FLD2008-08026, 210 DREW ST, October 21, 2008
FLD2008-08026
210 DREW ST
DOWNTOWN BOAT SLIPS
PLANNER OF RECORD: WW
ATLAS # 286A
ZONING: D
LAND USE: CBD
RECEIVED: 08/04/2008
INCOMPLETE:
COMPLETE:
MAPS:
PHOTOS:
STAFF REPORT:
DRC:
CDB:
CLWCoverSheet
CDB Meeting Date:
Case Number:
Agenda Item:
Owner/Applicant:
Representative:
Address:
October 21. 2008
FLD2008-08026
E4
City of Clearwater
Michael Ouillen. PE. City Engineering
210 Drew Street
,CITY OF CLEARWATER
PL~GDEPARTMENT
STAFF REPORT
GENERAL INFORMATION:
REQUEST:
Flexible Development approval to permit a marina for 127 slips in the
Downtown (D) District with a reduction to the side (north) setback from
135.7 to 19 feet, a reduction to the side (south) setback from 135.7 to 7.67
feet and an increase to the maximum width from 75% of the lot width
(1,017.7 feet) to 109.8% of the lot width (1,490 feet), under the provisions
of Sections 2-903.H, 3-601.C.3 and 3-603.
CURRENT ZONING:
Downtown (D) and Preservation (P) Districts
CURRENT FUTURE LAND Central Business District (CBD) Category
USE CATEGORY:
PROPERTY USE:
Current Use: Coachman Park; Parking lots; Water
Proposed Use: Marina for 127 slips
EXISTING North: Downtown District
SURROUNDING ZONING
AND USES: South: Downtown District
East: Downtown District
Overnight accommodations
(Sandcastle Resort)
Attached dwellings (Pierce 100
Condos)
Coachman Park, City Main Library,
Stein Mart, Waters Edge, City Hall
Water (Clearwater Harbor)
West: Preservation District
ANALYSIS:
Site Location and Existing Conditions:
The 23.96 acres is located along the Downtown Clearwater Harbor between Drew Street (north) and
Pierce Street (south). The overall site is currently developed with the Coachman Park, City Main
Library, Harborview Center, Stein Mart and City Hall. The proposed marina will utilize and make
improvements to those areas of the subject property adjacent to or in Clearwater Harbor. The site has
approximately 1,357 feet of waterfront frontage on Clearwater Harbor between the north and south
property lines. There currently exists a public fishing pier on the north side of the project that will
remain and be expanded as part of the marina. On the pilings of the old Memorial Causeway Bridge that
was tom down, the City is constructing a Promenade that will stretch into the water approximately 200
feet and be adjacent to the dock in the North Basin. On March 13,2007, Clearwater voters approved a
referendum providing for the construction of the proposed downtown boat slips for a maximum of 140
slips.
Community Development Board - October 21,2008
FLD2008-08026 - Page 1 of 10
The upland area of the waterfront being improved as part of this application currently includes a small
storage building on the north side at 210 Drew Street, two surface parking lots adjacent to the water (one
under the Memorial Causeway Bridge and one north of Cleveland Street) and on-street parking areas
along Drew and Cleveland Streets. Abutting on the north side of the subject property exists the
Sandcastle Resort on the north side of Drew Street between S. Ft. Harrison Avenue and the water. The
Pierce 100 Condominiums abut on the south side of the south boat slip basin.
Development Proposal:
The proposal is for a municipal marina, where the primary users will be the boaters who lease dock
space, transient boaters visiting Clearwater, recreational boaters docking for events or activities in
Coachman Park or downtown and the general public visiting the waterfront area. The development
proposal consists of the construction of a marina consisting of a l27-slip, concrete floating dock system.
A floating concrete structure was chosen for this project as being the most aesthetically pleasing, easiest
to maintain and allowing the docks to rise and fall with the tides (greatly increasing their durability
during storm events). The docks are designed to maximize views of the waterfront at both the pedestrian
and bluff levels. No covered boatlifts, roof structures or vertical walls are proposed as part of this
project. Due to FDOT requirements, no permanent slips can be situated under the new Memorial
Causeway Bridge, which separates the marina into a North Basin and a South Basin. The North Basin
will have 41 slips. The slips will be accessed by boaters on the north side close to the existing public
fishing pier and will include an expanded public dock for fishing. Tenants and the public will access the
dock in the North Basin adjacent to the Promenade. The South Basin will have 86 slips and boaters will
access the slips on the south end on the west side of the Pierce 100 Condominiums. Tenants will access
the dock at a point close to the north end of the southern parking lot (under the new Memorial Causeway
Bridge). Boat slip lengths will range between 30 - 55 feet. The design of the docks in both the North
and South Basins accommodates maintenance vessels for the bridge and a minimum 30-foot clearance
around the bridge support columns and bases. The dock design in the North Basin also accommodates
the Promenade, which is a separate City project constructing a pier approximately 200 feet out into
Clearwater Harbor on the pilings of the old Memorial Causeway Bridge. On the outside (west side) of
the docks in both the North and South Basins adjacent to the channel, as well as the south side of the
dock in the North Basin adjacent to the new Memorial Causeway Bridge, the docks accommodate the
transient side tie of boats up to 25 feet in width and 100 feet in length or larger for persons traveling up
and down the coast (staying for a few days or a week) or for boaters attending events or activities in
Coachman Park or the downtown. Boats moored at these transient side ties will be sufficiently set back
from the centerline of the channel of the Intracoastal Waterway so as to not impact the safety or
navigation of boats in the channel or at the side ties. The outside (west side) of the docks, as well as the
ends of docks, is designed as wave attenuators to reduce wave impacts on boats moored in the slips. In
the North Basin, the existing public fishing pier will be extended to provide wave attenuation and be
linked to the dock on the south side for the protection of sea grasses adjacent to the seawall. The docks
in the North Basin will also provide for a ferry landing, although the exact location has not yet been
determined. The ferry landing can provide a pre-arranged place of loading or off-loading of customers
boarding commercial boats or water taxis between the mainland and the beach. Such allowance would
allow commercial vessels where their base operation is somewhere other than this marina to pick up or
drop off customers lessening parking demands on Clearwater Beach. Sea grasses in the South Basin will
also be protected from boat encroachment by a floating boat barrier between the seawall adjacent to the
Pierce 100 Condominiums and Dock D, the easternmost dock in the South Basin.
The proposal contains three primary components: (1) the floating docks and wave attenuators, (2) the
renovation and expansion of the existing building at the north end for a harbor master office and (3)
upland parking improvements including a drop-off area for boaters or persons accessing the ferry,
enhanced landscaping, sidewalks and public art. The docks and wave attenuators have been discussed
Community Development Board - October 21, 2008
FLD2008-08026 - Page 2 of 10
above. The existing building on the north end at Drew Street will be renovated and expanded toward the
south to provide for a harbor master's office, as well as providing restrooms, showers and laundry
facilities for persons using the docks in the existing portion of the structure. The building will be made
handicap accessible. A new blue, standing seam metal roof will be added, including additional gables on
the east and west sides for visual interest. The building will be finished with gray cement plank or
similar siding and white trim. The upland improvements will upgrade existing conditions along the
waterfront. Based on a parking ratio of one parking space per two slips and 127 proposed slips, a total of
64 parking spaces are required for this marina. There are two existing parking lots that will be upgraded
to provide parking for the marina. . The northern parking lot is adjacent to the water just north of
Cleveland Street and will provide 20 parking spaces. futerior landscape islands will be added, the edges
of the pavement curbed, a new sidewalk constructed adjacent to the seawall and the parking lot
landscaped. The southern parking lot, located under the new Memorial Causeway Bridge and adjacent to
the water, is accessed from Pierce Street and will provide 46 parking spaces. futerior landscaping will be
added, primarily defining drive aisles around the bridge support column, the edges of the pavement
curbed, a new sidewalk constructed adjacent to the seawall and the parking lot landscaped. Sidewalks
along the seawall adjacent to these two parking lots will be wider than normal and will be raised to act as
wheel stops for vehicles. These two parking lots combined provide the minimum parking required for
the proposed marina. However, on-street parking along Cleveland Street west of the driveway entrance
to the Harborview Center/Stein Mart and along Drew Street between Cleveland Street and the driveway
to the Sandcastle Resort will be upgraded with bulb-out landscape islands to define parking space rows.
After the completion of the improvements, there will be a total of 59 on-street parking spaces within the
area of construction mentioned. Crosswalks to the parking lot at the Harborview Center/Stein Mart and
to Coachman Park will be constructed. The median at the intersection of Cleveland and Drew Streets
will be landscaped. Drop off areas will be constructed within the streets at the end of Cleveland Street
and at the harbor master building for persons accessing the ferry or for dropping off gear and persons for
the slips. Large paved areas adjacent to the proposed harbor master building will be removed and
landscaped. A new trash enclosure will be constructed adjacent to the harbor master building. The areas
along Cleveland and Drew Streets will be landscaped, as well as new lighting installed. Fire hydrants
and fire risers will be installed for fire protection purposes for boats moored at the docks.
A marina is subject to the relevant review criteria of Sections 2-903.H, 3-601.C.3 and 3-603. The
proposed marina is not located in any of the areas of environmental significance listed in the criteria,
with the exception of its proximity to Clearwater Harbor grass beds. Sea grass beds were mapped prior
to the dock design phase. The proposed docks in both the North and South Basins have been located in a
manner to avoid any sea grasses. There are no residentially zoned properties adjacent to the proposed
dock (adjacent properties are zoned Downtown District). No commercial activities will be permitted in
the leased slips. Living aboard non-transient vessels will be prohibited. Private tenants (those who lease
slips) may be permitted to stay aboard a total of eight nights a month, so that they may enjoy the benefit
of using their vessel during select weekends or when in conjunction with a family vacation or holiday.
Transient guests (those that travel from marina to marina much like those that travel in a recreational
vehicle from RV park to RV park) will be permitted to stay aboard their vessels while visiting Clearwater
(an average stay of three days at the Beach Marina). There will be no fueling facilities, boat launching or
dry storage of boats at this marina. Sewage pump-out facilities are proposed in both the North and South
Basins, but such facilities will be a vacuum system linked to the upland sewer system so that there will be
no holding tanks located over water. The proposed harbor master building on the north side complies
with the Downtown Design Guidelines.
Other than the small dock for the Pierce 100 Condominium, there are no other docks in close proximity
to the proposed project. The proposal has been sensitively designed at an appropriate scale, character
and intensity to complement neighborhood residential, commercial and recreational uses proximate to the
Community Development Board - October 21, 2008
FLD2008-08026 - Page 3 of 10
site. This municipal marina, as approved by the voters in 2007, is envisioned as another catalytic project
contributing to the redevelopment of the downtown. The upscale design of the docks and the proposed
parking, roadway, public art and landscaping will ensure the project is in harmony with the
neighborhood. Since there are no other docks in close proximity (other than the small dock for the Pierce
100 Condominiums), there is no established dock pattern to be compatible with and there are no other
marinas in close proximity. The proposed dock has been designed to be sufficiently set back from the
centerline of the channel of the Intracoastal Waterway to not have any detrimental effects on the use of
the adjacent waters for navigation, while still allowing for the side tie of vessels on the outside of the
wave attenuators, as established by the US Army Corps of Engineers. The channel is well marked and a
slow speed minimum wake zone is in place between Pierce 100 and the Seminole Boat Launch Ramp to
maximize boater safety. Access to the docks is limited to three points to also maximize boater safety.
Existing sea grasses are currently unprotected from boaters entering the area. The proposal will restrict
access to these sea grass beds, thereby protecting them from boaters through the pedestrian dock
paralleling the seawall in the North Basin and a floating boat barrier in the South Basin. While manatees
frequent the area, it is not expected that the addition ofthe marina will increase the threat to manatees. A
manatee protection plan will be required as part of the State and/or Federal permitting process. The
proposed marina will not adversely impact marine resources found along the seawall and underneath the
public fishing dock. Water depths beneath the proposed boat slips range from approximately five feet to
approximately 16 feet. The water depth under Dock D in the South Basin is the shallowest at 4.9 feet at
mean low tide, which provides more than the one-foot clearance distance between the bottom of the
vessel and the bottom of the water body at mean low tide. These slips in Dock D have been designed to
accommodate the smallest vessels with the least draft, which is sufficient to not adversely impact
bottomlands. The docks as designed will not cause erosion to bottomlands by vessels utilizing this
facility. The City will be seeking a Florida Clean Marina designation, which is voluntary non-regulated
program designation for the facility that acknowledges and rewards environmentally conscious marina
facilities. There will be no material adverse impact on wildlife, marine life and other natural resources.
There are no beaches proximate to the site and additional protection to the existing seawalls is
anticipated as part of the project design. The layout of the slips, docks and pedestrian walkways, coupled
with the proposed Clean Marina designation and compliance with County, State and Federal permitting
requirements, serve to ensure the proposed facility will not have adverse impacts on the habitats listed in
Section 3-601.C.3.f.ii. There are no upland habitats of significance impacted by the project.
Servicing of boats will be limited to routine maintenance and minor repairs necessary for the preservation
and seaworthiness of the vessel that respect boats moored in other slips, much as is permitted at the
Beach Marina, and will be monitored by the Harbor Master staff. Such routine maintenance and minor
repairs include, but may not be limited to, mechanical adjustment, minor painting, leak seals and rot
prevention. Major repairs would require the boat to be brought to appropriate off-site repair facilities.
Servicing of boats allowed at this facility will be limited to the hours between 6:00 am to 9:00 pm. The
City's Harbor Master has determined the proposed marina will pose no hazard or obstruction to
navigation. Trash receptacles are being provided on the upland at both the North and South Basins to
allow boaters to dispose of trash when leaving their vessels. Trash from these receptacles will be placed
by City personnel in the trash dumpster proposed to be located next to the harbor master building on the
north end. In the event of a spill, the City has a containment process utilizing absorbent booms and pads
to contain the spills. Requirements of the Pinellas County Inland Navigation Control Authority, Florida
Department of Environmental Protection and the US Army Corps of Engineers are more stringent than
City regulations and these docks are subject to these more stringent regulations.
The marina project represents an appropriate addition to the waterfront and complements the downtown
redevelopment plan and neighboring properties. The scale and coverage of the proposed marina is
appropriate for this location, as it has been designed to fit into the existing basin. The marina will not
Community Development Board - October 21, 2008
FLD2008-08026 - Page 4 of 10
hinder or discourage the appropriate development/redevelopment of adjacent properties. Moreover, the
Harborview Center and Coachman Park will likely be redeveloped and improved as part of the City's
ongoing downtown and waterfront redevelopment efforts. The marina is a key component of this
redevelopment effort and will enhance recreational and pedestrian opportunities along the waterfront for
permanent residents and tourists visiting the area. The boat slips and upland improvements will improve
safety aspects along the waterfront. On-street parking areas will be enhanced with landscaping, as well
as two off-street parking lots, and sidewalk and crosswalk improvements will significantly upgrade
traffic circulation for vehicles as well as pedestrians. The community character of the area will be
clearly enhanced through this waterfront improvement project. The marina will be staffed 24 hours a
day, seven days a week and the marina will be monitored by a security camera system. Staffing will
consist of a dock master office staff manned by a Marine Department personnel worker from 6:30 am to
9:00 pm, and a Police Aide Security Guard from 9:00 pm to 6:30 am.
Code Enforcement Analysis: There are no outstanding Code Enforcement issues associated with the
subj ect property.
COMPLIANCE WITH STANDARDS: With regards to setbacks, the dimensional standards criteria
set forth in Section 3-60 I.C.3.h of the Community Development Code state that docks shall be located no
closer to any property line as extended into the water than the distance equivalent to ten percent of the
width of the waterfront property line. The width of the waterfront property line is 1,357 feet; therefore
the proposed dock must be set back from the east and west property lines a minimum of 135.7 feet. The
proposal includes a deviation to reduce the setback of the docks in both the North and South Basins
below that required. The existing public fishing dock is set back from the extended north property line
19 feet. A wave attenuator extension to the west of the existing dock, which also provides access to the
expanded public fishing pier to the south protecting the sea grasses adjacent to the seawall, will be set
back approximately 66 feet. The closest portion of the proposed dock that will have boat slips is
approximately 200 feet from the extended north property line, exceeding the minimum setback of 135.7
feet. There is no existing dock at the Sandcast1e Resort north of this existing public fishing dock. There
will be no navigation issues with the docks in the North Basin in regard to adjacent property. The Dock
A in the South Basin is proposed at a minimum setback of 7.67 feet to the extended south property line
(adjacent to the Pierce 100 Condominiums). Other portions of the proposed dock in the South Basin are
setback from the seawall along the south property line much greater, but still less than the required
setback (Dock B - 81.67 feet; Dock C - 84.5 feet; and Dock D - 68 feet). The Pierce 100 Condominium
property juts out into the water, helping to form the South Basin. There is an existing, relatively small
dock for the Pierce 100 Condominium located close to the southern portion of the west side of the
property, providing slips oriented north/south. The design of the docks in the South Basin has attempted
to minimize wave action into the marina for the protection of the moored boats, which represents a
primary need for a setback reduction from the south property line extended. There are no navigation
issues with the proposed docks in the South Basin in regard to the adjacent property.
With regards to length, the dimensional standards criteria set forth in Section 3-601.C.3.h of the
Community Development Code state that commercial docks shall not extend from the mean high water
line or seawall of the subject property more than 75 percent of the width of the subject property as
measured along the waterfront property line; thus the length of the dock cannot exceed 1,017.75 feet. As
proposed, the dock has a maximum length of 685 feet from the southeast comer of the east seawall to the
western edge of the proposed dock in the South Basin. This dimension diminishes as it moves to the
southwest in the South Basin and diminishes as it moves northward through the North Basin. The
proposal is less than and therefore meets the maximum allowable length of the docks. The same
threshold in Section 3-601.C.3.h that applies to length also applies to width; therefore the width of the
proposed dock cannot exceed 1,017.75 feet. The dock has a proposed width of 1,490 feet, measured
Community Development Board - October 21,2008
FLD2008-08026 - Page 5 of 10
from the northern edge of the existing public fishing pier in the North Basin to the southern edge of the
dock in the South Basin. The proposal includes a deviation to increase the dock width from the
maximum 75 percent to 109.8 percent of the lot width. This 1,490-foot dimension includes
approximately a 55-foot distance of blank area on the north side due to the angle of the western edge of
the proposed dock with the northern edge of the existing public fishing pier, approximately a 230-foot
distance between the docks in the North and South Basins where the new Memorial Causeway Bridge is
located and approximately 115 feet between the wave attenuator extension to the public fishing dock on
the north side and the northern edge of the proposed dock providing for water access to the docks in the
North Basin. When these other distances are taken into account, the width is 1,090 feet (representing a
modest increase of approximately 72 feet, given the size of the property).
The following table depicts the development proposals consistency with the standards and criteria as per
Section 3-601.C.3.h of the Community Development Code:
Standard
10% ofthe width of the subject
property (135.7 feet)
75% of the width ofthe subject
property (1,017.75 feet)
75% of the width of the subject
ro e 1,017.75 feet
Pro osed
North: 19 feet (to existing dock)
South: 7.67 feet
687 feet maximum from seawall
Consistent
Xl
Xl
Xl
Inconsistent
I ,490 feet
Xl
See Analysis for discussion of consistency/inconsistency
COMPLIANCE WITH FLEXIBILITY CRITERIA: The following table depicts the consistency of
the development proposal with the Flexibility criteria as per Section 2-903.H of the Community
Development Code (Marinas):
Consistent Inconsistent
1. The parcel proposed for development is not located in areas identified in the Xl
Comprehensive Plan as areas of environmental significance including:
a. The north end of Clearwater Beach;
b. Clearwater Harbor grass beds;
c. Cooper's Point;
d. Clearwater Harbor spoil islands;
e. Sand Key Park;
f. The southern edge of Alligator Lake.
2. No commercial activities other than the mooring of boats on a rental basis shall be Xl
permitted on any parcel of land which is contiguous to a parcel of land which is
designated as residential in the Zoning Atlas, unless the marina facilities are totally
screened from view from the contiguous land which is designated as residential and
the hours of operation of the commercial activities are limited to the time period
between sunrise and sunset.
3. The design of all buildings complies with the Downtown District design guidelines Xl
in Division 5 of Article 3.
4. All marina facilities shall comply with the commercial dock requirements set forth Xl
in Section 3-60I.C.3 and the marina and marina facilities requirements set forth in
Section 3-603.
See AnalYSIS for diSCUSSIon of consistency/inconsistency.
Community Development Board - October 21, 2008
FLD2008-08026 - Page 6 of 10
COMPLIANCE WITH FLEXIBILITY CRITERIA FOR COMMERCIAL DOCKS (SECTION 3-
601.C.3.a-l!:): The development proposal has been found to be consistent with the criteria for commercial
docks. Specific responses to each of these criteria have been provided by the applicant and are included
with their application. The individual criteria for commercial docks are set forth in the following table:
1. The proposed dock shall be subordinate to and contribute to the comfort,
convenience or necessities of the users or the occupants of the principal use of the
property.
2. The proposed dock shall be in harmony with the scale and character of adjacent
properties and the neighborhood in general.
3. The proposed dock shall be compatible with dock patterns in the general vicinity.
4. Impacts on Existing Water Recreation Activities. The use of the proposed dock
shall not adversely impact the health, safety or well being of persons currently using
the adjacent waterways for recreational and/or commercial uses. Furthermore, it
shall not hinder or discourage the existing uses of the adjacent waterway by uses
including but not limited to non-motorized boats and motorized boats.
5. Impacts on Navigation. The existence and use of the proposed dock shall not have a
detrimental effect on the use of adjacent waters for navigation, transportation,
recreational or other public conveniences.
6. Docks shall be sited to ensure that boat access routes avoid injury to marine
grassbeds or other aquatic resources in the surrounding areas.
7. Docks shall not have an adverse impact upon natural marine habitats, grass flats
suitable as nursery feeding grounds for marine life, or established marine soil
suitable for producing plant growth of a type useful as nursery or feeding grounds
for marine life; manatee sanctuaries; natural reefs and any such artificial reef which
has developed an associated flora and fauna which have been determined to be
approaching a typical natural assemblage structure in both density and diversity;
oyster beds; clam beds; known sea turtle nesting site; commercial or sport fisheries
or shell fisheries areas; and habitats desirable as juvenile fish habitat.
8. All turning basin, access channels, boat mooring areas and any other area associated
with a dock shall have adequate circulation and existing water depths to ensure that
a minimum of a one foot clearance is provided between the lowest member of a
vessel (e.g. skegs, rudder, prop) and the bottom of the water body at mean or
ordinary low water (-0.95 NGVD datum).
9. The dock shall not effectively cause erosion, extraordinary storm drainage, shoaling
of channels, or adversely affect the water quality presently existing in the area or
limit progress that is being made toward improvement of water quality in the area in
which the dock is proposed to be located.
10. The dock shall not have a material adverse impact upon the conservation of
wildlife, marine life, and other natural resources, including beaches and shores, so as
to be contrary to the public interest.
11. The dock shall not have an adverse impact on vegetated areas; vegetative, terrestrial,
or aquatic habitats critical to the support of listed species providing one or more of
the requirements to sustain their existence, such as range, nesting or feeding
grounds; habitats which display biological or physical attributes which would serve
to make them rare within the confines of the City; designated preservation areas
such as those identified in the comprehensive land use plan, national wildlife
refuges, Florida outstanding waters or other designated preservation areas, and bird
sanctuaries.
12. Impacts on Wetlands HabitatlUplands. The dock shall not have a material adverse Xl
affect upon the uplands surrounding.
See Analysis for discussion of consistency/inconsistency.
Community Development Board - October 21, 2008
FLD2008-08026 - Page 7 of 10
Consistent
Xl
Inconsistent
Xl
Xl
Xl
Xl
Xl
Xl
Xl
Xl
Xl
Xl
COMPLIANCE WITH FLEXIBILITY CRITERIA FOR MARINAS AND MARINA FACILITIES
(SECTION 3-603): The development proposal has been found to be consistent with the criteria for
marinas and marina facilities. Specific responses to each of these criteria have been provided by the
applicant and are included with their application. The individual criteria for commercial docks are set
forth in the following table:
Consistent
Xl
Inconsistent
1. All proposed activities including, but not limited to, fueling, pumping-out,
chartering, living-aboard, launching, dty storage and the servicing of boats, motors
and related marine equipment shall require approval in accordance with the
provisions of the zoning district in which the marina or marina facility is proposed
to be located.
2. For marina facilities located adjacent to residential districts, no fueling or launching Xl
facilities shall be located within 20 feet of the residential property line, and no
fueling or servicing of boats shall occur at such marinas after 9:00 p.m. or before
6:00 a.m.
3. No fuel storage facility or sanitary pump-out station holding tank shall be located X
over water.
4. The marina shall pose no hazard or obstruction to navigation, as determined by the Xl
city harbormaster.
5. The marina shall not adversely affect the environment, including both onshore and Xl
offshore natural resources.
6. Adequate sanitary facilities shall be provided landside and a sanitary pump-out station Xl
shall be provided and shall be available to marina users 24 hours a day.
7. A manatee protection plan shall be provided and appropriate speed zone signs shall Xl
be posted to control boat speed for manatee protection.
8. Adequate spill containment areas shall be provided on the property. Xl
9. Design of the marina shall maintain existing tidal flushing and aquatic circulation Xl
patterns.
10. In the event of conflict between these standards and federal or state law or rules, the Xl
federal or state law or rules shall apply to the extent that these standards have been
preempted; otherwise, the more stringent regulations shall apply.
See Analysis for discussion of consistency/inconsistency.
COMPLIANCE WITH GENERAL STANDARDS FOR LEVEL TWO APPROVALS: The
following table depicts the consistency of the development proposal with the General Standards for Level
Two Approvals as per Section 3-913.A of the Community Development Code:
1. The proposed development of the land will be in harmony with the scale, bulk,
coverage, density and character of adjacent properties in which it is located.
2. The proposed development will not hinder or discourage development and use of
adjacent land and buildings or significantly impair the value thereof.
3. The proposed development will not adversely affect the health or safety of persons
residing or working in the neighborhood.
4. The proposed development is designed to minimize traffic congestion.
5. The proposed development is consistent with the community character of the
immediate vicinity.
6.
See Analysis for discussion of consistency/inconsistency.
Community Development Board - October 21, 2008
FLD2008-08026 - Page 8 of 10
Consistent
Xl
Inconsistent
Xl
Xl
Xl
Xl
Xl
SUMMARY AND RECOMMENDATION:
The Development Review Committee (DRC) reviewed the application and supporting materials at its
meeting of September 4, 2008, and deemed the development proposal to be sufficient to move forward to
the Community Development Board (CDB), based upon the following findings of fact and conclusions of
law:
Findings of Fact:
1. That the 23.96 acres is located along the Downtown Clearwater Harbor between Drew Street (north)
and Pierce Street (south). The overall site is currently developed with the Coachman Park, City Main
Library, Harborview Center, Stein Mart and City Hall. The proposed marina will utilize and make
improvements to those areas of the subject property adjacent to or in Clearwater Harbor;
2. That there currently exists a public fishing pier on the north side of the project that will remain and
be expanded as part of the marina;
3. That on March 13,2007, Clearwater voters approved a referendum providing for the construction of
the proposed downtown boat slips for a maximum of 140 slips;
4. That the site has approximately 1,357 feet of waterfront frontage on Clearwater Harbor between the
north and south property lines;
5. That the development proposal consists of the construction of a municipal marina consisting of a
127-s1ip concrete floating dock system, with 41 slips in the North Basin and 86 slips in the South
Basin;
6. That the design of the docks in both the North and South Basins accommodates maintenance vessels
for the bridge and a minimum 30-foot clearance around the bridge support columns and bases;
7. That on the outside (west side) of the docks in both the North and South Basins adjacent to the
channel, as well as the south side of the dock in the North Basin adjacent to the new Memorial
Causeway Bridge, the docks accommodate the transient side tie of boats up to 25 feet in width and
100 feet in length or larger for persons traveling up and down the coast (staying for a few days or a
week) or for boaters attending events or activities in Coachman Park or the downtown;
8. That boats moored at these transient side ties will be sufficiently set back from the centerline of the
channel of the Intracoastal Waterway so as to not impact the safety or navigation of boats in the
channel or at the side ties;
9. That the outside (west side) of the docks, as well as the ends of docks, is designed as wave
attenuators to reduce wave impacts on boats moored in the slips;
10. That the existing building on the north end at Drew Street will be renovated and expanded toward the
south to provide for a harbor master's office, as well as providing restrooms, showers and laundry
facilities for persons using the docks in the existing portion of the structure;
11. That based on a parking ratio of one parking space per two slips and 127 proposed slips, a total of 64
parking spaces are required for this marina;
12. That two existing parking lots that will be upgraded to provide parking for the marina. The northern
parking lot will have 20 parking spaces, while the southern parking lot will have 46 parking spaces.
An additional 59 on-street parking spaces along Cleveland Street and Drew Street proximate to the
marina will also be upgraded as part ofthis project;
13. That there are no properties zoned residentially adjacent to the proposed dock (adjacent properties
are zoned Downtown District);
14. That the proposed dock meets the required length criteria of the Code;
15. That the proposal includes a deviation to reduce the side (north) setback from 135.7 to 19 feet and to
reduce the side (south) setback from 135.7 to 7.67 feet;
16. That the proposal includes a deviation to increase the maximum width from 75% of the lot width
(1,017.7 feet) to 109.8% of the lot width (1,490 feet);
Connnunity Development Board - October 21, 2008
FLD2008-08026 - Page 9 of 10
17. That water depths beneath the proposed boat slips range from approximately five feet to
approximately 16 feet, providing more than the one-foot clearance distance between the bottom of
the vessel and the bottom of the water body at mean low tide; and
18. That there are no outstanding Code Enforcement issues associated with the subject property.
Conclusions of Law:
1. That on March 13, 2007, Clearwater voters approved a referendum providing for the construction of
the proposed downtown boat slips for a maximum of 140 slips;
2. That the development proposal is' consistent with the Flexibility criteria as per Section 2-903.H of the
Community Development Code (Marinas);
3. That the development proposal is consistent with the commercial dock review criteria as per Section
3-601.C.3 of the Community Development Code;
4. That the development proposal is consistent with the marina review criteria as per Section 3-603 of
the Community Development Code; and
5. That the development proposal is consistent with the General Applicability criteria as per Section 3-
913.A of the Community Development Code.
Based upon the above, the Planning Department recommends APPROVAL of the Flexible Development
application to permit a marina for 127 slips in the Downtown (D) District with a reduction to the side
(north) setback from 135.7 to 19 feet, a reduction to the side (south) setback from 135.7 to 7.67 feet and an
increase to the maximum width from 75% of the lot width (1,017.7 feet) to 109.8% of the lot width (1,490
feet), under the provisions of Sections 2-903.H, 3-601.C.3 and 3-603, with the following conditions:
Conditions of Approval:
1. That living aboard non-transient vessels be prohibited, except as may be allowed for private tenants
under the Private Docking Permit;
2. That there be no fueling facilities at this marina;
3. That no private tenants conduct any commercial business from any slip at this marina;
4. That ferry service may be permitted, with written prior permission from the City Manager or
designee, to allow commercial vessels with a base operation in another location other than this
marina to pick up and/or drop off customers at this marina;
5. That major servicing of vessels be prohibited, but permissible servicing of vessels be limited to
routine maintenance and minor repairs necessary for the preservation and seaworthiness of the
vessel, as determined by the Harbor Master;
6. That signage be permanently installed on the docks or at the entrance to the docks containing
wording warning boaters of the existence of protected sea grasses and manatees in the vicinity;
7. That a copy of the SWFWMD and/or FDEP Permit and Corps of Engineer's Permit, if applicable, be
submitted to the Planning Department prior to commencement of construction; and
8. That, prior to the issuance of any permit, compliance with all requirements of General Engineering,
Traffic Engineering and Stormwater Engineering be met; and
9. That the Public Art and Design Impact Fee be due on this project, pending transfer of impact fee
funds.
Prepared by Planning Department Staff:
Wayne
ATI ACHMENTS:
* Location Map * Aerial Map
* Existing Surrounding Uses Map
* Zonin Map
* Photographs of Site and Vicinity
S:\Planning DepartmentlC D BIFLEX (FLD)\Pending caseslUp for the next CDBIDrew 0210 City Downtown Boat Docks.Marina (D) _
10.21.08 CDB - WWlDrew 0210 StafJReport.doc
Community Development Board - October 21, 2008
FLD2008-08026 - Page 10 of 10
Wayne M. Wells, AICP
100 South Myrtle Avenue, Clearwater, FL 33756
Phone: 727-562-45041 Email: wavne.wells(tV.mvclearwater.com
PROFESSIONAL EXPERIENCE
· Planner ill
Planning Department, City of Clearwater, FL
November 2001 to Present
As part of the Development Review Division, prepared and presented staff reports for Flexible
Standard Development (staff-level cases), Flexible Development (public hearing cases) and Plats
before the Development Review Committee and the Community Development Board and
Development Agreements before the City Council; Reviewed building permits for Code
conformance; Prepared and/or assisted preparation of Code amendments; Provided public information
(via telephone, mail, email, zoning counter or predevelopment meetings).
· Zoning Coordinator
Zoning Division, City of Pinellas Park, FL
March 1989 to November 2001
Acting Zoning Director; Represented the Zoning Division on cases and issues before the City
Council, Community Redevelopment Agency, Planning and Zoning Commission, Board of
Adjustment and outside agencies; Prepared and presented staff reports for land use plan amendments,
rezoned, planned unit developments, conditional uses, variances and site plans; Reviewed final site
plans and building permits for Code conformance; Prepared and/or assisted preparation of Code
amendments; Provided public information (via telephone, mail, zoning counter or pre development
meetings).
