NORTH GREENWOOD NEIGHBORHOOD TRAFFIC CALMING PROJECT - 02-0055-EN - ADMINISTRATIVE CHANGE ORDER #1 & FINAL5 Administrative Change Order #1 & Final PROJECT: North Greenwood Neighborhood Traffic Calming CONTRACTOR: MTM Contractors, Inc. 6550 53rd Street North Pinellas Park, Florida 33781 DATE: October 1, 2008 PROJECT NUMBER: 02-0055-EN PO REFERENCE NO.: ST103464 DATE OF CONTRACT: Iuly 13 2007 CODE: 0315-92259-563700-541-000-0000 (A) 0315-92259-563700-541-000-0000(B) SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT See attached sheet increases/ additional items, and approve a time extension of sixty (60) days. = STATEMENT OF CONTRACT AMOUNT ACCEPTED BY: ORIGINAL CONTRACT AMOUNT Adm. Change Order #1 & Final NEW CONTRACT AMOUNT $2,114,271.73 ($206,291.68) $1,907,980.05 ors, n . MTM C atraff George T calino, President Date: October 15, 2008 ATTEST: Ad Kab , A Cynthia E. Goudea, City Clerk Date: 10.21 CITY OF CLEARWATER, IN PI LLAS COUNTY, FLORIDA William B. Horne, 11 City Manger Witnesses: Lynn Den mme Tina Nednien Reco ended By: Gary A. on, CGC Public S ices Director FL Michael D. Quillen, . . City Engineer Page 2 of 4 Administrative Change Order # 1 & Final North Greenwood Neighborhood Traffic Calming Code "B" - 0315-92259-563700-541-000-0000 - Traffic Calmin g Fund Decreases ITEM DESCRIPTION QUANTITY UNIT UNIT COST TOTAL COST 4 Tree Barricades 221 LF $ 5.00 ($1,105.00) 5 Root Prunning 226 LF $ 10.00 ($2,260.00) 6 Asphalt Driveway Removal 39 SY $ 1.00 ($39.00) 10 Concrete Gutter Removal 256 LF $ 8.00 ($2,048.00) 12 Drainage Pipe Removal 22 LF $ 25.00 ($550.00) 13 Drainage Structure Removal 1 EA $ 1,000.00 ($1,000.00) 19 Tree Removal 2 EA $ 1,450.00 ($2,900.00) 23 Excavation, Roadway 119 CY $ 6.50 ($773.50) 25 Unsuitable Material Removal 300 CY $ 10.00 ($3,000.00) 26 Flowable Fill, pipe 4 CY $ 250.00 ($1,000.00) 28 12" Type B Stabilization 220 SY $ 5.50 ($1,210.00) 29 8" Crushed Concrete Base 72 SY $ 12.00 ($864.00) 31 Flowable Fill, base 127 CY $ 250.00 ($31,750.00) 36 Asphalt Trail 17 TON $ 416.00 ($7,072.00) 40 Concrete Sidewalk, 4" 112 SF $ 4.45 ($498.40) 43 Concrete Traffic Separator, Type I Option II 164 SF $ 12.00 ($1,968.00) 44 Concrete Traffic Separator, Type IV Option II 71 LF $ 12.50 ($887.50) 45 Curb & Gutter, Type 1 327 LF $ 14.00 ($4,578.00) 46 Curb & Gutter, Type 1 (modified) 52 LF $ 14.50 ($754.00) 47 Straight Curb 24 LF $ 16.00 ($384.00) 49 Concrete Valley Gutter Curb 236 LF $ 21.00 ($4,956.00) 50 Concrete Valley Gutter Curb (36") 46 LF $ 25.00 ($1,150.00) 52 FDOT Shoulder gutter 10 LF $ 80.00 ($800.00) 59 15" RCP 49 LF $ 54.00 ($2,646.00) 71 FDOT Manhole J-7 1 EA $ 5,500.00 ($5,500.00) 72 Raise Sanitary Structure 1 EA $ 2,000.00 ($2,000.00) 74 Adjust Manhole 1 EA $ 200.00 ($200.00) 75 Adjust Water Valve Box 2 EA $ 65.00 ($130.00) 79 Pavement markings 6'-10'Skip, 6" 3 LF $ 0.50 ($1.50) 81 Pavement Markings, 12" 109 LF $ 1.65 ($179.85) 83 Pavement Markings, 24" 26 LF $ 2.55 ($66.30) 84 Pavement Marking Removal, 6" 3484 LF $ 1.50 ($5,226.00) 89 Remove Existing Pavement Markings 16 SF $ 3.05 ($48.80) 90 Retro-reflective Pavement Marker 89 EA $ 6.00 ($534.00) 92 Smartstud Crosswalk System 1 EA $ 29,700.00 ($29,700.00) 93 Delineator 5 EA $ 51.00 ($255.00) 96 Sod 38 SF $ 0.35 ($13.30) 98 Liriope Muscai "Emerald Goddess" 222 EA $ 6.20 ($1,376.40) 101 Raphiolepis Indica "Dwarf Indian Hawthorne" 99 EA $ 10.65 ($1,054.35) 103 Senna Surattensis "Glaucous Cassia" 2 EA $ 345.00 ($690.00) 114 Water for Grass 6.75 MG $ 175.00 ($1,181.25) 117 Truncated Domes Tile 88 SF $ 34.00 ($2,992.00) 118 Utility Allowance 0.91 LF $ 50,000.00 ($45,500.00) 119 Contingency 1.00 LS $ 161,654.50 ($161,654.50) Total Decrease to Code "B" Traffic Calming ($332,496.65) Increases 7 Concerte Curb removal 533 LF $ 4.50 $2,398.50 8 Concrete Driveway Removal 41 SF $ 0.40 $16.40 11 Concrete Sidewalk Removal 139 SY $ 2.00 $278.00 14 Pavement Removal 1804 SY $ 4.00 $7,216.00 16 Relocate Cleanout 1 EA $ 200.00 $200.00 17 Relocate Water Meter 1 EA $ 150.00 $150.00 22 Mailbox Relocation 1 EA $ 10.00 $10.00 32 6" Concrete Pavement 758 SF $ 5.40 $4,093.20 37 Aspahlt Texture Print 85 SF $ 12.45 $1,058.25 38 Concrete Brick Pavers 390 SF $ 8.50 $3,315.00 39 Concrete Driveway 1116 SF $ 7.00 $7,812.00 Page 3 of 4 Administrative Change Order # 1 & Final North Greenwood Neighborhood Traffic Calming Concerte Sidewalk Ramp (excluding truncated 42 domes) 51 FDOT Curb & Gutter, Type RA 64 FDOT Inlet Type P-9 67 FDOT Manhole P-8 68 FDOT Gutter Inlet Type S 77 Pavement Markings, 6" 82 Pavement Markings, 18" 94 Signage 102 Ilex Vomitoria'NanaDwarf Youpon Holly" 111 Meter & Drop for Lighting 112 Electical Sleeves (SCH 80-2") 113 Water Meter Assembly Additions 120 12 x 18 ERCP 121 Extra survey & sawcut 122 24" RCP 123 30" RCP 124 Irrigation Sleeve 125 Truncated Domes Tiles w/ sound 126 Paint Island Ends Yellow 127 Valley Gutter Work @ Harbor & Fairmont 128 Paveway Texture Print @ Palmetto 304 SF $ 13.50 $4,104.00 190 LF $ 20.00 $3,800.00 1 EA $ 6,700.00 $6,700.00 1 EA $ 5,000.00 $5,000.00 2 EA $ 6,500.00 $13,000.00 2490 LF $ 0.75 $1,867.50 28 LF $ 1.80 $50.40 4 EA $ 311.00 $1,244.00 4 EA $ 10.80 $43.20 2 EA $ 1,000.00 $2,000.00 5 LF $ 4.50 $22.50 1 EA $ 380.00 $380.00 Total Increases to Code "B" Traffic Calming $64,758.95 125 LF $ 62.00 $7,750.00 1 IS $ 2,963.10 $ 2,963.10 8 LF $ 75.00 $600.00 3 LF $ 95.00 $285.00 160.0145 LF $ 27.56 $4,410.00 208 SF $ 36.00 $7,488.00 28 EA $ 75.00 $2,100.00 1 IS $ 3,920.00 $3,920.00 1 LS $ 75,317.50 $75,317.50 Total Additions to Code "B" Traffic Calming $104,833.60 Net Total (Decreases)/Increases,/Additions Traffic Calming Code "B" ($162,904.10) Code "A" - 0315-92259-563700-541-000-0000 - Intersection Improvement Fund Decreases ITEM DESCRIPTION 2001 Tree Barricade 2002 Root Prunning 2003 Asphalt Driveway Removal 2004 Concrete Curb Removal 2005 Concrete Driveway Removal 2006 Concrete Curb & Gutter Removal 2008 Concrete Sidewalk Removal 2011 Pavement Removal 2013 Excavation, Roadway 2014 Fill, Roadway 2015 12" Type B Stabilization 2016 8" Crushed Concrete Base 2021 Concrete Sidewalk, 4" 2024 Curb & Gutter, Type 1 2025 Straight Curb 2027 FDOT Shoulder gutter 2028 Bicycle Pipe Guiderail (Aluminum) 2030 Reinforcing Steel (Barrier Wall) 2032 12" PVC 2033 15" PVC 2042 Adjust Manhole 2044 Pavement Markings, 6" 2050 Sod 2051 Water for grass 2052 Truncated Domes Tile 2053 Contingency UAL NTITY UNIT UNIT COST TOTAL COST 65 LF $ 5.00 ($325.00) 60 LF $ 10.00 ($600.00) 90 SY $ 1.00 ($90.00) 563 LF $ 4.50 ($2,533.50) 41 SF $ 0.40 ($16.40) 309 LF $ 5.00 ($1,545.00) 118 SY $ 2.00 ($236.00) 659 SY $ 4.00 ($2,636.00) 172 CY $ 6.50 ($1,118.00) 9 CY $ 35.00 ($315.00) 18 SY $ 5.50 ($99.00) 39 SY $ 12.00 ($468.00) 410 SF $ 4.45 ($1,824.50) 20 LF $ 14.00 ($280.00) 18 LF $ 16.00 ($288.00) 10 LF $ 80.00 ($800.00) 10 LF $ 67.62 ($676.20) 21 LB $ 22.00 ($462.00) 17 LF $ 44.00 ($748.00) 26 LF $ 62.00 ($1,612.00) 2 EA $ 200.00 ($400.00) 79 LF $ 0.75 ($59.25) 533 SY $ 0.35 ($186.55) 13.727 MG $ 200.00 ($2,745.40) 12 SF $ 34.00 ($408.00) 1 LS $ 30,552.03 ($30,552.03) Total (Decreases) to Code "A" Intersection Improvement ($51,023.83) J Page 4 of 4 Administrative Change Order # 1 & Final North Greenwood Neighborhood Traffic Calming Increases 2018 2" Asphalt Pavement (Type S-1) 3 TON $ 260.00 $780.00 2020 Concrete Driveway 61 SF $ 7.00 $427.00 2023 Concrete Sidewalk Ramp 40 SF $ 14.00 $560.00 2043 Adjust Water Valve Box 1 EA $ 65.00 $65.00 2045 Pavement Markings, 12" 119 LF $ 1.65 $196.35 2046 Pavement Markings, 24" 18 LF $ 2.55 $45.90 Total Increases to Code "A" Intersection Improvement $2,074.25 Additions 2054 Truncated Dome Tiles w/ sound 32 SF $ 36.00 $1,152.00 2055 Irrigation Sleeve 160.0145 LF $ 27.56 $4,410.00 Total Additions to Code "A" Intersection Improvement $5,562.00 Net Total (Decreasesylncreases/Additions to Intersection Improvement Code "A" ($43,387.58) Net Total (Decrease)/Increases/Additions to Contract ($206,291.68)