January 28; 1988
Members Present:
Elizabeth S. Haeseker
Nick Lewis
Bob Maran
Vic Chodora
Don Meerians
Cecil Henderson
Paula Harvey
Ream Wilson
Also Present:
George Garrett
Stanley Wohl
Greg D. Veltman
Sherrie Nicodemus
Assistant City Manager. Chairman
Fi re Marsha 11
- representing Public Works Department
representing Building Department
- representing Traffic Engineering Department
- Utilities Director
- Planning Director
- Parks & Recreation Director
~ Regional Engineers Planners & Surveyors. Inc.
- P. E.
- G.C./Developer
- Recording Secretary
-------------------~-------------------------------------------------------------------
The meeting was called to order at 9:10a.m. by Chairman Haeseker in the Operations
Conference Room.
Minutes of the regular ORC Meeting of January 14. 1988. were approved as corrected.
1.
PACT. INC. (PACT. INC. SCHOOL), located on the north side of the npACT" site
and east of One Kapok Terrace Condominium. east of McMullen-Booth Road
VARIANCE - APPROVED
PRELIMINARY SUBDIVISON PLAT - APPROVED WITH CONDITIONS
G
For the record, the Chairman stated that representatives of PACT were informed this
item would be reviewed in their absence.
Fire - No comment.
PUOTic Works - Easements should
distance from RPM to center of easements.
given on supplementary drawing.
Building - No comment.
Traffic Engineering - No comment.
Utilities - No comment.
Planning - No comment.
Parks & Recreation - No comment.
be tied down to sanitary sewers and show
Distance between building and line to be
MOTION Paula Harvey moved to approve the variance to the subdivision regulations reqUiring
that all platted property have direct access to right-of-way.
Motion was seconded by Bob Maran. Motion carried unanimously.
, '
MOTION Paula Harvey moved to approve the preliminary plat for PACT. Inc. based upon a finding
,) of this Committee that the plat conforms with design guidelines for plat approval
subject to the following:
~ 1. As required by Engineering. the easement should be tied down with measurements
~ from the PRMIs to the, center of the ten (101) foot sanitary sewer easement
for both sides of the property. If it is found that the bUilding encroaches.,
into the easement. the easement should be moved and vacated away from the
building.
,2. Final, plat should be recorded within six (6) months of the date of certification
'of the preliminary plat.
-1-
1/28/88
,"
. '
I ..
,
"
hJU4..~.....__.._~..........._,._.........~,~,.... .. . ..
"
..' O.J;4..... kM. , _'n.. ~ In , ........
iI"!"!\
'fii:I
1. (Cant' d . )
Motion seconded. Motio~ carried unanimously.
2. THE VININGS AT COUNTRYSIDE, located at the southwest corner of the intersection
of McMullen-Booth Road and Allen Avenue.
FINAL SITE PLAN - APPROVED WITH CONDITIONS
PRELIMINARY SUBDIVISION PLAT - APPROVED WITH CONDITIONS
fire - No comment.
~ding - Submitted written comments to developer.. (AttaChment HI)
Traffic Engineering - Questioned Allen Avenue entrance. Width of parking stalls to
be shown. Sidewalks on Allen Avenue and McMullen-Booth Road need to be addressed.
Correct calculation for handicap parking to be used and spaces to be shown on plan.
Utilities - Submitted written comments to developer. (Attachment H2)
PlanninQ - Questioned dedication of McMullen-Booth right-of-way. Signs
are subject to separate review and permitting. Final landscaping plan to include
heavy landscaping with buffer area along west property line.
Parks & Recreation - Submitted information sheet to developer stating park dedication
was satisfied at time of annexation and project Is exempt from City's existing open
space/recreation assessment ordinances.
MOTION Paula Harvey moved to approve the preliminary plat for The Vinings At Countryside
based upon the findings of this Committee that the plat conforms with the design
guidelines for the plat approval subject to the following:
I. A county road designation for McMullen-Booth Road should be prOVided on the
plat.
2. If it is the applicant1s intention to dedicate right-of-way for McMullen-
Booth Road the dedication should occur in conjunction with the final plat.
~ 3. A drainage and utility easement is required by Public Works. should be
..., provided over Bishop Creek and shown on the plat.
4. The final plat should be recorded within six (6) months of date of certification
of the preliminary plat.
5. A ten (10') foot utility easement be provided over the water main up to and
including meters and hydrants.
6. An ingress and egress easement be provided.
Motion was seconded by Cecil Henderson. Motion carried unanimously.
