Loading...
8016-08 ORDINANCE NO. 8016-08 AN ORDINANCE OF THE CITY OF CLEARWATER, FLORIDA, AMENDING THE COMPREHENSIVE PLAN OF THE CITY AS ADOPTED ON MAY 18, 2000, AS SUBSEQUENTLY AMENDED, AMENDING THE CAPITAL IMPROVEMENTS ELEMENT, MAKING CORRECTIONS AND MODIFICATIONS PURSUANT TO THE UPDATED SCHEDULE OF THE CITY OF CLEARWATER'S FY2008/09 THROUGH FY2013/14 CAPITAL IMPROVEMENT PROGRAM BUDGET ADOPTED ON SEPTEMBER 18, 2008, AND UPDATING THE REFERENCE IN POLICY 32.7.6 TO THE SCHOOL DISTRICT'S FIVE-YEAR WORK PROGRAM OF FY2008/09 THROUGH 2012/13 AS ADOPTED BY THE SCHOOL BOARD ON SEPTEMBER 9, 2008; PROVIDING FOR SEVERABILITY; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the Local Government Comprehensive Planning and Land Development Regulation Act of Florida empowers and requires the City Council of the City of Clearwater to plan for the future development and growth of the City, and to adopt and periodically amend the Comprehensive Plan, including elements and portions thereof; and WHEREAS, the City of Clearwater adopted a Comprehensive Plan on May 18, 2000 by Ordinance Number 6522-00, subsequently amended; and WHEREAS, certain amendments are statutorily required, and others are advisable in order to harmonize the Comprehensive Plan with state law and good planning practice; and WHEREAS, amendments to the Comprehensive Plan of the City have been prepared in accordance with the applicable requirements of law, after conducting the appropriate planning analysis, and public participation through public hearings, opportunity for written comments, open discussion and the consideration of public and official comments; and WHEREAS, the Community Development Board, serving as the designated Local Planning Agency for the City, has held a public hearing on the proposed amendments and has recommended adoption of the proposed Comprehensive Plan amendments; and WHEREAS, the proposed amendments have been transmitted to the Florida Department of Community Affairs for review and comments, and the objections, recommendations and comments received from the Florida Department of Community Affairs have been considered by the City Council, together with all comments from local regional agencies and other persons, in preparing the final draft of the amendments; and Ordinance No. 8016-08 WHEREAS, the City Council finds it necessary, desirable and proper to adopt the amendments to the objectives and policies of the Comprehensive Plan in order to reflect changing conditions; now, therefore, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CLEARWATER, FLORIDA: Section 1. Amendments to the text of the Clearwater Comprehensive Plan attached hereto as Exhibit "A" are hereby adopted. Section 2. Severability. If any section, provision, clause, phrase, or application of this Ordinance shall be declared unconstitutional or invalid for any reason by a court of competent jurisdiction, the remaining provisions shall be deemed severable therefrom and shall remain in full force and effect. Section 3. This ordinance shall become effective when the Department of Community Affairs (DCA) issues a final order determining the adopted amendment to be in compliance, or the Administration Commission issues a final order determining the adopted amendments to be in compliance, in accordance with Section 163.3177, 163.3178,163.3184,163.3187 or 163.3189,163.3191, F.S., as amended. PASSED ON FIRST READING November 6, 2008 PASSED ON SECOND AND FINAL READING AND ADOPTED Novpmnpr JR. 700R -:::1 . / // '~J'~'. .(dz( / {:x(/ ; ~ACt.,. 'C p. /"-it?/:?/C Frank Hibbard Mayor -Councilmember Approved as to form: Attest: ("ft 2 Ordinance No. 8016-08 ORDINANCE 8016-08 EXHIBIT A AMENDMENT 1 - CAPITAL IMPROVEMENTS ELEMENT SUMMARY Amendfollowing Capital Improvements Summary of the Plan on Page 1-1 asfollows: Capital Improvements Summary: The following are examples of current capital improvement projects and funding sources proposed for public facilities supported in the Comprehensive Plan Elements and as specified in the City's six-year schedule of the Capital Improvement Program (CIP) budget adopted on September 18,2008: summarizes Capital Improvements Element . The $1.25 million Druid Road Improvements project is planned in 2008/09 for the completion of the Druid Road Trail section of the Pinellas Trail from Glen Oaks Park to the Memorial Causeway Bridge. Improvements include landscaping, sidewalks and bike paths. Funding is Penny for Pinellas. . The City's Streets and Sidewalks Program is currently budgeted for $15.472 million on the six-year CIP schedule with a funding source of road millage. . The City proposes a total of $48.44 million of improvements within the City's Stormwater Infrastructure Program over the six-year CIP period. The funding sources for this project are the Stormwater Fund and a future bond issue. . The $1.552 million Commercial Container Acquisition CIP project is planned through Solid Waste funds. . The $21.066 million Reclaimed Water Distribution System CIP project is being funded through: $863,400 from FY '09 Bond Issue, $13.841 million from future bond issue, $4.833 from Sewer Revenue, and $1.529 million from Utility Renewal and Replacement. . Transportation,l Major Street Maintenance projects total $21.1 million over the next six years and include funding for the traffic calming program, street maintenance and resurfacing, beach streetscape, S.R. 60 beautification and North Greenwood corridor enhancements. . The outdated Memorial Causeway Bridge will be replaced with a nevI $10 million architecturally unique bridge that v;ill include pedestrian facilities and serve as a Pinellas Trail spur to the beach in 2001. . Park Development will total $17 million over the next six years and include improvements to Ruth Eckerd Hall, the Long Center, North Greemvood Recreation Complex, Ross Norton Complex and development of the Harbor Bluff Waterfront Park. City of Clearwater, FL Ordinance 8016-08 Exhibit A - 1 - · The construction of a $10.8 million high tech, state of the art, signature new Main Library "yill be constructed in 2002 in dovmtown. · The $2.8 million Memorial Cause\vay Civic Center is scheduled for construction in 2001 and will provide comlmmity meeting space. Library space, police substation, visitor information center and the Jolly Trolley station. · The To\vn Pond, dov.ntown storm facility, '.vill provide an expanded stormwatcr facility to resolve persistent flooding of streets and structures. The total cost of the project is 6.2 million and is scheduled for construction in 2002. · Sewer system improvements '.vill total over $30 million the next six years and will include ',vater pollution control, sanitary se',ycr extensions and expansion and impro':ement of current facilities. · Water system improvements total over $30 million the next six years and 'Hill include expansion of the reclaimed water system, improvement of the vmter supply and treatment facilities, infrastructure improvements and overall system expansion. AMENDMENT 2 CAPITAL IMPROVEMENTS ELEMENT GOALS, OBJECTIVES AND POLICIES Amendfollowing Policy 32,1.2 of Objective 32.1 of Goal 32 on page 1-2 asfollows: ***** 32.1.2 The City shall be permitted to amend the Schedule of Capital Improvements two times during any calendar year and as allowed for emergencies, developments of regional impact and certain small-scale development activities pursuant to Florida Statutes 163.3187. The schedule of capital improvements included in the Clearwater FY2008/09 Capital Improvement Program Budget is incorporated as Schedule I-A of this Capital Improvements Element. ***** AMENDMENT 3 CAPITAL IMPROVEMENTS ELEMENT GOALS, OBJECTIVES AND POLICIES Amendfollowing Policy 32.7.6 of Objective 32.7 of Goal 32 on page 1-10 asfollows: ***** The City hereby adopts by reference the School District's Five-Year Work Program for FY 2008/09 through 2012/13 FY 2007/08 through 2011/12, as adopted by the School Board on September 9.2008 11,2007. City of Clearwater, FL Ordinance 8016-08 Exhibit A - 2 - CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY2008/09 POLICE PROTECTION This section includes all maior comouter technology and equipment needs for the Police Deoartment. These items would typicallY be funded with General Fund dollars. Projects in this section suooort the "Clearwater Provides the Infrastructure to Suooort 011 its Attributes" element of the City Council's Vision and the following related priorities: .:. Well Maintained Infrastructure .:. Efficient Responsive City Services .:. Communication Police Computer Network LIP Gen Fd 250,000 250,000 250,000 250,000 250,000 250,000 1,500,000 Total Police 250,000 250,000 250,000 250,000 250,000 250,000 1 ,500,000 91147 Police Computer Network This oroiect was originally established in the FY 1993/94 Caoital Imorovement Budget and orovided for the Police Department's computer plan and network operations, The focus of the oroject includes uogradin~ the in-house computer systems' desktop computers, file servers, orinters, and network hardware as new technology becomes available. Maintaining the Police computer in-house network as "state of the art" is of utmost imoortance, and the ever-changing nature of computer technology makes it impossible to be specific regarding future ourchases or needs. ANNUAL OPERATING BUDGET IMPACT Proiect FTE's 2008/09 2009/10 2010/11 2011 /12 2012/13 2013/14 Police Computer Network (2) 0.0 88.700 177.400 266,100 266.100 266,100 266.100 Total Police 0.0 88.700 177.400 266,100 266,100 266,100 266,100 /21 Operatina costs ore for debt service to be funded bv the General Fund. City of Clearwater, FL Ordinance 8016-08 Exhibit A - 3 - FIRE PROTECTION This section includes all maior eauipment and vehicle needs for the Fire Department. All Fire Department facility renovations and or new construction would also be included in this section. Eauipment and vehicles could be funded with General Fund or Lease Purchase dollars, with the debt funded by the General Fund. In addition, Penny for Pinellas revenue can also fund a Fire Department vehicle as well as an emeraency medical service vehicle. Any facility renovations and or new construction would typically be funded with Penny for Pinellas revenue. Proiects in this section support the "Clearwater is a Wonderful Place to Live" element of the City Council's Vision and the followinq related priorities: .:. A Safe Clean Green Environment .:. Safe Comfortable Walkable Neighborhoods Proiects in this section also support the "Clearwater Provides the Infrastructure to Support all its Attributes" element of the City Council's Vision and the following related priorities: .:. Well Maintained Infrastructure .:. Efficient Responsive City Services .:. Communication Proiects in this section also support the "Clearwater includes Special Places that Belong to Everyone in the Community" element of the City Council's Vision and the following related priorities: .:. A Quality Beach Environment 91218 Fire Enaine Reolacement LIP Gen Fd 450,000 450.000 450.000 450,000 450.000 450,000 91221 EMS Caoital Eauioment General Fd 15,000 15,000 15.000 15,000 15.000 75.000 LIP Gen Fd 145.000 140.000 285.000 91229 Reolace & Uograde Air Packs LIP Gen Fd 125,000 750,000 875,000 91236 Rescue UP Gen Fd 140,000 1 60,000 170,000 470,000 91247 Traffic Preemotion Control UP Gen Fd 75,000 75.000 150.000 91257 Auto External Defibrillator prog General Fd 50,000 50,000 continued on next page City of Clearwater, FL Ordinance 8016-08 Exhibit A - 4 - FIRE PROTECTION (continued) Radio Replacements General Fd 50,000 51,500 53,050 54,640 56280 57,970 323.440 91261 Personal Protective Eauio General Fd 133,000 136,990 14LlOO 145,330 149,690 154,180 860290 91262 Self-Contained Breathing ADD General Fd 125,000 125,000 Upgrades-Fill Station 91263 Extrication Tools General Fd 56,000 56,000 91264 Fire Hose Reolacement General Fd 25,000 25,000 25,000 25,000 25,000 25,000 150,000 912xx Rescue Sauad Replacement LIP Gen Fd 850,000 850,000 Total Fire Protection 473,000 753.490 1.064.150 885.970 1.890.970 1 .452. 150 6.519.730 91218 Fire Engine Replacement This proiect orovides for the reolacement and eauipping of one (11 Pumper each year from FY 2009/10 through FY 2013/14, These Pumoers will replace the fleet of 1999 units that will be at the end of their service life, This will also allow for orocurement of new eauioment for each pumoer, Maintaining uo to date response vehicles along with reauired eauioment. allows the deoartment to maintain its level of service to the community and orovide for the safety of our oersonneL Funding for replacement is partiallY reimbursed by the County since the eauioment also serves the unincorporated area of the Clearwater Fire District. 91221 EMS Capital Eauipment This oroiect orovides for the orocurement of capital eauioment for the EMS system per County EMS agreement. The oroiect will fund the replacement of Lifeoak 12 cardiac monitor/defibrillators, which have a useful life exoectancy of seven years. Additional equipment includes electronic suooort equioment, radios, stretchers, solints, oxygen regulators, etc, 91229 Replace & Upgrade Air Packs The funding orovides for the replacement of breathing apparatus needed for worn or damaged front line units. This oroiect orovides the ourchase of self-contained breathing aooaratus (SCBAl uograde kits that have been approved through National Institute for Occupational Safety & Health (NIOSH) and the CDC (US Centers for Disease Control & Prevention) and includes an Accountability Monitoring System that orovides for tracking firefighters in hazardous environments, The new NFPA (Notional Fire Protection Associationl 1982, 2007 edition is now in effect. Our current SCBA's do not meet these standards and do not provide the needed orotection in 0 terrorism event. The new recommended standards will allow the deoartment to maintain equioment to provide for the safety of our oersonneL Funding in FY 2013/14 orovides for ourchases for anticioated chanCles to NFPA standards that may come about after the NFPA 2007 edition. Funding is oartially reimbursed by the County since the eauioment also serves the unincorporated area of the Clearwater Fire District. City of Clearwater, FL Ordinance 8016-08 Exhibit A - 5 - FIRE PROTECTION (continued) 91236 Rescue This proiect provides for the scheduled replacement of Fire/EMS first remonse vehicles. Fundina will allow for the replacement of one (1) transport capable rescue vehicle every other vear. Funding for replacement is partially reimbursed by the County since the eauipment also serves the unincoroorated area of the Clearwater Fire District. 