· Program Manager, Zoning Branch
Manatee County Dept. of Planning and Development, Bradenton, FL
June 1984 to March 1989
Trained and supervised three employees; Prepared and presented variances and appeals to the Board
of Zoning Appeals; Coordinated final site plan and building permit review for Code conformance;
Assisted in preparation of Code amendments; Provided public information (via telephone, mail,
zoning counter or pre development meetings). Interim Code Enforcement Manager- Managed the
Code Enforcement Section; Supervised six employees; Prosecuted cases before the Code
Enforcement Board; Investigated and prepared cases of alleged violations of land use and building
codes. Planner II, Current Planning Section - Prepared and presented staff reports for rezones,
planned developments, special permits, plats and mobile home parks to Planning Commission and
Board of County Commissioners; Reviewed final site plans and building permits for Code
enforcement; Assisted in preparation of Code amendments; Provided public information (via
telephone, mail, zoning counter or predevelopment meetings).
· Planner I
Alachua County Dept. of Planning and Development, Gainesville, FL
June 1980 to June 1984
Prepared and presented staff reports for rezones and special permits to Planning Commission and
Board of County Commissioners; Reviewed site plans and plats for Code conformance; Assisted in
preparation of Code amendments; Provided public information (via telephone, mail, zoning counter
or predevelopment meetings). Intern - Compiled and coordinated the Alachua County Information
and Data Book; Drafted ordinance revisions; General research.
· Graduate Assistant
University of Florida Dept. of Urban and Regional Planning, Gainesville, FL
1979 to 1981
Coordinated downtown study for Mayo, FL; Coordinated graphics for Jefferson County
Comprehensive Plan.
· Planning Technician
Planning Division, City ofSt. Petersburg, FL
1977 to 1979
Prepared primarily graphics, for- both publication and presentation; Division photographer for 1 Yz
years; Worked on historic survey and report.
EDUCATION
Master of Arts in Urban and Regional Planning (Degree not conferred; course work completed, thesis not
completed), University of Florida, 1981
Bachelor of Design in Architecture, University of Florida, 1976
LICENSES & CERTIFICATES
American Institute of Certified Planners
American Planning Association, Suncoast Section
FLD2008-08026
210 DREW ST
DOWNTOWN BOAT SLIPS
PLANNER OF RECORD: WW
ATLAS # 286A
ZONING: D
LAND USE: CBD
RECEIVED: 08/04/2008
INCOMPLETE:
COMPLETE:
MAPS:
PHOTOS:
STAFF REPORT:
DRC:
CDB:
CL WCoverSheet
Planning Department
100 South Myrtle Avenue
Clearwater, Florida 33756
Telephone: 727-562-4567
Fax: 727-562-4865
CASE #:
RECEIVED BY (staff initials):
DATE RECEIVED:
.. Clearwater
o SUBMIT ORIGINAL SIGNED AND NOTARIZED APPLICATION
o SUBMIT 14 COPIES OF THE ORIGINAL APPLICATION - Plans and
application are required to be collated, stapled, and folded into sets
o SUBMIT FIRE PRELlMARY SITE PLAN: $200.00
o SUBMIT APPLICATION FEE $
* NOTE: 15 TOTAL SETS OF INFORMATION REQUIRED (APPLICATIONS PLUS SITE PLAN SETS)
FLEXIBLE DEVELOPMENT APPLICATION
(Revised 07/11/2008)
~PLEASE TYPE OR PRINT~
A. APPLICANT, PROPERTY OWNER AND AGENT INFORMATION: (Code Section 4-202.A)
APPLICANT NAME: City of Clearwater
MAILING ADDRESS: 100 South Myrtle Avenue, Clearwater, FL 33756
PHONE NUMBER: 727-562-4747 FAX NUMBER: 727-562-4755
CELL NUMBER: EMAIL:
PROPERTY OWNER(S): City of Clearwater
List ALL owners on the deed
AGENT NAME: Michael Quillen, PE, City Engineer
MAILING ADDRESS: 100 South Myrtle Avenue, Clearwater, FL 33756
PHONE NUMBER: 727-562-4747 FAX NUMBER: 727-562-4755
CELL NUMBER: EMAIL: michael.ouillen@mvclearwater.com
B. PROPOSED DEVELOPMENT INFORMATION: (Code Section 4-202.A)
PROJECT NAME: Downtown Boat Slips PROJECT V ALUA TION: $ 12,600,000
STREET ADDRESS 210 Drew Street, Clearwater, FL 33756
PARCEL NUMBER(S): 16-29-1500000-210-0110; 15-00000-210-0100; 15-43956-000-0010; 15-76482-002-0010; 15-20358-001-0040
PARCEL SIZE (acres): 23 96 PARCEL SIZE (square feet): 10,436,976
LEGAL DESCRIPTION: See Attachment
PROPOSED USE(S): Marina
DESCRIPTION OF REQUEST: Approval of commercial docks including a reduction to the side (north)
Specifically identify the request setback from 136 feet to 19 feet, a reduction to the side (south) setback
(include number of units or square
footage of non-residential use and all from 136 feet to 8 feet and deviation from the width dimensional standard
requested code deviations; e.g. (section 3 601. c . 3 . h . i i i) bv 4 73 feet.
reduction in required number of
parking spaces, specific use, etc.)
C;IDocuments and Setlingslderek.fergusonlDesktoplplanning dept fonns 0708IFlexible Development (FLD) 2008 07-11.doc
Page I of7
DOES 'THIS APPLICATION INVOLVE THE TRANSFER OF DEVELOPMENT RIGHTS (TOR), A PREVIOUSLY APPROVED PLANNED UNIT
DEVELOPMENT, OR A PREVIOUSLY APPROVED (CERTIFIED) SITE PLAN? YES _ NO ~ (if yes, attach a copy of the applicable documents)
C. PROOF OF OWNERSHIP: (Code Section 4-202.A.5)
o SUBMIT A COPY OF THE TITLE INSURANCE POLICY, DEED TO THE PROPERTY OR SIGN AFFIDAVIT ATTESTING OWNERSHIP
(see page 7)
D. WRITTEN SUBMITTAL REQUIREMENTS: (Code Section 3-913.A)
o Provide complete responses to the six (6) GENERAL APPLICABILITY CRITERIA - Explain how each criteria is achieved, in detail:
1. The proposed development of the land will be in harmony with the scale, bulk, coverage, density and character of adjacent properties in which it is
located.
Please Refer to Attachment
2. The proposed development will not hinder or discourage the appropriate development and use of adjacent land and buildings or significantly
impair the value thereof.
Please Refer to Attachment
3. The proposed development will not adversely affect the health or safety or persons residing or working in the neighborhood of the proposed use.
Please Refer to Attachment
4. The proposed development is designed to minimize traffic congestion.
Please Refer to Attachment
5. The proposed development is consistent with the community character of the immediate vicinity of the parcel proposed for development.
Please Refer to Attachment
6. The design of the proposed development minimizes adverse effects, including visual, acoustic and olfactory and hours of operation impacts, on
adjacent properties.
Please Refer to Attachment
C:IDocuments and Settingslderek.fergusonlDesktoplplanning dept forms 07081Flexible Development (FLD) 2008 07-11.doc
Page 2 of7
WRITTEN SUBMITTAL REQUIREMENTS: (Flexibility Criteria)
o Provide complete responses to the applicable flexibility criteria for the specific Use as listed in each Zoning District to which the waiver is
requested (use separate sheets as necessary) - Explain how each criteria is achieved, in detail:
E. STORMWATER PLAN SUBMITTAL REQUIREMENTS: (City of Clearwater Storm Drainage Design Criteria
Manual and 4-202.A.21)
D
A STORMWATER NARRATIVE MUST BE SUBMITTED WITH ALL APPLICATIONS. All applications that involve addition
or modification of impervious surface, including buildings, must include a stormwater plan that demonstrates compliance with the City of
Clearwater Storm Drainage Design Criteria manual. A reduction in impervious surface area does not qualify as an exemption to this requirement.
D
If a plan is not required, the narrative shall provide an explanation as to why the site is exempt.
D
D
D
D
D
D
D
D
At a minimum, the STORMWATER PLAN shall include the following;
Existing topography extending 50 feet beyond all property lines;
Proposed grading including finished floor elevations of all structures;
All adjacent streets and municipal storm systems;
Proposed stormwater detention/retention area including top of bank, toe of slope and outlet control structure;
A narrative describing the proposed stormwater control plan including all calculations and data necessary to demonstrate compliance with
the City manual.
Proposed stormwater detention/retention area including top of bank, toe of slope and outlet control structure;
Signature and seal of Florida Registered Professional Engineer on all plans and calculations.
D
COPY OF PERMIT INQUIRY LETTER OR SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT (SWFWMD) PERMIT
SUBMITTAL (SWFWMD approval is required prior to issuance of City Building Permit), if applicable
D
ACKNOWLEDGEMENT OF STORMWATER PLAN REQUIREMENTS (Applicant must initial one of the following):
(FDEP permit exemption received for upland improvements)
N / A Stormwater plan as noted above is included
Stormwater plan is not required and explanation narrative is attached. At a minimum, a grading plan and finished floor
N/A elevations shall be provided.
CAUTION -IF APPLICATION REVIEW RESULTS IN THE REQUIREMENT FOR A STORMWATER PLAN
AND NONE HAS BEEN SUBMITTED, APPLICATION MUST BE RESUBMITTED AND SIGNIFICANT DELAY
MAY OCCUR.
If you have questions regarding these requirements, contact the City Public Works Administration Engineering Department at (727) 562-4750.
F. SUPPLEMENTAL SUBMITTAL REQUIREMENTS: (Code Section 4-202.A)
o SIGNED AND SEALED SURVEY (including legal description of property) - One original and 14 copies;
D TREE SURVEY (including existing trees on site and within 25' of the adjacent site, by species, size (DBH 4" or greater), and location,
including drip lines and indicating trees to be removed) - please design around the existing trees;
o TREE INVENTORY; prepared by a "certified arborist", of all trees 4" DBH or greater, reflecting size, canopy (drip lines) and
condition of such trees;.
o LOCATION MAP OF THE PROPERTY;
D PARKING DEMAND STUDY in conjunction with a request to make deviations to the parking standards (ie. Reduce number of spaces).
Prior to the submittal of this application, the methodology of such study shall be approved by the Community Development Coordinator and
shall be in accordance with accepted traffic engineering principles. The findings of the study will be used in determining whether or not
deviations to the parking standards are approved;
D GRADING PLAN, as applicable;
D PRELIMINARY PLAT, as required (Note: Building permits will not be issued until evidence of recording a final plat is provided);
D COpy OF RECORDED PLAT, as applicable;
C:IDocuments and Sellingslderek.fergusonlDesktoplplanning dept forms 07081Flexible Development (FLD) 2008 07-11.doc
Page 3 of7
G. SITE PLAN SUBMITTAL REQUIREMENTS: (Section 4-202.A)
o SITE PLAN with the following information (not to exceed 24" x 36"):
Index sheet referencing individual sheets included in package;
North arrow;
Engineering bar scale (minimum scale one inch equals 50 feet), and date prepared;
All dimensions;
Footprint and size of all EXISTING buildings and structures;
Footprint and size of all PROPOSED buildings and structures;
All required setbacks;
All existing and proposed points of access;
All required sight triangles;
Identification of environmentally unique areas, such as watercourses, wetlands, tree masses, and specimen trees, including
description and location of understory, ground cover vegetation and wildlife habitats, etc; Location of all public and private easements;
Location of all street rights-of-way within and adjacent to the site;
Location of existing public and private utilities, including fire hydrants, storm and sanitary sewer lines, manholes and lift stations, gas
and water lines;
All parking spaces, driveways, loading areas and vehicular use areas;
Depiction by shading or crosshatching of all required parking lot interior landscaped areas;
Location of all solid waste containers, recycling or trash handling areas and outside mechanical equipment and all required screening
{per Section 3-201(0)(1) and Index #701};
Location of all landscape material;
Location of all onsite and offsite storm-water management facilities;
Location of all outdoor lighting fixtures;
Location of all existing and proposed sidewalks; and
Floor plan typicals of buildings for all Level Two approvals. A floor plan of each floor is required for any parking garage requiring a
Level Two approval.
o SITE DATA TABLE for existing, required, and proposed development, in written/tabular form:
EXISTING
REQUIRED
PROPOSED
Land area in square feet and acres;
Number of EXISTING dwelling units;
Number of PROPOSED dwelling units;
Gross floor area devoted to each use;
Parking spaces: total number, presented in tabular form with the
number of required spaces;
Total paved area, including all paved parking spaces & driveways,
expressed in square feet & percentage of the paved vehicular area;
Official records book and page numbers of all existing utility
easement;
Building and structure heights;
Impermeable surface ratio (I.S.R.); and
Floor area ratio (FAR.) for all nonresidential uses.
o REDUCED COLOR SITE PLAN to scale (8 Y, X 11);
o FOR DEVELOPMENTS OVER ONE ACRE, provide the following additional information on site plan:
One-foot contours or spot elevations on site;
Offsite elevations if required to evaluate the proposed stormwater management for the parcel;
All open space areas;
Location of all earth or water retaining walls and earth berms;
Lot lines and building lines (dimensioned);
Streets and drives (dimensioned);
Building and structural setbacks (dimensioned);
Structural overhangs;
C:IDocuments and Settingslderek.fergusonlDesktoplplanning depl forms 07081Flexible Development (FLD) 2008 07-11.doc
Page 4 of7
H. LANDSOAPING PLAN SUBMITTAL REQUIREMENTS: (Section 4-1102.A)
o LANDSCAPE PLAN with the following information (not to exceed 24" x 36"):
All existing and proposed structures;
Names of abutting streets;
Drainage and retention areas including swales, side slopes and bottom elevations;
Delineation and dimensions of all required perimeter landscape buffers;
Sight visibility triangles;
Delineation and dimensions of all parking areas including landscaping islands and curbing;
Existing trees on-site and immediately adjacent to the site, by species, size and locations, including driplines (as indicated on required
tree survey);
Location, size, and quantities of all existing and proposed landscape materials, indicated by a key relating to the plant
schedule;
Plant schedule with a key (symbol or label) indicating the size, description, specifications, quantities, and spacing requirements of all
existing and proposed landscape materials, including botanical and common names;
Typical planting details for trees, palms, shrubs and ground cover plants including instructions, soil mixes, backfilling, mulching and
protective measures;
Interior landscaping areas hatched and/or shaded and labeled and interior landscape coverage, expressing in both square feet and
percentage covered;
Conditions of a previous development approval (e.g. conditions imposed by the Community Development Board);
Irrigation notes.
o REDUCED COLOR LANDSCAPE PLAN to scale (8 Y. X 11 );
o COMPREHENSIVE LANDSCAPE PROGRAM application, as applicable. Landscape associated with the Comprehensive Landscape
Program shall exceed minimum Code requirements to offset the areas where minimum Code will not be met.
I. BUILDING ELEVATION PLAN SUBMITTAL REQUIREMENTS: (Section 4-202.A.23)
o BUILDING ELEVATION DRAWINGS - with the following information;
All sides of all buildings;
Dimensioned;
Colors (provide one full sized set of colored elevations);
Materials;
Ila REDUCED BUILDING ELEVATIONS - same as above to scale on 8 Y. X 11.
J. SIGNAGE: (Division 19. SIGNS I Section 3-1806)
o All EXISTING freestanding and attached signs; Provide photographs and dimensions (area, height, etc.), indicate whether they will be
removed or to remain.
o All PROPOSED freestanding and attached signs; Provide details including location, size, height, colors, materials and drawing;
freestanding signs shall include the street address (numerals)
o Comprehensive Sign Program application, as applicable (separate application and fee required).
o Reduced signage proposal (8 Y. X 11) (color), if submitting Comprehensive Sign Program application.
C:IDocuments and Settingslderek.fergusonlDesktoplplanning dept forms 0708IFlexible Development (FLD) 2008 07-11.doc
Page 5 of7
K. TRAFFIC! IMPACT STUDY: (Section 4-202.A.13 and 4-801.C)
o Include if required by the Traffic Operations Manager or his/her designee or if the proposed development:
Will degrade the acceptable level of service for any roadway as adopted in the Comprehensive Plan.
Will generate 100 or more new vehicle directional trips per hour and/or 1000 or more new vehicle trips per day.
Will affect a nearby roadway segment and/or intersection with five (5) reportable accidents within the prior twelve (12) month period or
that is on the City's annual list of most hazardous intersections.
Trip generation shall be based on the most recent edition of the Institute of Transportation Engineer's (ITE) Trip General Manual.
The Traffic Impact Study must be prepared in accordance with a "Scoping Meeting" held with the Traffic Operations Manager and the
Planning Department's Development Review Manager or their designee (727-562-4750)
Refer to Section 4-801 C of the Community Development Code for exceptions to this requirement.
o Acknowledgement of traffic impact study requirements (Applicant must initial one of the following):
Traffic Impact Study is included. The study must include a summary table of pre- and post-development levels of service for all
roadway legs and each tuming movement at all intersections identified in the Scoping Meeting.
Traffic Impact Study is not required.
CAUTION - IF APPLICATION REVIEW RESULTS IN THE REQUIREMENT FOR A TRAFFIC IMPACT STUDY
AND NONE HAS BEEN SUBMITTED, APPLICATION MUST BE RESUBMITTED AND SIGNIFICANT DELAY
MAY OCCUR.
If you have questions regarding these requirements, contact the City Public Works Administration Engineering Department at (727) 562-
4750.
L. FIRE FLOW CALCULATIONSI WATER STUDY:
Provide Fire Flow Calculations. Water Study by a FIRE PROTECTION ENGINEER to assure an adequate water supply is available and to determine if
any upgrades are required by the developer due to the impact of this project. The water supply must be able to support the needs of any required fire
sprinkler, standpipe and/or fire pump. If a fire pump is required the water supply must be able to supply 150% of its rated capacity. Compliance with
the 2004 Florida Fire Prevention Code to include NFPA 13, MFPA 14, NFPA 20, NFPA 291, and MFPA 1142 (Annex H) is required.
o Acknowledgement of fire flow calculations/water study requirements (Applicant must initial one of the following):
Fire Flow CalculationslWater Study is included.
Fire Flow CalculationslWater Study is not required.
CAUTION - IF APPLICATION REVIEW RESULTS IN THE REQUIREMENT FOR A FIRE FLOW
CALCULATIONSI WATER STUDY AND NONE HAS BEEN SUBMITTED, APPLICATION MUST BE
RESUBMITTED AND SIGNIFICANT DELAY MAY OCCUR.
If you have questions regarding these requirements, contact the City Fire Prevention Department at (727) 562-4334.
M. SIGNATURE:
I, the undersigned, acknowledge that all representations made
in this application are true and accurate to the best of my
knowledge and authorize City representatives to visit and
photograph the property described in this application.
STATE OF FLORIDA, COUNTY OF PINELLAS
Swom to and subscribed before me this _ day of
, A.D. 20 to me and/or by
, who is personally known has
produced
as identification.
Notary public,
My commission expires:
Signature of property owner or representative
C:IDocuments and Sellingslderek.fergusonlDesktoplplanning dept forms 07081Flexible Development (FLD) 2008 07-11.doc
Page 60f7
. .
N. AFFIDAVIT TO AUTHORIZE AGENT:
Provide names of all property owners on deed - PRINT full names:
City of Clearwater
2. That (I am/we are) the owner(s) and record title holder(s) of the following described property (address or general location):
210 Drew Street Cleary;rClteI~ FL. 33756
3. That this property constitutes the property for which a request for a: (describe request)
Downtown Boat Slips
4 That the undersigned (has/have) appointed and (does/do) appoint:
Wade Trim
as (his/their) agent(s) to execute any petitions or other documents necessary to affect such petition;
5. That this affidavit has been executed to induce the City of Clearwater, Florida to consider and act on the above described property;
6. That site visits to the property are necessary by City representatives in order to process this application and the owner authorizes City
representatives to visit and photograph the property described in this application;
7
That (I/we.), the un~rs~~hority, hereb~certify that the foregoing is true and correct.
-~~.( \
. . pro;e~
Property Owner
Property Owner
Property Owner
STATE OF FLORIDA,
COUNTY OF PINELLAS
Before me the un~ersigned, an officer duly commissioned by the laws of the State of Florida, on this
is'
day of
5cp-f.
~. g- personally appeared
tn \ Ke- QV\'UJen
who having been first duly sworn
Deposes and says that he/she fully understands the contents of the affidavit that he/she signed.
EDWARD CHESNEY, JR.
MY COMMISSION # DO 44n02
EXPIRES: November 3, 2009
Bonded Thru NoIary PIilIic UndelWlll8t1
~qjJ ~~
Notary Public Si~re
My Commission Expires: N oJ, :5 i Z:C; t) Cj
Notary Seal/Stamp
C:IDocuments and SettingslderekJerguson\Desktoplplanning dept forms 07081Flexible Standard Development (FLS) 2008 07 -11.doc
Page 7 of7
Flexible Development Application
Clearwater Downtown Boat Slips
& Upland Improvements
Prepared By:
City of Clearwater
100 S. Myrtle Avenue
Clearwater, FL 33756
727-562-4747
September 12, 2008
Table of Contents
1. Flexible Development Application Form
2. Project Description
3. Compliance with Downtown (D) District (Section 2-903.H)
4. Compliance with Section 3-601. Docks (3, a-g)
5. Compliance with Section 3-603. Marinas and Marina Facilities
6. Project Drawings/Graphic Renderings
. Boat Slips
. Restroom/Laundry/Dockmaster Building
. Upland Improvements
.,
FLEXIBLE DEVELOPMENT APPLICATION
APPLICANT RESPONSES
Section D. Written Submittal Requirements (Code Section 3-19.A)
1. The proposed development of the land will be in harmony with the scale,
bulk, coverage, density and character of adjacent properties in which it is
located:
Comment: The boat slips have been designed to fit into the existing basin
generally located between the Pierce 100 Condominiums and the existing City
owned dock located at the end of Drew Street, north and south of the new
Memorial Causeway Bridge and west of the existing channel. The marina project
as proposed represents an appropriate addition to the waterfront and
complements the downtown redevelopment plan and neighboring properties.
The scale and coverage of the docks is appropriate for this location. No new
structures are proposed on the lands ide portion of the project other than the
renovation of the existing structure at the end of Drew Street.
2. The proposed development will not hinder or discourage the appropriate
development and use of adjacent land and buildings or significantly impair
the value thereof.
Comment: The only properties directly abutting the proposed boat slips are the
Pierce 100 Condominiums on the south and the City-owned Harborview Center
and Coachman Park on the east, and Church of Scientology property on the
north. The Pierce 100 Condominiums are fully developed. The location of the
boat slips in proximity to this high rise structure will not discourage the
redevelopment should it ever occur. The Harborview Center and Coachman
Park will likely be improved as part of the City's ongoing downtown and
waterfront redevelopment efforts with the boat slips enhancing this ongoing
redevelopment program. The proposed boat slips are a key component of this
redevelopment plan and provide enhanced recreational and pedestrian
opportunities along the currently underutilized waterfront.
3. The proposed development will not adversely affect the health or safety of
persons residing or working in the neighborhood of the proposed use.
Comment: This project is part of a comprehensive strategy to protect, preserve
and promote public access and activity on Clearwater's waterways and
waterfront. The boat slips and upland improvements will positively affect the
downtown neighborhood by providing additional recreational and pedestrian
opportunities for permanent residents and tourists visiting the area. Similarly, the
project will improve the aesthetics of the currently underutilized waterfront.
4. The proposed development is designed to minimize traffic congestion.
The project has been designed to provide a convenient drop off area for boaters
and sufficient city-owned parking already exists along the waterfront north and
south of the Memorial Causeway Bridge to meet the project's parking demands
of one space per two boat slips. Additional overflow parking beyond this
...
requirement exists along the waterfront proximate to the project, if needed. The
existing parking lots will be improved with new landscaping to comply with the
current code and additional pedestrian ways will be provided.
5. The proposed development is consistent with the community character of
the immediate vicinity of the parcel proposed for development.
Comment: The project represents a vital component of the Downtown
Redevelopment Plan. The character of the immediate vicinity is changing
positively with the ongoing redevelopment activities in the downtown. The
project has been thoughtfully designed to complement these ongoing
redevelopment activities. As a result, the community character of the area will be
clearly enhanced through this waterfront improvement project.
6. The design of the proposed development minimizes adverse effects,
including visual, acoustic and olfactory and hours of operation impacts, on
adjacent properties.
Comment: The boat slips are proposed to be floating concrete structures which
are typically the most aesthetic pleasing and easiest to maintain. The docks are
being designed to maximize views of the waterfront at both the pedestrian and
bluff levels. Pedestrian access and views of the waterfront will also be enhanced
with the construction of the promenade located between the north and south
basin overlooking the proposed boat slips (a separate but related project).
Additional landscaping and community art will be provided on the adjacent
uplands enhancing the visual impact of the current waterfront area. No adverse
acoustical and olfactory impacts are anticipated.
Hours of Operations for the Downtown Boat Slips;
The Downtown Boat Slips will be staffed 24 hours a day, seven days a week.
The staffing will consist of a Dock Master office staff manned by a Marine
Department personnel worker from 6:30 AM until 9 PM, and a Police Aide
Security Guard from 9 PM until 6:30 AM the next morning.
The Downtown Boat slips facility has several components which each will have
unique operating hours. Those components are:
The public downtown fishing pier
The public docks (connecting the fishing pier to the main walkway on the
north side of the Promenade)
The rented boat slips
The rented transient side tie moorings
The Dock Master office
The Downtown Fishing Pier is currently closed. As part of the Downtown Boat
slips, once construction is complete and the docks are expanded, itwill be open
24 hours a day.
The public docks. The public docks are a free to the public amenity that will be
open from 8 AM until 10 PM to keep their hours in line with a recent city
ordinance on public docks located in several locations throughout the city.
Exceptions will be made for City special events such as Jazz Holiday and fishing
tournaments held by other city departments.
The Downtown Boat slips will be staffed 24 hours a day, seven days a week.
The staffing will consist of a Dock Master office staff from 6:30 AM until 9 PM,
and a Police Aide security guard from 9 PM until 6:30 AM the next morning.
The rented boat slips will be accessible 24 hours a day by persons renting slips
or transient boating guests renting transient mooring space. There will be gates
restricting access to these dock areas from general public access during the
hours of 9 PM and 6:30 AM.
The transient side tie moorings will be accessible under the same hours and
process as the rented boat slips.
The Dock Master office will be open to the public from 6:30 AM to 6:30 PM and
will be staffed with Marine Department personnel who can address both boat slip
tenant concerns and the concerns of transient boaters. The facility manager will
be onsite during those core hours. While the office staff will be at the facility until
9 PM, the hours from 6:30 PM until 9:00 PM will be for closing out paperwork,
and providing security rounds of the facility. At 9 PM they transfer the shift over
to the Police Aides for night security. The police aides make rounds from 9 PM
until 6:30 AM at which time the Marine Department staff takes back over.
Section E. Storm water Plan Submittal
Comment: The upland portion of the project has been determined to be exempt
from FDEP stormwater requirements. A copy of the agency exemption letter is
provided on the next page.
~
Florida Department of
Environmental Protection
Charlie Crist
Governor
lefr Kottkamp
Lt. Governor
Southwest District Office
13051 North Telecom Parkway
Temple Terrace, Florida 33637-0926
, L N ? 0 2008
....
Michael W, Sole
Secreta ry
Mr. Edward Chesney, P.E., Environmental Manager
City of Clearwater
100 South Myrtle Avenue
Clearwater, Florida 33756
;1'-''1'\
I$C-grv~iJ'
t.' " CJ. i\\\l\\
j\)\'1 c.. t.J , C'
.... '1' -, ~tl~\, \N
'krr\D~ -~
"I".
Re: Deminimus Exemption
Clearwater Bayfront - Upland Connection
FDEP Permit #: 52-0265938-004
Pinellas County
Dear Mr. Chesney:
Thank you for your request to the Department for authorization to make landscape/beautification
improvements and perform maintenance construction at the existing Coachman Park.
Improvements include replacing pavement with planters. The project will result in an
approximate net decrease of 5,300 square feet of impervious surface and a decrease of 16,000
square feet of impervious area subject to vehicular traffic. The authorization addresses only the
specific proposed features shown on the attached Sheets C-lO through C-13 entitled "Proposed
Site Plan", signed and sealed by Michael Edward Rice, P.E., #23070, and dated May 19, 2008.
The project site is located at Coachman Park, 301 Drew Street, Northeast of the Memorial
Causeway span over Clearwater Harbor, Clearwater, Section 16, Township 29, South, Range 15
East, Pinellas County.
This type of activity requires a regulatory authorization for construction and operation of the
project pursuant to Part IV, Chapter 373, F.S., unless otherwise exempt by statute or rule,
proprietary authorization to use state-owned submerged lands Chapters 253 and 258 F.S., and
federal authorization for works in waters of the United States through the State Programmatic
General Permit (SPGP) program. Your request has been reviewed for all three authorizations.
The authorizations you have been granted are listed below. Please read each section carefully.
Your project may not have qualified for all three authorizations. If your project did not qualify
for one or more of the authorizations that specific section will advise you how to obtain it. You
may NOT commence your project without all three authorizations. If you change the proiect
from what vou submitted, the authorization(s) granted may no longer be valid at the time of
commencement of the project. Please contact us prior to beginning your project if you wish to
make any changes.
"More Protection, Less Process"
i'I-'WH', dcp.statc 17. us
REGULATORY REVIEW - APPROVED
Pursuant to Part IV, Chapter 373, Florida Statutes (F.S.), and based upon the forms, drawings,
and documents submitted on March 23, 2008, the proposed project appears to have only minimal
or insignificant individual or cumulative adverse impacts on the water resources of the State.
Therefore, the proposed project appears to qualify as an activity, which is exempt from
regulation pursuant to Chapter 373.406(6), FS. A,copy of Chapter 373.406(6), F.S. is attached.
This determination is based solely on the information provided to the Department and the
statutes and rules in effect when the application was submitted and is effective only for the
specific activity proposed. This determination shall automatically expire if site conditions
materially change or the governing statutes or rules are amended. In addition, any substantial
modifications in your plans should be submitted to the Department for review, as changes may
result in a permit being required. In any event, this determination shall expire after one year.
This determination that your activity qualifies for an exemption does not relieve you from the
need to comply with all applicable water quality standards during the construction and operation
of the facility. Activities conducted under this exemption must be constructed and operated
using appropriate best management practices and in a manner, which does not cause water
quality violations, pursuant to Rule 62-302, Florida Administrative Code (F A. C.).
The determination that your project qualifies as an exempt activity pursuant Chapter 373.406(6),
F.S. may be revoked if the installation is substantially modified, or if the basis for the exemption
is determined to be materially incorrect, or if the installation results in water quality violations.
Any changes made in the construction plans or location of the project may necessitate a permit or
certification from the Department. Therefore, you are advised to contact the Department before
beginning the project and before beginning any work in waters or wetlands, which is not
specifically described in your submittal. .
Authority for review- Part IV of Chapter 373, Florida Statute, Title 62, FA.C. and in accordance
to operating Agreements executed between the department and the Water management Districts,
as referenced in Chapter 62-113, FA.C.
PROPRIETARY REVIEW - APPROVED
A review of the location of your proposed project indicates that it is not on state-owned
submerged lands. Therefore, your project is exempt from the further requirements of Chapter
253, Florida Statutes.
Please be advised that any use of sovereign submerged lands without specific prior authorization
from the Board of Trustees will be considered a violation of Chapter 253, Florida Statutes and
may subject the affected upland riparian property owners to legal action as well as potential fines
for the prior unauthorized use of sovereign land.
Clearwater Bayfront - Upland Connection
FDEP File No. 52-0265938-001
Page 2 of9
SPGP REVIEW - APPROVED
Your project has been reviewed for compliance with a State Programmatic General Permit
(SPGP). Your proposed activity, as outlined on the attached drawings, is in compliance with the
SPGP program. U.S. Army Corps of Engineers (Corps) Specific conditions apply to your project,
if attached. No further permitting for this activity is required by the Corps. The authority granted
under this SPGP expires July 24,2011. Your project must be completed prior to this expiration
date.
Authority for review - an agreement with the U.S. Army Corps of Engineers entitled
"Coordination Agreement Between the U. S. Army Corps of Engineers (Jacksonville District)
and the Florida Department of Environmental Protection State Programmatic General Permit,
Section 10 of the Rivers and Harbor Act of 1899 and Section 404 ofthe Clean Water Act.
Please see the copies of the exemption attached to this letter and note that all specific conditions
in the rule must be met in order to qualify for this exemption. If you have any questions, please
contact Mr. Dennis Pierson at 813-632-7600 ex~ension 398. When referring to this project,
please use the file number listed above. .
Sincerely,
!JL//~
William L. V orstadt
Environmental Administrator
Environmental Resource Management
cc: Mr. Michael E. Rice, P.E., Project Manager - Water Resources, Wade Trim, Inc., 8745
Henderson Road, Suite 220 Renaissance 5, Tampa, Florida 33634
Enclosures:
Chapter 373.406(6), F.S., 1 page
Notice of Rights of Substantially Affected Persons, 1 page
General Conditions for Federal Authorization for SPGP IV-R1, 2 pages
Attachment "A" For Discretionary Publication, 2 pages
Attachments:
Proposed Site Plan, Sheets C-IO, C-11, C-12, C-13
Clearwater Bayfront - Upland Connection
FDEP File No. 52-0265938-001
Page 3 of9
Chapter 373.406(6), FS.
