Development Review Committee
Elizabeth S. Haeseker. Assistant City Manage=
Postmaster; Vision Cable; Sherrie Nicodemus. raffic Engineering; S. Glatthorn
CLEARWATER
t eo......pond.nc. Shelt
, "
SUBJECTI Development Review Committee
December 23, 1986
DATE:
December 19, 1986
There will be a meeting of the Development Review Committee in the
Operations Conference Room on TUESDAY, DECEMBER 23, 1986. at 9:00 a.m.
The following will be discussed:
Minutes of the ~egular DRe meeting of December 11, 1986 ~ APPROVED AS CORRECTED
1. Betty Lane Apartments located on the west side of Betty Lane
approximately 710 feet south of Sunset Point Road.
FINAL SITH PLAN APPROVED WI'm CONDITIONS
2. Cle?rwater Business Center located on the south side of
Sunset Point Ruad approximately 225 feet west of the inter-
section with Belcher Road.
@)
COURTESY REVIEW OF SITE PLAN
APPROVED WITH CONDITIONS
3. Morton Plant Hospital M.R.I.{Diagnostic Imaging Center located
at the northwest corner of South Fort Harrison Avenue and
Pinellas Street. ' ". ., ' . ' .
FINAL SITE PLAN
APPROVED WITH CONDITIONS
4. Extra Closet Addition located at the northeast corner of
Palmetto Street and Kapp Drive.
FINAL SI'1'E PLAN APPROVED WIlli CONDITIONS
Recording is assigned to: TRAFFIC ENGINEERING
DISTRIBUTION: William Baker, Public Works Director
Keith Crawford. Traffic Engineering Director
Cecil Henderson, Utilities Director
Nick Lewis. Fire Marshal
Joseph McFate, Planning & Ul'can Development Director
Andrew Onufer, Building Director
Ream Wilson, Parks & Recreation Director
..............____c_ ~"_____~_..
- -........~.. r 0... "'....
,e
Orl=l'''9L..
D /J.-r/'t, IS ~ -r I ~/fJ
"
.A/t 9/ Y 7
0'
. .1
\ .
\,
~ ~ F " ~,~.
. '~I;'" .' ..~,,~
;. : . J .~;.,
I ~ : ",~, p....~ ";Ct
" I,' ',"
',' . ;:;: ~ ~
,. ..<~
'\
, .
~~Df1...",.\ri..iJ.."''t~'J.'''''=-tl.''''''J,' ,....~'........:J.."'.....\ ~ rl'"h"..........,~t....:,..J:...
c. . . . >~ ~(o .. < ,
" '
",
1. (Cont'd.)
~ Paula Harvey moved to appr~ve the final site plan for the Betty Lane Apartments based upon
\/:;i,;J a finding of this Committee that the plan conforms with the design guidelines for site ,plan
review subject to the following: '
.'
i
1. Must show the location of the fire hydrants on the final site plan to be certifie~;
2. All easements to be dedicated to the City prior to the issuance of a building permit;
3. A 15 foot easement will be required over the force main and gravity line north of
the project and must be shown on the final site plan;
4. A 10 foot utility easement is required adjacent to the Betty Lane right-of-way;
5. The applicant must relocate the parking space immediately adjacent to the dumpster
location in order to provide 'adequate access to the dumpstp.r; ,
6. The dumpster should be visually screened with a 12 foot wide clear opening;
7. The Landscape Plan must be revised to show a new location for the tree proposed to
be located on the dumpster pad;
,.
B. Required recreation and open space fees must he paid prior to certification of
final site plan;
@
9. The requisite initial building permits be issued within six months from the date
of certification of final site plan and all requisite certificates of occupancy
be issued within two years from the date of issuance of the initial building permit.
Motion was seconded by Bob Maran; motion was carried.
2. Clearwater Business Center located on the south side of Sunset Point Road approximately
225 feet west of the intersection with Belcher Road.
Courtesy Review of Site Plan - Approved With Conditi.ons
J~ff Daniels The only fire hydrant shawn is on the northwest corner, at least
three more will be needed.
Bob Maran Submitted written comments (Attachment #5). Item #1 of Comments,
questions an detention will need to be cleared by the Environmental Section.
Andy OnufeI'
No comments.
Don Meerians Loading spaces do not need to be included in the required number of
parking spaces. The minimum parking depth i~ 19 feet, and 43 feet from edge to edge.
Bob Brrumback
Submitted written comments (Attachment #6).
Paula HarveUloor Upon annexation, the required open space for the entire lot is 30%.
Minimum eep~area'ratio~ should be .3 - if this is not lessened, then ~lil be non-conforming
A upon annexation. Adjacent property owners will be notified so the}' can come in ;:nd take a
: ~ look at site plan and if they have any comments they will be forwarded to the County. The
front yard open space should be 55%.