91247 Traffic Preemption Control The proiect provides fundina for the reqular periodic installation additions to an automated traffic control system that will allow public safety vehicles to more safely remond through intersections using in-vehicle control of traffic signals, with resulting decreases in response times to emerqency scenes. This important proiect will provide for the safety of our remonse personnel as well as the citizens. Total fundinq of this proiect will allow faster remonse times which helps ensure the department maintains its level of service to the community. Funding will be partially reimbursed by the County, as the system will help serve any unincorporated resident of the Clearwater Fire District. 91257 Automatic External Defibrillator Proqrams The Department has 25-biphasic Lifepak 500 AED devices currently in key City facilities such as City Hall. MSB, Libraries, and Police. In FY 2012/13, the proiect will fund the replacement of Lifepak 500 AED's, which have a useful life expectancy of seven years. Fundinq for replacement is partially reimbursed by the County since the equipment also serves the unincorporated area of the Clearwater Fire District. 91259 Radio Replacements Pinellas County Communications has adopted the APCO [International Association of Public Safety Communicators) Proiect 25 communication standards. This will require that all portable and mobile radio equipment be diqital by the year 2010. This proiect will provide fundinq for the upqrade, as well as additional portable and mobile radio equipment that will replace existinq units and uparade eauipment to make all Clearwater Fire & Rescue communication eauipment compliant with the new standard. Fundina will be partially reimbursed by Pinellas County, as the eauipment will help serve any unincoroorated resident of the Clearwater Fire District. 91261 Personal Protective Equipment This proiect provides funding for the complete outfittina of all personnel with the new Personal Protective Equipment (PPEl that the Fire Department has started purchasina in the last year. This proiect also provides for the National Fire Protection Association IN FP A) 1852 compliance and generates a revolvina replacement schedule for the replacement of PPE that has reached its 5-year life expectancy. This PPE provides a hiqh degree of protection for our firefighters along with providinq many safety features that could assist members in case of an emeraency at an incident. The excellent identification that is incoroorated in this PPE also assists Incident Commanders with accountability and safety. Funding for replacement is partially reimbursed by the County since the eauipment also serves the unincoroorated area of the Clearwater Fire District. 91262 Self Contained Breathing Apparatus Upgrades - Fill Station This proiect provides funding for one self-contained breathinq apparatus (SCBA) system FY 2012/13. This system will consist of a breathin~ air compressor; six (6) breathing air storaae cylinders and a facility type fill station. The system will allow for refillinq of Fire Department SCBA units located on our emergency response apparatus. Funding will be partially reimbursed by the County, as the system will help serve any unincorporated residents of the Clearwater Fire District. 91263 Extrication Tools This proiect will provide fundinq for the upgrade and additional vehicle extrication equipment packaqe that will replace existing units and upgrade equipment to current National Fire Protection Aaency INFPAl recommendations. Funding will be partially reimbursed by the County, as the equipment will help serve any unincorporated residents of the Clearwater Fire District. City of Clearwater, FL Ordinance 8016-08 Exhibit A - 6 - FIRE PROTECTION (continued) 91264 Fire Hose Replacement This proiect provides funding to ourchase reolacement fire hoses. Funding will be partiallY reimbursed by the County, as the equioment will helD serve any unincorporated residents of the Clearwater Fire District. 912xx Rescue Squad Reolacement This project will orovide funding for the ourchase and equipping of a replacement heavy rescue unit for the existing 1997 squad unit in FY 2012/13, which will have exceeded it's useful life. The Department has one squad unit and one soare vehicle. The squad is the department's only heavy rescue unit and is resoonsible for all structure fires, vehicle extrications and technical rescue incidents. The squad carries a variety of specialized equipment and the soecialized training the oersonnel have are essential in assisting mitiaation of comolicated emergency responses. Funding will be oartially reimbursed by the County, as the equioment will helD serve any unincoroorated residents of the Clearwater Fire District. Proiect FTE's 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 Fire Engine Reolacement 121 99 ,520 199,040 298,560 398,080 497,600 EMS Caoital Eauioment 121 0.0 32,070 63,030 63,030 63,030 Reolace & Uoqrade Airoacks 121 0.0 27,640 27,640 27 ,640 27,640 27,640 165,870 Rescue 30,960 30.960 66.350 66,350 103,950 72.990 Traffic Preemotion Control 121 0.0 16,590 33,180 33,180 33.180 33,180 Rescue Squad Reolacement 121 0.0 187.990 187,990 Total Fire Protection 58,600 174,710 358,280 488,760 813,870 1,020,660 121 Operatina costs are for Debt Service to be funded bv the Generai Fund. City of Clearwater, FL Ordinance 8016-08 Exhibit A - 7 - NEW STREET CONSTRUCTION This section includes all new street construction proiects. Prior to the voter approval of the additional one-cent State sales tax. known as Penny for Pinellas. many of these proiects were funded with Local Option Gas Tax. Development Impact Fees and Road Millage. Today. these proiects are traditionally funded with Penny for Pinellas revenue. Proiects in this section support the "Clearwater Provides the Infrastructure to Support all its Attributes" element of the City Council's Vision and the following related priorities: .:. Well Maintained Infrastructure .:. Efficient Transportation Systems Proiect Fundina 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 Total 92146 Druid Road Imorovements ~ 1.250,000 1,250,000 Total New Street Construction 1 ,250.000 1,250,000 92146 Druid Road Improvements This project provides for improvements at various intersections alonq Druid Road. Funding in FY 2008/09 will complete the Druid Road Trail section from Glen Oaks Park to the Memorial Causeway Bridqe. Improvements include landscaping. sidewalks and bike paths. Comprehensive Plan Objective: (2.51 The City shall encouraqe improved land use of transit oriented development planning. (2.5.11 The city shall support the pjnellas Trail and examine opportunities for Trail extensions or spurs to connect to reqional attractions and employers. 16.1) Roadway improvements to obtain desired Levels of Service must be included in City proiects. (6.31 To meet desired level of service standards as set forth in policy 5.5.1 . ANNUAL OPERATING BUDGET IMPACT Profect FTE's 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 Druid Road Improvements 111 0.0 5.000 5.250 5.510 5.790 6.080 6.380 Total New Street Construction 0.0 5.000 5,250 5.510 5.790 6.080 6.380 11 J Operatina costs ore for maintenance. which will be outsourced and funded bv the General Fund. City of Clearwater, FL Ordinance 8016-08 Exhibit A - 8 - MAJOR STREET MAINTENANCE This section includes all maior street maintenance projects for the City. Proiects in this sectjon are normally funded with Local Option Gas Tax and/or Road Millage. As defined by Florida Statutes, Local Option Gas Tax proceeds can be used for roadway and right-of-way maintenance, as well as bridge maintenance and operations. Road Millage revenues are established each year by Council policy and must be used to maintain the City's sidewalks and streets with the goal of maintaining a 10 to 15 year resurfacina cycle. Proiects in this section support the "Clearwater is a Wonderful Place to Live" element of the City Council's Vision and the following related priority: .:. Safe Comfortable Walkable Neighborhoods Projects in this section also support the "Clearwater Proyides the Infrastructure to Support all its Attributes" element of the City Council's Vision and the following related priority: .:. Well Maintained Infrastructure Prolect Fundlna 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 Total 92259 Traffic Calmina prog Gas Tax 800.000 800,000 800.000 200,000 200,000 200,000 3,000,000 92273 Streets & Sidewalks Road Millaae 2,682,150 2,600.340 2.547.430 2,547.430 2.547.430 2,547.430 15.472.210 92274 Bridge Maint & Gas Tax 600,000 800,000 650.000 1 ,250,000 1 ,300.000 1.300,000 5.900,000 Improvements Malor Street Maintenance Total 4.082,150 4,200,340 3,997.430 3,997.430 4,047.430 4,047.430 24,372,210 92259 Traffic Calming Proaram Proiect to promote traffic calming within Clearwater neighborhoods and establishment of a methodology for implementation. City staff to implement in succeeding years through capital programming. Specific proiects in FY 2008/09 will include Wood Valley & Morninaside. 92273 Streets & Sidewalks Ireplaces the Streets, Sidewalks & Bridges proiectl This project provides continuous maintenance for deterioration prevention of City streets and sidewalks by allowing approximately 20 to 30 miles of streets to be maintained yearly. This yearlY street maintenance includes asphalt pavement milling, pavement resurfacing and pavement remarking. The project also provides for the maintenance, repair and construction of sidewalks on a continuous, as needed basis. Comprehensive Plan Objective: (6.1) Roadway improvements to obtain desired Levels of Service must be included in City capital budgets. 92274 Bridge Maintenance & Improyements This proiect provides for a continuous, annual maintenance program to keep the City's bridges inspected and in good repair as well as providing for the complete replacement of bridges as necessary. Comprehensive Plan Obiective: (6.11 Roadway improvements to obtain desired Levels of Service must be included in City capital budgets. City of Clearwater, FL Ordinance 8016-08 Exhibit A - 9 - INTERSECTIONS This section includes improvements to intersections as well as new signal installation and siqnal renovation. These projects are funded with Transportation Impact Fees, Road Millaqe qnd Local Option Gas Tax. The Road Millage funding in the Signal Renovation project is used in conjunction with maior intersection improvements and road wideninq projects. The Transportation Impact Fee revenue is required to be used for capital improvements and the expansion of transportation facilities. Local Option Gas Tax proceeds can be used for roadway and right-of-way maintenance. Projects in this section support the "Clearvvater is a Wonderful Place to Live" element of the City Council's Vision and the followinq related priority: .:. Safe Comfortable Walkable Neighborhoods Proiects in this section also support the "Clearvvater Provides the Infrastructure to Support all its Attributes" element of the City Council's Vision and the followinq related priority: .:. Well Maintained Infrastructure Proiects in this section also support the "Clearvvater Includes Special Places that Belona to Everyone in the Community" element of the City Council's Vision and the following related priorities: .:. A Quality Beach Environment .:. A Vibrant Downtown that's Mindful of its Heritaqe Imorovements Trans Imp 50.000 50,000 50.000 50.000 50,000 50,000 300,000 92552 Siqnal Renovation Gas Tax 45,000 45,000 45,000 45,000 45,000 45,000 270,000 92553 New Siqnallnstallations Trans Imp 40,000 40,000 40,000 40,000 40.000 40,000 240,000 92558 Intersection Improvements Trans Imp 200,000 200,000 200,000 200,000 200,000 200,000 1 ,200,000 Gas Tax 55,000 55,000 55,000 55,000 55.000 55,000 330,000 Rd Millaqe 45.000 45,000 45,000 45,000 45,000 45,000 270,000 435,000 435,000 435,000 435,000 435,000 435,000 2,610,000 Total Intersections 92551 City-Wide Intersection Improvements The proiect provides intersection improvements of a minor nature to facilitate traffic flow, such as radii. riqht turninq lanes, and minor channelization, which often accompany the new signalization of an intersection. Comprehensive Plan Objective: (6.1) Roadway improvements to obtain desired Levels of Service must be included in City capital budqets. City of Clearwater, FL Ordinance 8016-08 Exhibit A - 10 - INTERSECTIONS (continued) 92552 ~gnalRenovatlon Renovation of substandard signalized intersections is required to meet the standards set by the national and State of Florida mandates to increase safety and reduce liability. This project also provides money to support the costs of relocating traffic signal equipment due to road widening proiects or intersection improvement projects where the cost of such relocation cannot be included in the cost of that project. Comprehensive Plan Objective: The FOOT has established minimum operating standards for urban minor arterials and minimum standards for State principal arterials. Clearwater intends that these standards be recognized as the minimum acceptable standards for State arterial roads. and should serve as a guideline for reviewing development applications. (6. II Roadway improvements to obtain desired Levels of Service must be included in City capital budgets. 92553 New Signal Installations The project provides for new traffic signals installed at previously unsignalized intersections that meet traffic signal warrants. Comprehensive Plan Obiective: The FOOT has established minimum operating standards for urban minor arterials and minimum standards for State principal arterials. Clearwater intends that these standards be recognized as the minimum acceptable standards for State arterial roads. and should serve as a guideline for reviewing development applications. (6.1) Roadway improvements to obtain desired levels of service must be included in City capital budgets. 