Any district or the Department may exempt from regulation under this part those activities that
the district or Department determines will have only minimal or insignificant individual or
cumulati ve adverse impacts on the water resources of the district. The district and the
Department are authorized to determine, on a case-by-case basis, whether a specific activity
comes within this exemption. Requests to qualify for this exemption shall be submitted in
writing to the district or Department, and such activities shall not be commenced without a
written determination from the district or Department confirming that the activity qualifies for
the exemption.
Clearwater Bayfront - Upland Connection
FDEP File No. 52-0265938-001
Page 4 of9
RIGHTS OF AFFECTED PARTIES
This determination is final and effective on the date filed with the Clerk of the
Department unless a sufficient petition for an administrative hearing is timely filed under
sections 120.569 and 120.57 of the Florida Statutes as provided below. If a sufficient petition for
an administrative hearing is timely filed, this determination automatically becomes only
proposed agency action subject to the result of the administrative review process. Therefore, on
the filing of a timely and sufficient petition, this action will not be final and effective until further
order of the Department. The procedures for petitioning for a hearing are set forth in the
attached notice.
This determination is based on the information you provided the Department and the
statutes and rules in effect when the application was submitted and is effective only for the
specific activity proposed. This determination shall automatically expire if site conditions
materially change or the governing statutes or rules are amended. In addition, any substantial
modifications in your plans should be submitted to the Department for review, as changes may
result in a permit being required. In any event, this determination shall expire after one year.
Be advised that your neighbors and other parties who may be substantially affected by the
proposed activity allowed under this determination of exemption have a right to request an
administrative hearing on the Department's decision that the proposed activity qualifies for this
exemption. Because the administrative hearing process is designed to redetermine final agency
action on the application, the filing of a petition for an administrative hearing may result in a
final determination that the proposed activity is not authorized under the exemption established
under Chapter 373.406(6), Florida Statutes.
The Department will not publish notice of this determination. Publication of this notice
by you is optional and is not required for you to proceed. However, in the event that an
administrative hearing is held and the Department's determination is reversed, proceeding with
the proposed activity before the time period for requesting an administrative hearing has expired
would mean that the activity was conducted without the required permit.
If you wish to limit the time within which all substantially affected persons may request
an administrative hearing, you may elect to publish, at your own expense, the enclosed notice
(Attachment A) in the legal advertisement section of a newspaper of general circulation in the
county where the activity is to take place. A single publication will suffice.
If you wish to limit the time within which any specific person(s) may request an
administrative hearing, you may provide such person(s), by certified mail, a copy of this
determination, including Attachment A. For the purposes of publication, a newspaper of general
circulation means a newspaper meeting the requirements of sections 50.011 and 50.031 of the
Florida Statutes. In the event you do publish this notice, within seven days of publication, you
must provide to the following address proof of publication issued by the newspaper as provided
in section 50.051 of the Florida Statutes. If you provide direct written notice to any person as
noted above, you must provide to the following address a copy of the direct written notice.
Clearwater Bayfront - Upland Connection
FDEP File No. 52-0265938-001
Page 5 of9
GENERAL CONDITIONS FOR FEDERAL AUfHORIZATION FOR SPGP IV -Rl
1. The time limit for completing the work authorized ends on July 24, 2011.
2. You mu~t maintain the activity authorized by this permit in good condition and in conformance with
the terms and conditions of this permit. You are not relieved of this requirement if you abandon the
permitted activity, although you may make a good faith transfer to a third party in compliance with
General Condition 4 below. Should you wish to cease to maintain the authorized activity or should you
desire to abandon it without a good faith transfer, you must obtain a modification of this permit from this
office, which may require restoration of the area.
3. If you discover any previously unknown historic or archeological remains while accomplishing the
activity authorized by this permit, you must immediately notify this office of what you have found. We
will initiate the Federal and State coordination required to determine if the remains warrant a recovery
effort or if the site is eligible for listing in the National Register of Historic Places.
4. If you sell the property associated with this permit, you must obtain the signature and mailing address
of the new owner in the space provided below and forward a copy of the permit to this office to validate
the transfer of this authorization.
5. If a conditioned water quality certification has been issued for your project, you must comply with the
conditions specified in the certification as special conditions to this permit.
6. You must allow representatives from this office to inspect the authorized activity at any time deemed
necessary to ensure that it is being or has been accomplished in accordance with the terms and conditions
of your permit.
Further Information:
1. Limits of this authorization.
a. This permit does not obviate the need to obtain other Federal, State, or loc~l authorizations
required by law.
b. This permit does not grant any property rights or exclusive privileges.
c. This permit does not authorize any injury to the property or rights of others.
d. This permit does not authorize interference with any existing or proposed Federal projects.
2. Limits of Federal Liability. In issuing this permit, the Federal Government does not assume any
liability for the following:
a. Damages to the permitted project or uses thereof as a result of other permitted or unpermitted
activities or from natural causes.
b. Damages to the permitted project or uses thereof as a result of current or future activities
undertaken by or on behalf of the United States in the public interest.
Clearwater Bayfront - Upland Connection
FDEP File No. 52-0265938-001
Page 6 of9
c. Damages to persons, property, or to other permitted or unpermitted activities or structures caused
by the activity authorized by this permit.
d. Design or Construction deficiencies associated with the permitted work.
e. Damage claims associated with any future modification, suspension, or revocation of this permit.
3. Reliance on Applicant's Data: The determination of this office that issuance of this permit is not
contrary to the public interest was made in reliance on the information you provided.
4. Reevaluation of Permit Decision: This office may reevaluate its decision on this permit at any time the
circumstances warrant. Circumstances that could require a reevaluation include, but are not limited to, the
following:
a. You fail to comply with the terms and conditions' of this permit.
b. The information provided by you in support of your permit application proves to have been false,
incomplete, or inaccurate (see 3 above).
c. Significant new information surfaces which this office did not consider in reaching the original
public interest decision.
5. Such a reevaluation may result in a determination that it is appropriate to use the suspension,
modification, and revocation procedures contained in 33 CPR 325.7 or enforcement procedures such as
those contained in 33 CPR 326.4 and 326.5. The referenced enforcement procedures provide for the
issuance of an administrative order requiring you comply with the terms and conditions of your permit
and for the initiation of legal action where appropriate. You will be required to pay for any corrective
measures ordered by this office, and if you fail to comply with such directive, this office may in certain
situations (such as those specified in 33 CER 209.170) accomplish the corrective measures by contract or
otherwise and bill you for the cost.
6. When the structures or work authorized by this permit are still in existence at the time the property is
transferred, the terms and conditions of this permit will continue to be binding on the new owner(s) of the
property. To validate the transfer of this permit and the associated liabilities associated with compliance
with its terms and conditions, have the transferee sign and date below.
(TRANSFEREE-SIGNATURE)
(DATE)
(NAME-PRINTED)
(ADDRESS)
Clearwater Bayfront - Upland Connection
FDEP File No. 52-0265938-001
Page 7 of9
A IT ACHMENT "A" FOR DISCRETIONARY PUBLICA nON OF NOTICE OF
DETERMINATION OF QUALIFICATION FOR AN EXEMPTION
,
In the Matter of an Application
for a Determination of Qualification
for an Exemption by:
Mr. Edward Chesney, P.E., Environmental Manager
City of Clearwater
100 South Myrtle Avenue
Clearwater, Florida 33756
FDEP File No.: 52-0265938-001
County: Pinellas
The Department of Environmental Protection gives notice that it has received a request
for authorization to make landscapelbeautification improvements and perform maintenance
construction at the existing Coachman Park, this activity appears to have only minimal or
insignificant individual or cumulative adverse impacts on the water resources of the State, and
has therefore determined the activity to be exempt from regulation under Chapter 373.406(6),
Florida Statutes.
A person whose substantial interests are affected by the Department's action may petition
for an administrative proceeding (hearing) under sections 120.569 and 120.57 of the Florida
Statutes. The petition must contain the information set forth below and must be filed (received
by the clerk) in the Office of General Counsel 'of the Department at 3900 Commonwealth
Boulevard, Mail Station 35, Tallahassee, Florida 32399-3000.
Mediation is not available.
If a timely and sufficient petition for an administrative hearing is filed, other persons
whose substantial interests will be affected by the outcome of the administrative process have the
right to petition to intervene in the proceeding. Intervention will be permitted only at the
discretion of the presiding officer upon the filing of a motion in compliance with rule 28-106.205
of the Florida Administrative Code.
In accordance with rule 62-110.106(3), Florida Administrative Code, petitions for an
administrative hearing must be filed within 21 days of publication of the notice or receipt of
written notice, whichever occurs first. Under rule 62-110.106(4) of the Florida Administrative
Code, a person whose substantial interests are affected by the Department's action may also
request an extension of time to file a petition for an administrative hearing. The Department may,
for good cause shown, grant the request for an extension of time. Requests for extension of time
must be filed with the Office of General Counsel of the Department at 3900 Commonwealth
Boulevard, Mail Station 35, Tallahassee, Florida 32399-3000 prior to the applicable deadline. A
timely request for extension of time shall toll the lllnning of the time period for filing a petition
until the request is acted upon. Upon motion by the requesting party showing that the failure to
file a request for an extension of time before the deadline was the result of excusable neglect, the
Department may also grant the requested extension of time.
Clearwater Bayfront - Upland Connection
FDEP File No. 52-0265938-00 1
Page 8 of9
The petitioner shall mail a copy of the petition to the applicant at the address indicated
above at the time of filing. The failure of any person to file a petition for an administrative
hearing within the appropriate time period shall constitute a waiver of that right.
A petition that disputes the material facts on which the Department's action is based must
contain the following information:
(a) The name and address of each agency affected and each agency's file or
identification number, if known;
(b) The name, address, and telephone number of the petitioner; the name, address,
and telephone number of the petitioner's representative, if any, which shall be the
address for service purposes during the course of the proceeding; and an
explanation of how the petitioner's substantial interests are or will be affected by
the agency determination;
(c) A statement of when and how the petitioner received notice of the agency
decision;
(d) A statement of all disputed issues of material fact. If there are none, the petition
must so indicate;
(e) A concise statement of the ultimate facts alleged, including the specific facts the
petitioner contends warrant reversal or modification of the agency's proposed
action;
(f) A statement of the specific rules or statutes that the petitioner contends require
reversal or modification of the agency's proposed action; and
(g) A statement of the relief sought by the petitioner, stating precisely the action that
the petitioner wishes the agency to take with respect to the agency's proposed
action.
A petition that does not dispute the material facts on which the Department's action is
based shall state that no such facts are in dispute and otherwise shall contain the same
information as set forth above, as required by rule 28-106.301.
Under sections 120.569(2)(c) and (d) of the Florida Statutes, a petition for administrative
hearing shall be dismissed by the agency if the petition does not substantially comply with the
above requirements or is untimely filed.
Complete copies of all documents relating to this determination of exemption are
available for public inspection during normal business hours, 8:00 a.m. to 5:00 p.m., Monday
through Friday, at the Department's Southwest District Office, 13051 North Telecom Parkway,
Temple Terrace, FL 33637-0926.
Clearwater Bayfront - Upland Connection
FDEP File No. 52-0265938-001
Page 9 of9
M.\TCHUNE
;-OIl!lS;~ e-11 .,~ '" -..... ...~. ....
/
-------.~~
c::~.
''-.~
..~
Ii
/
/
..
RECORD DRAWINGS
-.---'
'-~, '.' \... '
,-~" ',\
~ -","-.. '",
-~ " \-
<::;. '" ~
~::::- '~'-"\ "
'- )'<
I
/
/
I
I
/
/
/
/
/
/
//
/
/
I
I
I
I
I
}
/
,.~~
~' .-
- rJ)
_ _ ~r.. ;~..,t'
, ,
~
,\
I \
1
r'
t
\
\1
\
\
\
\ " '
\
\
\
\
\
\
\
~R.
..
~
..
~
CllY OF CLEARWATER, FLORIDA
ENGINEERING
:':'
CAt.L LOCAL t"..eL.lc;
UTILITY NQT.ICA.TlQN
-~-
PROPOSED SITE PLAN
CLEARWATER NEW UPLAND UNK
'" J..JNE
.............
TOSHEETG-ll
;>f
'0000
;>f
o
\
\
\
\
\
~
o
~
I.ORTH ARROW
20' 10' 0' 10' 20'
~-......-
4<)'
4J
.K
00/
APPIiOVED
STATE OF FI,Ql)!DA
,IUN 1 7
DEPARTMENT OF
IRONMENTAL PROTECTION
o
m
;>f
c
c.
Dl WADi!TRIM
IC;'=:".~
.......~--
-*-"",~",-
=--:=.:..::....":.---
- -----..-.-
CLW2067-0ltol
RO
C/O
...
NO"'O
t::lIIlIoI:I
.~~..:.............
ro..-rC-10
RECORD DRAWINGS
MAlOIIlfE
~,~ ..,.................
~ ~""""
7.'
MATCHUNE
...M.F~ -~....
,7 ';'J't".12
"1
.
NORTH ARROW
20' 10' 0' 10' 20' 40'
~....._- I
F
APPROVED
STATE OF F~QBI,RA
EO
llUN 1
DEPAfHMENT OF
ENVIRONMENTAL PROTECTION
II
"
"
"
G
8
ca.IC. &lDEWALX
_ ~:~-. ;;,,::if :::,,:--,---,-~--:::: :::::~ ::~:__: ~:::- - - - --
."
.
~"
"
"
",
011
I
I
I
I I
.. I I
...~..............t...............~..
"
~
-Jf
-Jf
9 ~_
-==r----..------:. --'::~ .~.\.
.:If .......:If ~.,<<:'ow..
· It] WADETRIM
----..-- ~
=--~~~-=-
c.-...~..,_
--- ............--
<D
ENGINEERING
-
AS
""m>
CR
CALl..l..ClCAl..1"I.8l..1C
IlTll..ITY HOTIFIGA.TlON
~=
-'!i!l'a-
CLEARWATER NEW UPLAND UNK
RO
PROPOSED SITE PLAN
, "
...IOl.C_11
::=.::
--
MATCHl/NE
................~.
- I : . : . 1. : - : . : - :TP~e.cc~13. . : . : . : _ : . . _
I.. .f.... - -.... -...
.. .. .. .. .. - ~ .. .. .. .. .. .. .. .. .. ..
. . . . . ./- . - . . . . . . . . . . . . . . . . . . . . . - . .
.. .... ........................
/ ... - . . . . . . . . - . . -
~ : ~ : ~ / : ~ : ~ : ~ : ~ : ~ : ~:i~~ : : . .
. . r. . . . . - - . . . .
.. .. .. .. .. .. .. .. .. .. .. .. ..
.. .. .. .. .. .. .. .. .. .. .. ..
.:-:.}:.:.:.:.:.:-:.:.:-:
_:::::(:::::::::::::::::: .
.:.:.):.:.:.:.:.:.:.:.:.'
~ :~:~r:~:~:::~: ~:~: ~:::'
.:.:.r..:.:.:.:.:.:.: -:
::: :1:::::::::: ::::::
. 1 . . . - . . .
.. .. .. .. .. .. .. .. .. ..
.. ..............
. 'f' . - - . . .
.. .. .... .. .. ... .. .. ..
.. .. .. .. .. .. ..
. . . j' . . ..:... :.....:", . . . . .
.... '.'~",:",,:L~....
. . f" .cae.!lAe. ~
.... ...... +1!!SBfCl.l.. ..
.. .. .. .. .. .. .. .. ..
. . r. - . . . . . .
.. .. .. .. .. .. .. .. ..
.... ..............
: : : :1: : : : : : : : : : : : : : :
. . ] . - . . . . .
.. ... .. .. .. .. .. .. ..
.. ..............
. - 't' . . . . . c...:...;..'
.. .. .. .. .. .. .. .. ..
..........~...
. - 1- . . ,r1t.l. At:>.~.~~1Ii . '
.. .. IM'WAlt,.PAIKI<<i lor ..
, f - . , . . . .
, . , , , . , , . ~
, ./' . . . ' . . . . , . , . . '. I
.. .. .. .. .. .. .. .. ..
.. .. .. .. .. .. .. .. ..
'I' - . . . , . , .
, ..... - . , ,
. f' . . . . . - .
.. .. .. .. .. .... ..
.. .. .. .. .. .. .. .. .. ..
</:::::::::::::>
.....~
ff1. CIIOIl
.. .. cae. ale
.. .. .. .. ..
...!::::::::::::~~L..~
-1-... -'. -... -...... -'.
., .." ,. "~~.~"."."~ri~.~.
10 IlHEET C-11
I
I
I
I
I
~
/
I
I
I
I
I
I
/
MATCHUNE
..........................
TO SHEET 0-13
+
NORTH ARROW
20' 10' 0' 10' 20' '0'
.....---- ,
"f
C:J
APPROVED
EJSTAl.~~ ~F ~LORI~
l\ '''-I I I
DEPARTMENl OF~ .
ENV1RO~\MENIf.:.u::.ROTI:'-' T.Qt!.
~=~SlCH5
r(TYP TH~S 73/a?
~
~
,;7J~~~;;.:"~i~:~~t;f,.C
-.....' ".--
~
COtIC, CURB
~'f~~
.,.~, ~ '::;" -
""..;" .......-
.../,_..'";~:'.:.- ".
. , ,,~. , . f . .'~
'p.>-c' ~~:"::;, ~:':,:-L:,~'"
f(5CGNC aJlO!l
..
L....
, .
lit MATCHUNE
....!..ll ~ ......~.....................
TO SHEET G-11
RECORD DRAWINGS
(;'~ .......ffi
~~' .
n .a
,....\" - '#1
~(R1';:""
CITY OF ClEARWATER-. FLORIDA
ENGINEERING
It] WADETluM
........--
".......tlI.I, '-""-11.-.
---
~"~Itt.l_
---... ...-.....-..".....
1:!!!!,...
CALL LOCAL ~IC;';
UTlLtfl' NOTIPICATIQt
~:~~
NEW UPLAND LINK
AS
NOTEO
"""
rcr"C_;2
PROPOSED SITE PLAN
=
--
.. ~ ~ .. ~ I .. .. .. .. ........ &E~~t ~ 0-
i0~-::.::::::::;.:::::::::::: :~~;.c~:
/, :.:.:.:.:':.: -j . : . : ' : ' : . : . ~, : . : ' ~~
/ ..:.:.:.:.:.:.:;:.:.:,:.:.:.:.:,:.:.:,:.
/ . ......'...../.....'..... ','.', '.'.','.
(1~: : ~ : ~ : ~ < ~ :l)~: : : : : : ~ : ~ : ~ : ~ : : : ~ : ~ : ~ : ~ : :
.'.r.....,....... '.',....',....'.',...,'..
: : : : j: : : : : : : : : : :j(: : : : : : : : : : : : : : : : : : : : : : : : : : .
. . ~ . . . . 'j' . . . . . . . . . . . . .
. . I' . . . . r . . . . . . . . . . . . . J
. : : : :1: : : : : : ;~: : : : : : : : : : : : : ::~~~ ~~ :
. .[. 'j' . .. . . . . . , . . . .
. ::J::;.:::::::: :::::::::::::......
. .t./. . . . . . . . . . . . .
. .... .........................
...f.I.........'..,.....,............
.. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ..
.. ............................
.. ............................
.. .. .. .. .. .. .. .. .. .. .. .. .. .. ..
.. .. .. .. .. .. .. .. .. .. .. .. ..
/
/
/
I
I /
II
l
/1
,
I
\
\
\
\
~ /
\V
1\
I \
I I
/ /
I /
II I
I I
I !
/ /
/ /
.----'
t !
\~
\\
\~
\
\
I':.:::::::::::i:::::::::::::::::: .
: . : . : ' : -: . : . F . :- : . : . :- : ' : . :- : . .
(f.....,....' ./.....'... -....,....
/. .:.: - :.:. :-j':-:':': -:.:.:.:-:.'
(:::::::: :~/:::::::::::':':'"
'-:':':'.'f .....
.
NORTH ARROW
20' 10' 0' 10' 20'
1.J""o..-_-
40'
I
.
~
C-:.
-
ClV-C:fV-CN_CTV_Cl'
COle. """
~---------'
- COlIc- "DIIl<LK
COle. """
A
o
o
0<~:O'
o
-"
APP lVED \
T. E O.F l.ORDA \
~:-I ~~-- ]
" , \
DEPARTMEr--!1 OF
ENVIRON'MEN'fA ~\TE'CTION
,/ "
// /'
~/ ,~
/y>/
/'
~
...;..-~: .
~~;~;':'.'I:1.1~':;..
.~ '. -' _~: c~'t7 0(
~.,:.. ;:':6 flr:.;.
.~~";;;;:.,:~;: ~.-,~"" "
. ............~...........~~~~~..
TO SHEET c-12
/. . . . . . . . . . . . -
.. .. .. . .. .. .. .. "CClNC.CUIlIe
.~o "j' . . . . . . . . . . . . .
),'.::;:::::::::::::::: :::::.
.! 'f' . . . . . . . , . . . .
./.... .....'....................
-, .. ..~~............;..;.~.~.;..~......
TO SHEET c-12
"RECORD DRAWINGS
It] WADEl'RIM
......,....
=-~~.:.:.-
~..,.......IiLI_
-.......- .............--..-
!.5i"
NEW UPLAND LINK
RO
ENGINEERING
CALL LOCAl. f'IllJl..lC
LlTILfTT NOTIFICATION
_~~'1:-
PROPOSED ~TE PLAN
'"
NOTED
~
--"
Legal for Downtown Boat Slips
That portion of City owned land bounded on the North by the North line of the NE % of
Section 16-29-16; Bounded on the South by the south right-of-way line of Pierce Street;
Bounded on the West by the waters of Clearwater Harbor; Bounded on the East by the
West rights-of-way lines of Pierce Boulevard and Drew Street.
Together with that portion lying in the 1200 foot right-of-way of Memorial Causeway
(State Road 60) lying East of a line 109 feet Easterly of and parallel to the centerline of
the Intracoastal Waterway channel.
Together with M&B parcel 21/011.
Together with the land described in the Internal Improvement Fund (IIF) deeds 17496,
17500, and 17512 lying East of said line 109 Easterly of and parallel to the centerline of
the Intracoastal Waterway channel.
Together with that portion of City owned land bounded on the North by a line 300 feet
North of and parallel to the North right-of-way line of Pierce Street; Bounded on the
South by the North right-of-way line of Pierce Street; Bounded on the West by the East
right-of-way line of Pierce Boulevard; Bounded on the East by a line 415 feet West of
and parallel to the West right-of-way line of Osceola Avenue.
City of Clearwater Land Ownership
During the preparation of the initial boat slips feasibility study in 2006, a review of past
and present deeds and title documents was conducted to determine whether existing
bottom lands upon which the proposed boat slips will be build are owned by the City.
With the exception of the Island View Condominium project (former Calvary Baptist
Church property), the City of Clearwater owns all of the lands lying between Drew Street
on the north, Pierce Avenue on the South, Osceola Avenue on the east and a 1200 foot
wide (Le. 700 feet south and 500 feet north of the original Memorial Causeway Bridge)
strip of land between the mainland and Clearwater Beach. There is a small area of
bottom lands on the north end of the proposed boat slip project that is outside of these
City owned lands. The City will need to secure a submerged land lease from the State
of Florida for this submerged parcel as part of the permitting process subsequent to City
approval of the project. The specific boundary of this submerged parcel will be
determined and legally described during the FDEP permitting process.
Downtown Boat Slip Project
0.89 Acres
Clearwater
Harbor
,.f,'.! ./......:,::~tl... .".. "' t .... .,~~;.~. t.u ,., II..... I'"
,"IL.........
. " :~. .1Il."
.... : ~. ..,....
j / ,......
: ,'" ........
;; ..~..~
! f...:,::/.
1/
. .
. .. ..... ..
" .. C/) ~
'. ;
. .
.. .
~ 14.19 Acres
~
co
o
"'~
O+I'1lC
~8~
1>8
"'q,~
.
;: ...
.......
~~...".ii
""'.. ",...",
....., "'0:...
\ \
:'I!I.'~"'I"IIl.'I'''''II''''.''''''''''I''''''''''''''''",,",.......,.
CLEVELAND
,'" ..,.... ....... ,... ... ......... .....;
.
.
1.35 Acres ·
.1'
...,............'1...11'.'.......
: w
i ~
7.53 Acres
\.
':.
. .
...,......'....I.......I'...II...I.~....I.............I."'...I.....;.
J....II"........".......
~.........I........':
.....:,.
..~........ ....
-.." ;..
.....i.;~
PIERCE 8T
;.
--p: ~
c. 0
~ ~
'Z r-
':.
- Clear\\'arer
-~
~
Acreage for selecte,j City Own>3-0 P:"opert;es " :1"'8 DGwntowr-
Area
\.,eaend
'"'~'?oareC ~\!
'::'''";.~I,1eer~n-b ,)€:Da;::-na~
";,;C~!'18jOg-, J!\',~':.,
"''''''..:;e<=...."ate~ ~_
1 ~ ~ ~ "
~ v'
;?3E' 3
1:<29s.."' 5fS
w
>
'"
'"
0
w
u
'"
0
z
sr
.D
>
'"
!;'
0:
;;
i7)
!i'
0:
'"
r
;;;
5'
i..AURA$1
r
a:
0
z
ST
w
>
'"
z
o
'"
~
0'
'"
@
u
'"
o
~
0:
E
"ti
).."
..-i ~_
\'T'i'
-:-.::
Project Description
The initial planning and feasibility studies for the Clearwater Downtown Boat Slips
project commenced in March 2003. In July 2006, a team of consultants working with
City staff finalized the Clearwater Downtown Boat Slips Study which provided
recommendations for approximately 138 to 140 wet slips generally located north and
south of the new Memorial Causeway Bridge between Drew Street and the existing
Pierce 100 Condominium. The study recommended utilizing a concrete floating dock
system providing slips and side moorings with slips generally ranging is size from 30 feet
to 55 feet and side moorings capable of accommodating vessels of approximately 100
feet in length. In March 2007 a City-wide referendum was held with voters approving
the project. The proposed boat slips will also accommodate transient boaters, mooring
of boats for Coachman Park or other downtown activities, a ferry landing, and pedestrian
docks for residents and visitors frequenting the waterfront area. The proposed ferry
landing will be located in the north basin at a location to be determined. At this juncture,
the precise size and/or type of ferry vessel has not been determined nor its hours of
operation, hence its location and docking needs have not been determined.
Notwithstanding, its location will not adversely impact boater safety within or outside of
the project footprint depicted on the final slip layout plan. The project has been designed
to protect the existing environmental resources including seagrasses adjacent to the
seawall through the addition of a pedestrian boardwalk connecting the Drew Street
fishing pier to the base of the marina north of the bridge and an additional dock adjacent
to the Pierce 100 Condominium. The Drew Street fishing pier will be extended and
provide for wave attenuation.
The Boat Slips project contains three primary components: (1) the floating docks and
wave attenuators, (2) a renovated restroom/laundry/and dock master's office in the
existing structure at the end of Drew Street, and (3) upland parking improvements and a
drop-off area for boaters, as well as enhanced landscaping, sidewalks, and public art.
The project as proposed is a vital component of the Downtown Development Plan and
has been closely coordinated with the recent Cleveland Street design improvements.
The Promenade structure (i.e. the pedestrian facility located on top of the old bridge
pilings), while in close proximity to the proposed boat slips, is not a part of this Flexible
Development Application. No structures will be located under the Memorial Causeway
Bridge as required by FDOT.
The City of Clearwater has contracted with Misener Marine utilizing a design-build
delivery system to design, permit and construct the boat slips with an estimated
completion date of late 2009. It is important to note that the City of Clearwater does not
issue dock permits and this Flexible Development Application represents the first of
several subsequent approvals and/or permits required for the project to be constructed.
More specifically, the Pinellas County Navigation Control Authority, Florida Department
of Environmental Protection (FDEP), and the U.S. Army Corps of Engineers must also
issue required approvals and/or permits before construction can commence.
rMODEL 400 CONCRETE FLOATING DOCK
SEE DETAILS SHr. 5 OF 6
/ MODEL 400 CONCRETE FLOATING DOC""
SEE DETAILS SHT. 3 OF 6
/
A
r/
I\~"'t.~."f"OF'~UATOR ~ LIMIT OF USE
503' -s 1/2"
r
/
71
'j
ED)
\
I
I
/
TD"~'= ~'nt "t
1 I I
I
~
1. -
~ ~l. ~
~."-a,i_1=- '5' a..rA11l .
U TYP. FOR F1NGERS
~
".L
~~.../
-<J
-(;
~
('
./
~
CO
~
~
~
~
~
I
I
f- 5'
]8'-10-
. , .
J"-10~ II 3&'-10" ll38"-tO" U 38"-10"
WOOEL 400 CONCRETE FJ.CM,11rc DOCk; \
SEE DETMS SKT. 4 OF' II
342'-10 1/4"
r- ... -11- ..
.B'~.~.~ ~ ~
~
SOUT
10'-
BASIN
I
LB'
287"41/2.
--
-..,224'
---
::": :~~~
. :\' :: ljfj: Ii ~':"":"'" . .;.. '. '.
.......{%i; 1.'. ~~~I,~~
L
'V
.;;s-
8'
o 1
o
.
,
;;;:::
rTJ
;;;:::
o
J>
~
{i30' CLEARANCE
UNE (1YP OF 2)
u.
~~
0=0 vV
'-- GENERAL LOCATION - ~
SEWERAGE PUMP OUT
FACIUTlES
12' -,
! I
i.
l.,,-
,
'\
MOOEL 400 ~MSF1..OA~~: _ \
.' --j I--+.r
\OCKC I ->- 85'
\ \ ..'-~
~\~~: D~ 1f1. ~ ~. ~ . ~ ~ "
517' """"'..
58'-'W
~
~
()
J>
C
(f)
rTJ
::;:
J>
I-If:-<
30' ClEARANCE
: ""' (M> ~ "
y
~f- ~IO Z~U~~"<
I "<
~ 0
SEAWALL
~
?Y
..)
CJ"
I
ISSUE
MO.
;::
rTJ
;::
o
2:!
J>
r
5.21.01 0
DATE REV
MO.
J>
-<
~ T
I sf
~ 1
-
'"=0
a
3
CD
/ I~
I
"'C
~
~CD
:J
Ql
g.
I;'.;
Ia
i
\:.(~
.rill'
;1!,"
..
APPROVED FOR aTY REVIEW
STATUS
1490'
r MODEL 850 WAVE ATTENUATOR SEE XMODEL 8 0 WAVE ATTENUATOR SEE
r~ODEL 400 CONCRETE FLOATING DOCK DETAILS SHr. 2 OF 6 DETAILS Hr, 2 OF 6
/ SEE DETAILS SHr. 5 OF 6
I OC =~ "-\ '\ - \\
L,I I I / I i ..,<... '\ \ /:
~ 'T L ~ '\ ~
~ ... ---+I ,.'-'0' f- -J 5' I-- -J ,). \
r="'=="".~- . 11 NORTHElASIN - Jti;;;';/"F'*"-'.'~'.i27'
~.. ...',<".\.".~.. ..lIt.;/ 'Ii' ". \
_~~ 4'~i-~#;J4!j//<i~~~L~ 77\c:::.\~~
i/iiMY3""!~" ,. -- ;~ ~
..\....:. ....:..:.. ":" ~~
::':':':':'/:':':. .:::.:.:.....:.:.~~'
.:::.:...... ~'
!"~~9~
~q.~ ~"
'0
..~/
.,./
- ,.' -11- .'
'T
i
B' -,
1-,0'
I 417'
15- CLEATS ... PER P
TYP. FOR FlNGae I: 0WJt
I
,~
r4' -1
7~
-45'~'
~. .
SLIP SCHEDULE
NORTH BASIN LENGTH Q1Y
WIDTH
1357'
2@19'
2@18'
2D@17'-11"
12"17'
s@17'
WIDTH
2@20'-6"
9@18'-s"
2@ 20'-5"
2 @ 22'-4.75"
2@2D'
2@ 19'-5"
4@ 18'-5"
17'"' 17'
16 2@ 18'-5.125"
14@19'
15@17'
16@ 12'
o "'"'-<l:T ~_____________
APPROVED AS SUBMITTED
A JI[1'ALDREVIE\IlFnaEllOO.IlIDfTSlSlIECIUIREJL
Pll:O..ECT VIU. IE IULT AI SHlJWN I'INJ ....Y COfTADI
Elll:EI"TDC TMOI TO PML.ECT SPU:'!F1CATlIK nESE
IIIUEN1'I: IEXD€ PART IF nE aJrfI1IACT lI'DN
MPf<N....
o APPROVED IJITH COMMENTS
ICI RE-suMTTM.. llDllIDlED.
DOCK A
SO'sUPS
24
DOCK B
DOCK C
SO' SLIPS
45' SLIPS
12
5
SOUTH BASIN LENGTH Q1Y
~
~
DOCK A
SO'slIPs
11
DOCK A
55' slI PS
11
U'
40' SUPS
DOCKB
DOCKB
17
<"
50' SLIPS
APPROVAL REQUIRED
50' 0
~--
- -
DOCK C
DOCK 0
45' SLIPS 15
30' SUPS 16
TOTAL SLIPS
QTY 16 30' SLIPS
QTY 17 40' SUPS
QTY 20 45' SLIPS
QTY 63 SO' SU PS
QTY 11 55' SLIPS
TOTAL SLIPS = 127
UGtMn.EJ_______________
nus APPRDVAL SET .MIST BE SIGED AND
RETURNED FCR PROJECT TO PROCEED.
