99-43
, ,
. '
'. . .
, '
C I
. . "
, .'
.4 ~('. . . . .
i '
" '
,
"
, ,
, ,
, j ~ '
': . . .
" " .
" .
1:., I
....
" '
,", ""',',,,..RESOLUTIONS
!:~ . .: '1', ~ <
.'. " "
,',;' ,
, "
, '
. . ."
) .: ~ . l . '., > .
, '
"'. . ...'
\..- '.'
# C
I, '
c, '
"
, c
q,?;
"
, i
2PJ .
'I
RESOLUTION NO. 99-43
r)
A RESOLUTION OF THE CITY OF CLEARWATER, FLORIDA,
AUTHORIZING THE ESTABLISHMENT OF A REGIONAL
STORMWATER TREATMENT FACILITY AND SERVICE DISTRICT
WITHIN DOWNTOWN CLEARWATER, FOR THE TREATMENT AND
ATTENUATION OF STORMWATER AND COMPLIANCE WITS STATE
AND LOCAL ENVIRONMENTAL REGULATIONS TO BE MANAGED BY
THE ENGINEERING DEPARTMENT; PROVIDING AN EFFECTIVE
DATE.
WHEREAS, the existing stormwater system within portions
of downtown Clearwater does not meet level of service criteria per
the City's comprehensive plan, and
WHEREAS, areas surrounding the existing Pierce Street
pond experience regular flooding, and
WHEREAS, the Land Development Code
January 21, 1999{Section 3-914-B) allows for the
regional retention districts for the purpose of
and state stormwater management regulations, and
as adopted on
establishment of
satisfying local
........../
WHEREAS, the establishment of a district will help
solve existing stormwater treatment and flooding problems and
provide an economic incentive to redevelopment; now, therefore,
BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF CLEARWATER, FLORIDA:
Section 1. The City Commission hereby approves the
establishment of the Town Pond Regional Retention District
(District)as defined by the following boundaries: beginning at the
intersection of North Fort Harrison Avenue and Drew Street,
extending south along the east side of the centerline of Ft.
Harrison Avenue to Court Street; then extending to the east along
the north side of the centerline of Court street to Missouri
Avenue; then extending to the north along the west side of the
centerline of Missouri Avenue to Drew Street; then extending west
along the south side of the centerline of Drew Street to North
Fort Harrison Avenue (see attached map) .
Section 2. The Town Pond retention facility will
require a subject project to be fully within the boundaries of the
District. Project owners may make payment to the City for water
quality treatment purposes, on the following basis:
$18,595.00/acre, prorated to the project square footage up to a
maximum of 1.5 acres (65,340 sq. ft.). Projects larger than 1.5
'J acres will pay $75,000.00 PLUS $25,OOO.OO/acre (prorated to the
.
l
i -..
I' .
:~
project square footage). For projects larger than 1.5 acres said
fees' represent the maximum payment. Participation is optional;
projects choosing not to participate will be responsible for
complying with all existing local and state stormwater
r~gulations.
Section 3. For projects larger than 1.5 acres, the City
Commission may reduce payment on a case by case basis depending
upon project variables such as total capital investment, number of
jobs, density of impervious area (green space), and the reduction
of surface area used for parking/roadways.
'.
Section 4. Establishment of this District will be added
as.,an appendix to the City's Stormwater Design criteria Manual.
Project eligibility will be determined during the permitting
process.
': ~: '
Section
immediately upon
5. This
adoption.
resolution
shall
take
effect
'.'
" ,
PASSED AND ADOPTED this
7th
day of October
,
1999.
...-....,
'-)
&.-f/l-~
Brian AU~
Mayor-Co ssioner
Approved as to form: Attest:
Cr-~ ~ ll~_~~ 2. Q5L>----.
~
" John Carassas ia E. Gou
" Assistant City Attorney Clerk
~
,
Resolution No. 99-43
~
"