92558 Intersection Improvements These are intersection improvements of a relatively major nature to facilitate traffic flow by increasing the capacity of the intersection. Specific proiects in FY 2008/09 will include intersections at Court & Chestnut with various cross streets as deemed necessary following the new bridge opening. Comprehensive Plan Obiective: (6.3) To meet desired level of service standards as set forth in policy 5.5.1. City of Clearwater, FL Ordinance 8016-08 Exhibit A - II - PARKING The Parkina section includes proiects for the maintenance of the Citv owned parking garages, as well as Citv owned parking lots, These proiects are usuallv funded with Parking Fund revenue, Also included in this section would be anv new Parkina Garaaes, These tvpes of proiects would traditionallv be funded with Parkina Fund revenues and/or a Parkina Bond Issue, Proiects in this section support the "C1earvvater Provides the Infrastructure to Support all its Attributes" element of the Citv Council's Vision and the followina related prioritv: .:. Well Maintained Infrastructure Project Fundina 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 Total 92630 Parkinq Lot Resurfacinq Parkinq Fd 50,000 50,000 50,000 50,000 50,000 50,000 300,000 92632 Parkinq Garaqe Maintenance Parkinq Fd 75.000 75,000 75,000 75,000 75,000 75,000 450,000 and Reoair 92636 Parkinq Lot Imorovements Parkinq Fd 100,000 100,000 100,000 100,000 100,000 100,000 600,000 Total Parkina 225,000 225,000 225,000 225,000 225,000 225,000 1 ,350,000 92630 Parking Lot Resurfacing The proiect provides for the resurfacing of various Citv Parkina Svstem lots as determined necessary bv Engineering, 92632 Parkina Garaae Maintenance & Repair The Garden Avenue and Municipal Services Complex parkin a aaraaes both reauire maintenance and repair, Bv performing this scheduled maintenance, lona-term serviceabilitv and safetv issues will be addressed, 92636 Parkinq Lot Improvements The proiect provides for interior improvements, both functional and aesthetic, to all parkina svstem facilities, Parkina facilitv locations will beqin with the beach lots and expand to include all parkina svstem facilities and on-street parking. Improvements include items such as brick pavers, parking meters, parking revenue control eauipment and sian uparades, City of Clearwater, FL Ordinance 8016-08 Exhibit A - 12 - MISCELLANEOUS ENGINEERING This section includes miscellaneous enaineering type of projects that are related to the Engineerina function. The smaller projects are typically either funded with General Fund revenue or Lease Purchase dollars if the proiect is equipment or vehicles. Projects in this section could also include major construction projects that don't easily fit in another category, i.e., the replacement of the Memorial Causeway Bridge, when active, was included in this section. The larger construction projects have been funded with Penny for Pinellas proceeds. Projects in this section support the "Clearwater Provides the Infrastructure to Support all its Attributes" element of the City Council's Vision and the following related priority: .:. Well Maintained Infrastructure Project Fundina 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 Total 92822 Miscellaneous Enaineerina General Fd 35,000 35,000 35,000 35,000 35,000 35,000 210,000 92838 Variable Messaae Boards Gas Tax 80.000 80,000 Total Miscellaneous Enaineerina 115,000 35,000 35,000 35,000 35,000 35,000 290,000 92822 Miscellaneous Engineering Establishes a project to provide funding for miscellaneous contractual services related to new road construction, public transit facilities, storm drainage, rights-of way, sidewalks, drainage structures, signal installation, or landscaping includina unplanned requests by other departments. 92838 Variable Message Boards This project provides funding for the replacement of four (4) variable message boards that are utilized by Traffic Operations for the control of traffic during special events and road detours. City of Clearwater, FL Ordinance 8016-08 Exhibit A - 13 - PARKS DEVELOPMENT The Parks Development section includes the largest amount of aualitv of life proiects in the Capital Improvement Proaram. Proiects in this section include all the proiects that support the Parks & Recreation function, excluding land acauisition. Manv of these proiects are maintenance projects that provide the necessary fundina to maintain our parks, and our park facilities, in good condition. These maintenance proiects are tvpicallv funded with General Fund revenue. Eauipment and vehicle proiects in this section would be funded with Lease Purchase dollars. The maior construction of new Parks & Recreation facilities or maior renovation of existina Parks & Recreation facilities have been funded with Pennv for Pine lias proceeds, grants, donations and impact fees such as recreation facilitv, recreation land and open space. Also, included in this section is a proiect for the maintenance of the Harborview Center. This proiect is funded with Harborview Fund revenue. Proiects in this section support the "Clearwater is a Wonderful Place to Live" element of the Citv Council's Vision and the following related priorities: .:. A Safe Clean Green Environment .:. Safe Comfortable Walkable Neiahborhoods Projects in this section also support the "Clearwater is a Wonderful Place to Play" element of the Citv Council's Vision and the followina related prioritv: .:. A Varietv of Cultural and Recreation Offerings Projects in this section also support the "Clearwater Provides the Infrastructure to Support all its Attributes" element of the Citv Council's Vision and the followino related priorities: .:. Well Maintained Infrastructure .:. Efficient Responsive Citv Services Projects in this section also support the "Clearwater Includes Special Places that Belona to Everyone in the Community" element of the Citv Council's Vision and the followino related prioritv: .:. A Vibrant Downtown that's Mindful of its Heritaoe 93204 Concrete Sidewalk & Pad Reoairs & Reolacement General Fd 55,000 55,000 55,000 60,000 60,000 60,000 345,000 93205 Briqht House Networks Field Infrastructure Reoairs/ Imar General Fd 50,000 50.000 50,000 50.000 50,000 50,000 300,000 93213 Park Amenity Purchase, Reoair & Reolacement General Fd 75,000 75,000 75,000 80,000 80.000 80.000 465,000 210,000 210,000 210.000 175,000 225,000 225,000 1.305,000 continued on next page City of Clearwater, FL Ordinance 8016-08 Exhibit A - 14 - PARKS DEVElOPMENT (continued) Plavaround & Fitness Eauip General Fd 150,000 150,000 150,QQ0 175,000 175,000 175,000 975,000 Purchase & Replacement 93247 Fitness Equip Replacement General Fd 25,000 25,000 25,000 30,000 30,000 30,000 165,000 93262 Fencinq Replacement Proq General Fd 125,000 125,000 125,000 130,000 130,000 130,000 765,000 93271 Swimming Pool R&R General Fd 60,000 80,000 80,000 80,000 100,000 100,000 500,000 93272 Recreation Trails Penny 360,000 360,000 FRDAP Grant 200,000 200,000 State Grant 160,000 160,000 93277 Harborview Infrastructure Harborview 100,000 100,000 100,000 100,000 100,000 100,000 600,000 Repairs & Improvements 93278 Long Center Infrastructure General Fd 50,000 60,000 60,000 60,000 60,000 70,000 360,000 Repairs 93286 Parking Loti Bicvcle Path General Fd 50,000 50,000 50,000 60,000 60,000 60,000 330,000 Resurfacing & Imprvmnts 93602 Special Events Eauip Sp Event Rev 30,000 30,000 30,000 30,000 30,000 30,000 180,000 Repairs & Replcmt 93604 Boardwalks & Docks General Fund 75,000 75,000 75,000 100,000 100,000 100,000 525,000 Repair & Replacmt continued on next pooe City of Clearwater, FL Ordinance 8016-08 Exhibit A - 15 - PARKS DEVELOPMENT (continued) 93611 Multi Terrain Loader LP-Gen Fd 58.em 58.em 93612 McMullen Tennis Complex (new soft courtsl Gen Fd Ret Ema FRDAP Grant 200.em 200.em 200.em 2OO.em 936xx Lona Center Miracle Field Pinellas Ctv Lona Or Found Owr for Youth FRDAP Grant 250.em 5O.em lO.em 200.em 250.em 5O.em 10.em 200.em 936xx Joe DiMaaaio Sports Complex Renovations Pinellas Ctv Outside Aaencv Donations 2.em.em 5OO.em 2.em.em 5OO.em Total Paks Development 2.110.500 4.167.500 957.500 1.045.000 1.065.000 1.075.000 10.420.500 93203 Carpenter Field Infrastructure Repairs and Improvements This proiect provides for the phased repairs and improvements needed at the Carpenter Field Complex. includina fence replacement. field renovations. building repairs. parkina lot restructuring. entrvway improvements. etc. This proiect will allow for the Camenter Complex to continue to be maintained in a maior league professional manner. Comprehensive Plan Obiective: (28.1 .5.2) A repair. remodeling. renovation or replacement of obsolete or worn out facilities that contribute to achieving or maintaininq standards for levels of service. 93204 Concrete Sidewalk. Pad Repairs and Replacement This proiect provides for the removal and replacement of damaaed concrete sidewalks. curbs. and pads and courts in various parks around the City as well as provides for new sidewalks for safety and accessibility reasons. Comprehensive Plan Obiective: (24.11 Improve the public's access to parks and recreation sites. 93205 Community Sports Complex Infrastructure Repairs and Improvements This proiect provides for the phased repairs and improvements needed at the Community Sports Complex according to the Joint Proiect Agreement (JPAl between the City of Clearwater and the Phillies. This proiect will allow for the Community Sports Complex to be maintained in a manner to meet current maior league professional standards. Comprehensive Plan Objective: (28.1.5.21 A repair. remodelinq. renovation or replacement of obsolete or worn out facilities that contribute to achieving or maintaininq standards for levels of service. City of Clearwater, FL Ordinance 8016-08 Exhibit A - 16 - PARKS DEVELOPMENT (continued) 93213 Park Amenity Purchase, Repair and Replacement This proiect proyides for the purchase, repair and replacement of such items as park identification signs, rules signs, park benches, trash receptacles, water fountains, grills, basketball goals, soccer and football goals, bleacher systems, and the like, at various Parks & Recreation facilities and sites. Comprehensive Plan Obiective: (24.1) Improve the public's access to parks and recreation sites. 93229 Tennis and Basketball Court Resurfacing This proiect provides for the scheduled resurfacing of tennis and basketball courts to prevent deterioration. Tennis courts tentatively scheduled to be resurfaced in FY 2008/09 include Bay Park Coachman Ridae and Forest Run Parks. Comprehensive Plan Objective: (24.1) Improve the public's access to parks and recreation sites. 93230 Playground and Fitness Eauipment Purchase and Replacement This project provides replacement of playground eauipment and the purchase of new equipment at the City's 32 playgrounds. Included in this project is the appropriate safety resilient surfacing. Playgrounds tentatively scheduled to be replaced in FY 2008/09 include Cherry Harris Park and Morningside Playground. This project also includes phased replacement of fitness court equipment. Eauipment tentatively scheduled for replacement includes Norton Recreation Center. As equipment is added and/or replaced, it is evaluated to assure it meets ADA requirements. Comprehensive Plan Obiective: (24.1) Improve the public's access to parks and recreation sites. 93247 Fitness Equipment Replacement This proiect provides for the phased replacement of old, worn out and over used fitness equipment at the City's five (5) fitness centers. Proiects for FY 2008/09 may include, but not be limited to, equipment at the North Greenwood Recreation Complex, Clearwater Beach Recreation Center, and Countrvside Recreation Center. Comprehensive Plan Obiective: (28.1 .5.2) A repair, remodeling, renovation or replacement of obsolete or worn out facilities that contribute to achieving or maintaining standards of levels of service. 93262 Fencing Replacement Program This project includes phased replacement of old, worn out and rusted fencing at the various recreation sites. The largest amount of fencing to be replaced on an annual basis exists at the fifty (501 ball fields, which includes backstops and dugout fencing. Fencinq is replaced as needs arise, and replacements comply with all current code requirements. 93271 Swimming Pool Renovations and Repairs This project will provide for the renovation and enhancement of the various pools in the City, for facility improvements, leisure pool enhancements such as slides, activity pools and long-term maintenance such as marciting and repair of autters, tile and decking. FY 2007/08 and 2008/09 funding are needed to provide marciting and deck replacement at Morningside pool. Comprehensive Plan Obiective: (28.1.5.21 A repair, remodeling, renovation or replacement of obsolete or worn out facilities that contribute to achieving or maintaining standards for levels of service. 93272 Recreation Trails This project provides for the construction of recreation trails throughout the city for walking, jogging, inline skating and bicycling. May include but not limited to projects such as Memorial Causeway, Turner Street. and Ream Wilson Clearwater Trail. Penny funding for FY 2008/09 is needed to provide partial funding for a portion of the Landmark Drive Trail and improvements at Lake Chautauqua Nature Preserve. Comprehensive Plan Obiective: (24.3) To correct deficiencies in the supply of core system parkland and facilities (24.3.81. New or expanded facilities that reduce or eliminate deficiencies in levels of service for existing demand. City of Clearwater, FL Ordinance 8016-08 Exhibit A - 17 - PARKS DEVELOPMENT (continued) 93277 Harborview Infrastructure Repairs and Improvements This project provides for the phased repair and replacement of capital items at the Harborview Center. In order to keep this facility as a ouality and successful Convention facility. a program of capital improvement repairs and replacements will need to occur each year ILe. replacement of carpetina, air conditioner replacements. eouipment replacement. paintino. repair roof leaks, etc.). Projects for FY 2008/09 may include roof and air conditions repairs, as well as replacement of carpetino and other floorino material. Comprehensive Plan Objective: (28.1 .5.21 A repair, remodelino. renovation or replacement of obsolete or worn out facilities that contribute to achieving or maintainino standards for levels of service. 