25'
so'
'00'
I
GRAPHIC SCALE
1" = 50'
o REVISE AND RE -SUBMIT
D<<1.UIE: VJTH IlEVtDM 'llCDEATm
FINAL SLIP LAYOUT
A ucusr 29, 2008
I'IJTEI PILE DESIGN TO BE FINALIZED AFTER ANCKJil:ING ANAL YSlS IS CDM'LETED.
DRAWING ISSUE RECORD
8 IIEVIIED PER Cl.II1DEJt REVIEV 2IAUli08
7 04"'-
. ,,-,~ .....-
g--
111111........ _
..... ........ ......
WI..ner Warfne Construction. Inc.
Tampa. norfda
.......~ ~ 41J'Ift'
~rrJf-~
PIJTD llIXK AND ""/WE A11'nf.JA11Jt SYSTEMS ME NOT DESIGNED m RESIST F1R:ES ASSOCIATED
VlTH I-lJRRICME SltRM EVDfTS.
NOm lIIlCI( NGI \lAVE l\TTOIJlteTml: SYSTEMS NI!E. fill I:E:SJGNED m RESIST F1lRCES IJR A"TTEfrlMlTE
"'AVES ItSSDCIATED VIlH UJNG PERIOD S\I'ELLS,
THIS IlRAVING COrlTAINS, PRIlPRIETMY IWIJRMIflTIDN VHlCH IS Tl€ PRlFERTY rE' SMJREMAS1'ER INC.
AND SHALL N:JT BE ctPIED, REPRDDUCED [II MAllE AVAILAIlLE TO f1I4Y PERSQrKS) 'W'ITlOJT
PRUII 'W'RITTEN a:NSENT IF stIJREMASTER JNC.
----.- .
~I~ · SUl'S
.,....T~~ ~ 3 NGI
~~~.. :.. LCUTD ~
V.P.- ..Mel OPERAnONS
CLEARWATER MARINA
au: U: I ~/U/"
~";' I _n
DWG ,:
.
CUEMl ~~ ~. r.:.:L =. EST.
D1STRlIUTlON
(}J h iJI..L
I APPROVED BY
mu
CLEARWATER DOWNTOWN BOAT SLIPS
AND UPLAND IMPROVEMENTS
COMPLIANCE WITH DOWNTOWN DISTRICT (D)
Section 2-903.H
The proposed project furthers the intent and purpose of the Downtown District by
providing additional opportunities for recreational boating in close proximity to the
downtown, improved pedestrian facilities enabling residents and visitors to better utilize
the waterfront, and enhances the aesthetics and appearance of the waterfront
contributing to the redevelopment goals of the downtown area.
The proposed project is located in the Downtown (D) District. Pursuant to Section 2-
903.H of the City's Land Development Code, "Marinas and marina facilities" require
review and approval by the Community Development Board (COB) as a Level 2
application. The code requires the applicant address specific flexibility criteria outlined in
this section as follows:
1. The parcel proposed for development is not located in areas identified in
the Comprehensive Plan as areas of environmental significance including:
a. The north end of Clearwater Beach
b. Clearwater Harbor grass beds;
c. Cooper's Point;
d. Clearwater Harbor spoil islands;
e. Sand Key Park;
f. The southern edge of Alligator Lake
Comment: The proposed project is not located in any of the referenced areas
with the exception of its proximity to Clearwater Harbor grass beds. The project
has been consciously designed not to impact grass beds in the harbor. Project
consultants have mapped existing sea grass beds along the entire waterfront
area of the proposed project. The slips and docks have been located in a
manner to avoid any sea grasses.
2. No commercial activities other than the mooring of boats on a rental basis
shall be permitted on any parcel of land which is contiguous to a parcel of
land which is designated as residential in the Zoning Atlas, unless the
marina facilities are totally screened from view from the contiguous land
which is designated as residential and the hours of operation of the
commercial activities are limited to the time period between sunrise and
sunset.
Comment: Properties located north and south of Cleveland Street in the
downtown are designated Downtown (D) District. Consequently, there is no
residentially zoned property contiguous to the project.
3. The design of all buildings complies with the Downtown District design
guidelines in Division 5 of Article 3.
Comment: The existing structure located at the northern end of the project
proposed as restrooms, laundry facilities and Dock Masters office had fallen into
disrepair is being renovated as part of this project and will be compliant with the
referenced design guidelines. More specifically, the materials and colors
employed in the renovation of this structure comply with the Downtown District.
Please refer to the color elevations of the structure in Section 6 of this package.
4. All marina facilities shall comply with the commercial dock requirements
set forth in Section 3-601.C.3 and the marina and marina facilities
requirements set forth in Section 3-603.
Comment: Please refer to Section 4 and 5 of this package which addresses
compliance with these criteria.
CLEARWATER DOWNTOWN BOAT SLIPS
COMPLIANCE WITH DIVISION 6 DOCK/MARINA STANDARDS
SECTION 3-601. DOCKS
The proposed project requires City of Clearwater approval and Pinellas County Water
and Navigation Control Authority permit. The City of Clearwater approval is processed
as a level Two (flexible development) approval. The proposed project is classified as a
"Commercial dock" because it is being constructed and maintained by the City of
Clearwater. As such, the project must address the criteria outlined in Section 3-
601.C.3.a-g as follows:
a. Use and compatibility
L) The proposed dock shall be subordinate to and contribute to the
comfort, convenience or necessities of the users or the
occupants of the principal use of the property.
Comment: The principal uses of the property abutting the proposed
boat slips is a waterfront park (Coachman Park) and parking for the
Harborview Center. The proposed project is one component of the
City's Downtown Redevelopment Plan. As such it will contribute to
the comfort and convenience to the residents of downtown and the
City as a whole. The primary users of the facility will be the boaters
who lease dock space, transient boaters visiting Clearwater,
recreational boaters docking at the facility for activities in Coachman
Park, and the general public visiting the waterfront area.
ii.) The proposed dock shall be in harmony with the scale and
character of adjacent properties and the neighborhood in
general.
Comment: Other than the small dock located at the Pierce 100
Condominium there are no docks in close proximity to the proposed
project. The proposed project has been sensitively designed at an
appropriate scale, character and intensity to compliment
neighborhood residential, commercial and recreational uses
proximate to the site. It is important to note that this is a "municipal
marina" project which is notably different than small private docks.
This project was approved by a city-wide referendum in 2007, and is
envisioned as another catalytic contributing to the redevelopment of
the downtown. The upscale design of the project and proposed
roadway, parking, public art and landscaping will ensure the project is
in harmony with the neighborhood.
iiL) The proposed dock shall be compatible with dock patterns in the
general vicinity.
Comment: Other than the small dock serving the Pierce 100
Condominium, there are not docks in close proximity to the proposed
project.
b. Impact on existing water recreation activities. The use of the proposed
dock shall not adversely impact the health, safety or well being of persons
currently using the adjacent waterways for recreational and/or commercial
uses. Furthermore, it shall not hinder or discourage the existing uses of
the adjacent waterway by uses including but not limited to non-motorized
boats and motorized boats.
Comment: At the present time the only boaters utilizing the basins north and
south of the new Memorial Causeway Bridge are boaters who infrequently gather
between the channel of the Intracoastal Waterway and the seawall adjacent to
Coachman Park for 4th of July and/or other park activities. The channel is well
marked and a slow speed minimum wake zone is in place, between Pierce 100
and the Seminole Launch Ramp, to maximize boater safety.
City Staff and the consultant met with the U.S. Army Corps of Engineers in early
2008, to establish a safe setback from the centerline of the channel of the
Intracoastal Waterway. It was determined that vessels with widths up to 25 feet
could dock along the outside wave attenuator docks along the existing channel in
a safe manner.
Three controlled access points into the boat slip basin are being provided. One
from the southwest, one from the northeast and one from the west near the
proposed promenade. The outside wave attenuators proposed for the boat slips
will parallel the channel and will be available for transient vessels.
The public dock depicted on the final slip layout plan is designed for docking of
vessels coming to events at Coachman Park.
c. Impacts on navigation. The existence and use of the proposed dock shall
not have a detrimental effect on the use of adjacent waters for navigation,
transportation, recreational or other public conveniences.
Comment: The City's Harbormaster has determined the proposed dock will not
adversely impact the health, safety or well being of the current users of adjacent
waters. There is a slow speed minimum wake zone currently in effect from the
Pierce 100 Condominium to the Seminole Launch Ramp which covers the entire
boat slip project thereby minimizing the impact of the proposed facility on
adjacent waters for navigation, transportation, and recreational boaters traversing
the area west of the marina.
Additionally, subsequent to City review and approval of this application, U.S.
Army Corps of Engineers and the Pinellas County Water and Navigation Control
Authority will review the proposed project to ensure the project does not have
detrimental effects on the use of adjacent waters for navigation. Discussions to
date between project team members and the U.S. Army Corps of Engineers in
Jacksonville have been positive and a permit is anticipated.
d. Impacts on marine environment
i.) Docks shall be sited to ensure that boat access routes avoid
injury to marine grassbeds or other aquatic resources in the
surrounding areas.
Comment: Underwater field studies were conducted in May 2006 in
support of the proposed project. The studies were conducted to
determine the presence and locations of the seagrass and notable
benthic communities within the project area. Seagrasses were
mapped and the docks located and designed to protect the
grassbeds generally located adjacent to the existing seawall. (Please
refer to the slip layout plan that depicts the location of the
seagrasses.) Currently, these seagrasses are unprotected from
boaters entering the area. The location of the pedestrian dock
paralleling the seawall in the north basin and the additional docks
paralleling the seawall at the southern end of the south basin will
effectively protect these seagrasses from boaters who have
historically entered these areas and damaged seagrasses during
special events.
ii.) Docks shall not have an adverse impact upon natural marine
habitats, grass flats suitable as nursery feeding grounds for
marine life, or established marine soil suitable for producing
plant growth of a type useful as nursery or feeding grounds for
marine life; manatee sanctuaries; natural reefs and any such
artificial reef which has developed an associated flora and fauna
which have been determined to be approaching a typical natural
assemblage structure in both density and diversity; oyster beds;
clam beds; known sea turtle nesting site; commercial or sport
fisheries or shell fisheries areas; and habitats desirable as
juvenile fish habitat.
Comment: In addition to the response above, it is important to note
that manatee records kept by the FFWCC Florida Wildlife Research
Institute were reviewed during the preliminary design of the project.
Records can be dated back to 1974. I n the last 32 years, there have
been two (2) confirmed water craft related manatee deaths within one
(1) mile of the project site. Throughout all of Pinellas County, which
includes Tampa Bay, there have been 28 water craft related deaths.
While manatees frequent the area, it is not expected that the addition
of slips will increase the threat. Notwithstanding, a manatee
protection plan will be required as part of the state and/or federal
permitting process.
There is a band of barnacles growing on the seawall face as well as
anthropogenic debris found along the seawall and underneath the
Drew Street fishing pier. The oyster clusters have colonized but have
aged to the point of being indistinguishable from a naturally developed
population. The proposed boat slips will not adversely impact the
noted marine resources.
e. Impacts on water quality
i) All turning basin, access channels, boat mooring areas and any
other area associated with a dock shall have adequate
circulation and existing water depths to ensure that a minimum
of one foot clearance is provided between the lowest member of
a vessel (e.g. skegs, rudder, prop) and the bottom of the
waterbody at mean or ordinary low water (-0.95 NGVD datum).
Comment: Water quality data were collected in April 2006 by the
City's consultant team. Surface water samples were collected at four
stations, surface and bottom for the deeper sites and surface for
shallow sites and analyzed for fecal coliforms, metals, salinity,
dissolved oxygen, turbidity, Nitrate, Nitrite, Nitrogen and
Orthophosphate.. Salinity, turbidity and dissolved oxygen were
analyzed by Delta Seven, Inc. field ecologists.
The site meets the state standards for levels of fecal coliform and
metals with the exception of copper. Copper values exceeded state
standards at one location. Data obtained from the Environmental
Protection Commission of Hillsborough County (EPCHC) indicated
that high values are not uncommon and copper appears to be
elevated throughout the system. Water quality impacts will also be
evaluated during the forthcoming permitting of the project by FDEP
and the U.S. Army Corps of Engineers.
A bathymetric survey was conducted for the site (see copy of survey
in this package). This is a plan view drawing showing sounding data
and contours at 1 foot intervals. The maximum depth within the study
area is approximately 16.9 feet at the edge of the Intracoastal
Waterway and a minimum depth is approximately 0.1 feet at the
seawall. The depth beneath the proposed boat slips ranges from
approximately 5 feet to approximately 16 feet. The water depth under
Dock D (the dock located in the shallowest water) is 4.9 feet at mean
low tide, which provides for more than one foot clearance distance
between the bottom of the vessel and the bottom of the waterbody at
mean low. It is envisioned that these slips will accommodate the
smallest vessels with the least draft. This depth is sufficient to
accommodate vessels envisioned to utilize the marina without
adversely impacting bottomlands.
ii) The dock shall not effectively cause erosion, extraordinary storm
drainage, shoaling of channels, or adversely affect the water
quality presently existing in the area or limit progress that is
being made toward improvement of water quality in the area in
which the dock is proposed to be located.
Comment: The docks as designed will not cause erosion to
bottomlands by vessels utilizing the facility. Conversely, the project
will afford a higher level of protection than currently exists in the areas
below 5 feet due to the proposed docks paralleling the existing
seawall westerly of the existing grass beds.
The City will be seeking a Florida Clean Marina designation which is a
voluntary non-regulated designation for the facility which is a program
that acknowledges and rewards environmentally conscious marina
facilities. Administered by FDEP, the marina must meet select criteria
including compliance with environmental regulations and submerged
land lease, and utilize Best Management Practices determined from a
self-assessment checklist and designated review. Other factors
involved in the Clean Marina program include an available resource
person at the marina to provide customers with environmental
information, adequate and well managed trash/garbage and recycling
containers, posting for viewing, or otherwise publishing, a set of
environmental policies used by the marina, water and land of the
marina clean without signs of oil, sewage or litter, sewerage pump-out
facilities located in the marina.
f. Impacts on natural resources.
i) The dock shall not have a material adverse impact upon the
conservation of wildlife, marine life, and other natural resources,
including beaches and shores, so as to be contrary to the public
interest.
Comment: As noted in the previous responses above, the proposed
project must meet additional county, state and federal approval and
permitting requirements (subsequent to City approval) ensuring no
material adverse impacts upon wildlife, marine life, and other natural
resources. Studies and evaluations of the proposed facility as
presented in the July 2006 Clearwater Downtown Boat Slips Study,
prepared by Wade Trim, Inc., indicate there are no adverse impacts
identified at this juncture in the design process. There are no
beaches proximate to the site and additional protection to the existing
seawalls is anticipated as part of the project design.
ii) The dock shall not have an adverse impact on vegetated areas;
vegetative, terrestrial, or aquatic habitats critical to the support
of listed species providing one or more of the requirements to
sustain their existence, such as range, nesting or feeding
grounds; habitats which display biological or physical attributes
which would serve to make them rare within the confines of the
city; designated preservation areas such as those identified in
the comprehensive land use plan, national wildlife refuges,
Florida outstanding waters or other designated preservation
areas, and bird sanctuaries,
Comment: The project as designed will not impact existing
seagrasses or ichthyofaunal and elasmofaunal species that might be
present in the area. A manatee protection plan will be required as
part of the subsequent state and federal permitting processes. The
waters of Clearwater Harbor are designated as Outstanding Florida
Waters. The layout of the slips, docks and pedestrian walkways,
proposed Clean Marina designation and compliance with county, state
and federal permitting requirements serve to ensure the proposed
facility will not have impacts on habitats noted above.
g. Impacts on wetlands habitat/uplands. The dock shall not have a material
adverse affect upon the uplands surrounding.
Comment: As previously noted, the proposed project will not impact
existing wetland habitats. There are no upland habitats of
significance impacted by the project. Conversely, the project will
improve the uplands adjacent to the boat slips by providing additional
landscaping. Upland improvements include sloping the existing
sidewalks along the seawall to drain toward upland landscape areas.
Currently this area is constructed without regard to preventing
overland flow towards the seawall.
h. Dimensional standards.
i) Setbacks. All commercial and multi-use docks shall be located
so that no portion of such dock is closer to any property line as
extended into water than ten percent of the applicant's property
width measured at the waterfront property line. Multi-use private
and commercial docks abutting adjacent waterfront single-family
or two-family property must be setback a minimum of one-third
of the applicant's waterfront property width from the adjacent
waterfront single-family or two-family property.
Comment: The property line extends 1,357 feet along the existing
seawall between the property line on the north and the property line
adjacent to the Pierce 100 condominium on the south. A 10%
setback from the northerly property line would be 136 feet. As
currently designed (but not permitted), the proposed boat slips would
be 19.0 feet from the north property line, hence a deviation from the
code of 117 feet is being requested. A 10% setback from the
southerly property line would also be 136 feet. As currently designed,
the proposed boat slips would be 7 feet 8 inches from the southerly
property line, hence a deviation of 128 feet 4 inches through this
Flexible Development Application. It is important to note that final
permitting of the boat slips by county, state and federal agencies
could alter these setbacks as currently identified.
ii) Length. The length of commercial and multi-use docks shall no
extend from the mean high water line or seawall of the
applicant's property more than 75 percent of the width of the
applicant's property measured at the waterfront property line.
Tie poles may extend beyond the dock provided such poles do
not extend 25 percent of the width of the waterway and do not
constitute a navigational hazard.
Comment: The boat slips as proposed extend approximately 685 feet
from the seawall to the outside edge of the westerly attenuator docks
at the deepest point of the project. Seventy-five percent (75%) of the
width of the property is 1017 feet. Consequently the proposed boat
slips comply with this standard. The length of the docks is restricted
by the channel of the Intracoastal Waterway.
iii) Width. The width of commercial and multi-use docking facilities
shall not exceed 75 percent of the width of the applicant's
property measured at the waterfront property line.
Comment: As depicted on the enclosed final slip layout plan, the
width of the docking facility is 1,490 at its widest point from the
northerly point of the fishing pier to the most southerly dock paralleling
the channel. The width of the property is 1,357 feet generally at the
seawall. Seventy five percent of the width of the property is 1,017
feet. Therefore, the docking facility exceeds this standard by 473 feet.
Because of the irregular shape of the parcel (1,490 feet along the
channel and 1,357 feet along the seawall) the boat slips are wider
along the channel than along the seawall (property line). Additionally,
it is important to note that no boat slips can be constructed under the
Memorial Causeway Bridge as required by FOOT. Consequently the
boat slips have been designed in two completely separate basins
north and south of the Memorial Causeway Bridge which is
approximately 112 feet wide at the boat slip site. Given these site
constraints, a request to deviate from this standard is appropriate.
iv) Covered boatlifts. Covered boatlifts are permitted provided a
permanent and solid roof deck is constructed with material such
as asphalt shingles, metal tile or wood. Canvas and canvas like
roof materials are prohibited. Vertical sidewalls are prohibited
on any boatlift or dock.
Comment: No covered boatlifts are proposed as part of this project.
v) Deviations. Deviations from the requirements of this section
may be considered and approved by the community
development board in order to comply with the review criteria
established in sections 3-601 (C)(3)(a)-(g).
i.
Comment: A deviation for subparagraph above is being requested.
Publicly owned facilities. Roof structures shall be permitted on
publicly owned boardwalks, observation platforms, elevated
nature trails and other such structures not intended for use as a
dock facility, however, vertical walls shall be prohibited.
Comment: The proposed boat slips will be publically owned. No roof
structures or vertical walls are proposed.
Section 3-603. Marinas and marina facilities.
A. All proposed activities including, but not limited to, fueling,
pumping-out, chartering, living -aboard, launching, dry storage
and the servicing of boats, motors and related marine equipment
shall require approval in accordance with the provisions of the
zoning district in which the marina or marina facility is proposed
to be located.
Comment: No fueling facilities will be provided as part of this project.
Sewerage pump-out facilities will be provided within the north and
south basins project. Live-aboards will not be allowed as part of the
project. No dry storage is proposed as part of this project. No
servicing of boats, motors and related marine equipment will be
permitted at the facility.
8. For marina facilities located adjacent to residential districts, no
fueling or launching facilities shall be located within 20 feet of
the residential property line, and no fueling or servicing of boats
shall occur at such marinas after 9:00 p.m. or before 6:00 a.m.
Comment: No fueling facilities are proposed as part of this project.
No boat launching facilities are proposed. No servicing of boats will
occur after 9 PM or before 6 AM.
C. No fuel storage facility or sanitary pump-out station holding tank
shall be located over water..
Comment: No fuel storage facility or sanitary pump-out station
holding tank above water are proposed as part of this project. The
sewerage pump-out facilities will be located, designed and permitted
to meet state and local requirements. The precise locations have not
been determined by would likely be located inside the project along
the east/west docks paralleling the Promenade. The specific
locations will be identified on the final construction plans.
D. The marina shall pose no hazard or obstruction to navigation, as
determined by the city harbormaster.
Comment: The City's Harbor Master, Mr. William Morris, has
determined the marina will pose no hazard or obstruction to
navigation. Please refer to previous comments above regarding
navigation.
E. The marina shall not adversely affect the environment, including
both onshore and offshore natural resources.
Comment: Please refer to the numerous responses above
addressing the marinas impact upon onshore and offshore natural
resources.
F. Adequate sanitary facilities shall be provided landside and a
sanitary pump-out station shall be provided and shall be
available to marina users 24 hours a day.
Comment: Sanitary pump-out facilities will be provided in the north
and south basins to accommodate the project. In addition, the City
owns a sewerage pump-out vessel that could be utilized at the site if
needed. The City has adequate sewerage treatment capacity to
accommodate the project.
An enclosed trash comp3ctor receptacle will be provided at the Dock
Master office building at the north end of the project as noted on the
final slip layout plan. Additionally, at least two trash collection facilities
will be provided to serve the south basin.
G. A manatee protection plan shall be provided and appropriate
speed zone signs shall be posted to control boat speed for
manatee protection.
Comment: There is an existing slow speed minimum wake zone
currently in place between the Pierce 100 Condominium and
Seminole Launch Ramp with posted speeds to control boaters and
protect manatees that might frequent the area. A manatee protection
plan will be developed as part of the state and federal permitting
processes.
H. Adequate spill containment areas shall be provided on the
property.
Comment: As noted, there are no fueling facilities proposed as part of
this project. Similarly, sewage pump-out facilities are proposed as
part of the project in the north and south basins. In the event of a
spill, the City has a containment process utilizing absorbent booms
and pads to contain spills.
I. Design of the marina shall maintain existing tidal flushing and
aquatic circulation patterns.
Comment: Tidal flusing studies and aquatic circulation pattern studies
are not required as part of the City permitting process unless called
for. The City does not issue dock permits, but relies upon the
required permits and/or approvals of Pinellas County, FDEP and the
USCOE, where these issues are thoroughly addressed.
J. In the event of conflict between these standards and federal or
state law or rules, the federal or state law or rules shall apply to
the extent that these standards have been preempted; otherwise,
the more stringent regulations shall apply.
Comment: The City of Clearwater does not issue dock permits.
Since the proposed boat slips are classified as "commercial docks"
under the City's Land Development Code, Community Development
Board approval is required. Dock permits are issued by the Pinellas
County Inland Navigation Control Authority, Florida Department of
Environmental Protection and the U.S. Army Corps of Engineers, all
subsequent to Flexible Development Approval by the City. Each of
these permitting requirements is more stringent than the City's
approval of this project.
~
-". '-.-.>..""""....."'-~
~"""'."-",4
~'<"
, ~~,r,':t0CE
~I
-2~:f
~J)
2~-~
~)
,~-:
~
i
i
I
'"
i
~
""
~
~1
'!:l'
:'~
\
?
~.
i
I
I
I
i
---I
+-,1
col
>1
,.-- I
llj I
I
'H I
i
I
//
&....
-
/'-""
""
"'-....
ill
i
I
..
it
1!~
;~
'" ~
~ ,
q
I !
\/'/(): /?
~ ~~At
~
--::J1I1>
,~
,,',,' \:.." - \\. -
~,-, ----~
'-
/,,-
..j:.
..
t
.
i
I
r'
(:~,
,
,"
(lJ ·
.-.---.
llJ
.f-')
H)
lij I
.
I
~
g~" f
.~} :1
k
;
[
I
i
UJI
.
,
.
I
I
~I
r I
;
:1
.
I
i IIU":;-~""\' .
",. \'
-...
~
...~
~.
i
.~
i
IJJ i
,
i
i
I
I .1 i.
I
i
.
i
j
;
1
'f:W~(WSlBl ~
'l 'l
,- 0
0 C
0 ;;l Z
:;::0 =
'l ~ ::r>
:;::0 ~ --I
::r> a 0
:s:::: z
z
<:0
-u ~
,- l'
::r> ~
z
L.~
"
,
o
UJ
I
PRo" 0 Foundation, Floor & Roof Framing Plans & 0 s "IT
l' 18 Dock Master Facility 8
EOOChmon ~J)rk IrlI
t'0 [g leorwoter, clarida Q
GJ[g [g
DRAWN g DATE ~O.
~ [g
;;': [g
[g
[g
Q C<J'mCliT FD'M!R ASSOCIATES MOlITfCTS, INC. 2008
"[g
18 II- FOX~~I~~~~~,I 2
[g_ "21~AR
[g
- - - - - - - - - - - - - - - - - - - - - -
PINELLAS COUNTY OFFSET
I
I
- - - - - - - - - - - - - - - - - - - l
I
I
I
I
- - - - - - - - - - - - - - - - - - -
\l'
50' 0
,.,--
--
<"
2.'
100'
I
so'
GRAPHIC SCALE
_____________c..:~O~________________________~~.~~~~~~R_~~~_________________:..i--- ..:2-----t-.---:;;:~ ;;;:;;.__;.<}" _ :..:.AL---..)f7."'-
~,': "1I':X:~~T~;rl' I' "" ~~ ..xxlo,.~;':'.xxxxn~lu.Jl!.!.!.
.~.!..:;. ~bJ;~~..~... '. t-. ~i: j::~j;O ~S:j;:S:" J / I !.J.J.!..!....!.~ ~kp;p S=Pp.. i!i.., .~l:t:!:
: ',':: "............... "NU..."'-C'O........ ,.;I>I>,~,...... ,...u....ClI~;,
'0' j.. ".. .. _"^.' .." <
<(
1C'l
<(I
~
- - - - - - - - - l
lIJ
::Jl::I
niJi
I-
<(
~
I
~RED UGHT
XX XxXXlCX XlCXr ~~~f ~ ~ ~~fx XXXXXXXIII XXIIIXXXXX 11111' X XIIIIXIIXII 111111
~~~~~~~~~~'ff~'feffefEe~ee~ff~E~~~EEe~~: I E~~eEf~e
~:: ~~f~ l111IT.!:1IlnIII ~f
tt~~efl::tte~~:t~=t~~e
~
1. ALL ELEVA'1l0NS ARE (+) PLUS UNLESS OTHER\I1SE NOTED.
2. ALL OFFSHORE ELEVA'llONS REFER TO MEAN LOW WATER DATUM.
ALL UPLAND ELEVA'llONS REFER TO NAVO 88 (NORTH AMERICAN VER'1lCAL
DATUM Of 19BB).
OfFSHORE ELEVA'llONS ARE THOSE WATERWARD Of THE APPROXIMATE SEAWALL
3. 0.0 FEET MEAN LOW WATER = (-)1.25 FEET NAVO 88.
MEAN LOW WATER VALUE FROM '1lDE INTERPOLATION POINT 1692.
AND POINT 12719. ntlp: / /dolo.loblns.org.
.,i.. .. . . ,,)) '. '!')" <>----oREEN UGHTL--o
I I ii-Hf+~~II--'~'+-~;';""'--.-V-x~," ".;:>, rX'H-f~~*~ffi~nr"m~"'~ II'~~~___
~";;E";;..;;...."...PPPi:~~~..~.....,"....',. llH~~H...".'...'."}' ....... .'........... .nnrllE~~~~ll~.t....:l....~..io;:. II ~e?j;OS:i+ij;OS: t:f'>s:s:j:~~.!..!.1..!.!..!..!. f fll 1.1. .!..!.!.1..!..!.!. II.!..!..!. .!..!..!.1..!.!.!.!.1.J.!..!..!..!.!.1.1..!.!.
.-- .............7~.~:~Ct~~E~eti:~Ef~~eeeee:t:zz~~~;~~~~"_.. "..... ......~t:t:~t:r:t:e E~ ~C :C~=: i:~:!:i::~::e~:c~~::~~er
'0'.'0. ...'0..... .c." ~ED UGHT~
~illx..,.r:.;::' .'0-:'::,;:'., lCIlXIIXJl:lIlIl11l1llJtXflllffiP, ffif~fn if~~iffffff~f:illllxxifff
pp...p.'....._..'...~',f~IlXlClllI II .~)c...;'.'..IlIl~fi if 1/ 111..!.!!.!..!.!.~PcJ.1'>!l':: ;;PQP!i~f~ -e~~~fE:Ei2te~l~Eg~:.
i', ......,.P"PPi;;1..!..!..!..!...!..:.!.lJ..:.!.~ppQ:;PPf="*'Z~i.o....,...-...t. ....l:N-....... _
.,y~...~eee.e~~~..e~......_..." "'-
'I
l~t~~l~ii~H~~'~i1~i~~ii'~li~~!H!i~)~l~!~~~!~:!:::::~~~~i~:::i\~:~~ :::=:~::~
5. ~~~~;~~g:A~~ ~~S~S~ ~E U~;N~~;: :~R~:ig~~RA~~~~E :,;SE. I
-i-~~~~~~~~~----------,~,c"c~,,-_______________________________~ --_3~~~--"1l---{T-----~--~~-~---~---~------"~T-----~;-~~~~~1::~:
9. THE HYDROGRAPHIC INFORMA'1l0N DEPICTED HEREON REPRESENTS A SURVEY MADE ON 3/20/06 l
AND CAN ONLY INDICATE THE GENERAL CONDmONS EXIS'1lNG ON SAID DATE. I tfE1EEEt111r1EE1Enrr rr.......... .., ....rr
10. LDCA'1l0N OF 1925 LAND GRANT SHOWN HEREON IS APPROXIMATE AND BASED ~;epep"pp"pppepPPPPP"PP~O""""UUlll'" '" 'll~i:;:;:
IN PART ON ELECTRONIC VERSIONS OF PINEUAS COUNTY TAX MAPS. -:,;i,t ..........<oo....."::",:.............."'c.o........ . ..;..:..~.~r::';~ee~g-' ~Ee~t:c..c-..
I
I
I
I
z
~
~/
~c
~APPftO>1MAlE ~
/" lOCA 110N OF SEAWALl ~
Vl
4. VER'1lCAL CONTROL IS BASED ON CITY Of CLEARWATER BENCH MARK "F-05".
ELEVATION- 6.5075 FEET NAVO BB. 5.2575 FEET MEAN LOW WATER.
PINELLAS COUNTY OFFSET
11. RIGHT OF WAY EASEMENT SHOWN HEREON AS PER TRUSTEES Of THE INTERNAL
IMPROVEMENT FUND Of THE STATE Of FLORIDA "CANAL RIGHT-Of-WAY EASEMENT".
'2. SEAGRASS SHOWN HEREON AS MARKED IN THE FlELO BY TOM CUBA Of DELTA SEVEN ON 5/31/06
AND LOCATED BY GEORGE F. YOUNG \11TH REAL '1lME SUB-METER D1FFEREN'1lAL GPS.
DETAIL OF CHANNEL. EASEMENTS. AND SETBACKS
1~1.25lANOGRANT~1
'~...; 'w 7: ~w I 5OOoo'~1 _--
N: 1322693.53 .........
E: 3B9350.73~ _-
GRAPHIC SCALE _-
," = 200' _-
I 1 I _---------------- - / " -
--l--------------J~g-~L~~----------- ----------------r-~~:::.:.~ ~\('-~-
1!: - l -1- P.lliELl.A5 CllU'ill' QffSEL -, ,=cf _ _ _ _ _ _ _ _ E'-.:'96~2.~ _ _ _ ~ ~-~- \
:;:~. t-~ I - - :E~N~_ _ _ -"ElD CENlERlINE PER CHANNEL LIGHTS _~-~-~- J'l>(
-- -- - -------G.i.w.wc5iro;uNEPEi..uscOE---,~ -j-:-----------1-------------l""" \/
g ld.s b. 6 ~; 1322225.96 ........
C t E: 396576.77 ...... ..........
.,. 0 , ,.....
1- J - - - - _\P.lliEl.\AS<;QUNll'QffSEL - - - - - - - - - - - - -l- - - _ _ _ _ _ ~ /_--/--/
----------------_J~g_~L~~~____________,----------------r------------------(-/
\ ~ j~~~~~
~
\
\
\
\
\
\
\
\
\~
,..
~
\';
'Z
(
CUENT
PROJECT NAME
REVISIONS
(
4919
Wade Trim
Memorial Highway, Suite 200
Tampa, Florida 33634
HYDROGRAPHIC AND TOPOGRAPHIC SURVEY
CLEARWATER BAYFRONT MARINA
SEC.
SInce 1919
lWP.
S. RNG.
E.
No.
OlSCRlPIJON
DAlE
BY
George F. Young, Inc.
