Loading...
01/26/1989 ,. G) @ . ~~""tIo3__~__,<~....,.,,,,,,,_,..,,~,,,,.,,,,,,1.-!"".'''' .-N" ~,._~" . .,< " . .. ~... .. ~~...~._'<~}JI'~.~';t::~. C ! 'I' to" C LEA Il V A T II: R lnterdep.~t~nt.l Corre.pondence Sheet TOI Development Review Committee '1011 a Paula Harvey, Planning Director, Ac ti ng Chairma~ COPIES: Vis ion Cab le j Sherry Nicodemus, Traf fie Engineering SUBJECT : De:-relopment Review Committee -- January 26, 1989 DAn: January 20, 1989 A meeting of the Development Conference Room on Thursday, following: Review Committee will be held in the Operations January 26, 1989, at 9:00 AM to discus8 the Minutes of DRG meeting of December 22, 1988 - APPROVED AS AMENDED 1. IDP located on the 80uth side of Calumet Street, west of Belcher Road PRELIMINARY SUBDIVISION PLAT - APPROVED WITH CONDITIONS 2. IIATIOWn DATA PRODUCTS, IRC., located on the south side of Calumet Street, west of Belcher Road FINAL SITE PLAN - APPROVED WITH CONDITIONS 3. SOUTH OAKS FASBIOR SQUARE (A.K.A. CLEAKWATE& HAIlETPLACI) located at the southwest corner of McMullen-Booth Road and s.ft. 590 (Previous review: October 13, 1988) MAJOR AMENDMENT TO MASTER IPO SITE PLAN - RECOMMEND TO CITY COMMISSION TO APPROVE WIlli CONDITIONS 4. FLAGSHIP BESTAURART (RESTORATION) located on the west side of Island Way and 80uth side of Windward Passage FINAL StTE PLAN - APPROVED WIT11 CONDITIONS 5. WESTERN AUTO RETAIL CBKTER IDea tp.d at the northeast corner of the intersection of GulE-to-Bay Boulevard and Kilmer Avenue FINAL SITE PLAN - APPROVED WITH CONDITIONS Recording is assigned to: Traffic Engine~ring DISTRIBUTION: William Baker, Public Works Director (5) Vie Chodora, Building Official Nick Lewis, Fire Marshal I "Jooeph McF at e. Planning & Oeve lopment Di rec tor! Ream Wilson, Parks & Recreation Director I j I " f ~ ~c::< L/- -79 I" , I ; ~ 1 < .. .,: ... .~'::i1 ~i:r:":~:J . ,,'< , '" , ' , 1.,- i,l,.... .. I . ~ ". ~ ., ~. I,' '; . '! j , . .. . ; j,! ,'\..'01 U.:.I.-Il~:""':'~'::~.l.vJ:':-;;"":"'~""'~~';l::j~~"" .": .: . MINUTES DEVELOPMENT REVIEW COMMITTEE January 26, 1989 OFFICIAL I ~.' " . .. I.' :," . i ' . . mbers Present: a arvey ick Lewis Bob Maran Vie Chodora Don Meerians Bob Perkins Sandy Glatthorn Ream Wilson Also Present: td Olson. Jr. - Tampa Bay Engineering (Items #1 & #2) Ed Mazur - King Engineering (Item #3) Sam Ross Richland Properties (Item #3) Dave Healey - Healey Consultant Group (Item #3) Todd Emmons - Architectural Concepts. Inc. (Item #4) Daniel Simmons J & S Flagship (Item #4) Kenneth Gibson - J & S Flagship (Item #4) Edward Olson Western Auto TBE (Item #5) Michael J. Wright Asst. City Manager/ Community Services , ~~~rr!~_~!s~~~m~~__:__!r~~~E~r!et!~~L~~S~r~!~g_~~S[~!~rl__________________________________________ The meeting was called to order at 9:05a.m. by Acting Chairman Harvey in the Operations Conference Room. Planning Director, Acting Chairman Fire Marshall representing Public Works Department - representing BUilding Department representing Transportation - representing Utilities - representing Code Administration - Parks & Recreation Director ~~\,~f1i)}';ri,i:1r'\ "" l....(.~~..:-...... J,.,.s...<';;'.... I..~~'''' n "t' , '.,' 'O{ '. ~ _" :,;' . .,. ~.... l'l~ .'"' \,' c', ......'. " '~.~i:~.~~..~.T~~ :;::?; .,:4',:1 '.'''~d\M:' "_"\.I~'\: ~.(.~rV'+I~'i-.i~'': H.'...f/ '~'",\:\'-:~',..: :>f ~ I ~ ~ ~I ;":~ J~tj.,:J' ~.;~\.\ :;:-tf~;;~~~:~ ...:\. .XnJ}t; ]~~~: i};B=;l{l ' I ~~f*~tt)t. . Jot; }\:,~ " '.,<;,1, \.:r, . .~.i ' Minutes of the DRG meeting of December 22. 1988. were approved as corrected. -- NOP located on the south side of Calumet Street. west of Belcher Road Preliminary Subdivision Plat - APPROVED WITH CONDITIONS NATIONAL DATA PRODUCTS, INC.. located on the south side of Calumet street. west of Belcher Road Final Site Plan - APPROVED WITH CONDITIONS Fire A 6 inch sprinkler line will be required in conjunction with a hydrant and SIamese connection. To be shown on site plan. Public Works Copies of applications to DER and SWFWMD must be submitted prior to certification and copies of approved permits are to be provided to the Public Works Department prior to issuance of a building permit. Pinellas County is proposing a regional storm water detention pond south of this site. The proposed work in the 50 foot