. )
Page 2 of 5
D.R.C. 12/23/86
"
-' .
'.1 '
"
,,<
"
\... '
"
,
. f
.: I
.,
..-,,"" ~." t,........_.~ ....~ ,.
" ~,
. ,
2. ( Cant' d . )
o
Art Kader Submitted written comments (Attachment 07).
to meet the Open Space Ordinance of the City.
Site will be required
Paula Harvey Discussion on confusion about parking requirements and terminology
for storage area. Request a breakdc..wn of data calculation for parkins, and to make a
distinction for the two different types of land uses to show on plan. Discussed that the
plan as submitted is non-conforming and that there is the oppor>tunity to make adjustments
now~o be conforming when come in for anne~ation at a later> date.
for the vronerty.
Paula Harvey moved to recommend approval of the final site plan for Clearwater Business
Center based upon a finding of the site plan review for the City of Clearwater> sUbject to
the following:
1. Open space on the lot, front' ,yard open, space, ,and floar area ratio af the, , '
project, unless adjusted, will create a non-conforming situation far this project
upon annexation;
2. Additional fire hydrants should be shown on the final site plan as required by
the Fire Marshall;
3. The detention pond should be designed as a dry'detention area as required by
Public Works;
4. The location of the storm drain pipe on the west side of the property should be
shown on the site plan;
~ 5. The dumpster pad should be reoriented for easier access;
6. The dumpster must be visually screened with a 12 foot wide clear opening;
7. The parking calculation should be clarified in order> to identify the requirement
for> both office and storage areas;
8. That the required recreation and open space fees must be paid prior to final
reading of the annexation ordinance;
9. The minimum size of the parking spaces are 9 feet by 19 feet, as required by the
City of Clearwater>;
Motion was seconded by Andy Onufer; motion was carr>ied.
3. Morton Plant Hospital M.R.I./Diagnostic Imaging Center located at the northwest
corner of South Fort Hat'I'ison Avenue and Pinellas Street.
Final Site Plan - Approved With Conditions
Jerf Daniels'
and distance.
No fi-s:>e hydrants are shown on site plan. Need to know where located
Bob Maran
e one foot deep. Would
come in.
Andy Onufer
Don Meerians
Not comfortable with all the small r>etention ponds that are under
like to work out drainage witk'contractor before construction plans
Submitted written cowoents (Attachment HB).
Questioned abutting property line, why driveways were narrowed down
.. ,
',:..,)
"
,1:
,
\ '
, ^
. ~ .
',)
.:;.~: ~i
",
.. . ~
'- I r..
t'
. . i
....
, '
, ,
. ~~!~::l".~:.u-..."'H';.;:!.lli~":.'.. ~...~.~t i..n. .,\~:}I.u..~"'.'""
. . ... .....
q .. "','"
3 . (Cont I d . )
<:) to 22 feet, and installation of sidewalks adjacent to property line.
Bob Brumback
Submitted written comments (Attachment #9).
Paula Harvey Approval of this site plan will not constitute approval of any of the
area ,marked as "future development". Should be some provision for being able to demonstrate
that you are meeting parking t'equirements for this facility - give us something that shows
you are providing parking for this facility in terms of numbers, and identify where you
are providing the parking for this addition. Need calculation of floor area ratio, and
identify building height in feet.
Submitted written comments (Attachment #10).
Art Kader
Paula Harvey moved to approve the final site plan for the Morton Plant Hospital H.R.I./
Diagnostic Center based upon a finding of this Committee that the plan conforms with the
design guidelines for site plan review subject to the following:
1.
2.
3.
<0 4.
5.
6.
Approval of this site plan does not constitute approval of any area marked
"future" on this site plan;
The developer should demonstrate on the site plan that sufficient parking has been
provided for this expanded facility;
Calculations should be provided for the floor area ratio of this project;
The building height should be identified in feet;
Fire hydrant location should be shown on the site plan;
Retention areas must be designed as required by Public Works and approved in
concert with review of the construction plan.
7. Driveways should be 24 feet wide unless the Traffic Engineer approves a lesser
width at specified location;
a. A 10 foot utility easement will be required over all water lines up to and
including meters and hydrants, such easement to be granted prior to issuance of
building permit;
9. Dumpster loca~ion must be revised, such relocation to be approved by the Utilities
Department;
l,
10. Dumpster must be visually screened with a 12 foot wide clear opening;
ll. Required open space fee shall be paid on the additional property prior to
certification of final site plan;
12. The requisite initial building permits be issued within six months from the date
of certification and all requisite certificates of occupancy be issued within"
two years from the date of issuance of the initial building permit.