UCINSID BUSIMISB 011
ARCJII'I'EcruRJ . IHGINBERDfG . ENVIROJOIENTAL
LAllIlSCAPE .\RCJII'I'EClUl. PLAlIIIJJlO . SUIlVIYJNG
sr. PmIlsBuRc. T_.. _ . G.lIIIESVIW!:
RESPONSIBLE OFfICE: 299 9th street North
~~.;p~bu~~~lOl~~27) 822-2919
FlELDOI\TE:
1lA'"
""'"
'"
'"
+
...,
~
Vl
-,
c
GSN
IIIXII.ur"xxx II XII II X II III1XX ll'X,lC.X-,
'tllllllllllll'III"I'"
S;~Eea:~EE~EEf eec:t:i:~'
l.~eff~TtfT~~~ffitij
1'1111/111111
f ~~~~~~~~~~f~!:rl 1111i,J
e~~~ eeeee
tz~e&zzr)~.............rFmrrrrr......I rrmr ~
"\; ."...~:~.;==~:==ii::"l:=~~~.....::~~e r~~~~&e::;~ ~
'.t I s~~~r!~~~.)i\ ~
XX::~)cIlIlIllXIIII :::i'i ~;~:;:~l:f:!:::.
ZZ~~~t:e~~.U'U: ff::: ::f::UZzzzZZZZrU1ZZZZZ f ZZ f~f / ~ filII X xx xrzzzz~(:zt !
Nc.or;ocll>~c.or.o ""'~~~~~~~iZ.....i.u.o"''''''''''''ClIW_:''_..c..w'' .,."'~~ e. r..g..;......e~:i:t' r:
~
X XlIX,:~~ lCIl: lI:xxf ff~::'ffllllx xxxx IIx Xli: "lI:X lIJr ~~t~~ttt*ttt* XII>t~~.~ ~
,,.~"'"._~~'" """"'" ,,'" ........ ..... ..............."" ",;
J:~,~cM..io"'~:;",: 000 ~u~~"'llICJtC~tt;~tttt~~~e=~~~. g.c t:~~t:S~~.
IIfrZZZ7~f
Jorllq.wc. JoI;I>
x lI:XlI:Xl'l'''':lI:Jr II IIJr'" II f~*Cgu
~~~e~6~,6;~~:*l:~
=~ccec tc:r:~
ZZXX leX II X x ll'XlCX xZZZZZZ1~l
.... ",..ilt400"''''WN!:;i'
SEE SHEETS 3 THROUGH 5 FOR
UPLAND DETAiL DRA'MNGS
~
~
~
f
!
I
~
~
~
g
+
'"
j:!;
Vl
\'"
~
<;J>
~
~
%
\~~
THIS SURIlEY IS NOT VAUO "THOUT THE SIGNAWRE AND THE OTlIr>.N~
RAISED SEAl Of" A flORIDA UCENSED SUR'YnOR AND ~APPER.
~
..
SHEET
1
"'"1 s. Nt,."...
florida Surveyora Reg'"_ PSMI LS568J
~
8'
I
."
~
....
co ~
co
ct lI: f~u'
co c;'I>:<"
3 3
~ 0 >""YP
::I. ~ (')
2- /' ~'?')
:!I :r Q. ~ .,,,,,-o:i>
0 co
::I. .0' ~
Q. ~ .....
0 IE ::I.
... ~ 3
... STA 8+00
Ol Ul
... ~
....
co
I'>
8
:t:
-<
C
:;::0
(")0
,-C)
1"'"1:;::0
)>)>
Ul :;::o"'tJ
r ~:t:
)>(")
-4
1"'"1)>
i :;::oz "
:;0
:0 aJC ~
~
)>-4 ~
-<0 ~
!II '"T'I"'tJ
:;::00 lI:
:;0 ~
Z OC)
p Z:;::o
I -4)> /'
~"'tJ
f'1 )>:!: /'
/'
:;::0(") /: <;l.,U'
Z(/) C;"""
)>C :;-0<;)
:;::0
<
1"'"1
-<
~
~
;
:;0
~
Vi
o
z
Ul
~
!!l
r
co
~---
Ii.
~~
~ ~
~ J~ II ~
~ CIl
~:~ ;: I. "~
;jU ~ gllll.
~~~ ~I '; ~~I~
~';€~~II'!g
!! iii::
~ ='
;;; Q
~
~
fa ~~
~~!l!
.J o..~
",y> ~~~
Jl.z r2~
?~. jlI!ii
i~
----
STA 9+00
/'
/'
/'
/
FlLE: 1:\PROJECT\SUR\oe lJ-0.35e-OO\DWG\0J1305370 l-REV.OWG
/
0"1-)1
."1-
O'I-x
'1>-.
O'I-x
O'l-X
fi~;-
liI'S-X
n:~
...-.
011->(
'~>-::i:
....-
xg'[-
xg'['-
x["['-
xt"i'-
)1[''['-
....-
....-
;11['1::-
KOT-
lCO"t-
i"Z-.
9"l-l(
n:~
C1:,...x
trl-:-ll
...O;,..ic....51.t~II..
"'0.-.: :S:~"'II
.'0->< ['I-x
.~--~ ~}I:'~
..~\~~~~~:
V'O-x
i1)~x
9'O~lt:I'i~ii:
t'O';':-x
--t'1)-l(
['1)-x
1'0-1<
I'O-X
l'l)-x
ro-x
~
~
l'I-.
."-111
ell-x
H:~
["i-x
~':~H:~f1~::t-;n:
~~i:~ :l:~::
x:g; IIl'S-
.n-~ . ,.,-
'!l:vlQ . n-
:8;'~ : !~:
~~:=CIl- ~ ~~:~ II'L-
H:: ....... :::==
L"i-x .'8-1(
n-x t"i-x
Q.w....,oc: tv-x
1:::;~ f:;;
Ih--x ~'lj"".l!:
~li\\ ~l\
~~i~t;f::
\{:.~ s:i=:
n'-IC ~.~::.
nl:;
15Tl-x
r"'l-"
Irrl-I(
1:"1-"
"'U-l(
t:U-1(
Q"U-x
nt::
11"01-)<
STA 10+00
STA 11+00
---
STA 12+00
i
!l
E
>
;;I
~
-
Ii
l;\
~
~
1=
STA lJ+OO
STA 14+00
STA 15+00
STA 16+00
FIElD BOOK: HYDftO X'JII PAGES. 28-27
\"
'\.~
.*-
\~
'%
\~
'\f"
,-<l
~
,'ii>
\'2,
'\'
\
\
\
\
\
\
\
\
r,;\
\
\
\'
\
\
\
\
\
\
\
\
\
\
\.
ni~'
I"tL~
nl~'
[,'''I
'sa-x
[''!iI-x
nil-x
15~I-x
Ute:
8?:I-x
ill::
Il?;L-lI
t>"tL-x
Z"tl-II
HI::
81:L-"
r"Z1-"
r"ZI_x
HI::
i!:I:L-x
nL-x
1:"01-1{
co-x
C8-x
'rs-x
"11-"
'"II-x
r"s.,.."
""... '.'.
z;-o-..
n..."x::';.,,:.';"
H'I'
Z'I5~-Jl-'
t1":jf';
/:"I5-X
1:"6-x
re-l(
Z'B-x
L'll-I(
8"i-x
Z'll-x
r'e,-.x
L'g! I{
na-x
nl-x
8-"'-01
8'rl-x
HI::
"'51 x
n':~
l"il-I(
L'ln-x
1t'8L-x
"ll-x
8'71-
iil:~
nl:~
11111-
8 I-x
to l-l(
~-i==
Il'iL-l<
~'!i -x
8't'L-1(
8'tI-x
nl-II
8't1-)l
L1:I-x
MATCH LI E
SHEE
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
-L
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~ :tI1:
xlj'U-
xl'U-
XII'U-
xt'u-
xt.u-
x""I_
Illnl-
KZ'OL-
lC['OI-
"+'01-
8'01_:"'01-
"'Ol-x
"'OL-x
"'OI-x
[''OI-x
Z"OI_x
Z"OI-I(
Z'OI,.-,lC
11:'01-1(
1'<OL,.,.
f1'lI;':if'
.......>1"
n=:
':~~~::,.,'
r'-'
il~;
Irs-x
tn-x
p~-
1~1:~
.'l:l-
"11-
ll'U-~
nl~~
m~
at;.
l~t-l:
~;:~;
n-r
n"
;1l'8~ .:',
:~~:~,..,
"'e~
.,oJ'.'".....
..,;g',..
1111-...
:1::; I
n-x [
~"~:~ I
"o;..,:x!
j
I
I
I
I
I
I
I
I
I
I
I
I
1
1
I
I
I
1
1
J
J
I
I
I
I
I
I
I
I
I
I
I
I
I~
I
I
I
I
'I',
I
I
I
I
I
I
'1 ;
I
I
I
I
I
J
I
I
I
I
I
I
I
I
I
I
I
I
1
'1
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
1
I
I
I
I
I
I
. ,.,1
I
I
I
I
I
I
I,
I
I
I
''Il~-x
r'lIl-x
I~I::
l'1l~-x
HI::
..,u-x
II'.(I-x
nl:~
I....l-x
l....'-x
I....l-x
lO....l-x
~it:;
In."l-x
Z'tl-x
......~-x
""I-I(
".l-x
Z'tl-x
r'["l-I(
'tt:~
:il\E~:;:
O~I;"'~xW
Li:!-)I"
a'1:l-x
l'i'l-x
lila-x
''i'I-x
nl:~
1~1-1(
"'91-x
l"il-x
RI:~
"'91-1(
"'91-1(
''tl-x
["'81-)1"
l~l:~
""iI-x;
,",I-x
II'.~-I(
iil::
1'9I-x
a'['I-x
t:tt::
a'tl-I(
1'''l-x
1.:"'I-x
"'1>~-x
......~-)I"
nl=:
'....I-x
.....l-x
(''9~-x
.....I-x
Wi:;
iit-:
l"'l-x
.....~-x
II..~-x
l'tll-x
1I'8I-x
["'III-x
1'1I1-x
rlil-x
1'8I-x
nn-x
8'1;1-x
""i~-x
i'it~~
..tl-x
["'1:I-x
Z'tl-x
IJ!I~~
,
"~I~T"
~li~'>..;.
8'OI_~,~ll:~
S1U-xZ'U-...
8"OI-x ["'U-x
S"O~-x ["'u-x
s"Ot-x
lI"Ol-x
Il.t)t-II
.,: ;:;:it~E'
l"c)I-)I"
lI'OI-x
"'Ol-X
:~!:=
.{iv. '.-......
I-II
'(11-.
nf:~
""OI-x
..~~t:~
~:gt:~
~h'
>);t~t;~,
"~g"f
i~E:
lI'OI-x
nl-X;
1;'U-x
rtt::
~-'U~__ll' .
i:llt::
S'll-x
It'll-Ie
~:u::
Cll-x
f.lt::
H~~l(
';,n{;:.~
't~t::g .,
l'i'l-x
e'i'1-x
U'-.'
HI-It
>~.:
ll'U;""j(
8'1:I-x
r-t'1-X
,'9I-X
lil:~
""il~x
Ila~1e
t:n""..
'Utt=
iII=1
tit::
II'""
ill:;:
ltt:.~
n~::
HI::
::n=:
,:: l~~~!E~':::'::
ru::
l'U-II
8'U-x
"'u-x
nt:~
1~1~~
II"OI-x
"'Ol-x
\"OI-X
"OI-x
lI's-x
f'-'
;:1::
f:~;=;, .
1'8-)(
...-.
c.-.
,,-.
ZlJ-x
1'8-x
I'll-X
,a::.=:...
:te.
n::
""II-x
...-.
11"11-.
r:::
Ill....,.
", ~...:~
Z:f:
nt~:
......I-x
l"il~X
It!:S
IR!:
l~li:
HIl:
",U~~
r'lll-x
S'OI-x
nil:
m~~
;:;I:~
B"SI- ~
m:t
C"I-
L'Vl-
Il....~-
S'9t-
l"il-
l'Vt-
s...t-
''''1-
1';1-
1..1-
",-
"'S'l-
"'Vl-
I'GI-
8'91-
S....I-
':"'1-
.iil:
:~f..
s'rl-
HI:
~l: .
nt .~i ,~,
l,"i .:;
:A. .il'
h",'t!a:
.....lllC
~~fS
~~I1X.,.', "
!ifU> ;<~
l'GlilC . '.W
1"51, x
~~tl=
'!!!~
:~il:
''''ITll
Wi~
flf~
.. .
il E
" .
l> .
;~.,..v,..~x
>;\'f~if:' /~~
"'f'
..."l x
1l'81 X
i"i~ II
1~tT:
1I"i1 x
.. .
H I
:i~=
I..:rx
:JilfE,:;-
""'1,""
flffE
l::t1:
i.;::,:::ill';
~ :~:h
iiliS
I't-'It.
~..
r:tf~
.....ITx
tillS
..:11
nt=:I
8T1-iCl
8'i'I-xl
:11;':1,
~i:/I{I
i'i'l-l
...,-
..."t'I-
Il'i't-i
8'["1-
1'["1-
tlJ,:._.,.::.,
,:\;1;~~: ~.
;10
'''1
1'1:1-
11:1-
rZI
,.~,.~~
I' ~..."
II H""x
'U-x
"Il-x
l' 1 -!x
o8'!
. :tll I-X
: H1E U/=:
:,tt~ ru~:
~u- l'U-x
l'II/:: ::u=:
'~:
j
I
I
I
I
I
I
r
I
I
I
r
I
I
I.
I
I
I
'*i'
I
I
I'
~..
,-.
Il'DI-x
\
\
\
"'-
"''''
.,'"
"''''
"'"
.,'"
~9'
"'"
.,
"'~\
.. .. \
\
\
\
\
\
\
\
\
\."
\'t
\Q..
\~
\?,.L
\<"
\'d,
\~
\~
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
"'-
:g~
0>'"
"'-
",,,,
o.~
",0>
'"
\-<l
\~
Y
\\0
\%
\'\
\Q,
\~
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
"
'"
)>
~"O
':r:
II n
~..Yi
)>
r
'"
A-A
1 2
"
Gi
:J:
-<
o
."
~
-<
"'
)>
Vl
"'
'"
~
I
I
~\
r.>.. \
\
\
\
\
\
\
\
\
\
\
\
"'-
"''''
.,'"
~iD
~~
"'it
\1
<;J:
\~
\'2,
\"t.
\':i.
Q,
\~
\~
\
\
\
\
\
\
\
\
\
\
\
\
s
~
~
r,;
~
w
~HOWAl<ESlGN
E
S
20' 0
~--
--
10' 20'
I
GRAPHIC SCALE
," ~ 20'
...,
.89 ".93
CLlE
Wade Trim
4919 Memorial Highway, Suite 200
Tampo, Florida 33634
-3.23 -2-
~ '>9-1'
?-~~'?
~~~~'f
f;>.~>.'?
-'"':'f~~~~ :'
;'f~ ~~'f
<>'f~~~'?
><>'?~~~'?
;-~-~-~
-..,~~~~~~
~I~~l'-- D.10
>~'?~~~'?..
;>~'?~~~i>:
<>~'f~~~'?
,><>~'fi':2'?~ >EA",," e'.r_
-.~,,,~~'f~X>~'?~
~~'?~~~'?,
<>~'?~ ~~'? 'S7
>~'f~~~'f
7~,?~ ~~'?
~'?~~~'?
~.~:~:'?
-'A3V~ y~ yV<-,
>I~ x>f/,
7'?~~~'?
.'f/~X>~i>:
i>~~~~
A.
.
WOOD DOQ(
PROJECT NAME
HYDROGRAPHIC AND TOPOGRAPHIC SURVEY
CLEARWATER BAYFRONT MARINA
SEC.
S.RNG.
lWP.
E.
24~SlEEl.PIPE
(PIPE TlIRNS AND GOES DOYM)
"
PIERCE 100 CONDOMINIUMS
REVISIONS
....
DfSCftIPTKlN
Or'"
""TE
8 INCH PVC
!NV. _ 111
BY
SEAWALL (1.; 'MOE)
(
SInce 1919
" (/
I I
I I
I I
I I
/ !
/ f
"ATC I LINE B B
r J SHEE 3-4
/// /
// ;'
/// II
.-/ II
,--- /
\
\
\
~-- "
\ --~
\
\
//)
(/
I I
I /
I //~
L, _. ___---///'/
'''----- --
George F. Young, Inc.
UCIII8ID BU8IRIBII 021
.ARCHlTIc'ruRI- BNGINIBRING -INVIROlOIIN'I'AL
LANDSCAPI: ARCJIlI'ICI'URI. PLANNING . SURmING
ST. PJ:I'DSBURG. TAMPA- BRADIN'fQlf . GAINISVIU.I
RESPONSIBLE OfFICE: 299 9th Street North
~.:Po~l.l4J~101F~727) 822-2919
'"
. JRP
CHECKfD: GSN
.".,
""'"
SEE SHEET 1 FOR
NOlES. SIGNA lURE,
AND S<AL
,
, -
Grep S. N1pp8l"
Aorldo SUl'V8)'or s Rag'n. PSMI LSS683
1~ lftDl RCP
~v. ,. -0.\
,
5
,
:v."?2.~ -- .. ::~'~
IS
,
SHEET
:
i
I
~
~
I
~
<
~
!
~
$
!
I
!
i
~
!l
;::,
'1.
!l
I
~~: I
J~~:
...
U'
NEW BRIDGE STAUClIJRES
(SEE SHEET 1 OR CADD Fl.E FOR AClUAL LOCATlON)
/~PIUOC
/
/
/
/
///
//
----
~II
'..
1::::
~~
----
<"
r-
/
/
/
(
\
\
\
\
\
\
\
\
)
/
\ /
V
//"',
/ \
( '-
\ ----- /
\ -----_.../
\
\
\
\
\
\
\
/)
./
-/...../
20' 0 10'
~..._-
(~
20'
I
",.",.---------,
// \
......-/ \
"
\
\
\
/r-------.....
/
/
/
/
/
/
I::;: //
////~-~
/ / ~
1..../ <', \
_ 15 ,,'\ SEAWAU. (1.4' .x)
\ = ~~!.CI" TfUHSPCRTAlO (D.o.T.)', \...
\ FEl..O ElEVATION _ !U&' NAW88 \..... -!'~ WEl[R (TlP.
\PUElJSHED ELEVATION (PER o.O.T.) _ &.14' NC\(l ~ '-___.....
,
" /
''------/
SEAWAll. (1.T
'.""
GRAPHIC SCALE
,. = 20'
....
NEW IIIlIOGE """"""'"
(SEE SHEET 1 OR CAOO FU: Fat ACnJAl. lDCATlON)
~
,..
~"
::~2
Cl.D BRIDGE S1mIClUAES (Typ)
!ir.27
REVISIONS George F. Young, Inc. SHEET
( UCBNSBD BtJ!IMIIBB 021
ARCIIJTIC'J'uM . ENGINDRING. INVIRONIlIHTAL SEE SHEET 1 F'OR
WlIlSCAPI: ARCHJTBCTUIlI. PLlNIIIIIG . SIJIl'/EYIlIG NOTES. SIGNATURE,
ST. PE!'EBS8URG. TAMPA. BRADINTOM . GAINESVILLI: ..., SEAL i
RESPONSIBl..E 0F'F1CE: 299 9th Street North
~.:~2~43~101F':'~n7) 822 2919 Florida 5ul'\l';~S ~eg~~sw, LS5683 5 !
Since 1919 0 " "'''' I
No. o<scRPIION "'IE II'< """'" .... "'''' 59 08
- GSN """" , - JOB No. 0&13-035&-00
7117
".../
lIl476
~ASPHALTPARlONG
lIl470
;114.~
'-m
...........
'TDIPORNff BEN04 WARK 11 ~
SET IRON ROO WI RED CAP
ElEVATION .. &.82' HAW ell
./
,/'/
....('"
,/
/
/'
/'
/'
~'"
/
/'
/'
..x:;;
--lO' ,/'
~\-y
c'-/";"
,,\~'..,
N'f'ROXlWATECanIRl..INE\ ~ t..~
y'
,/'
,~..
,~..
,..,.
'A~V~~ ~?\
I "..
~ W[TAL STREET SIGN (TYP.)
,~..
lIl6..19
)(6.10
"n
x 6..12
~~
0--""
WAHHlllE
6.l13 6..17
....
/
~;3
. ~' ..'~ . ':
..,.
)(6.24
'6.2,
l:?\
,~
,~"
\
\
)
"<1<
CUE
PROJECT NAME
Wade Trim
4919 Memorial Highway, Suite 200
T ampo, Florida 33634
HYDROGRAPHIC AND TOPOGRAPHIC
CLEARWATER BAYFRONT
SURVEY
MARINA
SEC.
E.
TWP.
S. RNG.
Ul~
:I: >
~d
iil:I:
~c
IZ
()l1Tl
o
I
o
1(4.63
4,74X
"
..
,
,/'
~
~
~
i
~
~
I
~
~
~
~
f!
8
~
~
f
~
~
Ii
~
~
!
~
---
"
,
"
'---
""N~
........................---
r/
/
/
/
/
/
/
/
_/
---
/---
/
/
(/
I
, I
'--.j
---
---
.......----
V'
20' 0 let
I""\.i-.-
20'
I
GRAPHIC SCALE
1" = 20'
r-----------------..........
/ '
/
/
/
/
/
///
_/'/
---
....0lASS
/~-
///
/'/////
/'
---
----
/////////~---
//////'/
1Il~
:J:>
1T1-1
1T1(")
iil:J:
.Jo.C
IZ
UlIT1
(")
I
(")
..............--
~_/
----
/--..
,// ............
-~////// '-
r ,
( \
I \
J I~ I~Di2.~r\..-
- 10 IN. PAUl
---
"..
---
---
...
_1.67 ~
....,.
--
--
---'SEAWAll.. (1,4' WIOE)
'.03
)114.92
--------------
_-~7-
--
-----~-1--- _.~\
~~ ------~--J
~~:~~ ~-~
8 lNot Q..AYPlPE ---~
Nt \NV... 1.42 -___
...6.61
~_'. ':: : .', .
'., . . :: .:',' ~~.
: "
. " ~
....'
1Io~.92
~
I
-
~
~
~
:l
"
-
--
---~.;
-
.... /.
rASPHALTPARKIMG~ )(4.3
".
)Il )(443 e
----
---- '
-
-'~'
_----"!99'
----
..-<..
---- '
----
,"'"
----
./
./'
/'
./
/'
/"'"
,/
/
./'
./'
,/..11
~
9
i
~
~
Ii
,
~
Ii
~
~
!
g
"
)(4.61
/-
,/'
SEC.
lWP.
S. RNG.
E.
REVISIONS George F. Young, Inc.
r IEIN9ID BUSINI9S 021 SEE SHEET 1 FOR
ABCIIl'l"IcTuR . ElfGINDRlNG . INVIRONIIENTAL NOTES, SIGNATURE.
I.ANDSCAPI ARCHl'I'ICTt1BI. PLANNING . SURYBYlNG AND SEAl.
sr. PmRsBuRa. TAMPA. IlRADINTOH . GADIBSVILLI'
RESPONSIBlE 0FFlCE: 299 9th Street North
~.:P(j27)b~2~4JJ,3i01F~~27) 622-2919
Since 1919 """""'"' "OLD '" Floflda Survtl)'~'S ~.;.t~M' LS568J
No. QESCR\PT\ON DATE "" ORA.... .,'" D.uE: - ., Oi
CHECI<EI> GSN ""'" 1 _ 20
UENT
PROJECT NAME
Wade Trim
4919 Memorial Highway, Suite 200
Tampa, Florida 33634
HYDROGRAPHIC AND TOPOGRAPHIC SURVEY
CLEARWATER BAYFRONT MARINA
. ,
Responses to DRC Comments of
September 4,2008 DRC Meeting
General Engineering:
1. General Note: DRC review is a prerequisite for Building Permit
Review; additional comments may be forthcoming upon
submittal of a Building Permit Application.
Comment: Concur. No action needed.
Environmental:
1. No issues.
Fire:
1.
Show and label FDC locations and all associated Fire Hydrants.
PRIOR TO CDB
Comment: FDC locations and fire hydrants are shown on
plan set.
2 . Add general note to state intent to meet NFP A 303 requirements
for standpipe systems.
PRIOR TO CDB
Comment: Note added to plan set
Harbor Master:
1 . 8/26/08 - Per Bill Morris -
I and my staff have reviewed this and the only thing we could
find is not on a numbered page but near the front of the
application Under Flexible Development Application Applicant
Reponses. I am not sure if they are material to the application in
that it concerns the Job classification we say we will put in the
office on site and that has not been decided yet.
Section D. Written Submittal requirements (Code Section 3-
19.A) Subparagraph 6. Where it speaks to Hours of Operation.
It is worded that:
" The Downtown Boat Slips will be staffed 24 hours a day,
Seven Days a week. The staffing will consist of a Dock Master
office Staff manned by a Marine Trades worker from 6:30 Am
until 9 PM and a police Aide Security Guard from 9 PM until
6:30 AM the next morning."
It should read:
" The Downtown Boat Slips will be staffed 24 hours a day,
Seven Days a week. The staffing will consist of a Dock Master
office Staff from 6:30 Am until 9 PM and a police Aide Security
Guard from 9 PM until 6:30 AM the next morning."
similarly further down in the same section the last paragraph in
Section 6 Says the office;
" will be staffed with a Marine Facility Operator"
and it should just say:
"will be staffed with Marine Department personnel"
and in the last line of that same paragraph the words:
"Marine Facility Operator"
Should be:
"Marine Department staff'
Comment: Revisions have been made to the text reflecting
Mr. Morris's comments.
Legal:
1. No issues.
Land Resources:
1 . No Issues.
Landscaping:
1 . See Zoning comments.
Parks and Recreation:
1 . The Public Art and Design Impact Fee is due on this project,
pending transfer of impact fee funds. Please contact Chris
Hubbard with any questions 562-4837.
Comment: Concur
2. No issues in regards to P&R impact fees - City project.
Stormwater:
1 . The following shall be addressed prior to issuance of the Building
Permit:
1. Sheet C-I5: Provide invert elevations and slope of the
proposed 18" RCP.
Comment: Invert elevations have been provided on the
revised plan sheet.
2. Sheet C-I5: Provide a detail of the proposed gutter grate.
Please show the connection of this grate with the adjacent
structure and/or pavement in a larger scale.
Comment: Detail of proposed inlet has been provided
on the revised plan sheet.
3. Sheet C-I7: Provide a detail of proposed inlet type C.
Comment: Detail has been provided on the revised plan
sheet.
4. Sheet C-I7: Provide invert elevations and slope of the
proposed 15" RCPs
Comment: Invert elevations have been provided on the
revised plan sheet.
5. Sheet C-I7: What type of manhole is proposed on the
existing pipe? Will it be a doghouse type? Provide a detail of
this proposed manhole.
Comment: Please refer to revised plan sheet.
General note:
1. DRC review is a prerequisite for Building Permit Review;
additional comments may be forthcoming upon submittal of
a Building Permit Application.
Comment: Concur.
Solid Waste:
No Comments
Traffic Engineering:
1. The City's parallel parking dimensions are measured 8'
wide by 23' long. If the parallel parking spaces along
Cleveland Street and Drew Street are striped to 23' in
length then the applicant can acquire more public parking
spaces.
Comment: The plan has been revised to reflect these
dimensions and one additional parking space resulted.
2. Describe where and how boats will be unloaded and loaded
with a boat trailer?
Comment: There are no boat ramp facilities proposed
with this project. The Seminole Boat Ramp north of the
project site will continue to accommodate boat trailers.
The above to be addressed prior to a Community Development
Board (CDB) hearing.
The following to be addressed prior to a Building Permit:
1. On page D-I of the detail page see handicap parking sign,
change the Florida Statute number to read "F. S. 318.18".
Comment: The detail page has been revised to reflect
this statute number.
3. Add to the projects detail sheet the F.D.O.T.'s truncated
dome detail (Index 304 page 6 of 6). See link provided:
http://www.dot.state.fl.us/rddesign/rd/R TDS/08/304.pdf
Comment: Please refer to the General Notes where this
information is provided.
General Note(s):
1) Applicant shall comply with the current Transportation
Impact Fee Ordinance and fee schedule and paid prior to a
Certificate of Occupancy (e.O.).
Comment: Concur.
2) DRC review is a prerequisite for Building Permit Review;
additional comments may be forthcoming upon submittal of
a Building Permit Application.
Comment: Concur.
Planning:
1. Description of Request on Page 1 of the application needs to
include all setback reductions (north and south) and width
increase. The reduction to the required setback should be written
"a reduction to the side (south) setback from 197 to 43 feet".
Additionally, there should be a reduction to the side (north)
setback as the existing dock, nor the proposed extension, does not
appear to be 197 feet from the north property line extended.
Finally, there may be a dock width increase, because we need to
look at the TOTAL width of the docks (existing and proposed)
from the north "end" to the south "end", including the Memorial
Bridge Causeway area (not an addition of 535' + 503'). See other
comments about dimensioning.
Comment: The application form has been revised to reflect
this wording and the appropriate setback requests.
2. Site Plans need to show the following:
a. City property lines on the north and south
Comment: Property lines are depicted on the final slip
layout plan.
b. A dimension as to the property width (it has been indicated
as 1,970 feet but I have no drawings that show such
dimension)
The property width is 1,357 feet as reflected on the
revised final slip layout plan.
c. The property lines (see "a" above) need to be extended into
the water
Comment: Please refer to response above.
d. Setback dimensions need to be indicated from the property
lines (north and south) to the closest part of the docks
(existing and proposed) on the north and south. On the
north side there is the existing fishing pier that is included
as part of the "dock" and there is an extension of such that
also includes the floating dock that keeps boats out of the
sea grass area;
Comment: Please refer to the final slip layout plan
prepared by Misener Marine.
e. A dimension as to the dock width (that dimension between
the setbacks requested);
Comment: The dock width is 1,463.1 feet (i.e. 1,490
feet minus the two setbacks of 7.9 feet south setback and
19.0 feet north setback)
f. A dimension as to the dock length (it has been indicated as
675 feet, but I have no drawings that show such dimension);
and
Comment: The Dock length is 1,490 feet at its widest
point in the southern basin. Please refer to the final slip
layout plan that shows this dimension.
g. A dimension showing the width of the waterway that the
docks are being located within (response to Section 3-
601.C.3.h.ii refers to 75% of the waterway width being
1,477 feet, but it is 75% of what dimension?).
Comment: The narrowest point of the Intracoastal
Waterway at the Boat Slip site is 930 feet (see graphic
on next page). The widest point of the Marina from the
seawall to the outside edge of the attenuator docks
paralleling the channel is 685 feet. Hence, the width of
the Boat Slips is 73.7% of the width of the waterway.
3. The first page of the application indicates the following parcel
numbers are involved with this application: 16-29-15-00000-210-
0110; 16-29-15-00000-210-0100; 16-29-15-43956-000-0010; 16-
29-15-76482-002-0010; and 16-29-15-20358-001-0040. After
cross-referencing with the Pinellas County Property Appraiser's
office, it does not appear that these are all of the parcel numbers
for property involved with this project. For advertising purposes,
I need to ensure all affect parcel numbers are listed on the
application. Please check with the Property Appraiser's office for
all affected parcels. I have a map that indicates the properties
listed above by parcel number that you may have to assist in
determining all affected parcel numbers.
Comment: The first page of the application reflects all of the
affected parcels.
4. Need to complete the Affidavit to Authorize Agent (page 7 of the
application) by including the appropriate information in Sections
1,2,3 and 4.
~Ol
!1~:~
!
~
Comment: The Affidavit to Authorize Agent has been
revised as requested.
5. Response to General Applicability criteria #2 - The boat slip
project is also abuts the Scientology property on the north side of
Drew Street. Revise response to include this adjacent property.
Comment: The response has been revised as requested.
6. Response to General Applicability criteria #5 - In the 4th line,
change "compliment" to "complement".
Comment: The response has been revised as requested.
7. Response to General Applicability criteria #6 - The response
refers to "the public docks". Am unclear where such "public
docks" are located, as the Misener Marine plan does not indicate
where the "public docks" are. Expand the written material in this
criteria response and provide a plan as to where such "public
docks" are located.
Comment: The response has been expanded to clarify the
location of the public docks. They are also depicted on the
final slip layout plan.
8. City of Clearwater Land Ownership - This paragraph describes
what submerged land the City owns. Can there be submitted a
map showing what the City owns (even if 8.5"xll" in size) with
an indication (generally) where a lease will be necessary from the
State?
Comment: A graphic has been included (from the 2003
Marina Feasibility Study) depicting the general location of
the state owned submerged lands. A legal description of this
parcel will be submitted with the FDEP permit application.
A lease will be executed with the State of Florida as part of
the FDEP permitting process for this parcel.
9. Project Description - The first paragraph mentions a "ferry
landing", but there is no plan that shows where that is to occur.
Indicate such on plans. Additionally, suggest expanding the
written material to discuss what is meant by a "ferry landing",
including where such a ferry might operate between other
location(s), where such a ferry might dock (it probably won't
operate 24 hours a day, so that it will be docked someplace just
like any other boat), the operational characteristics of such a
APPROXIMATE LOCATION OF
STATE SOVEREIGN LANDS FOR
WHICH A SUBMERGED LAND LEASE WILL
BE REQUIRED
"
....., '!
, - '. /
, "~ ''/
. ,"'"" '
. . ."'~.