drainage and utility ease- ment is to be coordinated with Pinellas County. A 4 foot wide sidewalk one foot off of property is to be shown on the site plan prior to certification. Buildin~ No comment. Transportation Driveway to the west to be redrawn so as to miss manhole. Utilities . The proposed 6 inch water line must be tapped to the existing 8 inch water main located along the north side of Calumet Street. not to the sanitary sewer as shown on the plans. The proposed water service should also be tapped to the existing au water main. not to the proposed fire line as shown on the plans. An ingress/egress easement and a 10 foot utility easement over water mains up to and including mGters and hydrants are required prior to the issuance of a building permit. A Pinellas County Public Health Unit Permit is required prior to the installation of the water distribution system. The proposed dumpster location must be moved to the north to avoid an excessive baCking distance by Sanitation ]vehicles. The maximum allow- ~le backing distance required by the City is 75 feet. Also. the dumpster enclosure cannot , ~croach on the building setback ,unless a variance is obtained. The dumpster must be in a Visually screened enclosure prior to the issuance of a certificate of occupancy. Provide gates with a minimum 12 foot clear opening to the front for access by Sanitation trucks. There is an existing 2 inch natural gas main located along the south side of Calumet Street that must be shown on the sIte plan prior to certification. 2. ORe 1/26/89 -1- 'I) , . -, '., . ....: " rOM, . . R t q ..' .~. ~ . ',: "I:~ '.. ::~ '.~ ,.~t Item #1 (Contld.) Code Administration Signs and fencing/walls are subject to separate review and permitting .ocesses. The required setback dimensions shall be given on the supplementary drawingt prior certification of the preliminary plat. All proposed lot dimensions must be given on the eliminary plat and the lot size for each proposed lot must be given on the preliminary plat and/or supplementary drawing, prior to certification of the preliminary plat. The structure located on the proposed lot line between Lots 1 and 2 must be removed prior to recordation of the plat. The final plat shall be recorded within 6 months of certification of the preliminary plat. The required ingress/egress easement and 10 foot utility easement over water mains up to and including meters and hydrants shall be provided on the plat prior to recordation. Parks & Recreation This project is not required to meet open space requirements since it has preViously been paid by the previous owner. Sandy Glatthorn moved to approve the prelilninary plat based upon a finding of this Committee that the plat conforms with the design guidelines for subdivision plat review subject to the followi ng: 1. The required ingress/egress easement and 10 foot utility easement over water mains up to and including meters and hydrants shall be provided on the plat prior to recordation. 2. Signs and fencing/walls are SUbject to separate review and permitting processes. 3. The required setback dimensions shall be given on the supplementary drawing prior to certif- ication of the preliminary plat. 4. Prior to certification of the preliminary plat all proposed lot dimensions must be given on the preliminary plat and the lot size for each proposed lot must be given on the preliminary plat and/or supplementary drawing. 5. The structure located on the proposed lot line between Lots 1 and 2 must be removed prior to recordation of the plat. 6. The final plat shall b~ recorded within 6 months of certification of the preliminary plat. ~tion seconded by Bob Maran. Motion carried unanimously. ~ndY Glatthorn moved to approve the final site plan based upon a finding of this Committee that the plan conforms with the design guidelines for site plan review subject to the follOWing: 1. Prior to certification a fire hydrant and siamese connection shall be provided on the site plan as required by the Fire Marshall. 2. Prior to certification the radii of the westerly driveway shall be reduced as required by Traffic Engineering. 3. The proposed water distribution system and dumpstet' location must be revised subject to the Utilities engineer approval prior to certification. 