Motion was seconded,by Andy Onufer; motion was carried.
I'
fit
"
.
4. Extra Closet Addition located at the northeast corner of Palmetto Street and Kapp Drive.
Final Site Plan
Approved With Conditions.
,',.
,)
, ::~,
r.'~ ~
~~ ~
.i
" '
.; c f ~
~'~ '. .
If........,_~~ JH ...,' ~"...._R'~.'."""'..____. '.+'.
,.,
4. (Con1= 'd.)
~ Jeff Daniels No comments.
Bob Mal'an No sidewalks adjacent to site now.
sidewalk be put in adjacent to Palmetto and Kapp Drive.
utility easement along east, side.
Requested th~t a 4 foot
Need to show existing 10 foot
Andy Onufel'
No comments.
Don Meel"ians
No comments.
Bob Brumback
Submitted Wl"itten comments (Attachment #11).
Paula Harvey Si~1s on project site are subject to a separate review and permitting
pl'ocess. Need to show parking calculation in relationsnip to appropriate parking formula.
Art Kader
Submitted Wl'itten ccmments (Attachment #12).
Paula Harvey moved to approve the final site plan for the Extra Closet Addition based
upon a finding of this Committee that the plan conforms with the design guidelines, fol"
site plan l'eview Subject to the following:
1. Signs are subject to a separate review and permitting process;
2. Pal"king calculations must be shown in relation to the appropriate parking
formula;
@)
3. A If foot sidewalk should be provided along the l"ights-of-way of Palmetto and
Kapp Drive.
4. Need to show a dumpster location on the site plan if the dumpstel' service is
l'equil"ed by the Sanitation Superintendent.
5. Identify existing 10 foot drainage and utility easement along the east side of
the propel'ty on ~he site plan;
6. The l'equisite initial building permits be issued within six months from the date
of certification and all reqUisite certificates of occupancy he issued within
two years from the date of issuance of the initial building permit.
Motion was seconded by Andy Onufer; motion was cal'l'i~d.
The meeting adj9urned at 10:15 a.m.
/. ;
/ 'f)~~ {Nick
(for) Eliza th S~ Haeseker, Chairman
Leuis' '
",'..
>'.~.
~:.~i~,:~.: .
. c ~'. . T .. c'
~~~(ii-i;!d~it?";;"':".'
,"
','
~ r ~:~:
. '. .......~.....
. ,
, P~ge,5 of 5
D.R.C. 12/23/86 , "
. i "
o
@)
',\-
\,...
Attachment #1
I,'l"""';4/!
1111~\U"~a'l.
~I~~~
~C,J: ..\ I, Ii'.
(~ ~, ;3'
~ ~::~ ~~
'\.~iI; --, ~II~
~-~TE~,~"","
"",-",
CI TY
OF
CLEARWATER
POST OPPICE BOX 4748
C LEA R W AT B R, F LOR I D A 33518 - 4748
PUBLIC WORKS DEPARTMENT/ENGINEERING DIVISION
(DRC)
DEVELOPMENT REVIEW COMMITTEE
DATE: MEETING OF TUESDAY, DECEMBER 23, 1986
SUBJECT:
BETTY LANE APARTMENTS
ITEM fl
1
LOCATION: West side of Betty Lane approximately 710 feet' South
of Sunset Point Road
REVIEWED BY:
Bob Maran, Bill Shepard, Terry Finch
COMMENTS:
1. All required easements are to be dedicated to the City of
Clearwater prior to issuance of a building permit.
2.
A 15 ft. easement for the 12~ force main and proposed
gravity line north of the subject property will be required.
This development is 8 portion of the proposed Lewis Homer
Villas Subdivision which was never filed for record.
3.'
y, I c:' ~ ~ .e-~~ ~~ ~\ -t.._e ~~.J
k ....iA-< e..O.,^"
RJM/vn'
I'
--~,.,
.\
l~f~~i{ji'~;"i,,~':~~,.,;:,-,~~,~~,~ I ,~m P ',.' ~. ~"
and A/flrmaf'lJlt. ACflon Emp'o)'er"
,\
e
e
,:1
"-
.' \.
. . . .
,i-,
Attachment #2
" "'Pl!i I
'~ll:.lIJ" >
~.: "
; ,J~ I ':
C LEA R W A T~E R
, 'J ~',j! ~ \ I
POSTOFFICB BO~.~748 : I
CLBA R W A TB R I FLO RI DA 33S18~-"748 'I
;;'H't
!;';c' I
~ l '.~! i :
c'.,!. .
" I
..:~ ~ f
,< '
. \~'. f. L!