, '- ''', '" "'" ~
'" "', "<""" '" '~~")~"'<, ", '" 'y/
'" '- ," ' " " """'/
~ ~~~~\\~~[/~~$~~ ;:~
"" l ~",~"'",,,,~ 'i<~.:(~,,~,"".'\ ",~~;~n
:" ~<:~~"~~~\~:~~":)~c~~1
'~. , I-_~,_ ~ 'I I
I' ' ' " , /~__'" f ~'_'-:~',,:",'~ I
-~.~ -,--. ~-,'. '~;~~~~ " '"
'~",,,-, '-'..
/
'-.
-'-."
i "',
v~_...-
c.-:-J.o,GHMAN PARK
...
~~~~
,S~"':::;.~.';:.:.
Con!coi!etl LandS
5::2t8 SC1\tere~gn Lands
Source:
Clearwater Bayfront Marina Feasible Study, Wade Trim, Inc.
September 15, 2003
ferry, the positives and negatives for having such a ferry landing,
how it relates to upland improvements (including the drop off
area and parking), etc.
Comment: The proposed ferry landing will be located in the
north basin at a location to be determined. At this juncture,
the precise size and/or type of ferry vessel has not been
determined, nor its hours of operation, hence its location and
docking needs have not been determined. Notwithstanding,
its location will not adversely impact boater safety within or
outside of the project footprint depicted on the final slip
layout plan.
10. Responses to Section 3-601.C.3.a.ii) - The response needs to
comment only on the docks and not the dock master building or
other upland improvements. It is important to note in the
response that this is a publicly owned marina, which may not be
consistent with docks on adjacent properties, but is also as
generally approved by the voters in 2007.
Comment: Reference to the dock master building and other
upland improvements has been deleted. It is important to
note that this is a municipal marina which is inherently
different than nearby residential docks. Its upscale design
utilizing floating concrete docks represents a purposeful
effort to complement the surrounding area and serve as a
catalyst project for further redevelopment in the general
area. This project was also approved by city-wide
referendum.
11 . Responses to Section 3-601.C.3.b - Need to include how the
design of the docks will not inhibit boat traffic within the channel
of the Intracoastal Waterway and how the dock design will
provide a defined location for transient slips for events at
Coachman Park.
Comment: This section has been revised to further discuss
how the docks will not inhibit boat traffic.
12. Responses to Section 3-601.C.3.c - There is no plan that shows
where the channel of the Intracoastal Waterway is located,
especially in proximity to the proposed marina. Include such.
Comment: The centerline of the channel is shown on the final
slip layout plan.
13 . Responses to Section 3-601.C.3.d.i) - The slip layout plan by
Misener has been referenced as to the location of sea grass beds.
However, the shading of such beds is not called out as "sea grass
beds" so that it is clear as to what the shading depicts.
In the South Basin, what will prevent boaters from traveling
eastward closer to the seawall, and into the sea grass bed, east of
Dock D? Will there be any signs restricting access to this eastern
area?
Comment: The final slip layout plan has been revised to
depict the sea grass beds. Signage will be placed adjacent to
Dock D in the southern basin restricting access to the sea
grass area.
14. Responses to Section 3-601.C.3.e.i) - Part of the criteria was left
out when typed (add in). Also, the response in the last paragraph
needs to address the one-foot minimum clearance distance
between the bottom of the vessel and the bottom of the water
body at mean or ordinary low water.
Comment: The criteria has been inserted as requested. The
water depth under Dock D (the dock located in the shallowest
water) is 4.9 feet at mean low tide which provides for more
than one-foot minimum clearance distance between the
bottom of the vessel and the bottom of the water body at
mean low. It is envisioned that these slips will accommodate
the smallest vessels
15. Responses to Section 3-601.C.3.h.i) - Need to also deal with any
setback reduction on the north side. For both the north and south
side setback reductions, need to provide justification for such
reductions.
Comment: Please refer to the revised response to this section.
16. Responses to Section 3-601.C.3.h.ii) - Need to also indicate that
the length of the docks is restricted by the channel of the
Intracoastal Waterway.
Comment: Please refer to the revised response to this section.
17 . Responses to Section 3-601.C.3.h.iii) - See other comments
needing dimensions on plans showing the waterfront width
(indicated as 1,970 feet in width). Width of the dock must be
measured from the northernmost tip of the existing fishing pier
(closest to the seawall) in the North Basin to the southernmost tip
of the wave attenuator on the south side of Dock A in the South
Basin. You cannot take out for the Memorial Causeway Bridge.
It appears that the width will exceed the 75% rule. Will need to
determine the actual width, include such in the request and
provide justification for such increase in width.
Comment: The width of the dock measured from the
northernmost tip of the existing fishing pier in the North
basin to the southernmost tip of the wave attenuator on the
south side of Dock A in the South basin is 1,490 feet. The
irregular shape of the basin and presence of the Memorial
Causeway Bridge bisecting the two basins creates a
challenging, yet appropriate, site for a boat slip project. At
FDOT's request approximately ten (10) slips were omitted
from the original plan resulting in the 129 slips proposed.
Strict enforcement of the 75% rule would result in the loss of
a significant number of slips. Variance from this provision is
appropriate given the demand for wet slips, the slow
minimum wake zone abutting the proposed docks, the
catalytic nature of the project on surrounding redevelopment
activities as evidenced by the positive voter referendum.
Additionally, as noted elsewhere in this application the
project as designed will not adversely affect boater safety in
the area.
18. Responses to Section 3-601.C.3.i - This IS a publicly owned
facility. Need to provide a response.
Comment: The proposed boat slips will be publicly owned
and operated. No roof structures or vertical walls are
proposed.
19. Response to Section 3-603.A - Response states that sewerage
pump out facilities will be provided. Unclear if this is a change
from prior Committee meetings, as I do not recollect such facility
to be provided. If to be provided, show where such will occur
and the operational aspects of such.
Comment: Sewerage pump out facilities will be provided at
single locations in both the north and south basins. The
precise location has not been determined but would likely be
located inside the project generally along the east/west docks
paralleling the Promenade. The specific locations will be
identified on the final construction plans.
20. Response to Section 3-603.B - Need to address all aspects of the
criteria (only fueling addressed). Additionally, the proposed
marina is not adjacent to residentially zoned property.
Comment: No fueling facilities are proposed, No boat
launching facilities are proposed. No servicing of boats will
occur after 9:00 p.m. or before 6:00 a.m.
21 . Response to Section 3-603.C - Response appears inconsistent
with that in the Response to Section 3-603.A, where sewerage
pump out is proposed. Need to expound and clarify.
Comment: No fuel storage facility is proposed as part of the
project. The sewerage pump out facilities will be located,
designed and permitted to meet state and local requirements.
There will be no above water pump out holding tanks.
22. Response to Section 3-603.F - Did not address "adequate sanitary
facilities" landside (at the dock master building).
Comment: An enclosed dumpster facility will be provided at
the Dock Master office building at the north end of the
project as noted on the final slip layout plan. Additionally, at
least two trash collection facilities will be provided to serve
the south basin.
23 . Response to Section 3-603.1 - Need to provide a response,
beyond that other agencies approval processes will require
demonstrate adequate tidal flushing and aquatic circulation
patterns.
Tidal flushing studies and aquatic circulation pattern studies
are not required as part of the local permitting process. The
City's does not issue dock permits but relies upon the
required permits and/or approvals by Pinellas County, the
Florida Department of Environmental Protection, and the
U.S. Army Corps of Engineers where these issues are
thoroughly addressed.
24. Dock master building - There needs to be a discussion in the
application material as to what functions will occur at this
building (dock master offices, laundry, restroom and showers).
Need to discuss (possibly if floor plans are available [existing
versus proposed] to assist visually) the existing building, how it
has been used, how it will be renovated and expanded and how it
will function.
Comment: The Dock Master building has been utilized in the
past as a ticketing facility when the ferry operation that used
to launch from the adjoining dock. The building will be used
as a Dock Master's office staffed by Marine Department staff.
The Downtown Boat Slips will be staffed 24 hours a day,
seven days a week. Staffing will consist of Marine
Department personnel from 6:30 a.m. until 9:00 p.m. and a
police Aide Security Guard from 9:00 p.m. until 6:30 a.m.
The building will also provide ADA accessible shower and
laundry facilities for boaters utilizing the marina. The
building has and will continue to be renovated and upgraded
to serve the proposed boat slip project. A floor plan has been
included in this Flexible Development application along with
color architectural renderings of the structure.
25. Sheet C-IO - Wheel stops are required for the eastern parking
spaces in the southern parking lot (Section 3-1204.D). Because
the western parking spaces are flush with the sidewalk, it is
highly recommended to install wheel stops to prevent vehicle
encroaching the sidewalk and traveling into the water (same
comment is applicable to the parking spaces on the west side of
the northern parking lot on Sheets C-ll and C-12).
Comment: Wheel stops have been added as requested and
noted on the referenced Sheets.
26. Sheets C-2, C-5, C-6, C-9, C-IO, C-13, C-14, C-17, C-18, C-21,
E-l & E-4 - Show property lines (there is private property to the
west and to the north).
Comment: Property lines are shown as requested.
27. Sheets C-2, C-4, C-5, C-6, C-8 & C-9 - Remove proposed boat
slips from the "Existing Site Plan" and "Demolition Plan" sheets.
Comment: The boat slips have been removed from the
"Existing Site Plan" and "Demolition Plan".
28. Sheet C-ll - Dimension the width of the sidewalk west of the
northern parking lot.
Comment: Dimension is now shown on Sheet C-ll.
29. Sheet C-ll - Dimension the width of the landscape area between
the northern parking lot and street curb for parallel parking
spaces.
Comment: Dimension is now shown on Sheet C-ll.
30. Sheet C-ll - Parking spaces have been dimensioned as nine-feet
wide typically with an overall dimension of 36'. It was
previously recommended to make the landscape island on the
south side of the handicap parking space 0.9 feet larger. Instead,
the HC space has been widened to 13 feet. Reduce the HC space
to 12 feet and convert the 0.9 or I-foot to landscaping as
previously requested.
Comment: Completed as requested.
31 . Sheets C-ll & C-12 - It appears that the concrete curb proposed
on the west side of the parking spaces in the northern parking lot
on the 90% plans has been removed. As such, it appears, based
on the ME indicated on Sheets C-15 and C-16, that there should
be no need for a handicap ramp for the handicap space in the
western sidewalk.
Comment: Revision completed.
32. Sheet C-12 - Indicate the width of the sidewalk along the seawall.
Comment: Width indicated as requested.
33. Sheet C-12 - Indicate the width of the driveway into the northern
parking lot.
Comment: Width indicated as requested.
34. Sheet C-13 - It was previously recommended to install a flagpole
in front of the harbormaster building. If to be provided, need to
show location on this sheet (need to also indicate proposed
height of flagpole).
Comment: The location of the flagpole has been indicated in
Sheet C-13. The height of the pole will not exceed 40 feet.
35. Sheets C-18, C-I9 and C-20 - Code requires interior landscaping
at a rate of 10% of the vehicular use area of these two parking
lots, with one shade tree per 150 square feet of interior landscape
area (two accent trees = one shade tree, planted relatively close to
each other; three palms = one shade tree, planted in a cluster of
three). Revise to provide the required number of trees.
Comment: Revisions made to referenced Sheets as requested.
36. Sheets C-18 and C-19 - Fire truck access from north end of
southern parking lot to Cleveland Street - How will the fire truck
driver know the location of the geoweb so as to stay on the access
area? Will it be outlined somehow so the driver knows the path?
Is the sidewalk along Cleveland Street being designed to
withstand the weight of the fire truck?
Comment: Trees have been added to define the geoweb area
for fire truck access. Yes, the sidewalk along Cleveland
Street is designed to withstand the weight of the fire truck.
37. Sheets C-19 and C-20 - Landscape islands in the northern parking
lot are large enough for shade trees to be planted. Alternately,
two accent trees or three palms are required in the islands.
Comment: Referenced sheets have been revised as requested.
38. Sheet D-6 - Move to be Sheet C-22
Comment: All landscape plans are labeled with "L" prefix.
39. Sheet D-6 (should be C-22) - Revise the Landscape Schedule for
the following:
a. Indicate for the LI, LI2 and LJ that they must be a
minimum of2" caliper at time of planting; and
b. Indicate there must be a rain sensor for the irrigation
system.
Comment: Revisions made as requested.
40. To be clear, is the electric service for the bollard lights and the
parking lot lights for the southern parking lot being placed
underground?
Comment: Yes.
41 . Need a detail for the compactor dumpster enclosure. Unclear
how one gets into the dumpster enclosure to dump the trash.
Unclear of the exterior material and color of the dumpster
enclosure, including the gates.
Comment: A standard detail has been provided for the
dumpster. The exterior material and color of the enclosure
will compliment the Dock Master building.
INDEX OF PLANS
u..
.61,,"11',;~
.,~, ~\ ~
.",S~hL. OF rilE ~~
~.._, ~~
~~ I ~~
$G ,,\,~ 0 \
s" ~ ~
s s
~c> :g:1
'\~ ~~
~~~ ~~.~
~.;{1:4TER ~~l
~""'III},IJ
SHEET #
c-o
C-1
C-2 to C-5
C-6 to C-9
C-10 to C-13
C-14 to C-17
C-18 to C-20
C-21
L-1 to L-4
L-5
E-1 to E-4
E-5 to E-6
"
~
.,
I
U
"
~
uti:
zm
Qo
"'r
~m
O~
~"-
-0-
)t.~
0_
0
"'~
0
g~
irg ;;
0
~
~
~ J
w
>
8
"'
~
.,;
~
J,
u
"
f
~
~
,..,
Q:~
~~
~{
~~
0
t'"
a~'
0::..(."
"-u
SHEET DESCRIPTION
COVER SHEET
LEGENDS
EXISTING SITE PLAN
DEMOLITION PLAN
PROPOSED SITE PLAN
GRADING AND UTILITY PLAN
SITE DETAILS
SWPPP PLAN AND NOTES
LANDSCAPING PLAN
LANDSCAPE DETAILS
ELECTRICAL PLAN
ELECTRICAL DETAILS
o
a er
ea
>-
I--
u
Engineering Department
BAYFRONT UPLAND IMPROVEMENTS
Sect. 16, Twn 29 South, Rnq 75 Eost
07-0045MA
~t"-
.~.
It] WADETRIM
8745 Henderson Road Suite 220, Renaissance 5
Tampa, FL 33634
813.882.8366 FAX 813.884.5990
Certificate of Authorization No: 3592
www.wodetrim.com Building relationships on 0 foundation of excellence
LOCATION
OF PROJECT
ENGINEER OF RECORD:
MICHAEL E. RICE, PE
PE NO. 23970
Frank Hibbard
George N. Cretekos
John Doran
Carlen A. Petersen
Paul F. Gibson
Bill Horne
Michael D. Quillen, PE
City Engineer
Mayor
Vice Mayor
Council Member
Council Member
Council Member
City Manager
Seat 1
Seat 2
Seat 3
Seat 4
Seat 5
LOCA nON MAP
.><
,!O
Approved By
"
c
c
1:
VICINITY MAP
09/15/08
08/01/08
05/19/08
11/08/07
City EnglDeer
FINAL DRC SUBMITTAL
DRC SUBMITTAL
90% SUBMITTAL
30% SUBMITTAL
'"
Q.
Z
Date Approved
City Job Number
Plan Set Number
2007061
i
1
]
~
9
S~EETLAYOUTLEGEND
'" /
"N
6'"
"N
"'..,
;:::;;D /
~~
zw
y
/
/
/
/
/
/
/
"
iL
W-
il ~
i~
[f--=
(}=,:-
0$'_-'-0.--'.' . -.,..f_...<;".,!.c
""""""
---~-
----------~~-==--
~~lt:
~- * ~- 5f.- if ~
.~
.-'
RECORD DRAWINGS
\111~~(At::;....__
/$~"'"\
~ ,d,.... {':::.
~ n -.....:: II %
:::.~ ~ !-oo~
~'Vp j'i'
-__..1v4 rtR ~ ,III'
..........., /111
CITY OF CLEARWATER, FLORIDA
ENGINEERING
~e:PST
l"'ItOJEC'ENl:iM_i11
~!Klo"1P'l:
REVISION
,,-
CO,
C-~
C-13
C-Il
E-4
C-4
C-B
C-12
C-16
E-3
C-3
Co,
con
C-15
E-2
B
8
~
::*-
CENTER LINE - L C
ClI<8 . GUTTER - MIAMI
ClI<8 . ('uTTER - ,TANDARD
DISTANCE
EDGE CI' ROADWAY - PAVED
EDGE CI' ROADWAY - LNPAVED
FENCE
FENCE UlT~ GATE
INLETS. DRAINAGE MAPS
INLETS
LANE LIE
LIMITED ACCESS ROAD
MATC~ LINE
PROPERTY LINE - L P
LAND LINE - L L
RAILROAD - RR
RIGHT -CI'-WAY - RI1IJ
SECTIOO LINE (SECTlON- TOWNSHIP-RANGE)
S1.1RVEY BASE LINE - SURVEY L B
CENTER LINE CI' COOST.-L C046T.
>'EDGE
BCRF<lCW PIT
DIT~ BANK OR SLOPES
TREES
u.ETLANO
OVERlAND FL<:lll
S~ LINE - EDGE CI' WATER
S~BBER'r
STREAM
S TRUe lURE
TRAVELED WAY
1OCIODED AREA. EDGE CI'
ELECTRIC CABLE. BURIED
ELECTRIC DUCT
FIRE ~YDRANT
GAS MAIN
GU'r lINE , ANC~ PIN
MANIlOLE
POLE. CCt1BlNATlOO POu.ER . TELEPOONE
POLE. L1(,~T
POLE. ELECTRIC POu.ER
POLE. TELEf'I.1Oo1E
SANIT AR'r SEu.ER
ST()f;I'-lJJATER PIPE
TELE~ CABLE. BURIED
TELE~ DUCT
TELEY1SIOO CABLE. BURlED
Tou.eR
VALVE
WATER MAU><
WATER METER (WM.J
TRAFFIC INTERCa<. CABLE (TC)
TEMP. COO$T. EASEMENT lTeE)
LEGEND
EXISTING PROPOSED
~ ~
0< :>uu !-.ooo~ ~uu )0 0-( :>uu ~W~' :>uu ):l
)( x )(
-x-x-
x x
-x___x-
o
1:1 [! ----<III--
c
---
Q a ~~-
,',',"
...',,',"
Ii'.
l
I1III1 I1I1 I II I
....---EXIST R/W
,-R/W
I , ,-1jl SURVEY
I , ,-~ aONST
c=J c=J c=J c=J c=J
L...-.- B.P. I
~-----_..
610.......<;.._ g.::. -r," --6::...1> 6
o OAK... PALM. PINE oMISC CYPRES
, ,-<;, GONST
B.P. I
1 ..
6 6
o.
~
OOOOOOO'UOODo
~
~~
---.:r--BE (7. 5K'4-----
-BE4MTD(75K-4--
6-
C' ell
a; ---<
@ SAN QJElEC J[) STM <D TEL
'Q,CS
OS
'Q,PW
-0--
~B"SA"
~36"RCP-----
~T(200PR1------
-- BT6MTD----
-----.:JC: --ue(CATv)-- --
!IQ.
~O"'WII
OI.M.
==--=--= TC
- BE(75KVt---
- BE4MTD(7SK'4--
-6-
- 6'0 GM---
--l
o
9
~
-B"SAN.---
- 36"RCP-----
- BT(200PRt---
-BT6MTD-
- UG(CATVt-----
~
!Xl
-10"W~
o W.M
TC
MISCELLANEOUS LEGEND
8 PK NAIL' DISK
o FO..ND lROl PIPE
~ SET lROl PIPE
. FOl.ND NAIL
$ BE~ MARK
6P ~ 5FLICE BOX
BOLLARD
o DENOTES ~TE SLAB
o DENOTES OVE~ COVERED AREA
Q DENOTES BUILDU><U AREA
I><J GAS vALVE
rn PROPANE lJU-MARKER
" WATER u.ELL
~ FIRE ~DRANT
$ SPRN:LER
$ V SPRN:LER COOTROL VALVE
o WATER vJ\ll.T
~M WATER MOOITOR u.ELL
STEEL SIUNAL 5ll"PORT POLE
CCNC. SIUNAL 5UFPORT POLE
SI(;N-SINULE
S';CO SAN. CLEAN01JT
I><J SAN. AIR RELEASE vALVE
o STORM t4..ET -URATE-CENTER
ISM SANITARY MARKER
F.C.M. FOl.ND COOCRETE MC>LNENT
FC.I.R. FOl.ND CAPPED lROl ROD
F.1. R. FaN) lROO ROD
F.I.P FOl.ND lROO PIPE
C.L F. C~AIN L1JoK FENCE
FM SANITAR'r FORCE MAIN
IRR IRRI(;ATIOO LINE
N.W.L NOI<I1AL WATER LEVEL
TRANS. TRANSFORt'ER
S/W SIDEWALK
P.V.c. POL WU><'rl C~ORJDE PIPE
,)
\1.(,' SPOT ELEvATIOO
B.F.P. BACK FL01l1 PREVENTOR
o PARKIG J-ETER
o PM PARKIG J-ETER
~
V////d
-
100
_"......TI
-,~
IMCAV",,'!I!
DEMOLITION AND SITE PLAN LEGEND
SIDEWALK REMOvAL
VE~Icu.AR PAVEMENT
REMOvAL
f'ROFOSED SIDEWALK
f'ROFOSED ~ALT
PAVEMENT
MATC~ ELEVATIOO
BA YFRONT UPLAND
GENERAL NOTES
STRUCTURAL LEGEND
FFBW FROOT FACE CI' BACK WALL EB
18 ME1<MEDIATE BENT EF
NF NEAR FACE FF
BF BACK FACE
END BENT
EAC~ FACE
FAR FACE
(t)
CALL LOCAL AJBlIC
UTILITY NOTIFICATION
CENTER
...,-
1---"''''
~=v::c-
It] WADETRIM
THIS DRAWING IS COPYWRlTTEN
o Wade Trim Group, Inc.
W,A.Q( TRIM PROJECT NUI,lBER:
_____...... ZIlJ
Il4l__T_"-_
1ftM!J~" FA)(::I1U14.Sm
c.--._~Nct.:..
............ .........................".....
CLW2067-01 M
YL
RO C:lECKEO &T MR
""""NO.
IMPROVEMEN TS
AND LEGEND
0<.....
AS
NOTED
COA.T!OIUoIlI4
05 19 0
!+EEl MO.
C-1
--..0 "'"
c;oelM.CTION
ikI"EIItvttING &Gt€ER
--
---
---
----
,/'
/'
I~____-
--
,,;?"
,,~
S"PVC
INV_3.19
.If
~-A.f-
n.!
MATCHLlNE
...........
TO SHEET C-3
o / I!J
/
/.
/// 10'.
/
\
1
\
\
Ii' \
"
\
\
\ \
\ 04"
\ '~"
~
....;p.... ........)i "..
;f
~tt i ~- ....'"
:-
~
.'11/.
.f ~
20" PALl.4
.Jf
I
/
/
/
/
/
/
/
/
/
/
/
/
/
I
/
I
I
\
I
/
)
./
---
~
~O
-r "'~
~
'I
.,;
"
"
~
i,
')fL"
or
~
'Go?
/
/=5
\
S-302A
lB"RCP
JNV=2_0
\
" ,
.
".
'i
"
z
8
\
SEAGRASS
rM---~--fM
rM~r.4
'iitrN"Ii'l. CQ"Q WAI It' r
rtl
BLOW/~E_____________~_________________________________-----WArrRl~E--------
~~~
~--------------
RECORD DRAWINGS
~CT IIGN!:III
!lPlEItV8HiIUCiIlNI!."
REVISION
- - -",
:{
.{'
~
NORTH ARROW
20' 10' 0' 10' 20'
-..r-.-
40'
I
.Ii'
~
0\'
+
r.1
c
I'O~"",IS::="I
---'-
------ t
---------
----
_,...tlll
1745.........."-1, r....R. 131M
It.--.IDI MX:~
c.-.:llllflAaIatIIIIonND.::-.z
...-......- ............................~
CLW2067-01t.f
"I' .........
/~"{ St:.AL.... -"'-..~
11(j~,^"
~ ..d" t~
~n"'~ g~
~~::::. ~~
~~ .$'/
-:.......:;4rER ~ ,ll,t
"'.." ""
CD
BA YFRON T UPLAND IMPROVEMENTS
SURVEY AND
EXISTING SITE PLAN
..... " YL [l(Sf(;N[DSY otECKEO Err RD CONn:w::f NO.
"""
AS ClW 067.01M
NOTED ..IT...... ....- SHttTHO'C_2
05
""""""'0""
""""""'"
~SN:iE"IOIIIEER .."
........~
-=
~.~
CITY OF CLEARWATER, FLORIDA
ENGINEERING
CALL LOCAL RJ6L IC
UTILITY NOTIFICATION
CENTER
"....-
~.....".
JWl...~1III'(lItl!
"Q,/ oc.t.v,,""
" \
~
I e
r 1 ~:)
I
I
I
SIGNAL J~
C~
;;>
.;' ~
.;'
IGNAL
'"
,,;:0.
"""
"
""
" .,
r I ~ Cj"'?
/1L/1 n\"'f
,
WATER UNE ..on I
MARKER 12"OIP
, 1 \)
;~ " ~;~~~~Gr'vON ~--
~ ,<I> I ~
I ,'/ I
,"' -<1'/;/ "!11k
. .'........ ~........ Ji'
MATCHLlNE
~~;.....................
/HEET C4
7
.......,..~ .)1..
~ -:--
.Y""
ASPHAl-+-
PARKI~
j..--
:,Q j; '"
-\- ~ +"
...r
.-r
---r
.-r
/'"
.., --r "
__ o,~ '"
~--.;.
---r ----
~~
, , ....T.~T
i ~ 1"
I ~ 1
\ 0 d
I".... ~
-; ..;>
l//)
/
\
/
_w
----
~ 4'
/
~ .......
TO SHEET C-2
RECORD DRAWINGS
I -----
~.~.......~~=-
"III~~(At:-:...-___
...(;~"~
~ "''''''' {~
~ p.... g~
\~~ --- $.,l
~-..~4;ER 5~11'
........." ""
~C'~H!:l!lIl
~~DCil""'"
REVISION
MATCHLlNE
.....F.............
, 1 \ TO SHEET G-4
~,' I \ ~
" EL dTRIC \
(>( 1 \
(,c; I ~..,\
, I "' '"- ----
):(?( '\ ---- -----
',' I \
\
\
"'
u
LJ UGHTING
~
LIGHTING
NORTH ARROW
20' 10' 0' 10' 20'
~-
40'
I
LIGHTING
LIGHTING
~~---------------------------------------------
\21
II
I
LIGHTING
G
8
UGHTING
LIGHTING
.,
<f
~ .'"
"
~
~
.::
,,~
~
-"
,^ "
-" -" -"
CLEVELAND ST.
., ~ .;'
"'
<t
-l'
~
,,I
"'
.
-,,'
\
\
\
\
.f..
.~
~PALM
~~
__-~ER~I~IfN.. .$
-:---:~
~
12" PALt.A
,.tc
,
- -2- -f^~~;Y6N - --UT;!n-L.:---=U---~\~__n_-_:~*N~n_---B~-W;;F.-R-
~ ',*, ....-~-" -~'~- ~--~
H ,~ - -;t ,'P ~ ~s '~~LEP~f';;~
'" 'W 1 ,., '" ~
:r 6" IDE CONe WALK ",,0 \ <.(r- 1~" P LM
~ I, ~
12 PAlM + I \ (<"
>f 5fALM )fLM " \ \ '~M
..;' \ :
UGT
~C)8
"',
^
~
,
~~
~
p
o ~/
.+>" Sf'
-- -- -- -rc:':':' 'ci- .
/ I-S--
/ y
/
0::::0
/?
,^
,^
,,"
5fALM Jf~M
,Jf
,,0 ,fj
~ ~.
19"
~
CLW2067-0'M
1__15_1
0_ film Gtouo. Me.
_ ... I'lIGlIrI ......
'"
-"
:t
-"
MATCHlINE
................
TO SHEET C-2
12" PALM
CITY OF CLEARWATER, FLORIDA
ENGINEERING
CD
BA YFRONT UPLAND IMPROVEMENTS
SURVEY AND
EXISTING SITE PLAN
.......'" YL DESlON(D BY RO CHECI((O ev RD CONTRACT NO.
""" .........,""
AS CLW2067.01M
NOTED .","""'" .....""" SHro'....C_3
05 19 0
.llPfl'1tlMD rQA
CONS'RL<TIOOO
SUPEIMSING EN(lIN(EF!
.......T_,.
--y~
1HeA.V.A'lt!
CALL LOCAl RJ6LIC
UTtL IT..,.- NOTIFICA nON
CENTER:
,~-
1-"."'"'"
l'WI. ... ItCUIS IIIPOM
Y(lUvc.IlV,l..
MA TCHLlNE
.~..............
TO~SHEEJC-s .
/
I
I
\
+--
\ ~ 'T--'-'c'-'-'----~--'--nffJ'\w--c-~--~
/~ j
I I
I I
! I
/12" - ""-----c--1---G"-------- (
I \ I C_-G_C_G
f CTV--iTV__L_ CATV
'~CTV
/ UGr
/
/
)
/
/
/
I
J
I
I
/
I
I
I
!
I
SEAGRASS
~
F ER
o IC
.;'
TV
y
CTV
-CTV---<:Af-cTV
I
I
,
I
I
,
1-
--r
9
:t:o
-r
.-r' ~ ~
}'
;;v
~t
y
-Y
y
r
.:r
~t
y
-r
~
r
f
I
~
Y
~
-----
--r-
A'
-f:
:t
~
.-Y
-+-
LIfTING
~
y,,-'
.-fk
..v
-r
..v
,..-
~
;:y-
-r
..:y ~ ,,'"
j;-"
..Y
-r
..Y
-r
..v
"' j; ,,"
.......-....
.;'
~
!l
10'
-"
~
4'
ASPHALT
RKING
~
~
{I
:>
-"
<1
.If
~
. Z
.'"
'-'
..
EDUCED
SPEED TRAffiC
SIGN
@
5EAGRASS
~
p
., ~
18"RCP
INV=1.32
o
"
-"
~
~
{I
S.EAG~S
"I
MATCHLlNE,
..............
TO SHEET c-3
..
RECORD DRAWINGS
,111~SEA;.:----"':.
l$M"'~
~ ,d/, {~
~n ''-: ~%
~~ ~ !--o~
\."V.p, ~l
---..""'4i[R ~ ,."'
.........., ""
!Il.P'I!1'YI5INCiI~1Nl!.'"
REVISION
MATCHLlNE
............................
./ (FF TO SHEET C-5
!><l
J'
<0 ,
,
,
,
,
,
,
,
,
o ,
~ ~ :
:. ..,.:r ~ ./i' ...t: 'c? foQ""> ..,,g> J
~-f-:;---,----------___~:t~~ ,_~__l_
/ ..,0;+ ~16 PALM -r.,~~---------_____ I 1
~ti' ~ . -------<~---1, ,~--16"W __{~_ 12"W _____________
-, ~ +'. ~
'" ~ .( L_+,_-'
+' +" ~ : :
~SAMffl1lRf( Cl PIPE ElEVS.=3.2+/---' "f
UFT 1
STAlImlIl
:E'
~________~~I~_~~~~~w____J
,"
ClEARwATER PAVllllON
::-
~.
[~
LIGHT!
STORM
GRATE INLET
"
~
...........
/
J
I
/
/
I
j
7'-----
--,
",-- j
.:r:- ...
-f
I
I
I
/
I
~8'
G__________ 1;>"p
I -----------
CATV I
.,
or
-"
i?
"'
<r
=>
u
j ~
~'<r~
"-~
~
I--?:tt~"___n- --- - --
j I ~t \"",,,' ~HTING MATCHlINE
..... I. ..~.W!lLl ~~...~J~~..:::::..~...........
TO SHEET c-3
~
< >
><
"I
~
CITY OF CLEARWATER, FLORIDA
<D
__n
_T~
~~n
ENGINEERING
CALL LOCAL PUBLIC
UTILITY NOTIFICATION
CENTER
~-
1-_........".
,........~~
YOUlloCAv""""
;;
~
~
~
J'
<0
,"
~
~
~
"'
~
.-
~
i?
~
," WATER LlNES~.
BA YFRONT UPLAND IMPROVEMEN TS
SURVEY AND
EXISTING SITE PLAN
,
I
I
I
I
,
NORTH
,
,
20' 10': 0'
~-
J'
<0
I
I
I
I
,
,
I
I
I
,
,
I
,
,
I
WTR :
FOUNTAJ~~
----------__J.
It] WADETRIM
-,......
"4I~ "-I. T..... R. ...
euMt-.__ FAX:I1U14S18O
~"""""""'tIG.:_
............... ...........................,,--.
~
ARROW
20'
10'
40'
I
-t--
I
I
\
I
1'O.::;c"",I5~1
_ _ 1'IIMCf_
CLW2067-01M
......... n O(SlGN(O BY RO ""OlEO"" RD
JOII"'-
AS CLW2067.01 M
NOTED p",- ,...- 5''''' ... C _ 4
05 19 0
N'PRCM:D fQlll
",....."""""
SUf'(~["IGltoI[(R
....