4. Ingress/egress easement and 10 foot utility easement over water mains up to and including meters and hydrants are required prior to the issuance of a building permit. 5. The dumpster must be in a visually screened enclosure prior to the issuance of a Certificate of Occupancy. Gates must be provided with a minimum 12 foot clear opening to the front for access by Sanitation trucks~ 6. Existing gas mains must be shown on the site plan prior to certification. 7. Copies of applications to OER and SWFWMO must be submitted prior to certification and copies of approved permits are to be provided to the Public Works Department prior to the issuance of a building permit. 8. As Pinellas County is proposing a regional storm water detention pond south of this site, the proposed work in the 50 foot drainage and utility easement is to be coordinated with Pinellas County. 9. A 4 foot sidewalk one foot off the property line is to be shown on the site plan prior to certification. . 10. Signs and fencing/walls are subject to separate review and permitting processes. 11. Actual proposed setbacks should be given in the site calculations. fit . ;; ~. ORC 1/26/89 -2- '.' .'. ~.... ' .. ~.. ."' :. ~ .>;.',';.:~.r_l ~:;:... .._.i;~ Item #2 (Cont'd.) 12. Rezoning and amendment to the Land Use Plan must be finalized prior to certification of the ~nal site plan. ~. No building permit will be issued until the plat has been recorded. 14. The requisite initial bUilding permit must be procured within 6 months from certification of the site plan and all requisite certificates of occupancy must be obtained within three years from certification of the site plan. Motion seconded by Bob Perkins. Motion carried unanimously. 3. SOUTH OAKS FASHON SQUARE (A.K.A. CLEARWATER MARKETPLACE) located at the southwest corner of McMullen-Booth Road and S.R. 590 (Previous review: October 13, 1988) Major Amendment To Master IPQ Site Plan - APPROVED WITH CONDITIONS Fire No comment. FUDfic Works No comment. Building No comment. Transportation No comment. Utilities The proposed water distribution system is acceptable as shown on the plans. A Pinellas County Public Health Unit Permit is required prior to the installation of the water distribution system. This project will be served by dumpster pick-up. The proposed dumpster locations should be approved prior to certification. The dumpster must be in a visually screened enclosure prior to the issuance of a certificate of occupancy. Provide gates with a minimum 12 foot clear opening to the front for access by Sanitation trucks. Code Administration Conditions carried forward from preVious approval. Parks & Recreation No comment. nd Glatthorn moved to recommend approval of the major amendment of the Master IPQ site plan or out a s fashion Square, also known as Clearwater Marketplace, subject to the following: 1. As this project W!l~tb~'ferved by dumpster pick-up, the proposed dumpster location should be subject to approval/PfiHr1to te~tification. 2. The dumpster must be in a visually screened enclosure prior to the issuance of a certificate of occupancy. Gates must be prOVided with a minimum 12 foot clear opening to the front for access by Sanitation trucks. 3. Prior to issuance of a building permit, copies of approved DER and SWFWMD permits are to be submitted to the Public Works Department. 4. An ingress and egress easement and to foot utility easement are required over the water mains up to and including meters, hydrants and any required detector checks prior to the issuance of a building permit. 5. A landscape plan for each lot must be prepared and submitted prior to issuance of a building permit for each respective lot. If notice is given by the City of the construction of Landmark Drive prior to the issuance of a building permit for Lot 2, the required landscape plan shall be submitted at that time. 6. All certificates of occupancy must be obtained within three (3) years of October 24. 1988. 7. Any wall or landscaping provided along Landmark Drive must be located totally on the private property out of the right-of-way. Motion seconded by Bob Maran. Motion carried unanimously. 4. fLAGSHIP RESTAURANT (RESTORATION) located on the west side of Island Way and south side of Windward Passage Final Site Plan - APPROVED WITH CONDITIONS ~ire Satisfied with site plan. PUDfic Works No comment. Building No comment. 