~ \ ': t . ~
;::~~ I' ; ,
..., ~. '
l" -I- oj .
::::"1 ,; '. I',
.')'.' ". '"
'j.. I ~ I
~~h .;,
?~{'; :
,-1;,11 I,
"f
;.-j lp i,
,':;~;lj
': :l: ,:',
.... ,
.I:' t.
CI TY
OF
OUlc. of
Bulld'n, DI,.ctor
, (813)
462-6550
December
23,
1986
BETTY LANE APARTMENTS located on the west side of Betty
approximately 710 feet south of Sunset PoInt Road. "
Lane
FINAL
SITE PLAN
Parking lot lighting plan requested when applying for a permit.
. ,;'
J:, t.
'I .
Separate permits are required for
1.
Each buildingl
.'
2.
parking
lot,
3.
I
, '
\
..... ~ I
, ;-".<,
signsl
,11 ~:; ,
'~:I"
. .. J.'.
The'developer or architect may ,contact Phil Benni:'!, Chief of. Per":"'~t.:
mi ts or. Victor Chodora, Senior Code Analyst,. about .the permi.tting,::\...
process or code interpretatio.ns.' f.:{ J
Only' a complete submittal package with ai te plan approved by DRC:;;J'
will be accepted for permit application. ~'!:l;"
' :; :~! "
'. .
:\~'! .
4.
any ,fences/walls
Andrew B.
Victor C.
,",:j,
~ :.~; I '.
\' t ~ f
. I:; I! :
. ~.;.'
",;llL "
""'\ "
,),': j',
~ I:'~" I
'..\ .
:~.q ~ ;
~ .~?; : ~ .
Lt.' ~ I; " ' I:'
'\:'-i'f',:r, r ;'
..:. I "'I : '; h
\'U tt t".. ~~ ~ , .
:J;~ j;':~ ,:,'j
. 1ft 1" j:~. ....1
,~.' !.", ',\,'
...:~. i A ~ l ,. -I ' /
..' I ~i':'IJi;, " i I
',!" .,.' ;;
. f;it J.: ~ .~ 1
~ ~ .It. ~ ~ 1
('j'I'/' r'
d.}. I 1
"~.f .. ' , '.
Onufer, Directbr
Chodora, Senior Code Analyst
I'
Developer"
Recording secretary ,
File
.~ ...
~.~~ c,
!,:'::':;.."::'.','
~Jr~~,(~,;,~,::,~ :;' ~~':>::, :,;"
'.\,
jl:.
;1,
:,.>:~g,u' Ein;'01/1'1.i,n; ucl AI/'rrutiu' Action Emp'oyer"
, I,
[ "
I':
, i
I
',I
J:ll
:q
1..
'U
I."
; ,I:
I.t
:.
; ~
,i
"
, ,
,
, I
j I
: ,
.'
; ,
: j..
1: ;1: !
I. .
, Ii
': j
I,
, , ,
, "
" ,
I
'1
': I:
,::
;'1,.
" I
: I
r I f>
~. . ~ .
, ':l'
.@
'e"
~
DI"F'IC:E: 01"
UTILITIES DIRECTOR
Attachment 113
CaTV OF CLEARWATER
UTILITIES
DEPARTMENT
POST OF....CE 1I011 .7.11
CLEARWATER. FLORIDA 33' 18-47419
OFF' CEil. r~ D D' S P \.. A Of PI 0 0'" - II 0, 0 C H EST NUT S T R E E T
DEVELOPMENT REVIEW COMMITT~E
Date:
Subject:
Reviewed by:
Comments:
RMB:BP:h
Attachment
'- WATER
December 23, 1986
Final Site Plan for Betty Lane Apts. located on
the west side of Betty Lane approximately
710 feet South of Sunset Point Road (Braaksma)
PSP 86-25
Robert M. Brumback and Bob Perkins
Although master metering is allowed, we strongly
recommend that individual one inch (I") water
meters with l~" services on customer's side for
each building be considered. This type of
Jnetering,wil1 reduce water and sewer bills while
all?wing closer monitoring of water usage.
There are existing dead-end water laterals at
the northeast and southeast property corners
that may be utilized for fire hydrant locations.
. The proposed dumpster location cannot be approved
as shown. Please contact the utilities, Engineer
at 462-6790 for dumpster location approval.
.
.
. The dumpsters must be in a visually screened
enclosure with a minimum 12' clear opening to
the front for access by Sanitation trucks.
. Natural gas is available to this site.
"
NATURALQAS
SANITATION
"Equal Employment and Affirm'live Action EmploYe,"
, "
: ,>
/,
.'
..\
~
~
,.
!
~
~~,
,
..
./
',,:. 'c"
"
) ~ .
.J'
. ,.'