<>~ /
~w
<;9/j / \
-\--\-'9 OJ / \ \ -----"E-----"E-UE-
-l-' 9 ~ J> j ----\- _UE ----TUE
-\-' . 9 . 2 j ---u/-----"E uE \
-=::Ji?~UE-"E- / )
llfE ')j /
-\- '& }
-\--\- ,;& ;,~j / /
'& ''yj / I)
-\- <j / t
-\- :;;~Oj / I ~IJ I
+'& '9j / ! ~ //
OJ / ) :!~ /1
/ / /
/ / \
~ \
!
-\-
-\- "& .
'9 '/j
'9 OJ
97j
<'j
j,
-'r
.\-
~
EXISTING
ALUMINUM
DOCK
(
(
I /
j/
/
/1
/ I
/ \
\
\
I
/
~ /
/ /
I /
A //
./ /
SEAGRASS . / .
I /
\ /
I I
/. I
./
16"RCW
\
\
J
n.::; TT~" n"nc"C"",,
I .'
-/ JCHLlNE ' . ... .
.~..........................
TO SHEET C-4
RECORD DRAWINGS
!I.PE~pejoNE~1III
REVISION
\~
,.;
~
~
\"
~
/
/
/ ---Uf._LlE--
ut:-----UE
IJGE ---";
~
/
/
/
/
/
/
,,~%/ '
){r., .J'
GRATE tl~75
INY. EL 3 i
,>; -
u
~
NORTH ARROW
>
ii'
o
20' 10' 0'
~--
'"
~
/
.' /
~~j~/
/~<o...
,,(( ,"" ..
. UGT -i'
<' IDEWA ,
/
-l'
-i'
SEAGRASS
1 10
----L-----L-
t.,
SEAGRASS
14 OAK
RIGAmfA TlON
10'
20'
40'
I
~-
+'~,
20. RECLAIM
o!?
_';-~__.H"'~_
----I"'~-----
-i?
Ji'
..;
cr
/x-H--':- --~_-C:--=";~~=H::::'::'-~~__
//// -+10
.:>
// /
//", ~/
/ X,/
/:~~~
/;:/;t.~'\'>.:
~\>-\~_ ~ Ot>-(5)
/j\~I>-\~
>>~~<'."'"
/'<>'
//.///
///
// /.//
/. .,//'
///
///
/>/
;>/
.1/
G-G~
///lCTRICAL VAULT
,/ I ON CONe PAD
(I
i/I
:1
1
i?
IRRIG~~IO:;
CONTROL BOX
u
(y
'f:
I(:~ [:x:J
+' .:;-.f" ..'"
.;-'~O ',," , ..
-):{.;- 8.; 9
4" ,6" OAK
I
$~\GRASS ~
-' - + 12
RN10N 0
OAK i
-+'" .;:
+
.;'
i?
.;-'
o
o?
~o PAL"
.\'.c'll
').0
7" PALM :;
X .f'
9"()PALM'-
~ 7"PAL"
~6&lOWL
~-
,{><},4~ W
r:-- - --~ - -,L{)<1l------ - ------- ----------- ---16"
\ 1
\ 1
1 1
\ 1
\ 1
<" 1
4? v I
~"=:: - --+'-- - - - - - - ----- -- ----- -- --- --- - - 20"W -- -----------{><'f i
'...:'<" ~.Jf : :
24" RC NE INY ""'~,.() : :
EL."'1.1 . "'" : I
C) 30" R P WINY, EL.ooO.52 ~ I ~
/ 6" C 'I' S INY. EL.=1.75 "'" I 1
6'1:'1' N fNV. El=2.15 ~ : I
12" CLAY SE INV. ..,1/ "'" rG.I. I :
PI El. 3.10 -\' .P 'm' ~fSAtTNE..3.54 : :
. ... ......~................. .
TO SHEET C4
~ ';fL"
.;'
I'" ..............
,110-{ S(Al!r.... --_
l$M"'''''
~ "I,... {~
~~.. ~ ~~
~-v-A ~l
":..._..'-"41'ER ~ ,i
.............. /1'"
ID
~~~
e:~V"'T1!
CITY OF CLEARWATER, FLORIDA
ENGINEERING
BA YFRONT UPLAND IMPROVEMENTS
SURVEY AND
EXISTING SITE PLAN
CALL LOCAL F'lIBLlC
UTILITY NOTIFICATION
CENTE~
.~-
~::~:~
,"
;- ,...:"
o,~o '\'~
~I
"
1
1
WTR 1
rOUNTA1~
. 1
1
1
1
1
,
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
,
~
I
1
1
1
1
1
1
1
1
1 1
1 1
1 1
W ------ --- ------- ---__________+__J
1
1
1
1
1
1
1
1
1
1
1
1
1
It] WADETRIM
........1, 8lIII22O
I745H1n1nan RoId, r..... R. IMM
It,..,.... _tDI FA1l';: 111.1M.8m
~fII~ND.:82 ,
............ ....................".....
,,'b ~
~ +
~,,<o
CTV
20"RCW~
1
",
.r'i
OAK I
1
1
1
,
.\'1
+-- 1
1
1
1
~I
~:
1
1
.\'
~'I
OAK:
1
~-
G~ -~-----
l~ ~~~-
:~{J't><O,.,'t> ~()~ fL "'8'02
( -t- --\- BOTTOM EL-!.J.Ol
: ."" NV I~ACC[S~(Bl[
: ~ \
1 '
: 00 \
1 ~ '
1
~I
"
~I
-,
1
f50~
]:'0....-/'- .i;O':;
in
1
oJ'
+,
~
'-'
.;-"
/
"
(/
/ t~
j
l
'qs;
IlMS_IS-1
Q-,....~....
_ _ PIlllAl:I --.
CLW2067-01 W
YL
""""'" SY RO CH(ClCED By RO COIITAACTNO.
-..,. ""..,.
CLW2067.01M
.... ....... ....- S><D ....C-5
05 19 0
"""
AS
NOTED
olPPItlM:DrOll
CONS""'''''''
SUPElMSlNC OIClNEER
/
/'
TOTAL TREES INC~ES
TOTAL PALMS 0
("
~'~"''':~'
"~ "
',,"-....",
/
",>/
/
/
/
/
/
/
'-..._-
/
/
h
(<:.'....", //
'--"~....,, /
~",.::;
I
/
/
/
/ /
, ,/ /
7/
((
)
I-j ~
------
-
--
--
I LINE
,"
RECORD DRAWINGS
~"m<<IIl<lHlt
SPEItYIMG ac;....,a...
~
~
'..........."
'",.
"~
'",
"'"
\
\
MATCHlINE
...................
TO SHEET G-7
\
\
\
.'\.
\
\
-,~'--.-
2" LF CE ClJR8 .
GUTTER TO ee R:EI'1OYEo
).41 Sf ~ A5F'WALT TO BE
"""""ED
I.AaCUT EXl$fIt:i,
PAVer-eU ALaG EDGe
".,."..:
" EXlSTJt.rS p~ ~TCR5 TO BE
REMOvED. CCJ-jTRACTOR SJULL RB10VE
AK) HANTAIN IN 6000 CQlClIT'\C).l
5Tco::F'l.E AlL PARK/M:i f'ETERS FOR
DI5POSITlCN eTOJ.NER.
SEE DETAIL ~
5l-EETO.)
SEA WAll ~
____ 20'
------~~[ "M
'",
SAlLt:lJT EXl5T1(j, -,
PA\o'EMENT AlG1l't:i EDGE,
TYPIcAL
"'\eIs-e; A5f'l.IAl.TTO
eE 0EM:>vE0
50 EXl5Tfttj p~~ F"ETERS TO BE ~D.
cc:t4Tli!ACTOR 5I-W..L fi!B'1OVE Nt:> MAM'AIIo/ IN
60()0 COI:lInct( 5TOCKPflE AlL PAfi!J<tt'i
METE~ FOR DI5PoSIT~ BT OJ.HER
,I" ..............
tll.... SE.A~... --:..
/(;~'^'\
~ ,d,.. {~
~p ~ or . ~~
V.p -- ..ffl
-:"_.."4/ER ~ ,II'
............... ",/'
CITY OF CLEARWATER, FLORIDA
ENGINEERING
I
,
I
/
,
!
I
/
. I
. I
/
.7
. /
:~~~. . .
.... '" '" '" .. '" .. ...
.. .. ... ... ... ... ...
. -..../
. . /
. I
/
./
SEA WALL
'"
""
'~
~~';/~~ 'i
" ' , /
, , /
, /
/ /
~ :'~f /
~ '
/
/ /
/ /
, / /
'I /'
y
,I /
/
/
I
/
/
/
/
/
/
/
I
I
!
2&$0 LF CE EJ;l.C:lSlCN:
cc::..cm:;lL!-lAY' BALE
Qtl()LF 'fl.R3I01TY
..-ER
SAW:;:lJT EXlSrtti
PA...e1EHT ALatI EOOE,
TYPIcAL
!IS LF a- ER06Iaol
~moL $o/LTF&CE
"'~ ",' r!!
>:F ~ ""
n_~~~~==-===~====_----~_~~~~:~~_~~<~~_~~__~~;,~~J
;;1;~
;?-~------------
REVISION
SE~GRAS~
)It) 9= a:: A$AW.T TO BE
0EM:>vED
"" LF a: aJCe .
WTTE~ TO ee RB10VED
------- t
-----
----
<D =:~
CALL LOCAL PUBLIC
UTILITY NOTIFICATION
CENTER
TClI.L_
~""...."..
......-..8eII'OM
YOUlbleAv...f'I
u
z
o
u
..
+'
'" ~ +'
",' + \
\
\
~-8
\
\
\
\
\
\
+' ~
+'
~
. /-;;~
;' if e'.s ~\
~. ." . f
. 0" ,
it. . . '
! \\\ 0;. I
I\~~yl
1\
~', ~
I' ,", .t'
\ '
\ ""
c
"
ASPHALT
PARKING
"
.t'
"
+"
\
\
\
'!I 1 aca<<:.
~TOeE
BA YFRONT UPLAND
IMPROVEMENTS
DEMOLITION
PLAN
MATCHl/NE
...............
TO SHEET C-7
+{
~
.t'
20" PALM
Jf
/
TYPICAL TREES I P~&", ,/
TO BE REMOvED ~/'~,
"'~ ;'
o ~;~ /
~ ~"'<~1
/
/
/
/
'" 'f
'Y
/
~
\. .\
/- ./
/.J
,. j
/ .
, I
/. I
/ .1
~ - .)
//. . /
/.
r:'(// . . "AS.R.SS /
. . . . . I
..., ./
. . . . .' . 'I. . '
... ... ,.... ,.
'" ... ... ... ... '"
... ... ... ... ...
~ .
~o
'.~L"
~
,"
"c"
,"I NORTH ARROW
"c
"
20' 10' 0' 1 0' 20'
~--
/
or
,J
j
?!
Lit
ci /
'/'1 /
1/
ELECTRIC X
/...... 901/ '~
U / [J ~~
/
40'
I
~
,O~
~ ~
If'v
(,J
\ <?
"
\ ~,
>
0
\
"
+'
"'ON "
YL
"'"
AS
NOTED
.......,.,.,'"
'""""""'"
THIS DRAWING IS COPYWRlTTEN
o Wade Trim Group, Inc.
WADE TRIM PROJECT NUMBER:
CLW2067-01 M
""""""
CHeCKED B'I'
CR
COfrr/TFW;T NO.
'""........
05
........
C W2061.01M
SHEETNO'C_6
owe.""
st.IPCIMSlIIIGEJtGlNEER
~TI!D 5T
MATCHUNE
3J.....................
TO HEfT~ . . . . . . . . . . . . . . . . .
1...........
"'... 1 EXIS~ pkHtt'E~ TO ~ ~D~
'" . CGNfRACTCR fil.W..l MR1OVe"AH) MAlNTAIoI H G600 ....
... caplTJc:lt 5TOClCPI-E,JrLl P~r-ETEli5 Fat
~~~~y~
MATCHLlNE
.....F............
i \ TO SHEET C-8
1 ~. ~
I ~
1 ,~
1 >? q------~ ------------------{]
1 \
1 \
120LFa'E~\'
1 ~T~ MAY E.
i -d L1GHT:NG
1
i e
1
1
1
i
t
LIGHTING
LJ LIGHTING
~
....,......
LI~ tJ :
WI
0:::1
5AlLOJT EXIS I-- I
~~~T ALlot<; en I
UHF a' TTOS:
BEfilEJ'1O'w'fD W
I 0::: I
.
o
NORTH ARROW
J.EXfSt:tt:i eEtCJ.E&-TO 68-
.~_~~TE .
",PER L".OCAl,::ooEt
20' 10' 0'
I.JII'..-
10' 20'
40'
f
TYPICAl TREES I PALMS
TO BE REMOvED
"'\ ,.
\ \-
\' .
\.\
\\
I\.
i \.
i \\ "SEAGRASS '"
I \.
I \,. R.ACi POtE 6A!E TO eE
! '\... I<EI'1CMD.
\'te>",(JFcae.SlD~t
...,Ot""",
L"~ -ci
~w . ~
--- I
" --- ls\'sG-_l
O. P&'E TO BE I
~D 1 I
1 .
I
~I,
l~
TOTAl TREES INGlE"
TOTAl PAlM"
TOTAl ORNAMENTAL
TREES REMOVED
~
-1-
I
LIGHTING
1\1 ::
III ~\
\I~~ ~ ,>'
IlK.:'
1\ "
!'i\
Iii
y'~:'
'"
",'f--
""
" '
1: I
\
I
I
I
I
I
i
I
I
/
IIe>....V.?'E
/7'
/
/~l
Ir
~J
~~J
MSf:Fa'A5f'I..(ALTToee
""""""D
G
8
'./../,
/ .,r-~(.;!i!f>>t
// -..o~(~1
'ss
uGl-lTlNG
LIGHTING
n
;n:
LIGHTiNG
:u I
--~
.,
SAlCUT EXlSTH::i PAV'B'1ENT
Alo.t:. EOGoE, TYPICAL
It>I& f:F CE coc. SIOElIlAlK TO BE
IlET1CMD
5.AlCUT EXl5Tkt PA~T
Alat:> EDGE, TYPICAl
SPHALf PARKING
'"
';''' . '
" ~ ~ ~ " ~
~
~R""~
,.
",.-~. ~~~'-.~ ,'~' ;-~~;f >'>:,' ,... .... ~~- --.. '~. :.:~.J:t:. ,'~' ,... _'.. ,-.. i,
C~WR1J,..~:~~:::>".c._..,.4i: ~ ~ ~,~<<;,f-~'.
~.,'-..--~.."CC"'~."~<;' ... I i" ""'t ~
~' ,i
-~ ", I ""
cO; ~ 1-,
---; ~L~z:mNG ~ - _*<L- ====r==
O:~ .$ ,,0 i
-I;
'i~ ? ---
O$'~
,'"
\~,: ~ ",'"
-Y7t ;\3"f/.\O.
J' 'fJc
~
~
-"
SEA WALL
I
I I 'I'
I r--- t+-- ~
I I ' I ______
~ I ~
, :<.
,
,;::
II
I
SAILQJT EXl$fttj, I 32 V Of CURS .
PA\IEJ"eIT Al~ I ".... OOTTER TO ee REMOvED
eoc.e..\'Y~ i..;-\ .; ./; +.;;
I CLEVELAND ST. 161"'a'~"g I
-----~~~* 0 .
:... -------------T-------:::.:~
: PAVS"9(T AlCMi EOCiE. ~
: TYPlCAI. \\
~ ~ ~
I Os "I~ ~\
~ 2 I R~;YtN r;"----~-n.:nn-93-----['~J\-'-n-.-u--w_-----n-----n
^ ~~-~:.-----r------C,;:-_~~-
'\ S" _ ~_ .:t ' .-\- )::('5" '- I ~~
'4'~,' -;t ~ .... ---r~ \1) -?'t(<0
'\ ~ 6'~r -\" I \ ~
I '\ DE CONe WALK.{> l , l~U.A
^ OJ II', ""f"
~Al" '5fL" 16' PAL" 10 PA;: :: \, '>:..2L"
~ Jf ,": : ... ""f"
-t j I :
"
>
/
r \ u'
1 ~I \ "'00"
./~- ",.ll,f----\--"+yf
~ *<o~ ():: \ t UGT
\ \\! ~ ~:".: .'
I ! " !'1~T RM
I .f Sf RB I'
~;:~~~I\'ON ~ - -, - - - - - -.: r~'^'I~_-'
I ,/" ~ /.... y;,
. / r\ 3> I
I y j~:r :1
\ r~ )/ ~\ .'< I .:I
':--1/ i ~ ... l~k
...........~.......~~l
,0
~
:r
-"
------l-
~o
.~
81CIV TIR3lDIT'T' eARReR
THIS DRAWING 1$ COPYWRITTEN
e Wade Trim Group, Inc.
19"
'8
,
WADETRIM
........ a.... 220 ; 10
17"__T_R.~
it.............. FAX;.1iZ.r.o
t--..-IO>-:-
-......... ....................."......
CLW2067-01 M
MATCHLlNE
....................
TO SHEET C-6
RECORD DRAWINGS
-t-- 18"S~
I __
~.~..........
MATCHLlNE
................
TO SHEET C-8
<'
"
WADE TRllol PROJECT NUf.CBER:
'<
-"
12" PALM
"III~~(A(;:;..--":...
~'~~"''':.
~ <.J ,d/,, .{ ~
%p.... 2i~
~~ -- fk~
~-~"~r(R ~S>ll
................ ,;",11
<D
BA YFRONT UPLAND IMPROVEMENTS
""""" YL D(SCN(D BY RO CH(CI(EbEr'l' CR COIrITRACl NO.
"'" ""',.,.
AS C W 067.01M
NOTED ~n: DRAWN ""'-- .."',., C-7
05 '9 0
.IIfl'PROy(Orclft
CONSfRUCTlON
SUPElMSINCl ENC/t€EFI
_t11GoATt:
--
I!l"CAV"'1'!
CITY OF CLEARWATER, FLORIDA
ENGINEERING
CALL LOCAL R.l6L IC
UTILITY NOTIFICATION
CENTER
,~-
I_...J;J...,,.
11K...~1!Il!I'Ol'll!
TCUl!l"CAVA'I1!
~c_tfNl:OlNU:lt
DEMOLITION PLAN
~1tVe1l'G ENlOlN9:111
REVISION
I
/
I
I
\
---~--
\11
/1
I
I
I
II
/ I
II
/. '
, -;,
, , r
/,
';:
, 'r.
--,---J:
'c'
:/' '
t
'/' '
1
'I
, ,(
j'
, I
, , . r
r~' I,
, , 1
... ,. I...
... .../
. -1 '
... ... J '"
---N '" J ...
I ... .;1~~__ C-A.TV'"
(,
I
f
... I ... SEAGRASS
'~/"o-~ .UCT'
... ,. OOHERr.QeE~... ...
+1 sAli.a.rr ~rt-l;, PAvtr-EHr'" ... ...
, j'" *lCH:roEDGE.*TYPIC6l. ....
I6tlfi'a:~TToee'"
, , , """""""
;"LFG.:~ ,.
, eo<1Ia::<. ""y eAtE
f
r
/
'J
MATCHLlNE MATCHLlNE
................................................................................
-TOSI:;IE-ETC-9 - , . , . , . , . , . , / :/ / I'" / I J~:'!'~ 1 +,'" Err TO SHEET C-9
................... t'j,' j hl/"" ,"""
. . . (11 / J"! o.d1/ i' PAl" GRASS ~. ( +'
,!J& f "'!II "
SEAGRASS ' /l ;, / !.::; 1_ ; e5'1;#'a: T 10" PAL!.A <6> .+'
,'/, ;' / rOef D ~
I j CL[ARw,o.,TER PA\IILlfON
.1t./":/ : +'j~1
r----.c- f : i'le
:~TR -1-------- "" :fIp.' -16 ~
/f~, I 1>- I -:r~~~T~--~-
/ I >:01/ r~
r;].+';;> l t_ ~ I fF 1/ l ~ I" TRANSFORMEjI
fir - - - - _ _ -I"'" / 0! ". Qt,CRET ON CONe. PA
/ I ---_____ IE; / DRIV[2
I I .;;..~ -.1-- (
I ... .." _~~_12"V\.'_____
& r::;;;A;-
-t' GAK ~ PARKING SIGNS
I t-(TYP THIS
I - CON~j o. A
I CURe ~J
II 260g:a:~T .~~~::
0J ~,roee~D ~~~ 10,
~., SAIOClJrEJs~ ~~~ J
[0, PAvEf"9{1!,Al~ e~ "
-f' ^~~Z-r ~Bt: I
I -1-~ -.--'" f ~~():I J: ",..r
i =~. ~~ ~1-1-
I j
~!
f
... 2.cLEOF~....
GOTTER TO ee
, ~
PtV1 Tez Pi ~p
'"
~
NORTH ARROW
20' 10' 0'
~--
10'
20'
40'
I
'"
-",
-'r"'~
;;
~ :
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1 1
r--'-- ~-'--1
---------~-:=;--t__+rj--16 W___~-,u 'Z'W ------_______________
II
II
CL PIPE ELEVS."'J_2+/---/ 'f
1
~
~
~
,,"
TYPICAl TREES I PALMS
TO BE REMOvED
+'
~
TOTAL TREES INCl-lES
TOTAL PALMS
---:~-E>o<:Jf~ F.t{
",,~X_)6" PAl.M,~ }~~---
"r ;~'~~\\T1li ,:.f .t~
*~ r----,
~SA"~
"
,,"
Lln
STATir]}w
".
__________~~~w____J
[-J
1.' WATER LINES -_~.
" ;~~:i~c
J&lf~~.
. !:fER TO ee PQ:;~D
f 1
I ""","T EXI~T'"
PAvEt'9lT AlOft:j,
I EDGE. 1Yf1<:Al. LIGHT!
In 15"$0---
1
1
"""""V .
alTTe.;~ ~o
9-ITO~
1
~
~
I'~~
~o
z~
Wo
u'"
w_
~~
~~
l'~if
0"'
'" ~
0.-
~
~W' o-ITO
lS"S EXI.m,--~
PA TAl.ONI>eoo7/
rrP1<lAl.
W'JOF_T ( "
TO ~o I
=0:"
...J.....
~ " TlIRelDIIY
"~R
... SEAGRASS
:>
1
I
1
1 I?
I
1
1
1
1
.-1 I
~~
f
1
1
1
,
1
lIG!-H1NG
,
I
,"
i~
1
1
1
1
'"
",.
'"
u
z
o
u
~
1
, + '
&.A4LOJT QXI5TttOi PA....w-ENT ...
t ~~...EDGE....T'l'"PICfl
:. ~'5FI:F~'
},
. 11 ... ... "'&{)(IST~~5T'p8e...
~ N(:l 0tSf'0SE0 ClFf5{Te
, , , PER1.OCAt"cooeo
~"'''' "'1Q,~srm"'p~~FC5T~&E'"
, o~~~~~~,
At'l; PAll!(t6 t"'ETER&'FOR 0I5Pl')9H1(:III 8'r
:r . COlER,
'r
j>
~
m
'"
:0
U
----+-----
...:)' : .."""
1 "
I
1
I
I
1
I
1
I
I
:;' ,,'"
......
'" '" ... ... ~EAGR~SS
MATCHLlNE ' , .
................
TO SHEET C-7
RECORD DRAWINGS
~EtCioINl:l!:"
,/
REVISION
STORM
GRATE INLET
11--~________
T ---
!
I
I
I
I
~
[1--
-'I
~"
~
, ,
"
~
"'''OF
(';UTTER TO
REI10VeD
W1S1aASf"WALTrOee
llEI'1CMD
---------
6AIQIT Ex16TM:i
PA\'91EMT AL~ EDGE.
TYPIC.Al.
~ SF a A5AUL.r
~eE~
"'LP .
\GUTTER TO G
REI10VeD ~
.'1....
lS"SO---- - -- - - - - - - - -[} - __ __ _ _ ____
THIS DRAWING IS COPYW"RlTTEN
<C> Wade Trim Group. Inc.
It] WADETRIM
WADE TRIM PROJECT NUI,lBER:
G-G-G-G_
....... 6,," 22IlI
17................ ,...., R. ~
11"..,....... . 11M FAX:'t~
c::r.--. flAaItoItIIIIan HD.:_
--.........- .............. I........ "......
CLW2067-01 M
LIGHTING MATCHlINE
.....................
TO SHEET C-7
,II ..........
,Ill.." sEAL... ........
/$M'"'\
~ ,d/.. {- ~
ip.... ~i
V1l;............ $/
-.......~4.,.ER ~ ,11,1
.......... 11"
CD
t......, "
--~
_T~
lJa:,&.VA1'II
CHEactD lJY
CR
""""""'110.
YL
RO
CITY OF CLEARWATER, FLORIDA
ENGINEERING
BA YFRON T UPLAND
IMPROVEMENTS
sc.ou:
AS
NOTED
""'....
C W 067.01 U
S><If.... C-8
CALL LOCAL PUBLIC
UTILI,...,.. NOTIFICATION
CENTER
=-
'_.4N..""
HK...~llEJl<MI.
YQIJ IMeAVA"
.m .....
05 19 0
DWG.tw,lE
DEMOLl TION
PLAN
""""".roo
""""""'"
SUPElMSNl ENGlN(ER
i
I
I
I;
J
I,
I '
I
J
I
I
,
I
\
\
I
\
I"'IlOJI:CT&G1Nfe1lt
~~eco"":lII:
,/
/
/,,'
~UE-
/
i /
L-~
I~
i ,I
! !
/
I
i
I
I
!
I
I
I
\
\ I
I
\1
~
'"~ /
\\ /
%'y
/\
/ \ \ uc_uc_uc_uc-
1_UC~uC-UC----\-\
u[_-u
_UE----U[-- I I
UG[ / /
/
;
/
I
I
I
I
/
I
I
\~
~
/
/
/
-
~
\:;
~
l'
/
/
I
/ E__U[-
_,-::uc_UC_U
,1el5f' ~ c;o.c. SIOE1l.tAL..K.
TO ee JO:EMOvED
PALM TOElE ~D
>
g;
/
/
!
///
/f:~ . :
/ (,>
/ /. ,
Y )
I/.r. . . . ,/,',
.: ' r' . ;/. '
I, J' , I,
I. " , 'I"~ ...
.... SEAGRASS ~
I ' "\ '
\ ' ',I'
\ .: ':\' ,I. '
\ : : \: ' ;/,
, [ '~/"
,I -;'
, J :i: : : '
/
I
/
I
/
i
i
ll'i"~CW
\'"
~
NORTH ARROW
~
20' 10' 0'
~--
10'
20'
40'
I
UG[
',';,'
)-.-~: '<;: ,
." ',;'
i :. ' ,/, '
, f( ',,,,,, , it--. -/,/
\; " . ". :. ;<~ )JIll "I. T:"~D~~T;"~. .
\ ' , , . 1/ I
EXISTIN~--:~----lQ> .. !J...p~~
ALUMINUM
COCK
~
r
~
~
~
TYPICAL TREES I PALMS
TO BE REMOvED
14 LF a- OI-l ElECT~ TO BE REMOvED.
COlTRACTOR TO HSTAU lEU $ER',1CE
PRIOR TO REMOvAL a- EXIST~
~JN~
0,-' .:r ~,'
+- ~ <:>~
UT-------uT~~UT~i_
"l)~NJ- J-CAt~-~\1
TOTAL TREES INC~ES
TOTAL PALMS
---.-lL
~
SEAGRASS
.... 5t'F'Gl.JA1iiDRAt TO ...
...."""""".
... STQe1 STR!Jc'f1.lR! TO ...
.... ..,.",.~
...15M eCp ...
INY EL;..=O 9~
.0'
UT ~Jj~i ur CONc.U~rOEWAlk:l'T-U\-"
.,,';' ~~re:r~~D ______---I'~i'---_--I\n
STRA~TEN LIGl-{T ~[0.') <4!1& SF a- A5f'I.IALT TO
POlE C\'! i! "i ee FlE1OYEO
5AlLtUT EXlSr!t-t:J PA'w'E!"ENT
Alot:> E06f, TTPICAl
<i'
~~~:~~f _~_--\-I-rf-_
,,'b ~
k +
- - --101'1- __
a:
"
(r'y\
( (
'---'
:"JAK
l
u
C<
;;
,'" '" 63 IF'' a: ~ ElEClRIc fb ee '"
~ 6)' tln.eRS.
",~f,* fa ~fALLJElII "
SERYk:E PRIOR TO fe"t:lVAI.. a:
, . , Elds To<:.
"'SEAGRASS '"
l)tLFa:~c
d!JTTEJM'O ~D '"
~,
~.G :
,
,
.,
;':
12" GAK;
BOx
"
OAK ~
c;
;}
c;
,
,
;>'
-+:
,
,
,
,"
,1.;-0, ,'"
.;,{) ",~';'
,j'.;
~.
~ 5F'O' A5f'I.IAl.f'-TO
~ REI;l'MD,
""/
//
~o PALM
.
"'"
7" PALM
9" PALM ~
.'t
Jf. ,. PALM ~
_ ~6tRO!!.l~_ ~ _ 24
--~--7 PALM ;Jf.
\/-'f
//~////
'" /
1-0.</'(,
//
//
~
-"
"
i?
c;
:0 I
Q :
/ / ~=~T:C~\';;N~4 EL=3,19 :
I / ~r t~~P E~ ~N{54El.=3_29 : :
_______--CJ------15" RC~------~t-
RC~ - - -I:_~~ =-_,~r;~J~~.~=-~_~=~------- -~------16" W --~________________ _______ _ ~-l-- J
I , I
, I I
I , I
I I I
I , ,
,.', t I
\1 I I
1\ I I
- 20"W -------------{)<~r : :
I I I
I I ,
I I ,
I ,
I ,
I I
I I
I I
I I
I I
I I
I ,
I I
///.
~lJ'cI'~.
(il.nTEft TO BE Fi!EHdJVED '"
. 3Cl\Sfd'ASf'It4Lrr/l"~D
PILING 0
. / ,T:-:-:~-~-'-:-'-:-:~=-~-'-:-'-:-~:-;;;'-~-
, '/.. ';" nL;~
y' ourTeIt TO ~ REHQYED
! / ..... pAlM ro et
, , : I : ,..-.0
'/' t ,., Sf it A6PliALrro
'" ... '" e!'~D'"
';' /' ~J~H~i='i;..............
TO SHEET C-8
"
-----nli~~------------------------
~ CCN:~ ~T BAlE 0
""'- ..,'?
~T~;;~vftNT
<) "-
'/ / '/-2-
/ I - < < z - . "'"" J
C) z < z '" .., ""'-
/ I < ~ ['! ~ < "'" "" MATCHLlNE
.~..........~........................
It] WADE'TIRIM
WADE TRIM PROJECT NUMBER:
~G_I
/ GRATE EL=5,44
/ 12 RCPWINV=354
/
THIS DRAWNG IS COP'fflRITTEN
Cl Wode Trim Group, lnc
AilnlllllnDeI,"'220 t
.,..........."-1, T.....R..".
::"'-;=-=~~UIUI8O
....-.....- ..........................~......
RECORD DRAWINGS
CLW2067-01 M
TO SHEET C-8
REVISION
1'" .........
l~" sEAt.........-......':.
"(j~"..
~ ,d,... {~
~~ '''''''': ~~
\~ --z... $/
~-.....~.q fER ~ ~/
.......... ""
DEMOLl TION PLAN
(D
BA YFRONT UPLAND IMPROVEMENTS
""'.. '" Yl OE:SlGI<<08'l' RO ,,*,CI<EJl'" CR
5<'<' BOOK NO. .... NO.
AS ClW2067.01M
NOTEO "'''' ..... __c """.... C-9
05 19 0
...........,,,,.
"""""""""
SUPEIMSING ENGINEER
_.TU.ATl!
:=~
CITY OF CLEARWATER, FLORIDA
ENGINEERING
CALL LOCAL PUBLIC
UTILITY NOTIFICA flON
CeNfE~
'ou._
,-_..,...
tw(._~
TO.I~v"'Tl!
/
--------
------
--------
-----
L
@
RECORD DRAWINGS
1UP"'t:~IJGPGIND.I'II
REVISION
~)/ 1//
I
\
I
I
)
J
---'
MATCHLlNE
.~......~...........
TOSH,EETC-11 . ....
/
/
/
,/
~
\ . \.
\. .)
,/... ... ///
,c ,I
I ..../
PAY KIOSK
3"" LF OF SEA
WALL CAP, TYPE 3
~"CO<C, SLAB FOR
/, " BENCH ~ SF
. /.
~.
;
I
I
I
~......
r.......
;.......
. ............ ~Y KIOSK
\' . . . . . . . OEtECT"ABLE WA'RN\NU TYP.
. . . . . . . . . . . . . . . ''''l.SfA\,L 'Pe~R~CJT' OETAIL
. . . . . . . . . . . . . . . . . . . '61 LF OF' '. CURB
. . . . . . . . . . . . . . . . . . .4> ;0I'lC~ 910'E K, 63 SF
'" ... ... ... ... ... '" '" ... ... ,.. ... ....
. . . . . . . . . . . . . . . '2~' IF.d= 9E~L CAP, TYPE I
~
I"~ ..........
,tll'.... Sf. At.." ....-_
l$~"'\
~ ,di... {~
~n -....:: IH
~~ -::::::...... !--.~
\. ?.p; ~l
---...~,<frER ~ III"
........, 1111
CITY OF CLEARWATER, FLORIDA
ENGINEERING
:.-:
@
@
(D .,..""''''
-~
IlCAVA11!
CALL LOCAL pUBLIC
UTILITY NOTIFICATION
CENTER
=-
1--.001.<1".
11It....~~
TOUVoC.I.V"'''
\ I
~ ~I
~I
==Ill
-=11 I.