MOTION Paula Harve~ moved to approve the final site plan for The Vinings At Countryside based
upon a findlng of this Committee that the plan conforms with the design guidelines for
site plan review subject to the following:
I. Signs are subject to separate review and permitting.
2. Final landscaping plan must be submitted with the building plan providing
for heavy landscaping and berm treatment within the buffer area along the
west property line as directed by the City Commission. This plan must be
approved by the City Forester.
3. The tree survey should be overlaid on the site plan in order to identify
which trees are to stay and which are to be removed as a result of
construction.
4. Sidewalks must be provided along Allen Avenue and McMullen-Booth Road
rights-of-way.
5. DER and SWFMMD applications must be shown to the Public Works Department
prior to issuance of the building permit.
~ 6. Site plan should reflect a drainage and utility easement for Bishop Creek
W as required by Public Works. 1/
7. Calculations for storm water retention and'cross section of retention ponds
should be prOVided to Public Works. .
-2-
1/28/88
..". i
I , {~ .;:
., \. . J 1
.' , l . w'
,_. :,. ,H; .
~ ~ J . .' .
. i ~ ~."". ,'. I
. . . .
'. .'.......'.
"
'. . .."
.;'.~:sN~~i:
. .. - . <. ) "'f_'" . 't-~.t':,l -
'J.,~ ;~;{pg{).~~i~s'.
.e'~"'I' ':"':l.:..'lj.(.t}~'C:I~~;''' .....i.{
"'i'(~\\~ll~"',," ".",0';"",
;i~;~!j,,";]l&:.~~;:;;'~~I~!(
'f~:--r".~~~, ':""t~'~'1.'~1f.~::t.
tj~.:;;r~,~~"~~,: ~ r/j}li~')!
'\';.r.:'';l~l\(:':, t.~..\...\
:\tt.1f.... u 1€
~~.}
;'~J'
o
JIII!!\
~
>>~~ r~"....t:~w;;....o\"""':"~:'<.~"':"'
~ ...4'.~ I IT ....
. , '"'!,.'. 1 J~'" , ,. . ~....
, .. .; ,: .^ . \ ' .
(Cont'd.)
8. Sanitary sewers along Allen Avenue to tie-in perpendicular to the existing
main line on McMullen-Booth Road and this configuration shown on the site
plan.
9. The entrance point from Allen Avenue to be a single lane into the site.
10. Typical parkIng space sIze should be shown on the site plan, minimum size
beIng nine feet (91 x 191) by ninteen feet.
II. Eleven (11) handicap parking spaces are required for this site and should
be shown on the pian.
12. All proposed two (2") inch mains must be upgraded to four (4") inch mains.
13. Compactor area to be visually screened with a twelve (121) foot wide clear
openIng.
14. The site plan should reflect that a ten (101) foot utility easement over
the water mains. up to and including meters and hydrants, and an ingress
and egress easement will be provided.
15. The requisIte initial building permits to be issued within six (6) months
from date of certification of the final site plan and all requisite
certificates of occupancy be issued within three (3) years of date of
certification of the final plan.
Motion was seconded by Cecil Henderson. Motion carried unanimously.
2.
At 9:50a.m. ChaIrman Haeseker was excused. The meeting continued with Nick Lewis as
Acting Chairman.
3. FAIRWINOS {an adult congregate care facility). located on the east side
of Clearwater/Largo Road approximately 550 feet north of Belleair Road.
FINAL SITE PLAN - APPROVED WITH CONDITIONS
Public Works
Building
the developer.
Traffic Engineering - Sidewalk along Ft. Harrison needs to be addressed. "00 Not
EnterlO signs need to be posted for one-way circulation. Questioned one-way crossover.
Two handicap spaces are required.
Utilities - Submitted information sheet to developer stating an ingress
and egress easement and a 101 utility easement over gas and water mains up to and
including meters and hydrants must be provided prior to the issuance of a building
permit. Water meter size must be shown on the final construction plans. Dumpster
must be visually screened. Prior to construction the City will relocate an existing
211 natural gas main located along the west side of Sadlon Avenue.
Planning - Signs are subject to separate review and permitting. Cross-
hatching or Shading should be shown on site plan to identify interior parking.
Parks & Recreation - Submitt~d written comments to developer stating a "recreation
facility" impact fees wiil be required for the seven additional dwelling units for a
total of $1.400. This fee is due and payable at building permit stage.
Fire - Siamese connection to be on the same side as fire hydrant.