<,
.. ~ ~
"/ '
~\..;'t'~'c~' ':'~:;.....,-+' ~ ..~-:I"":.'I .:..",.~. . "i-d" + '~... ,'. (. '~ ,. .
:.:fi"~~~~.,J;i(r..;.......~t'#llJ'04....."",~~~_....\.l"""""'.~n..... c" _....~~....t- .. ...~, _.1."1." r.~'......
Attachment f~4
, ,
., '"' I.." u ~~ . "'......_ ~-....-'.....I
~
-
,"""'''''- ,
Illl\\~l"ltt~
~I~~~
fC::i ."t. cl
~ . , J;
~~ ~~
t~ ~/
'\~ ~l
'-~T[9.~~""
"CI-b"III"
POST OFFICE BOX 4748
CLEARWATER, FLORIDA 33518 - 4748
CITY"OF
CLEARWATER
Office of
Parks and Recreation Director
462-6531
DEVELOPMENT REVIEW ,COMMITTEE
December 23, 1986
DATE:
SUBJECT:
- Item II
1
Betty Lane Apartments
LOCATION; West side of Betty Lane approximately 710' ~on+:h of'
Sunset Point Rd.
REVIEWED BY: Ream Wilson
&>
COillffiNTS; site Plan - This residential development will be
required to satisfy the city's open space/recreation assess-
ment ordinances. The developmer or his representative should
complete the top portion of the attached work sheet and return
same to the Parks and Recration Department. A copy of the
most recent purchase contract and a copy of the just value
from the Pinellas County Property Appraiser's Office ha~cal-
ready been received.
The open space and recr.eation facility land assessment fees
will be payable prior to City certification of final site plan.
The "recreation facility" fees are payable at building permit
phase. Questions concerning this matter to either Ream Wilson
or Art Kader at 462-6532.
..
,<
",-
. ,~. ,.
" -,.".
~\;";{~~;:> :.:.:X,,:~;,:::;;~'" ~ /:..,',.',"
': 1:./""/',lilll/,l. '.\'/111"" ./111/ ..!/)"III,"il'.', At";, 'II lilli/II, '.H""
, .1
",..
~~::.~..-.
t~~r~:l;: ~ ,
.~~~..;... 'T'.. < ; ',; . :
t~f~;:;~':\'.:~':','.:.:','", ,:" ',~, ,::",' , '
~':i':'" ":"',: " ',r<.'.:~,,' .:l',' : " . ". "Eqllal Employm.n'
l~~~~~~~<~~;~j~;l~<~)~:;<~j;.:.;;':<~ J' ':'.'o~,.,:"",..:: ,.' .., "
i)
e
Attachment liS
C 1 T Y
OF
C LEA R \V ATE R
!'OST OFFICE BOX 4748
C LEA R W ATE R. F LOR I D A 33518 - 4748
PUBLIC WORKS DEPARTMENT/ENGINEERING DIVISION
DEVELOPMENT REVIEW COMMITTEE
(ORe)
DATE~
MEETING or TUESDAY, DECEMBER 23, 1986
SUBJECT~
CLEARWATER BUSINESS CENTER
ITEM II 2
LOCATION: South side of Sunset Point Road
~est of the intersection with Belcher Road
approximately 225 feet
REVlE\'/ED BY:
Bob'Maran, Bill Shepard. Terry Finch
C0I4MENT S:
1.
Detention pond must be designed
City specs., ie no greater than
3:1 side slopes.
as a dry detention per
three feet in depth and
2.
Need core borings in detention area to determine seasonal
high water table and percolation ra~es.
3. Need elevation of existing drainage ditch in southwest
corner.
4. Show storm drainage pipe on West side of property and
along N. W. corner.
RJ14/vn
\,
and Allirmalir. Action Employ.,"
" ,'1+
. ~ I I
"8
:,',.
.: ~ ~'. .
~".:~.'~: :.' T
@
.
""".11;,, . ,
';Itl ,rC)\~l't I.;:;~~__
tl....~R~'\
~~~ ~~
~i::i "J., Q i.
!,., ..~. . .~~
\r-:~f
...,.., -... .
~ ... ~l
"l--l~A T 19. ,~/
.....,.,(11""",","
OFFICE OF
UTU.ITIES CIRECTOR
'Attachmont U6a
't'j
CITY OF CLEARWATER
.,
u
I
L I
TIE S
D E P A. R T M, E N T
T
POST OFFICE BOlli 0I701l1
CLEARWATER. FLORIDA 3351 e.4749
OFFICE AND DISPI.AY ROOM - lIOO CHESTNUT STREET
DEVELOPMENT REVIEW COMMITTEE
Page 2
Date:
Subject:
Comments:
,(fI
,I
RMB:BP:h
Attachments
:~.<' :'W"ATE' R ..'