1/26/89 -3- >'".,. .., ~ '" c' .... ~ , 1:. J; .. .." . . .' - ~ I . f ~ . ~ . .' ';; : ""'. .~fi~r~~1 ~':. t:j'~~>J~~::;;i i:\i~~ .~';;'~F~ ~;~ 1~~' ..}~,;;~~~~Iv; ,'~";?';J~1.~!:f-!f. ~I.\~,,-~' ..~.L' :5:;~'L;.}...'l :;1.~,1i:r~~ :it~ ~ .' ! . ':. ~. '.". . I . .. .c' ~ "."d"~'.:::';:' ..~~'.::' Item #4 (Cont'd.) Trans ortation No comment. t es An ingress/egress easement and a 10' utility easement over water mains up to nc uding meters. detector checks and hydrants are requIred prior to the issuance of a building permit. A Pinellas County Public Health Unit Permit is required prior to the install- ation of the water distribution system. Code Administration Signs and fencing/wallS are subject to separate review and permitting processes. The requisite initial building permit must be procured within 6 months from date of certification of the site plan and all requisite certificates of occupancy must be obtained within 3 years from certification of site plan. Parks & Recreation No comment. Sandy Glatthorn moved to approve the final site plan based upon a finding of this Committee that the plan conforms with the design guidelines for site plan review subject to the following: 1. An ingress/egress easement and a 10 foot utility easement over water mains up to and includ- ing meters, detector checks and hydrants are required prior to the issuance of a building permit. 2. Signs and fenCing/walls are subject to separate review and permitting processes. 3. The requiSite initial building permit must be procured within 6 months from date of certi- fication of the site plan and all requisite certificates of occupancy must be obtained within 3 years from certification of site plan. Motion seconded by Bob Maran. Motion carried unanimously. 5. WESTERN AUTO RETAIL CENTER located at the northeast corner of the intersection of Gulf-to-Bay Boulevard and Kilmer Avenue Final Site Plan - APPROVED WITH CONDITIONS ( r J . ~ ~ -.' "." \ ,",'" ee Questioned sprinkling system in building. If qualify. a hydrant and siamese nection will be required. ublic Works Prior to certification of the final site plan, the engineer is to show the 15 inch ~CP storm water outfall pipe extended to the lake in Gulf-to-Bay Acres 1st Addition. The plan is to show the proposed pipe replacing the old corrugated metal pipe between lots 13 and 14 in the existing 10 foot drainage and utility easement. Prior to certification. copies of OER and SWFWMD permit applications are to be provided to the Public Works Department. Prior to issuance of a building permit, copies of approved DER and SWFWMD permits are to be provided. Prior to certification, the notes "connect to existing inlet 190 feet west of center line" is to be removed and note about conflict structure is to be removed as this will not be needed by draining to the lake instead of the shallow inlet. BUilding No comment. Transportation Questioned adding a 101 x 10' corner easement to tie-in sidewalks. Utilities Prior to issuance of a building permit an ingress/egress easement and a 10 foot utility easement must be provided. Code Administration Signs and fencing/walls are SUbject to separate review and permitting process. Conditions and date of conditional use approval by the P & Z Board shall be prOVided on the site plan prior to certification. The requisite initial building permit must be procured within 6 months from certification of the site plan and all requisite .certificates of occupancy must be obtained within 3 years from certification of the site plan. Parks & Recreation Questioned if there were previously any structures on this property. If no previous structures the open space fee will based on vacant land. Sandy Glatthorn moved to approve the final site plan based upon a finding of this Committee that the plan conforms with the deSign guidelInes for site plan review subject to the following: 1. Prior to certification of the final site plan, the engineer must show the 15" storm water .tfall pipe extended to the lake in Gulf-to-Bay Acres, 1st Addition. The plan must shaw the oposed pipe replacing the old corrugated metal pipe between lots 13 and 14 in the existing 10 foot drainage and utility easement. ORC 1/26/89 -4-