- Submitted written comments to developer. (Attachment #3)
- No comment. Standard building information was distributed to
It was noted that the developerls project data should be corrected to reflect 28
residents and not the 36 shown on the plan.
MOTION Cecil Henderson moved to approve the final site plan for Fairwinds based upon a finding
of this Committee that the plan conforms with the design guidelines for site plan
review subject to the fallowing:
~ I. A copy of DER and SWfMMO applications for permit be provided to Engineering
prior to site plan certification.
2. That the plan be modified to indicate ten (101) foot drainage and utility
easement on the south property line.
3. All easements on this site are to be shown as drainage and utility easements~
-3-
1/28/88
r > ~~..
,',.
,
I .,~
,
j" I
~ ; .,
--
o
tII'.
. c I~;
.;
"
..
1
'.
, "
..' ~1:1.t4~"'~W' "t<n(.~x 1',....-.. .J- .,;.,.,,,, ..". \ 'K, I"~ . '''~'..'' Yo'
, "
,
, I
(Cont1d.)
4~ A letter of no objection from the property owner to the south of the site
to work on this property will be required or a modification of the plan to
remove all proposed construction or encroachment from this property.
Provide to Engineering prior to certification.
5. Easements must be located so as to not have encroachments.
6. Show the sidewalk on Ft. Harrison or a note on the plans indicating that
sidewalk will be constructed.
7. Indicate two (2) handicap parking spaces on plan.
8. Signs and fencing are subject to separate permitting and should be indicated
" as such on the plan.
9. Cross hatching or shading of interior parking lot landscaping should be
shown on the plan.
10. The project data should be amended to correctly show the number of residents.
11. Recreation impact fees must be paid before issuance of the building permit
for the seven (7) additional units.
12. A siamese connection will be required and to be shown on the same side as
the fire hydrant. ,
13. An ingress and egress easement and a ten (101) utility easement over gas
and water mains up to and including meters and hydrants must be provided
prior to the issuance of a building permit.
14. The dumpster must be in a visually screened enclosure with a minimum
twelve (121) foot clear opening for access.
15. The two (2") inch natural gas main currently located on the site will be
relocated at City expense into an easement prOVided by the developer.
16. Requisite initial building permits be issued within six (6) months from the
date of certification and all requisite certificates of occupancy be issued
within three (3) years from the date of certification of the final building
permit.
Motion was seconded by Bob Maran. Motion carried unanimously.
3.
4. COUNTRYSIDE CHRISTIAN CENTER, INC.
DISCUSSION ONLY
It was the consensus of the Committee that accessing Lawrence Drive would not benefit
the connecting residential area which is within the City. If Countryside Christian
can get the approval of the residents in this affected area. the Committee would then
consider.
The meeting adjourned at lO:30a.m.
.' ,
, "
-4-
1128/88
. .,.. :,t;,,!x;1:,,{~:;{(
ATTACHMENT 112
@~">.
" ~.;
'. '
POST OFFice BOX "HD
C LEA R W ATe R. F LOR IDA 3 4 6 1 8." 7 4 9
C I T Y
OF
CLEARWATER
omCIIO!
UlIlIlIeI Director
DEVELOPMENT REVIEW COMMITTEE
January 28, 1988
Subject: Final Site Plan and Preliminary Subdivisin Plat for
the Vinings at Countryside Located at the Southwest
Corner of the Intersection of McMullen Booth Road
and Allen Avenue (CTSF Properties, Inc.) PSP 87-4
Sub 87-3
Date:
Reviewed by: Cecil M. Henderson, Jr. and Bob Perkins
Comments:
e
,
The proposed water distribution system is
accept~ble. However, all proposed 2" mains must be
upgraded to 4".
The proposed water meter sizes must be shown on the
Final Construction Plans. Please contact the
Utilities Engineer at 462-6790 to coordinate meter
sizing. Failure to do so will delay permit
processing at the Building Department.
. An ingress and egress easement and a 10~ utility
easement over water mains up to and including
meters and hydrants must be provided prior to the
issuance of a building permit.
.,
.
. A Pinellas County Health Department Permit is
required prior to the installation of the water
distribution system. Please see attached forms.
.
. The proposed refuse compacter location is
acceptable as shown on the plans. Please contact
the Sanitation Superintendent at 462-6659 for
approval of the refuse compactor.
The compactor area must be in a visually screened
enclosure. Provide a minimum 12~ clear opening to
the front for access, by Sanitation trucks.
'.
.',
.
Natural gas is available to this site.