~~. ,." .
i~~tLk\~:~);:,: ,/\~iL:,',,"
; ~ .
December 23, 1986
Courtesy Review -'Site Plan for Clearwater Business
Center
.
The proposed dumpster location is acceptable.
However, the pad should be rotated in a
clockwise direction to provide an access from
the East for Sanitation trucks that is not
obstructed by tree limbs. Provide a minimum
121 clear opening to the front.
.
Natural gas is available to this site.
"
\)
~
"
NATURAl. GAS
SANITATION
, .
"fOUl" E=mplnvmenl and Aflirmativf! Al:til'n fmolovpr"
. . . .
1/':"
1,
.,
i 1H! ~. ~ . \ :
~~I:l' , . ; f,
l~'" , I'
lft~. ': , I' i "
' , .'f', i : ,II"
C LEA R W A r~.'E: R :;,!j!i
~ ~ ... '1} I I t t \ ) t
~ ,'" I ' I ,. J ' '
Posr OFPICS BOX 4';'48 '~!
L f ~. f ' r.
C L ~:l~ 7 A4:~~~;~: R I DA 33';r/r:8u:'
"'" "; 'I'
';:a; ,~ ' f'l!
:" ~:: 1~ [ 'r ' '
i:;/!,: d':
. '/:r /' i ,: '1'1:'
f!;..;.' (' ,I ,. <' .
:" 1'1 '
'1'''1
i..:f: l':';
'lit.
.,0' ,
h~i::.
':I"f' ,
'~.u!: ", ~
'\.( -. ~
:'l~ 1: :
r.+~ ".: ;.:
, ':;~ l'.li',:
. , l.i'1 ~.::
. l.",'i'~ ..
'. ~.! "': I.'
applYing for a permit., 'f ".,. : '
. ~ !~J " "f:
I r"f .' ~
,).:'1
:1 'I t' ,
.~; t;.,
. t.',
'~r: '
)"l~r.
,:11:, ,
Bennis, Chief of Per-.f.;)"
abou~ the perrnitting~{:,
,'!J ,: !
I.~ f~"; '/ I'
:i:;', :'j i 1';
~; I ,) I; /1 .
. J..... ". l. "
,!I'I:",', ";' ;:
;~.~,il '"_C' !j ,'J
f" "i
...:..l, ; '"
:i: ti l. . It. ~ ,
. ~ l II' ~ I
' ~.i;! I ::::.
. r~ r : ~ r '
,. <;I~ I"":. " I) .
~ ;~.!~ i I ; . i ~ 'j' ,
, '. ",;
';!~'J': i
1~J.:I;:' : :['1,
j'1 " ! ' , ~111
f.~ 7,'1 : . 1 ~
c ~ ~. ., : . ,'.!;,
.:;~.; ~~ :' (J ~
'I~.l: I i.j:
';~i 1 " I
"'.' f'~.: I 1 r.:
'II'. ;"'" . '..
i'WJ~ilf' if I i '
(I(H~; "J .:
. WI;/:.,;, ~:', ;:1,:
, iC' h :';~ :,'11,:,
" i,.I.m ~'[::r~:!ji'lj I,;,
r!~ .' . "'I.Jf .
. . . tf'" :J J'. ~ I .f' 'I' .
, r .?" .1:. j~' ~ T -1,1 ~.
~1;1f"n:" if' ::.
g~~ :~~j t, ~.~ ~; ~I;
. i,!~ :: ~ ~;: " ~ t "
f'~l' , ., 'i'
; 1~~1:: ~ ;:: .'11: : ,:'
Attachment fiB
@)'
^',
"',","
Y.l-~ .
CITY
OF
OWe, 0'
BUlld'n, Dlr,elor
December
23,
19B6
MORTON PLAN HOSPITAL M.R.I./DIAGNOSTIC IMAGING
at the northwest corner of South Fort Harrison
Pinellas Street.
CENTER located
Avenue and
FINAL SITE PLAN
Parking lot
lighting plan req~ested when
Separate permits
are
required for _
@}
1
2
Each bUildingl
parking loti
3
signsl
4
fences/walis
The developer or architect may ,contact Phil
mits or Victor Chodor~, Senior Code Analys~,
process or code interpretations.
Only a complete
will be accepted
submittal package with site plan approved by DRC
for permit apPlication.
Andrew B.
Victor C.
Onufer, Director
Chodora, Senio~ Code Analyst
Developer
Recording
File ..
secretary!
'.'
. ,
~" -
'>'c
. .;,..'
" ,
J,F
, .
~'t ,
;:.A, .
