;-.. ~alks - sidewalks to be located one foot from property l~ne.
t,
i. '
" .
".
3/28/85
.::};
, "
,'i'
:;~"',~;;::{f/~,{~~" f;.',,',r;,::';. f~Y':;;;:!/;'\::';:'::j't'~';;(j;f'}l.';('ri;~\:i;;"j~(":,;Jii\;,::?;<;f: ;'~::;
. . q .. '. " , . . I' ','. '. . .' , ~. , ',. i'" . '.' 'j" . '" .
.ld' I .:'....,' .':;:......., . ;'<,
-... . " ~~
,L ~.. .'.;' :....., ," I. "L" I:.... :~:.I
":'::':':':'::~'.:~"::,:.':!:::...':".:'.:.:~,:.!.;,),:~::.:i;.i.:.:,,':;, ,.;,',.~i:.;~.':.:\.;:.'\" ;......'.;.... ,: .~::../.. ". .'., ':: i ,"'" " , ' . ,': :. ~ '. ,
.. . iiiC)P;,/,(;,'\:r'"
.....
.;:':....<..
!'f;'!',i,;({";;,;i~fJ,j{iJ;:l'ij[r:')li;l~f:,:, ,'," .;.' .:
. '"
}.~ :~.I,
'.1/,
~: :'.t~
.;><~,
"c',
I .~ >.' ,
;",: ': .
,., .
.11"
"<"
'.
j '. . .~
t.... t.
. '
1," .
, II. .
, . ' .~, .
'" ".(
.. .
. ~; .
". ,,....
. ~ , '~~. {', :'.c'j'
~I I
;,:/
,'.....
. . \~
"'"
c : '. .~
.I'
'.
:~.: >~ ':-;>;1.:."}':':', :.
" "
.1
..... .
.' .:-:.:
,"
.1",
I: .;' :.'", ....: ::..
\'., ,..,
,):;': :;~~?,~;::,} :;~ :'::):/.::::,~..~.}::c,:':::::::
.;
" .~.
";'!;'
fi . 'J~
, ,
. ,c{
............
1
,..-'''"
RDC - 3/29/85
Page 5
ryrofossional Building (Continued)
MOTION I Paula Harvoy recommended approval of the Finnl Site Plan for
the North Delchor Profossional Building subject to the following conditions:
. That a seoond fire hydrant be provided at the south entrance;
. that all parking spaces should be a minimum of 19 ft. in length;
. that the dumpstor location be approved by the Sanitation Superin-
tendent1
that the water line size be approved by the Utilities Department;
. that a five foot sidewalk be provided on Belcher Road;
. and that open space fee be paid prior to annexation.
Motion seconded by Ed Bethel and carried unanimously~
4. Jiffy Lube - located in Loehmann's Plaza.
Courtesy review.
Representative:
Mike White.
Preliminary Site Plan
I
..' :::JiC~ Lewis - no comments.
.;'. Paula Harvey - informed the developer what is required if the property were
~:. .
to be developed in the City of Clearwater. (1) Would require 40 ft. drain-
i: ..
',,", age and utility easement along U. S. 19, with the stipUlation that there
~"', wbuld be no parking within that easement; (2) the sign pole tha~ is supposed
~~:' to,be located in that area would have to be remove~ at owner's expense at
" the time 'that the area is necessary for road improvements;' (3) the property
when annexed would be Zoned CP and within this classification the setback
requirement from the west property line would be 20 ft. for the bUilding.
(4) No parking calculations were shown and Mrs. Harvey questioned how
the number of parking spaces was determined. Developer advised these
were estimated based on a master plan furnished to him - not sure exactly
how they were calculated.
,-
Ed Bethel - See attachment #5' for wri tten comments. Concerned ahout ele-
vation and suggested developer check flood maps to make sure not planning
at 'too low an elevation.
\
:
..
p' . Keith Crawford - UO comments.
Claude Howell '- Dumpster location not shown.
This is required.
.--Don Beachler - Expressed concern with concrete flume next to inlet. This
,:w"'could be' an environmental ha2.ard and this would have to. be moved to elimin-
. . - ate,posaibility of greasy water from parking lot going into storm drain
;", ,()stem..
;':, Ream Wilson no comments.
~~r;>
....:.
~:'~. '
3/28/85
~:~e<"':" ";;'~:1;2
J,(';~: :-,:':- ':
,.
,.'.
ROC - 3/20/85
'P4":{O 6
Jiffy Lubo (Continuod)
,.-....
/,....c. .
.:
i)
..
"
c' r~
1'_. ..
1
t
(
,
~
~ Somo diucuooion followod to enlighten Mr. White on the purpose
'jf this courtoDY roviow by the ROC Committee. Chairman Haeseker informed
him thAt tho City nnd County oporate under similar ordinances as far as
sidewalkE are aonaornod, nnd tho City requires sidewalks on public rights
o~ way. Tho itomn discussed at this meeting are what the developer should
be aw&ro of. 1[, for instance, the flume is left in its present location
and is lAtor found to bo infiltrating the City storm drainage system, the
developer will be cited. Mr. Bethel reemphasi~cd the need for the developer
to conform to FEMA Flood R09,uln tions. Chairman Haeseker informed Mr. White
that Bower and wator sorvice is not being held up because of this meeting.'
I;
.'
MOTION: Pftula Jlarvoy moved to recommend approval of the final site plan
for Jiffy Lube subject to the following:
.
That a dumpster must bo provided on site as required by the
Sanitation superintendentJ
that the concrete flume be relocated in accordance
with the standards of the Public Works Department;
that sidewalks be provided along U. S. 19 and N. E. Coachman
Road.
.
Motion seconded. Paula Harvey voted "Nay". All other RDC members voted
"Ayes". Motion carried.
,r- ter's Ed e Town Houses - this was an item not on the agenda. Paula
.'~ rvey explained to th~ committee that our legal department and Bill Shepard
were having difficuly getting the plat in an order so that it can be recorded.
This is not a condominium. it is proposed to he a townhouse. Townhouse plats
'normally have access to roadway, specific requirements for minimum lot size,
etc.' etc. This was previously before RDC and was formally recommended for
approval. Has been approved by City Commission. It has been before the
nOAA on ~onin9 and the Board did grant variances on minimum lot sizes but )
there has been no clarification on access requirements. Code requires a
minimum of 20 ft. of paved access to a townhouso lot. Four of the units on
northern side do not have this. This will have to go back to the Commission
and Paula Harvey now asking RDC members for their recommendation to the Com-
mission.
After some discussion between members Chairman Haeseker polled the committee
and the consensus was to support the request for a variance for the access
width.