93278 Long Center Infrastructure Repairs This project will provide for the replacement and repairs of various capital items at the Lono Center. This capital proiect replaces the annual sinkina fund included in the past Lona Center aareement with the City. Some of the infrastructure items that will need to be repaired or replaced include furnishinos, eouipment. pool. parking lot. driveway, ballfield, etc. Comprehensive Plan Obiective: 128.1 .5.21 A repair. remodelina. renovation or replacement of obsolete or worn out facilities that contribute to achjevino or maintaining standards for levels of service. 93286 Parkina Lot/Bicycle Path Resurfacina/lmprovements This proiect includes regularly resurfacing of parking lots and bicYcle paths to prevent deterioration and may include minor improvements to those parking lots and bicycle paths beina resurfaced. Comprehensive Plan Obiective: Improve the public's access to parks and recreation sites. 93602 Special Events Eauipment Repairs & Replacement This is a maintenance project for the special events division of the Parks and Recreation Department similar to other onaoing maintenance projects. This proiect provides for the purchase. repair and replacement of such items as sound eouipment. chairs. tables, tents. etc. used by the Special Events Division for special events, grand openings. dedications, celebrations. etc. The equipment used by this Division wears out from heavy use and a proaram is needed to replace this equipment Comprehensive Plan Objective: (28.1.5.21 A repair, remodelina. renovation or replacement of obsolete or worn out facilities that contribute to achieving or maintainina standards for levels of service. 93604 Boardwalks & Docks Repair & Replacement This project provides fundinq for the repair and/or replacement of boardwalks, docks and viewing platforms in various parks and beach access points. There are over 49.000 square feet of wooden boardwalks. docks and viewinq platforms throuahout the City. includinq such parks as Moccasin Lake. Crest Lake and Ed Wriaht and areas such as Turner Street Dock. Magnolia Street Dock and wooden access boardwalks to Sand Key and Clearwater Beach. The majority of these are over 20 years old and will need replacement within the next few Years. Replacement with recycled products will occur wherever possible to extend the life of the replacements. Comprehensive Plan Objective: 128.1 .5.2) A repair. remodelina, renovation or replacement of obsolete or worn out facilities that contribute to achieving or maintaining standards for levels of service. 93610 Bulldozer This proiect provides funding for the purchase of a D6N-CA T Bulldozer. This eauipment will primarily be used to maintain the sand on Clearwater Beach. This equipment will allow staff to re-arade the beach to keep the sand at normal baseline elevation. improve beach conditions to help minimize sand displacement onto sidewalks and roadways and also be used for storm cleanup activities. This equipment can also be used by Public Services. City of Clearwater, FL Ordinance 8016-08 Exhibit A - 18 - PARKS DEVELOPMENT (continued) 93611 Multi Terrain Loader This proiect provides funding for the purchase of a multi terrain loader. This eauipment will primarily be used to maintain the sand on Clearwater Beach. However, it will also be used to assist with excavation and grading of various park properties, athletic facilities and parkina areas. This smaller piece of equipment will allow sand to be removed from behind the sand walls and in the tight spaces along the beach by design proiect and will allow for the larger equipment on the beach to grade and keep sand at baseline elevation, thus limiting future sand build uP. 93612 McMullen Tennis Complex (new soft courtsl This proiect provides funding for the construction of four new lighted clay courts and tennis amenities at McMullen Tennis Complex. The additional courts will accommodate the need for additional clay courts and also allow maior tennis tournaments to be held in Clearwater. Any additional operating costs will be offset by additional revenue. Comprehensive Plan Obiective: (24.11 Improve the public's access to parks and recreation sites. (24.31 To correct deficiencies in the supply of core system parkland and facilities (24.3.81. New or expanded facilities that reduce or eliminate deficiencies in levels of service for existing demand. (28.1.5.3) New or expanded facilities that reduce or eliminate deficiencies in levels of service for existing demand. 936xx Long Center Miracle Field This proiect will provide for the construction of a miracle field with amenities at the Long Center, which can be used by children and adults with physical and mental challenges. The miracle field will be constructed with a synthetic surface so that children and adults in wheelchairs, walkers and other devices can play baseball and softball, which they cannot currently do in North Pinellas County. Additional amenities will include an increase of over 85 parkina spaces, lighting, dugouts, bleachers, water fountains, landscapina and other misc. park improvements. The City plans to partner with Pinellas County, the Long Center Foundation, Clearwater for Youth and the State of Florida to name a few. Comprehensive Plan Obiective: 128.1.5.31 New or expanded facilities that reduce or eliminate deficiencies in levels of service for existing demand. 936xx Joe DiMaggio Sports Complex Renovations This proiect provides for the renovation and improvements of the Joe DiMaggio Sports Complex by constructing seven (71 new soccer fields and one (11 maior league baseball field. In addition, there will be restrooms, concession building, press box, improved parking to accommodate the need for overflow parking for Bright House Networks Field and other park amenities. The City is hoping to partner with the County, State and Federal Government, as well as. local co-sponsor groups to fund this project, which would also include any additional operating expenses associated with construction. Phase I of the proiect in FY 2009110 includes the construction of four (41 new fields, lighting for the existing field to the south and installation of a new restroom/concession building. Comprehensive Plan Obiective: (28.1.5.2) A repair. remodeling, renovation or replacement of obsolete or worn out facilities that contribute to achieving or maintainina standards of levels of service. City of Clearwater, FL Ordinance 8016-08 Exhibit A - 19 - PARKS DEVELOPMENT (continued) Project FTE's 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 93610 Bulldozer 121, 161 0.0 45.340 45,340 45,340 45,340 45,340 93611 Multi Terrain Loader 121, 161 0.0 12,830 12,830 12,830 12,830 12,830 Total Parks Development 0.0 58,170 58.170 58.170 58.170 58.170 0 121 Operatina costs are for debt service to be funded bv the General Fund. 161 Operatina costs are for Fleet Maintenance. City of Clearwater, FL Ordinance 8016-08 Exhibit A - 20- MARINE FACILITIES The Marine Facilities section includes projects that support the Marine operations. Most of the proiects in this section are maintenance proiects. which are funded on an annual basis to keep the related infrastructure in good condition. Proiect funding sources for the maintenance proiects are based on the operation the project supports, i.e., Beach Guard operations are funded by the General Fund, Marina operations are funded by the Marina & Aviation Fund and Pier 60 and Sailin<;:l Center operations are funded by the General Fund. Any construction or maior renovation of facilities are typically funded the same way or with Penny for Pinellas proceeds or Special Development Fund revenue. Projects in this section support the "Clearwater is a Wonderful Place to Learn" element of the City Council's Vision. Projects in this section also support the "Clearwater is a Wonderful Place to Play" element of the City Council's Vision and the following related priority: .:. A Variety of Cultural and Recreational Offerings Proiects in this section also support the "Clearwater Provides the Infrastructure to Support all its Attributes" element of the City Council's Vision and the following related priorities: .:. Well Maintained Infrastructure .:. Efficient Transportation Systems Projects in this section also support the "Clearwater includes Special Places that Belong to Everyone in the Community" of the City Council's Vision and the following related priorities: .:. A Quality Beach Environment .:. A Vibrant Downtown that's Mindful of its Heritage General Fd 10,000 10,000 5,000 5,000 5,000 5,000 40,000 Marine 140,000 200,000 200,000 200,000 200,000 200,000 1,140,000 Marine 10,000 10,000 10,000 10,000 10,000 10,000 60,000 Marine 25,000 25,000 25,000 25,000 25,000 25,000 150,000 Marine 20,000 20,000 20,000 20,000 20,000 20,000 120,000 Marine 85,000 85,000 85,000 85,000 85,000 85,000 510,000 General Fd 100,000 100,000 100,000 100,000 100,000 100,000 600,000 General Fd 15,000 15,000 15,000 15,000 15,000 15,000 90,000 405,000 465,000 460,000 460,000 460,000 460,000 2,710,000 City of Clearwater, FL Ordinance 8016-08 Exhibit A - 21 - MARINE FACILITIES (continued) 93403 Beach Guard Facility Maintenance This oroiect orovides fundinq for the reolacement. as well as, the continuous maintenance of the Beach Guard towers and structures, Continuinq in 2008/09, two (21 towers will be reolaced, 93409 Marina Renovations This oroiect orovides fundinq for the oossible future develooment of a new Marina building and slio renovations at the current Clearwater Municioal Marina buildinq site, More specific details will be available in the future as the oroiect is defined. 93413 Utilities Service Reolacement The oroject orovides for continuous reoair and/or reolacement of deteriorated electrical wiring, and water service at the City's Municioal Marina and Island Estates Marina to continue to maintain the City-owned marinas in usable conditions. 93429 Dock R&R The oroiect orovides for continuous reoair and/or reolacement of deteriorated docks at municioal docking facilities and island Estates Marina. utilizinq the Marine Services section and equioment to continue to maintain the City-owned marinas in usable conditions. 93490 Fuel System R&R The oroject orovides for continuous reoair and/or reolacement of deteriorated fuel lines, disoenser and underqround oollutant storaqe tanks at the municioal marina, utilizing contractors to continue to maintain City-owned marina fuel system in usable conditions. 93496 Marine Facility Dredginq and Maintenance This oroiect is a combination of the former "Waterway Maintenance" and "Seminole Ramo Dredqing" oroiects. This oroiect will orovide funding for any facility that the Marine and Aviation Deoartment is resoonsible for that requires maintenance and/or dredginq. This includes such things as reolacement of City-owned aids for naviqation and informational signs: removal of derelict vessels. etc.; orocurement of oilinq and sign material to fabricate signaqe and buoys utilizing Marine Services staff: orocurement of equioment to continue to maintain waterways in a usable condition; reoairs/reolacement of floating docks. ramos and oilinqs. This oroiect will also fund dredginq of areas that the Marine and Aviation Deoartment is resoonsible for to allow for continued safe and usable condition at City-owned docks. 93497 Docks and Seawalls This is a continuous maintenance oroqram to keeo the City's several thousand feet of seawalls at street ends and docks, other than at Marina facilities. in qood reoair. 93499 Pier 60/Sailinq Center Maintenance This oroject orovides funding for the continuous reoair and/or reolacement of electrical services, water service. fire orotection equioment and structural comoonents of the Pier and Sailinq Center. City of Clearwater, FL Ordinance 8016-08 Exhibit A - 22- AIRPARK FACILITIES The Airpark Facilities section includes proiects that support the Airpark operations. These proiect range from maintenance proiects to the major renovation of facilities. These proiects are typicallY funded with Marine & Aviation Fund revenue or qrant revenue from the Florida Department of Transportation. Proiects in this section support the "Clearwater is a Wonderful Place to Learn" element of the City Council's Vision. Projects in this section also support the "Clearwater is a Wonderful Place to Piav" element of the City Council's Vision and the followinq related priority: .:. A Variety of Cultural and Recreation Offerings Projects in this section also support the "Clearwater Provides the Infrastructure to Support all its Attributes" element of the City Council's Vision and the following related priorities: .:. Well Maintained Infrastructure .:. Efficient Transportation Systems Aviation 10,000 10,000 10,000 10,000 10,000 10,000 60,000 10,000 10.000 10,000 10,000 10,000 10.000 60.000 94817 Airpark Maintenance and Repair This proiect will provide funding for maintenance and repairs at the Clearwater Airpark. City of Clearwater, FL Ordinance 8016-08 Exhibit A - 23 - LIBRARIES The Libraries section includes proiects that support the Library operation. The purchase of library materials as well as computer software proiects. are typically funded with Library Cooperative funding or General Fund revenue. Equipment purchases would be lease purchased and maior construction or renovation of facilities has been funded with Penny for Pinellas. qrants and donations. Proiects in this section support the "Clearwater is a Wonderful Place to Play" element of the City Council's Vision and the followinq related priority: .:. A Variety of Cultural and Recreation Offerings Proiect Fundina 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 Total 93527 Books and Other Library Materials Library Coop 694.480 715.310 736.770 758.870 781.640 805.090 4.492.160 Total Libraries 694.480 715.310 736.no 758.870 781.640 805.090 4,492.160 93527 Books and Other Library Materials This project is for the acquisition of books. periodicals. audiovisuals. online database subscriptions and other library materials for the Main. East. Countryside. Beach. and North Greenwood Libraries. The Pinellas Public Library Cooperative provides annual fundinq. some of which will be used in to purchase library materials to serve County residents using City libraries. City of Clearwater, FL Ordinance 8016-08 Exhibit A - 24- GARAGE The Garage section includes projects for the replacement of motorized eauipment as well as replacement eauipment for the radio system. These proiects are funded either with Garage Fund revenue or through a Lease Purchase contract pajd bv the Garage Fund. Proiects in this section support the "Clearwater Provides the Infrastructure to Support a/l its Attributes" element of the City Council's Vision and the following related priorities: .:. Well Maintained Infrastructure .:. Communication 94232 Radio User Eauipment LIP-Garage Fd 50.000 50.000 100.000 Replacement Proaram 94233 Motorized Eauipment Garage Fund 65.920 67.900 69.940 72.040 74.200 76 .430 426.430 Replacement-Cash 94234 Motorized Eauipment LlP-Garaae Fd 2.699.900 2.780.900 2.864.330 2.950.260 3.038.770 3.129.930 17.464.090 Replacement-LIP Total Garaae 2.815.820 2.898.800 2.934.270 3.022.300 3.112.970 3.206.360 17.990.520 94232 Radio User Equipment Replacement Program This on-qoing Lease Purchase project will fund a program to phase-in the replacement of the old portable radios. mobile radios, control stations, accessories, radio tower equipment, infrastructure equipment, and options (such as radio chargers, spare batteries, belt clips, etc.). 