. T" ~
. .,
:t{tf:.~:,? :{':'\..~ '.:",
: ,1
"J,.
", '
,,J ,;
."E'~~I E",ploT"""', u.d Alllr",,,,u Action ElltploT."'~
' . "" ' "r,
,!.' I
"
~ ! ~
: f.,.
t /"
.I ".
,.r J
.'! I'
'I
,
I,
, '
!
~ ~ .
"..:.:;.'
; I
{ ;
I'
I'
: r
I'
"
, '..;/",.'
..::~
, :":'.'c '),
c';: ,/.'
. ,
.~ _. ...""'....:i.:;.~....~:... "';. .~.:.....\:...t.z~;~;:.:,:~ ~."'.: t L.;;...<...~ .. r. ~ ~~.: l'....... ....n,..o\.-'tlt-
~_.................'-.........Ij~''i-''V,' _~40~.~~~L~L"..~'tL.-\.....::..._...~~'. _t.......";.,.,. .",,, .
.
Attachment #9
ClTV OF CLEARWATER
~
~
CI~EARWATf.R~ FL.ORIDA 33518.4749
UTILITIES
DEPARTMENT
POST OFFICE eox .7.g
OF'f'ICEOf'
UTILITIES DIRECTOR
OFFICE AND DISPLAY ROOM - gOO CHESTNUT STREET
DEVELOPMENT REVIEW COMMITTEE
Da te :
December 23, 1986
Subject:
Final Site Plan fqr Morton Plant Hospital
M.R.I./Diagnostic Imaging Center - located ,
at the Northwest corner of South Fort Harrison
Avenue and Pinella~ street (Morton Plant Hospital)
PSP 86 - 36
Reviewed by:
Robert M. Brumback and Bob Perkins
Comments:
i)
.
The water meter size must be shown on the Final
Construction Plan. Please contact the Utilities
Engineer at 462-6790 to coordinate meter sizing.
Failure to do so will delay permit processing at
the ~uilding Department.
. Depending an the water meter size, this site may
require an above-ground meter installation.
. A Reduced Pressure Backflow Prevention Device
is ~equired on the cuatomer's side of the water
met.er.
. Additional fire hydrants may be required by the
Fire Department. Allan-site hydrant locations
will require a 10' utility easement over the
fire line up to and including the hydrant prior
to the issua~ce of a Building permit.
. A Pinellas County Health Department Permit is
required prior to the installation of the water
service and any fire lines that are required.
please see the attached forms.
" ..
..1:.-
"
(continued on Page 2)
.'
. t ~ c . . '
,,~:,:, : 'WATER 'I
"
NATURAl. GAS
SANITATION
, <',
'~EqueIEmplOvmel'\t enrt Afflfmetive Action Emplover"
!...
~ '. .
:.: ,,~j:~c/: \
.. . c ~.
, (','
, ,.
"
"
'"
"
,
rf'; I.,
"
I'
"
"
" ,
~::.t:t"'~~.~'~~'L,;....,~....:...'I"'''':'W,,::.,...I:''''''''''~'' .....::.. ~ .
....A.,..,.....1.M.... 'J-. ....~t~...;....,. ',,,... ..1.... .'", T.........A
.
Attachment f/9a '
~,
~\\'r~~
t'C:i~.d" -\
.., -=-" <~
~ ,-, r:::h
~~TE;~'l
. ....,."",,'1
CLEARWATER. FLORIDA 335 t 8.4749
CITY OF CLEARWATER
u
T'I
I
L
TIE S
DEPARTMENT
POST OFFICE sox 4749
OFFICE OF
UTILITIES DIRECTOR
OFFICE "'ND DISPLAV ROOM - 900 CHESTNUT STREET
Page 2
DEVELOPMENT REVIEW COMMITTEE
Date:
December 23, 1986
Subject:
Final Site Plan for Morton Plant Hospital
M.R.I.!Diagnostic Imagin Center
Comments:
(i)
.
The dumpster location cannot be approved as
shown. A location must be provided which
will allow easy access for Sanitation
trucks.
. The dumpster must be in a visually screened
enclosure. Provide a minimum 12' clear
opening to the front.
.' The natural gas regulator and meter will be
set at the rear of the building, not in the
right of way as shown on the plans.
RMB:BP:h'
,Attachments
"
,',
o
~r,:..
j1~':~" ~h,:' . .
)~:I",V,',.wATER ',<,
~~Ei~i:~g!;::~i:;~",\/~\,',;\ ,',
NATURAL GAS
"Equll E~ploym.nt ,nd Aff!rmlt1ve Action Employer"
SANITATION
.' ~. .