94233 Motorized Equipment Replacement-Cash This proiect is for the replacement of motorized vehicles and equipment to cost less than $25,000.Qm vendor per transaction. The eauipment is for all Citv Departments, responsible for all Citv business. Future years are based on a proiected increase of approximatelv 3% per annum. 94234 Motorized Equipment Replacement-Lease/Purchase This project is for the replacement of motorized vehicles/eauipment estimated to cost $25.000 or more per vendor per transaction. The equipment is for all City Departments, responsible for all Citv business. Future years based on a proiected increase of approximatelY 3% per annum. City of Clearwater, FL Ordinance 8016-08 Exhibit A - 25 - GARAGE (continued) FTE's 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 0.0 1 1.060 22.120 22,120 22.120 22.120 11.060 0.0597.110 1.212.130 1.845.600 2.498,080 3,170.130 3,265,230 608,170 1.234,250 1.867,720 2,520,200 3,192,250 3,276,290 ,e funded bv the Garaae Fund. City of Clearwater, FL Ordinance 8016-08 Exhibit A - 26- MAINTENANCE OF BUILDINGS Proiects in this section provide funding for the major maintenance of Citv facilities. The funding is provided by the Fund that owns the specific facilitv that reauires maintenance. The facilities are outlined in the project scopes. Proiects in this section support the "Clearwater Provides the Infrastructure to Support all its Attributes" element of the Citv Council's Vision and the followinQ related priority: .:. Well Maintained Infrastructure Proiect Fundina 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 Total 94510 Air Conditioners -Citv General Fd 100.000 103,000 106,090 109.270 112.550 115.930 646.840 Wide Replacements Garage 15.000 15.000 15,000 15,000 15,000 15,000 90,000 Utility R&R 35,000 35,000 Gas 10,000 10,000 Marine 20,000 20,000 Adm Svcs 10,000 10,000 94512 Roof Repairs General Fd 10,000 10,000 10,000 10,000 10,000 10,000 60,000 Gas 5,000 5,000 94514 Roof Replacements General Fd 100,000 100,000 100,000 100,000 100,000 100,000 600,000 94517 Paintina of Facilities General Fd 100,000 100,000 100,000 100,000 100,000 100,000 600,000 Utility R & R 39,000 39,000 Stormwater 4,000 4,000 Gas 10,000 30,000 40.000 Garage 30,000 30,000 94519 Flooring for Facilities General Fd 25,000 25,000 25,000 25,000 25,000 25,000 150.000 Utility R&R 25,000 10,130 35,130 Stormwater 3,300 7,800 1 1. 100 94524 Long Center Maior Penny 700,000 700,000 Infrastructure Imprvmts Gen Fd Ret Erna 2,100,000 2,100,000 93269 Light Replacement & General Fd 75,000 75,000 75,000 80,000 80,000 80,000 465,000 Repair Total Maintenance of Buildinas 2,593.300 1.175.930 474.090 459.270 467.550 480.930 5.651.070 City of Clearwater, FL Ordinance 8016-08 Exhibit A - 27 - MAINTENANCE OF BUILDINGS (continued) 93269 Light Replacement and Repair This project includes the phased re-Iampinq, replacement and repair of liahtina svstems includina light fixtures, poles, service panels and wirina at various Parks and Recreation sites. Proiect mav include, but not limited to the followina locations in FY 2008/09 locations mav include: Frank Tack Park, McMullen Tennis, and miscellaneous service replacements, pole replacements and securitv liahting. 94510 Air Conditioners-Citv Wide Replacements The project Provides for the replacement of several air conditioning svstems that are in need of replacement due to age, deterioration, and excess enerav usaae. For FY 2008/09 facilities mav include: East Library, Shuffleboard Club, Countryside Library, Enaineering Field Office, and miscellaneous small units. 94512 Roof Repairs The project includes roof repair of various Citv buildings as needed to prevent water damaae to interiors of buildings, For FY 2008/09 facilities mav include: Countryside Library, Morningside Pool Building, and Ross Norton Pool. 94514 Roof Replacements This proiect includes roof replacements of various Citv buildinas. For FY 2008/09 facilities mav include: Municipal Services Building and the Police Department. 94517 Painting of Facilities This project includes scheduled paintina and waterproofing of Citv facilities. In FY 2008/09 facilities mav include: Pier 60 Pavilion, Main Library, Countryside Sports Complex, North Greenwood Aquatics Center, Municipal Services Buildino (metal work) Sand Kev Fire Station, Gas Sales and Graphics. 94519 Flooring of Facilities This proiect includes the scheduled replacement of worn or damaaed floorina. In FY 2008/09 facilities mav include: Public Services Buildings "B" and "C", and miscellaneous small replacements. 94524 Lona Center Maior Infrastructure Improvements This proiect provides funding for maior buildina improvements to the Long Center facilitv. This could include air conditionina replacement, roof replacement. paintina, major electrical repairs; as well as, repairs to the fire sprinkler svstems, replacement of pool lights and elevator repairs. The additional funding in FY 09 will provide for the installation of a new energy savings eauipment includina air conditionina, lightina and new exhaust and dehumidifier svstem in the pool area that will pav for itself over the next 20 vears and vield a proiect savinas of more than $130,000 over the life of the proiect. City of Clearwater, FL Ordinance 8016-08 Exhibit A - 28 - MISCELLANEOUS The Miscellaneous section includes oroiects that do not fit into another categorv. The maiority of the proiects in this section are technology proiects that are either managed by the Information Technology Deoartment or funded by the Administrative Services Fund. Other oroiects in this section include two environmental projects funded by the General Fund and one vehicle funded by the Customer Service Deoartment. Proiects in this section support the "Clearwater Provides the Infrastructure to Supoort all its Attributes" element of the City Council's Vision and the following related oriority: .:. Well Maintained Infrastructure Project Funding 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 Total 94736 Geographic Information Sys Adm Svcs 25,000 25,000 25,000 25,000 25,000 25,000 150,000 94761 Pollutant Storage Tk Reml Replacement-Gen Fund General Fund 20,000 20,000 20,000 20,000 20,000 20,000 120,000 94856 Accela Permitting & Code Enforcement Upgrade Adm Svcs 25,000 25,000 25,000 25,000 50,000 50,000 200,000 94803 Environmntl Assmt & Clean General Fund 50,000 50,000 50,000 50,000 50,000 50,000 300,000 94814 Network Infrastructure & LIP-Adm Svcs 250,000 250,000 250,000 250,000 250,000 250,000 1,500,000 Server R & R 94824 IT Disaster Recovery LIP-Adm Svcs 50,000 25,000 25,000 25,000 25,000 25,000 175,000 94827 Telecomm Upgrades LIP-Adm Svcs 50,000 25,000 25,000 25,000 50,000 25,000 200,000 94828 Financial Sys Upgrades Adm Svcs 75,000 75,000 75,000 75,000 75,000 75,000 450,000 545,000 495,000 495,000 495,000 545,000 520,000 3,095,000 continued on next page City of Clearwater, FL Ordinance 8016-08 Exhibit A - 29 - MISCELLANEOUS (continued) ProJect FundJna 2008/09 2009/1 0 2010/11 2011/12 2012/13 2013/14 Total 94829 CIS Uoarade Adm Svcs 100,000 100,000 100,000 50,000 50,000 50,000 450,000 94839 Roadwav & Traffic Gas Tax 300,000 20,000 320,000 Asset Momt Total Miscellaneous 945,000 615,000 595,000 545,000 595,000 570,000 3,865,000 94736 Geoaraphic Information System This proiect has been established to link location based data from the City's numerous databases in an enterprise geographic information system (GIS), The development of a GIS will areatly increase the accessibility of infrastructure, capital asset, and customer information throuah an intuitive map-based auery application. The system will also enable public and private access to mapped information via the Internet. Fundina includes costs for hardware and software as well as data collection and data conversion services. 94761 Pollutant Storaae Tank Removal/Replacement-General Fund This proiect is proposed to keep the City's pollutant storaoe tank locations in compliance with the current Florida Department of Environmental Protection Pollutant Storaae Tank Rules, and to reduce the potential risk of groundwater contamination. Expenses from this fund include tank maintenance, repair, replacement and routine expenses related to tank insurance and compliance, and fees associated with emergency spill response. 94856 Accela Permittina & Code Enforcement Uparade This proiect provides fundina to keep the Tidemark System UP to date, operating at optimum condition and to pay for uparades as needed. This proiect encompasses hardware, software and professional services. 94803 Environmental Assessment and Clean-up This proiect has been established to provide fundina for the assessment and remediation of contaminated sites owned or acauired by the City. This proiect is intended to meet the current state reauirements set forth in Chapters 62-761, 62-770 and 62-777 of the Florida Administrative Code, reauiring the City to meet mandatory target clean-up levels. This reauires mandatory target clean-up levels of sites where contamination could affect a potable water supplY or could pose a health or safety risk to the public. This proaram also reduces the potential risk of off-site contamination to private property and the potential for third party liability claims against the City. 94814 Network Infrastructure and Server Renewal and Replacement This proiect will replace network hardware (switches and routersl and uparade several enterprise system servers on the City's computer network. The City's wide area network incorporates more than eG 55 different access locations throughout Clearwater. Much of the infrastructure equipment is aging and not capable of handling the increased volumes of data as the City's computino systems grow. These upgrades will improve performance and efficiency of the network and systems, and enable tiered management of network traffic. The proiect will also fund the purchase of network and bandwidth management software, a new fiber switch and new router blades. Beginning in FY '08, this proiect will fund the maintenance of the Police network and infrastructure maintenance. City of Clearwater, FL Ordinance 8016-08 Exhibit A - 30 - MISCELLANEOUS (continued) 94824 IT Disaster Recoverv This project will establish an off-site business operations center for mission critical svstems necessary to maintain Citv operations (Leu Finance. Customer Service. Asset Management. GIS. pavroll. etc.), The proiect will include the purchase of backup equipment to store data and run svstems from a remote location. and establish necessary connectivitv. In FY 2008/09. the proiect will provide funding to outfit backup data centers at General Services and Fire Station 48. 94827 Telecommunications Upgrades This proiect will provide funding for the upgrade of telecommunications eauipment including Nortel switches. handsets and software The additional funding in FY 2008/09 will provide fund for ACD (automated call distributionl capabilities. the purchase of new switches and the upgrade of the phone systems at MSB. PO and General Services. 94828 Financial Systems Upgrades This proiect provides funding to keep the financial systems (PeopleSoft. Ross and Risk Management) UP to date. operating at optimum condition and to pay for upgrades as needed. This proiect encompasses hardware. software and professional services. 94829 CIS Upgrades This project provides fundina for upgrades of the Customer Information Svstem (CIS). This svstem supports Citv utilities. 94839 Roadway & Traffic Asset Management This proiect provides funding for the automated asset management (AIM) system. This svstem will help manage and maintain the existing and future infrastructure. but will also leverage other developing Citv technology. When complete. the system will identifv the most appropriate projects based on comprehensive information. The system will also provide a workflow for maintenance that can reduce cost by efficiency and preventative maintenance. ANNUAL OPERATING BUDGET IMPACT Proiect FTE's 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 Network Infrastructure & Server R & R 121 0.0 88.700 1 77 .400 266,100 266.100 266.100 266.100 IT Disaster Recoverv 121 0.0 1 7.7 40 26.610 35.480 26,610 26.610 1 7.7 40 Telecomm Uparades 121 Q.Q 1 7.740 26610 35.480 26,610 35.480 35.480 Total Miscellaneous 0.0 124.180 230.620 337.060 319.320 328.190 319.320 121 Operatinq costs me tor debt service to be funded bv the Administrative Services Fund. City of Clearwater, FL Ordinance 8016-08 Exhibit A - 31 - STORMWATER UTILITY This Stormwater utility section includes proiects that support the Stormwater Utility operations of the City. All proiects are included in the Rate Study approved by the City Council in June 2006. Proiects in this section support the "Clearvvater Provides the Infrastructure to Support all its Attributes" element of the City Council's Vision and the following related priorities: .:. Well Maintained Infrastructure .:. Efficient Responsive City Services Proiect Fundina 2008/09 2009 /1 0 2010/11 2011/12 2012/13 2013/14 Total 96124 Storm Pipe Svstem Improvements Stormwater Future Bond Issue 800.000 900.000 900,000 1 ,000,000 1 ,000,000 1 , 1 00,000 800,000 4,900.000 96168 Stormwater System Expansion Stormwater Future Bond Issue 500,000 600,000 328,720 271 ,280 700,000 700,000 800,000 3,628.720 271 ,280 96169 Stevenson Creek Stormwater 1 ,060,000 Future Bond Issue 569,990 1.610,010 1.816,510 1.983.490 263,970 3,206,030 1.468,360 1.131.640 353,050 2,146,950 5,531 ,880 10,078.120 96170 Coastal Basins Proiects Stormwater FY '09 Bond Future Bond Issue 921.680 570,000 678,320 450,000 263,970 305.720 2,511 ,370 678,320 9,085,310 2,630,000 1 ,550,000 2,211.030 1.094,280 1.600,000 961xx TV Truck & Camera L/P-Strmwtr 300.000 300,000 961 xx Vaccon Sewer Cleaner L/P-Strmwtr 300,000 300,000 961xx Alliqator Creek Stormwater Watershed Projects Future Bond Issue 450,000 2,830,000 263,970 2.711.030 305,720 1 ,694,280 2,100,000 1.019 .690 9,335,310 Total stormwater 3,960,000 7 ,180,000 10,880,000 10,620,000 7 ,700,000 8,100,000 48.440,000 96124 Storm Pipe System Improvements This proiect provides for repair and restoration of stormwater system components and for technical evaluation of storm water problems. A sianificant portion of this proiect will be Iinina or replacement of existina deterioratinq pipe. Comprehensive Plan Obiective: ( 19.6) Continue to provide sound fiscal manaaement of the stormwater manaqement systems to include maintenance, operation and construction in accordance with the watershed manaaement plans and concurrent with its implementation. City of Clearwater, FL Ordinance 8016-08 Exhibit A - 32 - STORMWATER UTILITY (continued) 96168 Stormwater System Exoansion (replaces Storm System Exoansion) This proiect orovides for reduction of structure, street and oroperty flooding or imorovements to water auality through orooerty acquisition and/or exoansion of the existing stormwater system. Prooerty acauisition may be exercised where it is determined that flooding may be alleviated or area for water quality treatment is provided. Comorehensive Plan Obiectives: (19.31 Lower high water orofiles during storm events, as necessary, to reduce house flooding occurrences and to lessen the resulting adverse effects on oublic health, the natural environment, public and orivate orooerty. (19.4) Continue the implementation of the most cost effective and efficient plan to reduce the occurrence of street flooding where safety issues and traffic problems exist as prioritized and set forth in the Capital Improvement Element. and listed in the stormwater management plans. 96169 Stevenson Creek Watershed Projects (replaces Stevenson Creek 1m ole mentation Proiects) This oroiect orovides for the imolementation of water auantity and quality proiects within the Stevenson Creek watershed, including those identified in the Stevenson Creek Watershed Management Plan, to abate structure and street flooding, improve water quality, add, uograde or restore Stormwater infrastructure and complY with mandated operation, maintenance and reoorting reauirements. FY 2008/09 will include Soring Branch and Turner Street box culverts. Comorehensive Plan Objective: (19.21 The City of Clearwater shall continue to develoo watershed management plans which should seek to identify, evaluate and implement the most cost effective and cost efficient orograms for Stormwater management. including Stormwater quantity and auality. These plans should also address any proiects included in the Pinellas county Stormwater Management Plan (SWMPl for the implementation of all Stormwater management. as well as recommended funding sources. 96170 Coastal Basin Projects (reolaces Coastal Basins Imorovements) This project provides for the imolementation of water auantity and quality oroiects within the City's coastal basins to abate structure and street flooding, imorove water auality, add, uograde or restore Stormwater infrastructure and comply with mandated ooeration, maintenance and reoorting reauirements. FY 2008/09 will include Tropic Hills outfall imorovements. Comorehensive Plan Objectives: (19.3) Lower high water orofiles during storm events, as necessary, to reduce house flooding occurrences and to lessen the resulting adverse effects on public health, the natural environment. oublic and orivate property. r 19.51 Protect and enhance the quantity of receiving waters by the use of "Best Management Practices" in accordance with the adooted watershed management olans. 961 xx TV Truck & Camera This oroiect provides funding for an additional TV truck with a camera. The eauioment will record data and monitor the City's 120-mile stormwater drainage system and facilitate the identification of old and deteriorating oioe. Comorehensive Plan Obiective: (19.6) Continue to provide sound fiscal management of the stormwater management systems to include maintenance, ooeration and construction in accordance with the watershed manaaement plans and concurrent with its implementation. 961 xx Vaccon Sewer Cleaner This oroiect orovides funding for an additional Vaccon Sewer Cleaner to accommodate the required increase maintenance of new oollution control boxes in the downtown and beach areas. Comorehensive Plan Obiective: (19.6) Continue to provide sound fiscal management of the stormwater management systems to include maintenance, ooeration and construction in accordance with the watershed management olans and concurrent with its imolementation. City of Clearwater, FL Ordinance 80 I 6-08 Exhibit A - 33 - STORMWATER UTILITY (continued) 961 xx Alligator Creek Watershed Proiects (reolaces Alligator Creek Implementation Proiects-Phase II) This oroiect orovides for the imolementation of water quantity and quality oroiects within the Alliqator Creek watershed. Including those identified in the Alligator Creek Watershed Management Plan. to abate structure and street floodina. imorove water quality. add. uparade or restore Stormwater infrastructure and comoly with mandated ooeration. maintenance and reoorting requirements. Comorehensive Plan Obiective: (19.2) The City of Clearwater shall continue to develoo watershed manaaement olans which should seek to identify. evaluate and imolement the most cost effective and cost efficient oroarams for Stormwater management. including stormwater quantity and quality. These olans should also address any oroiects included in the Pine lias County Stormwater Manaaement Plan (SWMP) for the imolementation of all stormwater manaaement. as well as recommended funding sources. ANNUAL OPERATING BUDGET IMPACT Prolect FTE's 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 TV Truck & Camera 121. 131. 161 LQ 118.650 1 21. 190 123.850 126.580 Vaccon Sewer Cleaner 121. (6) 0.0 94.370 95.690 97.080 98.540 100.020 Total Stormwoter Utility 1.0 94.370 214.340 218.270 222.390 226.600 121 Operatina costs are for debt service to be funded by the Stormwater utility Fund. /31 Operatina costs are for personal services. /61 Operatina costs ore for Fleet Maintenance. City of Clearwater, FL Ordinance 8016-08 Exhibit A - 34- GAS SYSTEM The Gas System section includes oroiects that suooort the Gas System ooeration for the City. The majority of these oroiects are maintenance oroiects to maintain the system. Also. included in this section are also several projects for the continued expansion of the system. All oroiects are funded by the Gas Fund. Projects in this section suoport the "Clearwater Provides the Infrastructure to Support all its Attributes" element of the City Council's Vision and the following related oriorities: .:. Well Maintained Infrastructure .:. Efficient Resoonsive City Services Proiect Fundina 2008/09 2009 /1 0 2010/11 2011/12 2012/13 2013/14 Total 96358 Environmental Remediation Gas 150.000 150.000 150.000 150.000 150,000 750,000 96365 Line Relocation Pinellas-Maint Gas 250,000 250.000 250,000 250.000 250,000 1.250.000 96367 Gas Meter Chanae Out-Pinellas Gas 210,000 210.000 210.000 210.000 210,000 210.000 1 ,260.000 96374 Line Relocation Pinellas-Cap Gas 300.000 300.000 300.000 300.000 300.000 1.500.000 96376 Line Relocation Pasco-Maint Gas 100.000 100,000 100,000 100,000 100,000 100,000 600,000 96377 Pinellas New Mains & Svc Lines Gas 200.000 1.200,000 1 ,200,000 1.300.000 1.300,000 1.300,000 6,500.000 96378 Pasco New Mains & Svc Lines Gas 300,000 3,200.000 3.500.000 3.300,000 3,300.000 3.300.000 16,900.000 96379 Gas Meter Chanae Out-Pasco Gas 210,000 210,000 210.000 210,000 210,000 210,000 1 ,260,000 96381 Line Relocation Pasco-Cap Gas 300,000 300.000 300,000 900,000 96384 Building Renovation Gas 125.000 125.000 125.000 125.000 125.000 125.000 750.000 96385 Gas Main Extensions General Fd 200.000 200,000 200.000 200,000 200.000 1.000.000 Total Gas System 1.645.000 5.945.000 6.245.000 6.145.000 6.445.000 6.245.000 32.670.000 City of Clearwater, FL Ordinance 8016-08 Exhibit A - 35 - GAS SYSTEM (continued) 96358 Environmental Remediation This proiect will provide funding for cleaninq UP the old qas plant site as may be reauired by the Florida Department of Environmental Protection. The site is located between Jones Street on the south, Maple Street on the north, Myrtle Avenue on the east, and Railroad Avenue on the west. The Florida Department of Environmental Protection will be providing us, at some future dote, their requirements for the remediation on the property. Other environmental locations reauiring remediation will also be funded from this proiect. as the reauirement is determined. Funding for this will be recovered through the Environmental Imposition Adiustment clause in the Gas System rates. Comprehensive Plan Obiective: To provide a safe and efficiently gas system that meets State and Federal regulations. 96365 Line Relocation Pinellas - Maintenance This is a continuinq project to fund the removal of abandoned gas lines as required by the State Department of Transportation. Comprehensive Plan Objective: To provide 0 safe and efficient gas system that meets State and Federal requlations. 96367 Gas Meter Change Out - Pinellas To provide fundinq for continually maintaining accurate gas meters in Pinellas County to maximize qas revenues. Comprehensive Plan Objective: To provide 0 safe and efficient qas system that meets State and Federal regulations. 96374 Line Relocation Pinellas - Capitalized This is a continuing project to relocate qas mains for road construction and upgrades to the mains. This portion of the project involves work that adds to the value of the qas system and is therefore capitalized. Comprehensive Plan Obiective: To provide a safe and efficient gas system that meets State and Federal requlations. 96376 Line Relocation Pasco - Maintenance This is a continuing project to fund the removal of abandoned qas lines as required by the State Department of Transportation. Comprehensive Plan Obiective: To provide a safe and efficient qas system that meets State and Federal regulations. 96377 Pinellas New Mains and Service Lines This project will provide for extension of gas mains and services as well as new mains and services within Pinellas County. It will fund related activities such as capital replacement of obsolete cast iron and qalvanized mains, liquid propane service. Comprehensive Plan Obiective: To provide a safe and efficient qas system that meets State and Federal regulations. 96378 Pasco New Mains and Service Lines This project will provide for extension of qas mains and services as well as new mains and services within Pasco County. It will fund related activities such as capital replacement of obsolete cast iron and galvanized mains, liquid propane service. Comprehensive Plan Objective: To provide a safe and efficient qas system that meets State and Federal regulations. 96379 Gas Meter Chanqe Out - Pasco To provide fundinq for continually maintaining accurate gas meters to maximize gas revenues. Funding of this project will come from available gas system revenues. Comprehensive Plan Objective: To provide a safe and effjcient qas system that meets State and Federal requlations. City of Clearwater, FL Ordinance 8016-08 Exhibit A - 36 - GAS SYSTEM (continued) 96381 Line Relocation Pasco - Caoitalized This is a continuing project to relocate gas main for road construction and upgrades to the mains. This oortion of the project involves work that adds to the value of the Gas System and is therefore capitalized. Funding for this oroiect will come from available gas system revenues. Comprehensive Plan Objective: To provide a safe and efficient aas system that meets State and Federal regulations. 96384 Building Renovation This oroiect orovides funding to purchase orooertv in Pasco County as well as to renovate the building at Myrtle Avenue to include the Sales Office and Showroom. This capital project will save the rental costs of the current Sales office. Ooerating costs will be reduced by rental expense; all other operating costs will be offset from one location to the other. Funding for this project will come from available gas system revenues. 96385 Gas Main Extensions This proiect orovides funding for the extension of natural gas mains in existing residential communities within the City of Clearwater. These extensions are funded bv the General Fund and do not meet feasibilitv under the Gas System seven-year oavback formula. Comorehensive Plan Objective: To orovide a safe and efficient gas system that meets State and Federal regulations. City of Clearwater, FL Ordinance 8016-08 Exhibit A - 37 - SOLID WASTE The Solid Waste section includes proiects that support the Solid Waste operations of the City. Included in this section are proiects for facility maintenance and major repairs. vehicle and container replacements, as well as the implementation of a commercial weight based system. All proiects are funded by either Solid Waste revenue or throuah Lease Purchase contracts paid by the Solid Waste Fund. Projects in this section support the "Clearwater is a Wonderful Place to Live" element of the City Council's Vision and the following related priorities: .:. A Safe Clean Green Environment .:. Safe Comfortable Walkable Neiahborhoods Projects in this section also support the "Clearwater Provides the Infrastructure to Support All its Attributes" element of the City Council's Vision and the followina related priorities: .:. Well Maintained Infrastructure .:. Efficient Responsive City Services Prolect Fundina 2008/09 2009 /1 0 2010/11 2011/12 2012/13 2013/14 TOTAL 96426 Facilitv R&R Solid Waste 55.000 55,000 100,000 105,000 315,000 96442 Vehicle Replacements LIP-Sol Wst 160,000 170,000 180,000 190,000 190,000 190.000 1 ,080,000 96443 Residential Container Solid Waste 110.000 110,000 110,000 110,000 141.000 150,000 731 ,000 Acauistion 96444 Comm Container Acauistion Solid Waste 240,000 240,000 250,000 250.000 282,000 290,000 1 ,552,000 964xx Comm Weioht Based Momt Svs LIP-Sol Wst 150,000 150,000 Total Solid Waste 510.000 670.000 595.000 605,000 713,000 735.000 3.828,000 96426 Facility R&R This proiect provides for the repair or modification of site and land improvements, buildinas, machinery and eauipment at the two (2) Solid Waste facilities. Major emphasis on maintenance and extending useful lives of fixed assets is reauired to ensure minimum downtime. The Transfer Station reauires replacement of necessary components to maintain and upgrade the oriainal eauipment installed in 1971. The current available balance in the proiect will provide fundina for this project for the next several years. Comprehensive Plan Objective: r 18.3) Continue to provide sound fiscal management for solid waste collection, disposal and recyclina as it develops. 