: I " ~
:..",'
/
@),
ii;a.~1
":
"''''''~
...."I:.\U.''':~ '
l?S~"~\
~~C.,J ,II., . ';
,., . '-"
~ ~~
'; ~i
~~ -"lc~l\
""~ TEl'" ",,11
-;'11'"
POST OFFICE BOX 474B
CLEARWATER, FLORIDA 33518 - 4748
Attachment fllO
C IT Y
OF
CLEARWATER
'Office of
Parks and Recreation Director
462-6531
DEVELOPMENT REVIEW COMMITTEE
DATE: December 23. 1986
SUBJECT: Morton Plant Hospital/Diaqnostic Imaqinq Cent~r- Item iJ 3
LOCATION: Northwest corner of S. Ft. Harr]Rnn AVe. & Pine11a~ ~t_
REVIEWED BY: Ream Wilson
@)
COMMENTS: Site Plan - Although this Diagnostic Center is being
constructed on property for which an open space assessment fee
has already been paid, an additional parcel of land is being
added to the site plan which will accolTunodate parking for the
Diagnostic Center and the M.R.I. Facility. Therefore, an open
space assessment fee will be required to be paid for that
portion of land ~ot included in the original site plan.
The developer or his representative should complete the top
portion of the attached work sheet and return same to the Parks
and Recreation Department. Copies of the just values and purchase
price of the additional sites should be attached to the work
sheet.
This open space fee will be payable pr~or to City certification.
of final site plan. Questions concern~ng this matter may be
directed to either Ream Wilson or Art Kader at 462-6532.
. '.GIll,
,..
,\
~,
'''Ii'III'11 lill'/'" '.\'"'''''' ,1111/ ..!Jji,m,iti"" .-1 rt;, "I I ;''''I'''IJl'I''
@
'r:&
,.W'
"
, CITY OF
UTILITIES
DEPARTMENT
POST O"'I"ICE BOle .. 7.(1
CLEARWATER. FLORIDA 335' 8.4749
O"ICI; Of'
UTILITIES DIRECTOR
OFFICI: AND DISP\.A" ROOM - 900 CHESTNUT STREET
.,
DEVELOPMENT REVIEW COMMITTEE
Date:
December 23, 1986
Subject:
Final Site Plan for the Extra Closet Addition,
located at the Northeast corner of Palmetto
Street and Kapp Drive (Hill) PSP 86-38
Robert M. Brumback and Bob Perkins
Reviewed by:
Conunents:
-
.
A note stating ~hat domestic water service
will be provided by the existing meter should
be shown on the Final Construction Plans prior
to their submittal to the Building Department.
A dumpster location may be required.
contact the Sanitation Superintendent
462-6650 to determine if the existing
barrel will be suff~cient.
. Natural gas is available to this site.
Please
at
black
.
RMB:BP:h '
, Attachment
.'
,\
,.
"Ii
..
'I
()
.-t:
'. '
';:'} ." ':WATER"
~~i:siA,(" '. .:
.!I',
NATURAtGAS
SANITATION
'. ,
'(h"'E'~ual Em'plClvment and Affi'mlltivf' Action fmpl,oVfl'"
"
::: ~ .'
."c.'
.::.\.;:.;:~(.u..
:~i{:.;,'
Ilt,t:"!,):;:2t;:'
l'iI.i;;::t,}"~,,{.,,, r',-,r",,,'. " ' , .',r,
~'f..:(,ft'l:-';" :~I~WI:'I.~.>..~';' ": ;..-~."
(i)'
(8
,l,
. +. ..,,'''1.r'............_
.,t! ~~~I,f/I.,...r~-:.
II"E;) ~~-:.
~\~ ,l,.":..
ti::i ~~$1r;~ i!; \
~~ - ~ .~~
=.~ .\t,ij, ~~
\~ ~l
\.1:'~ '".....~~/
-N~..l1 T E \\"1/,,11
""'/~I
Attachment 1112
,.'
C 1 T Y
OF
C L E II:..,. R W f\, T E R
POST OFFICE BOX 4748
CLEARWATER, FLORIDA 33518 - 4748
Officc'of
Parks and Rccreation Director
462-6531
~
~
DEVELOPHENT REVIEH, Cmn'II'l'TEF.
DATE:
December 23, 1986
SUBJECT:
The Extra Closet A~
I tern" 'II
LOCATION: Northeast Corner of Palmet~. a~p~iY-e
REVIEWED BY:
Ream Wilson
~ I
cmmENTS: Site Plan - A building of 12,069 sq. ft. currently exists
on this site. Since the expansion (6,000 sq.ft.) is less than
50% of 'the existing square footage, the project is exempt from
the City's open space assessment ordinance.
.J
"
, ,
(.
/,
. '::