96442 Vehicle Replacements This project provides for the replacement of Solid Waste maintenance and operating expense (M&O) owned vehicles, and other motorized eauipment on an on-aoing basis. Planned for FY 2008/09 is the replacement of one roll-off vehicle and one front-end loader. Comprehensive Plan Obiective: (18.3) Continue to provide sound fiscal manaaement for solid waste collection. disoosal and recyclina as it develops. City of Clearwater, FL Ordinance 8016-08 Exhibit A - 38 - SOLID WASTE (continued) 96443 Residential Container Acquisition This project includes the replacement of approximatelY 5-10% of the 26,800 automated containers in the field, and the acquisition of new 90-gallon automated containers to meet the anticipated less than 1 % annual growth of residential customers. Experience indicates that 2.700 containers will be required annually, at a current cost of approximatelY $59 each. Also included in this proiect is the cost of replacement parts, when automated containers can be repaired. Comprehensiye Plan Obiectiye: (18.3) Continue to provide sound fiscal management for solid waste collection, disposal and recycling as it develops. 96444 Commercial Container Acquisition This is an on-going proiect for the purchase and replacement of roll-oft containers, compactors and dumpsters for approximately 3,200 commercial accounts. This proiect includes the replacement of containers damaged or deteriorated during their normal useful life of five (51 years; and the acquisition of additional compactors, roll-ofts and dumpsters to meet system growth. Comprehensive Plan Objective: (18.3) continue to provide sound fiscal management for solid waste collection, disposal and recycling as it develops. 964xx Commercial Weight Based Management System This project provides for the development and implementation of a commercial solid waste system that more equitably charges the commercial customers for the appropriate cost of disposal. Currently, rates for commercial containers (dumpstersl are based on cubic yard capacity while disposal charges are based on weight. With technology being developed and tested now, commercial customers would be charged for their disposal cost based on the actual weight of their refuse when implemented in FY 2009/10. Comprehensive Plan Objective: (18.3) Continue to provide sound fiscal management for solid waste collection, disposal and recycling as it develops. ANNUAL OPERATING BUDGET IMPACT Proiect FTE's 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 Vehicle Replacements 121 35,390 72.990 112,800 154,820 196,840 203.470 Comm Weight Based Mgmt Svs 121 33,170 33,170 33,170 33,170 33,170 Total Solid Waste 0.0 35,390 1 06 ,160 145,970 187,990 230,010 236,640 121 Operatina costs are for debt service to be funded by the Solid Waste Fund. City of Clearwater, FL Ordinance 8016-08 Exhibit A - 39 - UTILITIES MISCELLANEOUS The utilities Miscellaneous section includes Utilities proiects that support more than one utilities operation. These proiects are tvpicallv funded bv one or more of the utilities operations depending on which operation the project supports. The proiects in this section support the "Clearwater Provides the Infrastructure to Support all its Attributes" element of the Citv Council's Vision and the followina related prioritv: .:. Well Maintained Infrastructure Proiect Fundlna 2008/09 2009!1 0 2010/11 2011/12 2012/13 2013/14 Total 96516 City-Wide Aerial Photoaraphy Water Sewer Stormwater 6,000 6,000 6,000 6.000 6,000 6,000 12,000 12,000 12,000 96523 Public Utilities Adm Utility R&R 26,000 26,000 26,000 26,000 26,000 26,000 156,000 Buildinq R&R Total PWA/Utilities Miscellaneous 26,000 26,000 44,000 26,000 26,000 44,000 192,000 96516 Citv Wide Aerial Photoaraphv The Public Works Department maintains a 100% scale atlas of aerial photoaraphv, which is updated on the desirable schedule of every four (4) vears. The aerial atlas is widelv used by the public and manv divisions of the Citv for information and plannina. The Enaineerina Division uses the aerials in coniunction with permitting, construction drawings, and as an important source of historical information, The aerial atlas presentlv in use was flown in December 2007, 96523 Public Utilities Administration Buildina R&R This proiect provides funding for the building and eauipment upgrades for the Public Utilities Complex to include the Public Utilities Administration Buildina, Motor Shop, Meter Shop and Supervisors Buildina. City of Clearwater, FL Ordinance 8016-08 Exhibit A - 40- SEWER SYSTEM The Sewer System section includes oroiects that support the Sewer System ooerations for the City. All projects, exceot the proiects funded with Lease Purchase, are included either in the current Rate Study or a future Rate Study. Proiects in this section suoport the "Clearwater Provides the Infrastructure to Suooort 0/1 its Attributes" element of the City Council's Vision and the following related priorities: .:. Well Maintained Infrastructure .:. Efficient Resoonsive City Services Project Funding 2008/09 2009/10 2010/11 2011 /12 2012/13 2013/14 Total 96615 Odor Control Utility R&R 72.520 149,940 222,460 96619 WWTP Generator FY '09 Bond Issue 1, 126,400 1, 1 26,400 Replacement Future Bond Issue 1,000,000 1,000,000 96630 Sanitary Sewer Sewer Impact 575,000 500,000 500,000 500,000 500,000 500,000 3,075,000 Extensions 96634 Sanitary Utility Sewer 183,520 28,630 212,150 Relocation Utility R&R 266,680 463,710 750,000 250,000 221 ,370 500,000 2,451,760 96645 Laboratory Upgrade Utility R&R 57,960 59,700 61,000 178,660 and R&R Sewer 56,270 62,800 64,700 183,770 96654 Facilities Upgrade & FY '09 Bond Issue 90,830 90,830 Improvement Future Bond Issue 622,000 500,000 31, 720 1,153,720 Sewer 468,830 24,070 645,750 1,138,650 Utility R&R 995,430 475,930 396,280 1,867,640 96664 Water Pollution FY '09 Bond Issue 1, 159,700 1,159,700 Control R&R Future Bond Issue 1, 176,030 1,113,230 1, 912,460 857,310 480,000 5,539,030 3,927,230 3,892,220 3,072.870 3,718,890 2,170,110 2,618,450 19,399,770 continued on next page City of Clearwater, FL Ordinance 8016-08 Exhibit A - 41 - SEWER SYSTEM (continued) Project Funding 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 Total 96665 Sanitary Collect & FY '09 Bond Issue 2,162,000 2,162,000 Transmission R&R Future Bond Issue 2,868,600 3,765,000 5,429,800 4,271,800 3,663,700 19,998,900 96666 wwrp East Bypass & FY '09 Bond Issue 62,000 62,000 NE Pump Future Bond Issue 1,548,400 40,000 1 ,588,400 96670 Pollutant Storage Utility R&R 7,880 8,120 8,300 24,300 Tank R&R - WPC Sewer 7,650 8,550 8,810 25,010 96686 Pump Station FY '09 Bond Issue 1,321,000 1 ,321 ,000 Replacement Future Bond Issue 1, 110,000 2,228,000 2,794,000 645,000 1,465,000 8,242,000 966xx NE wwrp Thermal Future Bond Issue 2,157,370 2,157,370 Dryers 966xx wwrp UV Disinfect Future Bond Issue 1,823,260 1,823,260 96202 wwrp Screw Pump Utility R&R 846,910 302,950 157,390 255,900 1,563,150 Replacement Total Sewer 8,326,790 9,730,050 9,073,990 12,108,380 7,351,360 11,776,590 58,367,160 96615 Odor Control This proiect provides fundina for the enclosure of channels/tanks to minimize air volumes for treatment. Comprehensive Plan Obiective: (14.2) Accomplish advanced wastewater treatment improvements at all water pollution control facilities in accordance with FDEP and USEP A requirements. 96619 WWTP Generator Replacements This proiect provides funding for the replacement of the back UP aenerators (two (2) per year) at the East, Marshall Street and Northeast WWTP's. Comprehensive Plan Obiective: 117.2) The City shall continue to produce advanced wastewater treatment (A WTl improvements at all water pollution control facilities in accordance with FDEP and USEP A reauirements. City of Clearwater, FL Ordinance 8016-08 Exhibit A - 42- SEWER SYSTEM (continued) 96630 Sanitary Sewer Extensions This proiect provides new sanitary sewer service to residents within the City of Clearwater service area. Comprehensive Plan Obiective: (17.1 ) To maintain adequate levels of service for existing and future populations. 96634 Sanitary Utility Relocation The project provides funding for the relocation of sanitary sewer infrastructure to accommodate roadway improvements by Florida DOT, Pinellas County, and the City of Clearwater. Proiects include: US 19 [Whitney to Seville!. US 19 (Sunset Point to Countryside Blvd), US 19 {Seville to SR 601, Sunset Point Road (US 19A to Keene!. McMullen Booth at Drew Street, Nursery Road [Belcher to US 19), Belleair Road at Keene Road, Progress Energy Trail. Pinellas Trail. Druid Trail. SR 60/Memorial Causeway (east of Island Way to Ft. Harrison!. Beach Walk, Osceola Streetscape and Pine lias County railroad crossin<;) improvements at Hercules Avenue and Belleair Road. Comprehensive Plan Objective: (17.1) To maintain adequate levels of service for existing and future populations. 96645 Laboratory Upgrade and R&R The project provides for the repair, replacement and upgrade of the existing laboratory instrumentation to meet state and federal testing reauirements for wastewater, bio-solids, reclaimed water, and environmental monitorin<;), stormwater treatment and potable water. Comprehensive Plan Objective: (17.1 ) To maintain adeauate levels of service for existing and future populations. 96654 Facilities Upgrade and Improvement The project provides fundina for future improvements and upgrades at the City's three (31 AWT plants and bio-solids facility. Comprehensive Plan Objective: (17.2) The City shall continue to produce advanced wastewater treatment (A WT) improvements at all water pollution control facilities in accordance with FDEP and USEP A requirements. 96664 Water Pollution Control R&R The proiect provides for the design, repair, rehabilitation, and replacement of Water Pollution Control Plant and bio-solids facility items such as sludge chains, pumps, motors, associated plumbing, instruments, and minor facility repair to return or maintain the Water Pollution Control facilities to or at designed capability, Comprehensive Plan Objective: (17.1) To maintain adequate levels of service for existing and future populations. 96665 Sanitary Collect and Transmission R&R The proiect provides general system wide condition inspections, rehabilitation and new appurtenances. Comprehensive Plan Obiective: [17.1) To maintain adeauate levels of service for existing and future populations. 96666 WWTP East Bypass and Northeast Pump This proiect provides funding for modifications for East WWTP Anoxic Tank Bypass System for FY 2009/10, and RAS Pump Station improvements and upgradina of the second anoxic flow split at Northeast in FY 2013/14. Comprehensive Plan Obiective: (17.21 The City shall continue to produce advanced wastewater treatment (AWT) improvements at all water pollution control facilities in accordance with FDEP and USEPA reauirements. 96670 Pollutant Storage Tank R&R - WPC This project provides for the systematic replacement of below ground tanks and maintenance of new above ground tanks at all pollution control plants. Comprehensive Plan Obiective: (17.1 ) To maintain adequate levels of service for existing and future populations. City of Clearwater, FL Ordinance 8016-08 Exhibit A - 43 - SEWER SYSTEM (continued) 96686 Pump Station Replacement This project provides fundinq to inspect, rehabilitate or replace existing pump stations systems, their related force mains and telemetrv systems to adhere to current industry and regulatorv requirements. Comprehensive Plan Objective: (17.2) The City shall continue to produce advanced wastewater treatment fAWT) imProvements at all water pollution control facilities in accordance with FDEP and USEPA requirements. 966xx NE WWTP Thermal Drvers This project provides for the installation of bio-solids dryers for the disposal of dried bio-solids to meet FDEP and EP A class A requlations. Comprehensive Plan Objective: (17.2) The City shall continue to produce advanced wastewater treatment (AWT) imProvements at all water pollution control facilities in accordance with FDEP and USEPA requirements. 966xx WWTP UV Disinfection This project provides fundinq for the installation of UV disinfection systems at all three (3) plants, including lamp systems and electrical modifications. Comprehensive Plan Obiective: (17.2) The City shall continue to produce advanced wastewater treatment (AWTl improvements at all water pollution control facilities in accordance with FDEP and USEPA requirements. 96202 WWTP Screw Pump Replacements This project provides funding for modifications and improvements to the existing Archimedes Screw Pump facilities at the Northeast WWTP for 2008/09, followed by improvements at the Marshall Street WWTP in FY 2009/10 and the East WWTP jn FY 2011/12 and FY 2012/13. Work includes addinq submersible pump capabilities to the internal recycle process at all three plants. Comprehensive Plan Obiective: (17.2) The City shall continue to produce advanced wastewater treatment (AWTl improvements at all water pollution control facilities in accordance with FDEP and USEPA requirements, City of Clearwater, FL Ordinance 8016-08 Exhibit A - 44- WATER SYSTEM The Water System section includes projects that support the Water System operations for the City. All proiects, except the proiects funded with Lease Purchase, are included either in the current Rate Study or a future Rate Study. Projects in this section support the "Clearwater Provides the Infrastructure to Support all its Attributes" element of the City Council's Vision and the following related priorities: .:. Well Maintained Infrastructure .:. Efficient Responsive City Services 96721 System R&R -Maint utility R&R 25,000 25,000 25,000 75,000 Water 25,000 25,000 25,000 75,000 96739 Reclaimed Water FY '09 Bond Issue 863,400 863,400 Distribution System Sewer Revenue 3,847,100 985,670 4,832,770 Future Bond Issue 2,921,470 1,649,150 81,020 3,189,390 6,000,000 13,841 ,030 Utility R & R 368,980 1,160,610 1,529,590 96740 Water Supply & Utility R&R 300,000 300,000 325,000 325,750 376,530 378,820 2,006,100 Treatment 96741 System R&R - Utility R&R 250,000 850,000 239,300 250,000 250,000 850,000 2,689,300 Capitalized 96742 Line Relocation - Utility R&R 550,000 234,340 954,570 250,000 250,000 1,000,000 3,238,910 Capitalized Future Bond Issue 165,660 1,145,430 1,311,090 96743 Meter/Backflow Repl Utility R&R 650,000 650,000 650,000 650,000 650,000 650,000 3,900,000 /Change Out 96744 System Expansion Water Impact 250,000 250,000 250,000 250,000 119,210 81,910 1,201,120 Water 130,790 168,090 298,880 6,735,500 5,396,470 6,224,120 2,200,750 6,151,530 9,153,820 35,862,190 continued on next paqe City of Clearwater, FL Ordinance 8016-08 Exhibit A - 45 - WATER SYSTEM (continued) Proiect Fundina 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 Total 96752 Water Service Lines FY '09 Bond Issue 500,000 500,000 Future Bond Issue 500,000 500,000 500,000 500,000 500,000 2,500,000 96757 Water Pick-up Trucks LIP-Water 33,780 34,770 68,550 96758 Fluoride in Water Svs Future Bond Issue 1,307,590 1 ,307,590 96760 Elevated Water Tks FY '09 Bond Issue 250,000 250,000 96764 Reverse Osmosis FY '09 Bond Issue 4,562,600 4,562,600 Expansion - Res # 1 Future Bond Issue 2,236.250 4,987,000 7,223,250 96767 Reverse Osmosis FY '09 Bond Issue 2,552,300 2,552,300 @ Reservoir #2 Future Bond Issue 1 ,516,830 1,117,230 15,178,160 7,852,040 25,664,260 Water Revenue 3,571,770 3,571,770 96768 Rebate-WeILLake, Water 50,000 50,000 50,000 150,000 Pond Iria Abd Utilitv R&R 50,000 50,000 50,000 150,000 96770 Hvdra Stop System LIP-Water 36,000 36,000 967xx RO Pick-up Trucks LIP-Water 40,000 40,000 Total Water System 14,720,180 9,699,550 12,913,120 17,928,910 18,125,340 11,051,410 84.438,510 Total Sewer 8,326,790 9,730,050 9,073,990 12,108,380 7,351 ,360 11,776,590 58,367,160 96721 System R&R - Maintenance This is an on-qoinq proqram relating to maintenance, repair or replacement of water mains, service lines, valves, fire hydrants, miscellaneous equipment, and damaqed facilities. Work involves maintenance, repair and replacement of facilities that do not involve upgrading. Comprehensive Plan Obiective: 121.3) Continue to maintain the water system in a safe, sound and efficient manner on a daily basis. City of Clearwater, FL Ordinance 8016-08 Exhibit A - 46- WATER SYSTEM (continued) 96739 Reclaimed Water Distribution System This proiect provides for the continued expansion of the City's Reclaimed Water System based on the Reclaimed Water Master Plan. Comprehensive Plan Obiective: (21.2) To provide adequate quantities and qualities of water services to all customers in the Clearwater service area: for the City's water system to be compatible with the environment: and also seek to conserve and protect sensitive natural resources. 96740 Water Supply and Treatment This proiect provides funding for maintenance. replacement, and upgrade of supply facilities. Comprehensive Plan Objective: (21.2) To provide adequate quantities and qualities of water services to all customers in the Clearwater service area: for the City's water system to be compatible with the environment: and also seek to conserve and protect sensitive natural resources. 96741 System R&R - Capitalized This proiect involves the repair and replacement of water mains, service lines, valves, fire hydrants, and facilities equipment. etc. that are upgraded during the repair/replacement process. Funding for capitalized labor, eauipment and material for in-house work is included. Comprehensive Plan Obiective: (21.3) Continue to maintain the water system in a safe, sound and efficient manner on a daily basis. 96742 Line Relocation - Caoitalized This is an on-going oroiect to relocate water mains and related facilities conflicting with public works oroiects of various governmental entities and which are upgraded during relocation. Funding for capitalized labor, eauioment and material for in-house work is included, Planned work includes US 19 (Sunset to Countryside), US 19 (Whitney to Seville!. US 19 (Seville to SR 60), US 19 @ SR 60 Sunset Point {Alt US 19A to Keene!. McMullen Booth at Drew Street. Nursery Road (Belcher to US 19!. Belleair Road at Keene Road, Progress Energy Trail. Pinellas Trail. Druid Trail. SR 60/Memorial Causeway (east of Island Way to Ft. Harrison), Beach Walk. Osceola Streetscape and Pinellas County railroad crossing imorovements at Hercules Avenue and Belleair Road. Comprehensive Plan Obiective: (18.4 ) To provide sound fiscal management for the ooeration and maintenance for potable water service in the City's service area. 96743 Meter/Backflow Reolacement/Change Out This is an on-going proiect to repair/reolace water meters, backflow prevention devices, and accessories to assure accurate flow measurement, maximum revenues, and oroper operation. Comorehensive Plan Obiective: (21.3) Continue to maintain the water system in a safe, sound and efficient manner on a daily basis. 96744 System Expansion This proiect provides funding and capitalizes Water Division labor, eauioment and material expenses relating to additions to Clearwater's distribution system, includinq new meters, backflow prevention devices, main extensions, etc. Location of work areas is determined by customer demand. Comprehensive Plan Obiective: (21.1) To maintain adequate levels of service for existing and future populations. 96752 Water Service lines This proiect is to upgrade the City's existing galvanized water service lines that are in ooor condition. Comprehensive Plan Objective (21.1) To maintain adequate levels of service for existing and future oooulations. 96757 Water Pick up Trucks This proiect provides funding for the purchase of two (2) additional 1-ton pick UP trucks. The vehicles will be used to perform required annual inspections of the Reclaimed Water System as contained in the Reclaimed Water Master Plan in years 2006-2012. City of Clearwater, FL Ordinance 8016-08 Exhibit A - 47 - WATER SYSTEM (continued) 96758 Fluoride in Water System This project provides funding for the City of Clearwater treatment ad distribution system to be modified to include fluoride iniection at each of the City's reservoirs. Comprehensive Plan Obiective: 121.31 Continue to maintain the water system in a safe. sound and efficient manner on a daily basis. 96760 Elevated Water Tanks Upgrade This proiect provides funding for the renovation and related distribution system work for water and fire protection concerns and the removal of the Del Oro tank in 2009. Comprehensive Plan Objective: 121.3) Continue to maintain the water system in a safe. sound and efficient manner on a daily basis. 96764 Reverse Osmosis Plant Expansion - Reservoir # 1 This proiect provides fundinq for the expansion of the City's existinq RO Plant potentially addinq one r 1) MGD in water production. This includes wells, raw water piping and plant equipment. Comprehensive Plan Objective: (21.2) To provide adequate Quantities and Qualities of water services to all customers in the Clearwater service area. 96767 Reverse Osmosis Plant at Reservoir #2 This proiect provides fundinq for brackish wells, raw water pipelines. 3.5 MGD brackish RO Plan with brine disposal to injection well. Additional operatinq costs for this proiect will not begin until 2014. Comprehensive Plan Obiective: (21.21 To provide adequate quantities and qualities of water services to all customers in the Clearwater service area. 96768 Rebate-Well. Lake. Pond Irrigation Abandonment This proiect provides funding for the Well. Lake, Pond Irriqation Abandonment program that was approved by the City Council May 3. 2007. This proqram provides a homeowner a rebate if they are willing to properly abandon a private well. lake or pond irrigation system, when establishinq reclaimed water service at their residence. Comprehensive Plan Obiective: 121.2) To provide adequate Quantities and qualities of water services to all customers in the Clearwater service area; for the City's water system to be compatible with the environment; and also seek to conserve and protect sensitive natural resources. 96770 Hydra Stop System This device is used to install a valve without shuttinq down a water main. This system would eliminate many of the boil water notices we post. the completelY shutting down a water main for tie-ins or cut & caps. and hiring a contractor to make taps. 967xx RO Plant Pick-up Trucks This project provides funding for two 121 additional 112 ton pick-up trucks to be used by the additional personnel to investigate plant arms (operational and chemical) at other Water Treatment Plants and to collect water samples as needed. City of Clearwater, FL Ordinance 8016-08 Exhibit A - 48- WATER SYSTEM (continued) ANNUAL OPERATING BUDGET IMPACT Proiect FTE's 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 Reclaimed Water Distribution 2.0 56,900 59.500 62,800 66,100 69 ,500 73.100 Svstem 131 141 181 Water Pick UP Trucks 121 161 0.0 9,370 9,270 9,270 18.760 18.760 9,490 Elevated Water Tanks Upgrade Ill. 141 0.0 35,280 37,040 38,890 40,840 42,880 45,020 Reverse Osmosis Plant Expansion - Reservoir #1111141181 0.0 498,400 523,820 550,520 Reverse Osmosis Plant @ 8.0 2,299,870 Reservior #2 III 131 141. 181 RO Pick-up Trucks 121 161 0.0 12,690 Hvdra Stop Svstem 121 0.0 7,960 7,960 7,960 7,960 7,960 Total Water System 10.0 109.510 113,770 118,920 632,060 662,920 2,990,690 (11 Ooeratina costs are for maintenance. 121 Ooeratina costs are for debt service to be funded bv the Water & Sewer Fund. 131 Ooeratina costs are for oersonal services. 141 Ooeratina costs are for utilities. 161 Ooeralina cosls are far Fleet Maintenance. f81 Ooeratina costs are for chemcials and/or other ooeratina suoolies. City of Clearwater, FL Ordinance 8016-08 Exhibit A - 49- RECYCLING The Recycling section includes oroiects that suooort the Recyclinq ooerations of the City. Included in this section are oroiects for the reolacement of equioment and containers as well as the oromotion of recyclinq oarticioation. All oroiects are funded by either Recycling Fund revenue or through Lease Purchase contracts with the debt oaid by the Recyclinq Fund. Proiects in this section suooort the "Clearwater ;s a Wonderful Place to Live" element of the City Council's Vision and the following related oriorities: .:. A Safe Clean Green Environment .:. Safe Comfortable Walkable Neighborhoods Proiect Fundlna 2008/09 2009 /1 0 2010/11 2011/12 2012/13 2013/14 Total 96804 Recyclina Container Recyclina 49.000 50.000 99.000 Acauistion 96805 Recyclina Expansion R&R Recycling 47.000 50.000 97.000 & Participation Proarams 96806 RecYcling Eauipment LIP-RecYcling 160.000 220.000 290,000 290,000 290,000 300,000 1 ,550,000 Replacement Total Recycllna 160,000 220,000 290,000 290,000 386,000 400,000 1.746.000 96804 Recycling Container Acquisition This oroiect orovides for the ourchase and reolacement of recyclinq bins. carts/containers and dumosters for the City's three Recycling Programs - Residential. Multi-Family and Commercial. The current available balance in the oroiect will orovide fundinq for this oroiect throuGh FY 2011/12. Then new fundinG will once again be required. Comorehensive Plan Obiective: 118.31 Continue to orovide sound fiscal manaqement for solid waste collection. disoosal and recycling as it develoos. 96805 Recyclinq Exoansion, R&R and Particioation Programs This oroiect oromotes oarticioation in recyclinq and sustains orocessing and marketinq as well as. the orofitability of the three recYcling orograms. State Grant funds that assisted in establishing this project are no lonGer available. In FY 2008/09, fundinq will orovide for the olacement of dividers/oartitions at the Processinq Center: in FY 2009/10, funding will orovide for shelter maintenance and inFY 2010/11. funding will orovide for oartial resurfacing of the orocessinq floor in the Processing Center. In FY 2011 /12, funding will orovide for the final resurfacinq of the orocessinq center floor. The current available balance in the oroiect will orovide fundinq for this oroiect throuqh FY 2011/12. In FY 2012/13, funding for the reolacement of the maqnetic seoarator conveyor and security system addition will be orovided. In FY 2013/14, fundinq will orovide for reolacement of the sUNeillance system and modification or reolacement of the Global PositioninG System (GPSl. Comorehensive Plan Obiective: (18.31 Continue to orovide sound fiscal management for solid waste collection, disoosal and recyclinq as it develoos. City of Clearwater, FL Ordinance 8016-08 Exhibit A - 50 - RECYCLING (continued) 96806 Recycling Equipment Replacement This project provides a reserve for the replacement of M & 0 automotive equipment for all three recycling programs, on an on-goin~ basis. Planned for FY 2008/09, replacement of the 2000 express van and 2001 Sterling Roll-off Truck. The current available balqnce in the proiect will fund projects. Comprehensive Plan Objective (18.3) Continue to provide sound fiscal management for solid waste collection, disposal and recycling as it develops. ANNUAL OPERATING BUDGET IMPACT Proiect FTE's 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 Recvclinq Equipment Replacement 121 35,390 84,050 148,190 212,330 276.470 307.430 Total Recyclino 0.0 35,390 84,050 148,190 212,330 276.470 307.430 121 Operatina costs are for debt service to be funded by the Recyclina Fund. City of Clearwater, FL Ordinance 8016-08 Exhibit A - 51 -