~. ... ~IJiII~ \
~J
---III 'I
~I'
~--=11
~II
~ ,I \
-aI,'
II
@ II
II ~ .,\
I 0,: \
I @\
I}
\
~d
@~
,
~.
~
~~
74'
@
""
MATCHLlNE
..............
TO SHEET C-11
\
\
~\L
\, \
( ;'
i
"------.." j
\
\
\s
\
\
\~
\
\
\
\ }:<
\
\
\
\
\
\
\
\
\
\
~~ ~'-'" ,\
~ '-. "',
"."~,, ".",,~ ,~.,~",. '\\., ,,'
~ ~, '.
~ ////'r ~
;;;I/'~<. .>~_.'O OOA' ".
('::~/;~/ ;i . REtY~~~~E~~~o;
~. I
/ /
[./ ;; / ;/
/ / /
...<~~ / I
........... / I ;
':1 II /
I " /
I /
1/ /
I
........1...............,...
.1 6Eou.eB DRIvEWAY, 41 SY I
o REMOvABLE BOLLARDS I
14 LF OF OF 6" IiEAOER CURB I
Il.I-lEEL STOPS I
I
/}:<
~I
i I
i I
I I
I .
;/
/ I !
IV
~/ 1~
//1 \
/ / I
/! I
WliEEL srcJ /
/ /
/ /
~ / /
\ /1
\)
I
@
BA YFRONT UPLAND IMPROVEMENTS
PROPOSED SITE PLAN
Jf
Af
\
\
\
\
\
o
~
20' 10' 0'
~--
~
NORTH ARROW
10' 20'
40'
I
TOTAL PARKINCi SPACES ~
o
III LF OF COlC. CURB
'31 LF OF CO;C. CURB
OF CONe. SLAB
FOR BENe>!, ~ SF
1
at
t
01
t
0 ~
@
;if
~.
c
o
.Jf
It] WADETRIM
........... DO
17.............,......R. JXM
1111 M') ~ _IDI FAX: t1UMJi111O
CdIciIlIrI~NIt.:_
-............ ......................~.......
AS
NOTED
_Fe.
CO"""""""
THIS DRAWING rs COPYWRITTEN
C Wade Trim Group, Inc.
wNX TRIM PROJECT NlAIBER:
CLW2067-01M
o...TE lMAWN DW'O. NAME
05 19 0
DESICNEO 8'f RO CR
"""""',...
ClTYJOeNO.
2007061
...NO.
ClW2067.01M
"""'''''C-10
YL
SUPEIlYl5IHG EJfClN([!l:
MATCHLlNE
;;......................
TO HEET C-f2 . . . . . . . .
:'! .......... P~ 11>10$' . . . .
I. . . . . . . . . '8j~ Sf bF. HlLb ANp' . . .
. " . . . ~'5W<FA~E 4~LT. .
. P AiKIN<;; LQT .
tI~C>I~A1"l:Eb ~f "
. Y"L~ OF.SEA,. UJ:ll.L.L t~:PE y-
. . . . ....~..
:
\ . "
\.\'" .
f\ ~'. :(
\~.<- :":)
/
80 IF OF SEAWALL~,AP. TYPE 3
4"~. Sl~6 FOR
'~~H; ~ SF
~TCHLlNE "", \:,
.....................
TO SHEET C-10
RECORD DRAWINGS
"" .........
111-{ SEA[..... .....-_
l$M"'''''"
~ "d,1' {~
~~,.. g~
~~ -- {j;~
~~4-: SS,,'
--..... Jq iER ~ ,Ill
.............. ""
CITY OF CLEARWATER, FLORIDA
ENGINEERING
~TE: ORAlfI'tol DWG. NI\IolE
05 19 0
\IlrI!.~DCllMaI'l
REVISION
MA TCHLlNE
.....F............
TO SHEET C-12
~
13 LF OF . CURB
~
NORTH ARROW
20' 10' 0' 10' 20'
~--
40'
I
TOTAL PARKm SPACES ~
~
~
e
~
H A ER
..J
PATTERNED CONCRETE CROSSWALK
CONe. SIDEWALK
28 l RETE PAYER !-lEADER
140 SF OF PATTERNED CCl-ICRETE CROSSWALK
G
R
"J
~
2lZl3 SF OF CONe. SIDEWALK
. :~~
..,.,tf>:<'<"""'':''''-:''''"V V V ' >..<>..<.<..{;;.J::'l..
. ~,- :.....,.;:,.:;. ~ ~ ~
CONe W>lK ~---_~
--------------- ---,-
- - - -- '-- - ---------------
€l
---
~ €l tr
~~------- ~
@ ~ --~-------
MH @
~
~
~
Jf
;tf
Jf
.Jf
Jf
Jf
~
19"
o
THIS DRAWING 1$ COPYWRITTtN
C Wade Trim Croup, Inc.
It] WADETRIM
MATCHLlNE
................
TO SHEET C-10
...........'-...220 Ilj WADE TRIM PROJECT NlNBER:
1741............. T~R. ~
..'--__ ."",oUiA.lIlOO CLW2067-01 t.1
~alAullftllanNo.:_
~ .............M..........._.....
(t)
OESJCN(D BT RO CR
SUR'oO'EOBY
CITl' JOB NO.
2007061
JOe"'.
CLW2067.01M
""" "'C-11
_.nr.u.te:
-y~
IlCA......tt;
BA YFRONT UPLAND IMPROVEMENTS
YL
CALL LOCAL pUBLIC
UTILITY NOTIFICATION
CENTE~
~,-
...-...u..".
I-.t.......".~
TClVllCAVA1l!
AS
NOTED
PROPOSED SITE PLAN
-....
_TRUCnO><
SUf'ER\/ISINCEHGltft:ER
~~pa""lIl
I
(
I
\
\
\Ii
/~
I
I
I
/
-/ -
-; - -
-:f.
-r
- r -
-/- -
:1:
- r .
-I. *
}-
-,
: : (
* -/'-
- -
r
- r. -
</-
> 1*
- I * 4' CONe. SLA& FOR
i * - * * _BE~,*~~*
-:f.
* -/:
--j--
: t : - 2HF CHONC. €URB
__/: __ - ~!'>tF_CiI'~. tu~
.12i!'>_sF QF*MU-C 41'10 _
- - f - _RE-5Ui<l'ACE.~ALJ
* PARKJNCs L.OT _
,.,. .. ,.pa~~ KI~
:/* -
**r**
*{
<1>>
MATCHLlNE
....J! -,,-.- !!II." ..... ..... ....II!.
TOSijEETC-13 _ _ * _ _ _
MATCHUNE
..........................
TO SHEET C-13
-~
~TE PAYER >lEADER
HANDICAP
PARKJNG SIGNS
(_ (TYP THIS AREA)!
0, O~
CONC
CURB
4/Z> SF OF CONe. SIDEWALK
DETECTABLE WARNING TYP.
24!'> SF PATTERNED CONCRETE CROSSWALK
!'>I LF OF CONe. CURB
!'>I LF OF CONe, CURB
81 LF OF CONe. CURB
tD 38 LF OF CONe. CURB
8.3'
Ls~ n
T I .. \I~ II MATCHLlNE
....l..~ .. ......~].....................
TO SHEET C-11
REVISION
"" ............-
,II" SE.AL...... ..-_
/$M'"'\
, ,d,.... {- ~
~n ...---= ~~
':::.~:::::.... ~~
"\ ~~ .J;l
--.... iqrER ~ "I'
................ ""
CALL LOCAL FUeLlC
UTILlrr NOTIFICATION
CENTER
TOI..L__
I-_-"N."'"
~:=v::o-
G)
--..
-=
I:loICAV..."
CITY OF CLEARWATER, FLORIDA
ENGINEERING
+
NORTH ARROW
20' 1 O' O' 10' 20' 40'
1..-.- I
TOTAL PARKI~ SPACES ~
CJ
It] WADETRIM
_''''2211
174f..........R*, r.....R. DIM
t11____.IIZ4FAX::I1~
CWIIIl:::II6IcI.........ND.:_
.....lIIIIIdIrrIII. ......................."......
THIS DRAWING IS COPYWRITTEN
C Wade Trim Group, Inc,
WN)( TRfI.t PROJECT NUt.l8ER:
CLW2067-01t.t
AS
NOTED
~1{ I)ftAWN owe. NAWr
05 19 0
DESIGNED BY RO CtiEOtED BY CR
SURVt'tED BY 8OQI( NO.
CITY.I08 NO.
2007051
JOe NO.
CLW2067,OlM
".." "'C-12
BA YFRONT UPLAND IMPROVEMENTS
Yl
- * MATCHilNE _ _ * _ _
................
TOSHEETC-11
RECORD DRAWINGS
PROPOSED SI TE PLAN
.....""""""
'""'""""""
!iUf'ElIM5INGENClN[ER
(
I /
I i
I / /
I / /
/ / /
If / /
'I U
1/7
\ II
\ I
\ '
\
\
\
RECORD DRAWINGS
IltEVIEU!O DT
Wl""lt;1I!V'I~_""."
~~ /
"iw
c
'{;,
/
I
I
/
\
\
)
/
/
/
I
I
)
/
/
~
------
I
/
/
i
/f
/~~:! : .
/". . . .. .
/;/:. .
/ ~<.
/
!
. r . .
I.
....1...
. . .
... ... .., '"
. i .
. ~ .
. \. .
. .
.... .,j. .... '"
. . \. . .
.... '" .... ....
... "" ... ...
. . \ . .
. .. I'
. . . . . . . ./. .
. .1' . . .
.<./:</<
-: . {I:
:;:
f . . ~ tF OF CONe, CURB
;..........
. .;. . . . . . . . .
.... .... .... ... ... ... ... ... ... ...
/...........
... ... ... ...
. . ./. .
~/ . :~C~IN~
..........................
TO SHEET G-12
.;.
. .
. I" .
. . .
. ! . .
. . .
.'j' . .
7'
. I .
. .
.; . . .
... ... ... ...
... ... ... ...
./. . .
. .
. / .
/
. . l.. . . . . .
./.......
... ... ... ... ... ... ... ...
.J..... . . . .
. ~ 51' 01' CONe. 5IDE1lJALK
REVISION
I0b LF OF CQlC, CURe
!:>2 LF CONCRETE PAYER ~EADER __
2!:>0 5I:.~~~5UJALK -
-----
~ 4b sa FT OF CONC, SIDEWALK
':l0 LF OF CQlC, CURe
\?
/
I
\~
"'
\c
~
\
\ ....;..
~. . . . . . . .
I (. . < < . . ./' ~: . b! tF. SEA. WtlL.L 'C~PT!PE 3
'i . ';. .. . . . . ...~....
... ... ... .... ... ...
... ... ... ...
. ! . . . .
... ... ... ... ...
... .. ... ... ... ...
./ . . . .
... ... ... ...
.;..... . '. .~. . .'
... ... ... ... ... ... ...
. . . J-'r==:~ .
~ lXISTrNG
ALUMINUM
~ .t"- DOCK
~-
............i ;..............
. . . . , ./ I .......
\~- -~- . . . . .
-----f-----~_-----1
~
/
~"'~, f}HA1N LINK fENCE
~3
3 LF OF CCNC. CURB EA~ SIDE
CONe SJD[WIo.lK
~ll'
20' 10' 0'
1..---
c=====-~
~~--
~___~ thJ
--~---
CO";',
./
/'/
~//
., /
?' .-
?' //
" 11:
\ ,,'~:' /
y//
/', '
/- /
/ /
///' ()
o
,I 2
.- 9.---~
o €>I' OF ceNC,<SIDEWALK
o
o ~~--
//-;:~/;;:;:~(} .. ...6
//, ~u
///
, ///
~/~:..~
/
. 200 LPSEltWAl:l CAP T'rPE"3
o
/
Jf
::f
Jf..
::f ~
F OF CCt-lC, CURB
!:>2 €>I' OF CCNC. SIDEWALK
DETECTABLE WA~ING TYP.
260 51' PATTE~ED CCNCRETE CROSSWALK
!:>2 LF CCNCRETE PAYER ~ADER MATCHLINE
............~..................
TO SHEET G-12
"r' ............
,l'-{ SE.AL..-.... --_
/$~"'\
:\' ,d/... {t
~~,.. ;S~
V.p, ~ .Il
-.....~4rER ~ ",1'
........" II"
HotI.'WMTJ:
_T~
l!HC.oI.V,ATJ:
CITY OF CLEARWATER, FLORIDA
ENGINEERING
BA YFRONT UPLAND IMPROVEMENTS
CALL LOCAL RlBLIC
UTILITY NOTIFICATION
CENTER
--.
1.....4J:l.4't'W
"\.:=v~
PROPOSED SITE PLAN
(:(
o
o
,--'v
(
~"-
p:
It] WADETRIM
~S."'220
1741.............. ,...., R. 13134
11-"'''''." FAX:11U14.S1l1O
~rI""""""Nlt..:..
.............. ......................",......
~
NORTH ARROW
10'
20'
40'
I
THIS DRAWING IS COPYWRITTEN
C Wade Trim Group. Inc.
W~ TRIW PROJECT NUMBER:
CLW2067-01 M
AS
NOTED
o.t..T'E DRAWN owe. NNoI(
05 19 0
DESIGNED 8Y RO CH(CKED It( CR
SURYEYED 8Y 900K HO.
CI1Y JOe NO.
2007061
JOe NO,
CLW2067,01 M
SHEEt NO. C-13
YL
_'OR
C<>NSlRUCnOo<
SUPElM'lilfC ENClNEER
/
y~
--------- --------- ~"
-------- "'"
"~ /
/ /
~ / I
~~"''' / /
"~:I /
! I
/ /
/
/
I
/
/
/
/
/
"" ,/
'~y/
/ /
II
i/
, /
/ /
/ /
, !
/
/
/
/
/
~1
RECORD DRAWINGS
etRveY"fiD IIY
:IUI"'l!___~1'Il
/
/
/
/
/
/
I
/
/
I
\
I
/
/
/
~
---------
..~
8"PvC
INV 3.19
"If
~ fl
PM-FM~M--------FM-rM-fM-FM-FM-FM-FM-FM-FM_FM_FM~M
:>
".
~
MATCHLlNE
.~......~...........
TO SJ:tEET C-15 ' .
I
/
I
/
I
I
/
/
~
\ .'"
\ ."
\. ,\
. /
/, /
/'" l
/ "'1
/. . /
, I
; "'/'
1.:/
, ,/
I
, I
'.;
/
. 'I
I
, !
:/
'~
: : : : : : : : : : : : :/)
',/
SEA WALL
"'
€I'
BLOW~YE_______________________________________________-----WArr~lmE~-------
MATCHLlNE
.............
TO SHEET C-15
~
.v..
NORTH ARROW
20' 10' 0' 10' 20'
1..---
40'
I
0.rJ
R
.i'
""
,;
o
SEA WALL
01
\
l
l
\~
\
\
\
1
I ^
~
l\-( \ L,)
\ {
c--J
/
\
00/
ABANDONED
FORCE MAIN
,;
---~~,. I-fDp[
~F~
FM~ !
'...r~~, k
o
,0
""
,;
o
~
o
~
o
~
Q
Q
<
'~,-~
~,
\,
Jf
18"RCP
lNV:20
M~M~FM__
----~r TH30C4 62(
M~:~S
~
r
~
'" "
o
c
,.
-FM_FM_FM_r
MHS#286A-4005 M-n.i-FtoA----FM_FM
BSSl -FM_FM_FM_FM
-FM_FM_FM____ t
n,4_______ M--fM
REVISION
I'" ............
,I'...... SEAI.-.. ..-_
/s~:"'\
'" '"'' {- ~
[p -... e~
\~.p, ---- e-l
-......~":Jr[R ,'~l
........, JIll
BY PATE
CITY OF CLEARWATER, FLORIDA
ENGINEERING
M
I TH4S ORAWtNG IS COPYWRrm:N I
C> Wade Trim Group, Inc.
WADE TRIM PROJECT tNUBER:
CLW2067-01M
AS
NOTED
~TElmNl'tI D'lfG..w.[
05 19 0
OCSIGHEO BY RO CHEC1l;EO fly CR
SU~Ofr1 8OOl<NO
em JOB NO.
2007061
"" NO.
CLW2067.01M
"""""C-14
......r.TlrM~
-y~
I!)(C.I,VAT'f:
BA YFRONT UPLAND IMPROVEMENTS
YL
GRADING AND UTILITY PLAN
APPRMO FOR
CONSTRVCnON
SUPERYISING ENClNlElf
t.\..lF....~:~~~~16.
I -::0, ~
I ~
1 }-
I ~ q-________________________--o
I \
1 \
, \
I \
I
I
1
f (0
f
i
j
I
f
f
.~ \[1
(I~ !j\
,~~ 1\\ ~
; IiI \,
4! 1\ \
, ,\ ~
~,. \.0. -.."
'I ~(Ji
" \i\\ ~ ABANDONED FORCE MAIN
~ .." , 1 k P MODIFY STRUCTURE NO.2
... , ,\ }"r .~\ INY. ELEV. 32>0
.' ", '. '~cl:f:;.,', SEE DETAIL Cl< SI-IEET C,I'3
~::t, }, :!' , 2'3 LF 18" RCP . 0.35%
CONSTRUCT TYPE A STORM INLET NO. I
TOP ELEV. 6.86
MATCHlINE
31......................
TO HEFT q-1'6. . . . . . . . . . . . . . . . .
~...........
. . .
. .
,0
.;"
k;!
,.
\. .
\!:~ .
\. .
I \:.
/ ~
I /!;'i- ~~
'. r/~4"
"'......../.-'401;
~/ '~"""~'C',C'E'S~';
I' '-""---,,-~_ 'j
/; . '..!:lEET AND '.
! MATCH EXISTIN6
~..,~
~~
:\ ~
~ ~ ~ : ~ :1
~:'
---..c::
.~
.~~~E.~. ...... ~';...~:.
TO SHEET C-14
RECORD DRAWINGS
; ~
'?\! ~ I 9' ts:
kmm'1 "
, ~ I .~
,/ <:2,\
~~/ ({\ CC I
I ,1 ~
L., ~ II
.0l I ,'5
\::1' -J ~ \ ,," " k
\1-1 II-- ~ .... '" ~
~~ I~ Ii..- -+= 1...../
~ ,: I I F
......................
~~OIICIe<<IIltCI.l'Il
REVISION
,II/~~(A(;::'-.._
l$~"'""=.
~ ,d/... t~
~n ---.: g~
,,'(; -:::::..... t-..~
\. Yp,-: .s/
-.._.....;~;:R ,;;,,111
CITY OF CLEARWATER, FLORIDA
ENGINEERING
.'", ......
05 19 0
LIGHTING
L.J LIGHTING
~
NORTH ARROW
20' 10' 0' 10' 20'
~-
40'
I
LIGHTING
LIGHTING
1.41-15#28685040
BSS1J
/l
I~r
\j)J
\
I
I
1
1
I
I
2'
LIGHTING
l1
LIGHTING
G
Ml
\J
LIGHTING
n
n
~ '" ~ "
J\.f"
^ ' ^" ^ "~l^^cc^^cc^)^;r.~^>.:. ,^cc,~ccf("~fr~,<~":Jc<~.c<"<."".:c"^^CC~~,^c<~^;; ;:,<}.tC'^C'
.;.. '\~ <....~,'~----
_________ --l-. 1..0-,\ ...... -~ ;:ONC WA.lK 'b
"-,,'"
~
';'
.J?
CJC!:C)
~
<,'
,,"
I
f
2'
->:f
Jf
Jf
,.;;
,,0
Jf
Jf
Jf
-I'
.\'
~
Jf
Jf
,0
-\'
19"
e
THtS DRAWING IS COPYWRITTEN
C Wade Trim Group, Inc.
W~ TRII.( PROJECT NUMBER:
.,
-\'
"
.\'
"
..\'
CLW2067-01 M
MATCHUNE
................
TO SHEET C-14
(t)
-"TlOATl!
_T~
.>a:.A",A1'I
CHECKED BY CR
_NO,
CfTY JOe NO.
2007061
","",
ClW2067.01M
SHEET NO'C-15
Yl
RO
BA YFRONT UPLAND IMPROVEMENTS
""'"
AS
NOTED
CALL LOCAL PIlBLlC
UTILITY NOTIFICATIClN
CENTER
tOLL ,..
1-_..>>..""
"'""...~~
TOUIJIC""'''lI:
GRADING AND UTILITY PLAN
"""""" 'OR
COtISTRtlCTION
SUf'DMSlNC ENClHfER
~Y1!pe"
/
/
I
\
--+--
I~
/~
/
,
I
!
aur"'Il-~OIl'Ci __a.-:
/.
1 .
I
I
I
!
,/ .
MATCHLlNE
..................
'TO SijeEr C-t7' , . , . 11)~:~~' . .
.A4ATCHUNE
..........................
/ TOSHEETC-17
. 1"'1
ft'"6'1/
/
I
/.'
r
/
I
;iD-_LGHTI
t'
i
/
h
~
r
/
II I
I } <~~
---H-- t- 8" ~ ~ 0 i
: -B-T ';.--l-- 1 5! --r7~(r--- ------ ----- 18'SO- ----------m-D- -- -'-
"~ .~ ~~ ~ I aw~G:i1~
~ ft':tj~ / ~::l \ k G-G-G-G-
" ," ~~ LIGHTING MATCHLlNE
...... .. ....l... .. l.~... .....................
TO SHEET C-15
CLEARWATER PAVILlION
I <0..';
-?
. MATCHLlNE. , . .
................
TO SHEET C-15
RECORD DRAWINGS
';, .
, f. .
, ,
,/,
, .
. r .
'/. .
- _'_ - ' I. . .
. -~r ~ -:- ~ - :::-:~: -~ ~-~ -,I ~'~-:- ~-~ -.-
}'
I
.'['.
, .
. ./'
. .
'r
~., ,/,
. "
. 'r.'
, . ,
~ : : : :/: '
) . 1.
/-' :f'
(I'. f'
> .j,,'
~ ~ 1 ~
. . r .
... ~ I'" ...
~:~ l}~
/'. . .
: t :
. '/ .
. .
. f '
. .
J
'1'
. ,
'{
>/
&>~
.;'
';f
o _
-t"'"Cl '
-i'
,^
.;'
,~
v
='r:""
,,;:1
v:zoC19
~~g" I
~0p -\-f
~z
~."h II !
;;g,-"
r~u
Q~C>>
2C'>
~.B"
~
STORM
GRATE INLET
~
18"RCP
INV=1.32
REVISION
"" ..............
II' -{ SEA~"," --_
/(j~0;..\.
'\ ,d,... -t t
~~""": iS~
V-A -::;:... ~l
--......""'4iER ~ ",1'
..........., ""
CALL LOCAL FUBLIC
UTILITY NOTIFICATION
CENTER
,=-
1___<IN_<I"F"11l
_"MCllM~
TOUI!lc:A.......TIi
ID
N\<1!1~11!
-~
.1OICA.....'It!
CITY OF CLEARWATER, FLORIDA
ENGINEERING
."
+"
"
""
.l'
+'
"
+'
"
wrR .\! "
f~~~/.4
~~ -t::'-~
;;- c)
"~ "
~- -;'
..
+"
QSANITAR'
LIFT
STAnON
WATER LINE
y----
---~-
-~--
I
I
I
I
I
BA YFRONT UPLAND IMPROVEMENTS
GRADING AND UTILITY PLAN
~
NORTH ARROW
20' 10' 0' 10' 20'
't..!-_-
40'
I
It] WADEThIM
THIS DRAWlNC IS COPYWRITTEN
o Wade Trim Group, Inc.
WADE TRiM PROJECT NUMBER:
........, 8'* 220
1f'45............. TIqIa, R. laM
11.'" ~ . 11M FAX: 11U14.-o
o.a.r.~AuIatIlIIarlHo.:_
.............. ............. ell........ "......
CLW2067-01M
YL
tl(SJGH(() BY RQ CHECKED BY CR
SVR\IE'r'ED 8T QOOI( NO.
CITY.IOB NO.
2007061
... NO,
CLW2067.01 M
,""IT "'C-16
AS
NOTED
MY( OAAWN D'lIC."""'(
05 19 0
_fa,
CONSTR\)CTION
SUPERVISING ENCIMlER
uE----
C--\jE-
//---
( /
I !
!
/
I /1 /
/
V /f
~ U
I
\
\
\
\
\
RECORD DRAWINGS
I"'I':O.JECT 9CoNEl!1lI
~~_ PG__'"
DUMPSTER AREA 5TORMWATER AND DRAINAGE ENLARGEMENT
SCALE: I" , 20'
~~ /
~N \\
i \ \1n
/ \ -----uc-
~ -----TUE_UE-~UE
_f-UE ) UE_UE \
ucE _UE_UE-UE / ~ .
/ / I(~ : ~ : ~ :-
/ /
/ I
/ I
/ !
j I
/
/
/
\~
/
~RUCT 1-3' - W'BEND
Ie>><ECTlON TO EXiSTING U
UE-JE~
uGE -r MATC~ EXISflN6
MODIFY STRUCTURE
TO MAN ~OLE
>
~
~
~
/
, . "!
:;:
, 'I"
./.
~I
/"
'j. , " . " , , " .
u" ';it-~
f. " , " . . / ~ E"STING
~... '" '" ... '" '" '" '" ","';' ...! P ~~~~INUM
\ " " " " ./.
\- - - , " . - _ -~' ./ i
~y
~
//~ .......
-'"
~
I I
/ -!
I
,-,/
- -/
,///: "/ "
///' .>(
/I!:: _ _~_'
, j' r
I / ,/,
o . . "
/r "I.'
(' > . ! .
L' I", '" '"
(. ,/ , " ! ' "
r J ' ' ";"
(, r ;'
'\ " :\' : I, '
\" ;",
' '\ "
I: . : I: .}:'
, " r -;,
:y(
""" r I: :/:: :~::.::::~::::::;:::.
;.'!..;-
/ II. ',,,wCHlINE ' , , , , , , , . . .
..........................
TO SHEET C-16
/
/
/
/
/
i? ~ ( IRRIGA TlON
.\' _or.JV
o ",,s; C><J"
/ ;~ ~///~~~'~~..:J"
~//'.Jr~ n ~ ,_F
H / ~
// .f ,//
// +'~
td' ~
:;. *'. {"
.",,0 ,,~.:.,o,
1,/
'"
BJX
;'
,
I
I
)S0 L'f 3'~DPE
. FORCE MAIN. DEFLECT '/
" , As Nl:cE5sAR'r
, , . " . <I
. /
/
, 7
/
I
:1
;j
,.
o
.&
",'
o
","
"0
~
"C) /-
~/~
.""'A$f/" J ,/
2" .. .
/>r'O~~. ."'~
//lr'
/
~,
/
A/
->r'" //
//
,0
~
;j
c.?
----::{}
---- ---
---=======
o;tf
Jf.
~ ---
_____ 24' RC-+'----
;tf- -:fLF OOTTER GRATE, SEE
DETAIL ON ~ET C-~
.^
.\"
-,,-----~~-----------------------------
" JI
--~ ~~" .\" MATC~EXISTIN6
i' ""()()O.l>.~co ~ rG'
"I o}.:}.: )Jl""1 ~ GRATE EL=544
r / ~ -< -< "'Dg~ 7,? / 12 RCP W INV=J54
~ I ~ ~ k ~ ~ ~ 0 -?@,o /
,tt"", l ~t~:~ l";> "t5' MATCHUNE
. .......~....I..................
TOSHEETG-16
It] WADETRIM
~
NORTH ARROW
20' 10' 0'
1..---
10'
20'
40'
I
,"I
o
,
,
,
,
,
,
or'
~ ,
,
,
,
" ,
'wI ,
, ,
, ('
"
~I
,
, -}.-
,
, ,
,
, ,
, ,
, lo'"
.0
,~ "';
'" ,
MODIFY EXISTING STRUCTURE
NO.6. BRICK IlESl INY. CORE
BORE 5OUl~ INY. ELEV. 3.05
CONSTRUCT 20 LF a= I!;' ReP
. 3.00%
CONSTRUCT TYPE 'A'NLET
NO. !;, INDEX NO. 2~
TOP ELEv. 6.1!;
INV. ELEv. 2.4!;
CONSTRUCT 6 LF a= 5' Ref'
. 3.00%
CONSTRUCT .ANCTICN BOX
-==::NO. 4. INDEX NO. 20!:>. SEE
DETAIL ON ~ET C-Xx.
TOP ELEV. 650
INv ELEv. 221
EAIJ ELEv. 2.1&
THIS DRAWING IS COPYWRITTEN
o Wade Trim GrouP. Inc.
W~ TRIM PROJECT Nl./IMJER:
~""220
1741............. T..... R. Jaa4
"'11_~_", FAX:IfUlUllllO
c.-=-.d............Nlt.:_
.....-....- ............lIt......... III.......
REVISION
,II'~~(AL:::"''''-_
/$~"''''''
~ ,d/... {'t
~n '''''':: IlJ
\~ -:::-. ~l
':. ~L: S5 "
~-.. Jq1'ER ~ 1111'
................. 1I11
........ 'OR
CONSTftUCTlON
<D
..._ft
-y~
1!)l(:.lY,ATI
BA YFRON T UPLAND IMPROVEMENTS
YL
CITY OF CLEARWATER, FLORIDA
ENGINEERING
CALL LOCAL F\JeLIC
UTILITY NOTIFICATIa-.!
CENTER
~,-
~:==-
AS
N01ED
GRADING AND UTILITY PLAN
CLW2067-01 M
"''''''''',.,
,.....,..'"
CR
CITY JOB NO.
200706'
""'..,.
ClW2067.0.M
SHEET NO. C-1 7
RO
~T[ DRAWN
os 19 0
~Et<<;lNUR
or
2'
Min.
Additional -4
a 5 shown
~ JL "v
>< /' S""..... fu ~
~J . aaooo
T acooo
\\~~:~=o~~J
~~/V
PLAN
i
PLAN ON PIPE q:
RECORD DRAWINGS
~CT erc:;.N!at
1UI"E.__ENGo~"
Additional '4
RebOf As SIlown
/
--k
/W;I~ ~~~'~I'\
/ f---, '%DD~\
/' ~OO~
/' H ~
/' 000000000
/' ~ 0000000
<// '-~
~~-I------!-~
\ 8.ld< Op~..,
Remove Win
PLAN viEW
~
Brick /
~
-"-:-~L -
r=c -
I-- -
I-- -
I-- -
- -
- I--
-
4= n :=
INV. 3.00 f.,:..;..., _ _ ._::.:;..~.\.~.:
I: ;'::':':":".',.4'-'"1~
~t
TYPICAL CROSS-SECTION
Ring l Cover
See Index 11203
'4-&" O,C/E.W.
/
><
'" .~
N 1:
,
~
T
~
.>:::;i"~'
SECTION 1-1
Channel to be made: with
Pipe . Mort.ar
or
Brick.. ( Morlar
NOTES,
El<istinlJ SIQO"m
Access Rin9 .
Co_
llc<<e bot"e 18. ReF'
() INV 3.15
MODIFIED STRUCTURE NO. 2
CITY OF CLEARWATER, FLORIDA
PUBLIC WORKS ADMINISTRATION
ENGINEERING
TYPE A STeEL NOSED
WIN::S INLET
REORA.VIN 8'1'
Novo
a-1EO<to BY
W"".
OESI=,BY r
I~
r-lI<fDEX NO.
L ,...
l l~'
~
SECTION x-x
l. Non t.rarric Bearing
2. Champher dll exposed edges 3/4"
3. All concrete to be 3.=e> p.'.1"
with fiber mesh reinforcing.
REVISION
JUNCTION BOX NO. 4
CITY OF CLEARWATER. FLORIDA
PUBLIC WORKS ADMINISTRATION
ENGINEERING
REDRAWN IV
Novo
a-tEO<ED BY
DAlE
J.JNCTION 60)( ~
NON- TfO!AFFIC ElEAAINa f---!!!L-
, "'"
~~: BY
"" ...............
1,,1 -\ SEA&-.... ":--:.
lcj~"''\
'\ ,d" t ~
~ n"'--: ~ ~
\~ ::::. iPl
-;.~~ ..$5"
-:..-...... -;qTER ~ .,11'
........" ""
rT :--r-----~~i;~:~~:-ifl-i ..1
8 - I I 3 phase. 24lZ> g- ~ I I
I I I volt be> amp Ui a. I I
I I . 14'-8" I I
I TI I I
~ 11 ___~ ~
-,:::- " I. 'I
l&. did. 5teel 0- : ~ Bollard. at ,,'
bolldrd& I I on center
cone. Filled (t~p) '" ..; l Cl I
::, I I
~- I I
g- ~ I I
[ij a. I I
-J. i
I I
I I
I I
I I
I I
9 :
I I I
I I I
L~_ 00_~r ,.,~ ~~ ,,~,
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
U
I
48"1
MaxI
I
I
,-l-
Ti
4' :
Min.
L:
2fZ)'
, I
V
I
I
I
I
I
,I~- j)
I '"
I ;n
I
I
I ~
?
12'
cledr~nce min.
Tie beam with
1-115 rebar continuous
12'
clearance min.
urAde
t
6'
l
'rC:]
6"J
u
~
o
,
1
8")( /6" concrete rooting
wi 2 - -S rebar (l~p.)
ELEVATION
N.T.S.
0 PLAN '-
drop pin hole 2 8/16/04 Rev. Notes
N.T.S. (t~p) . "/9/02 Rev. Notes
""V. DAlE DESCRIPTION
STANDARD PRE -PAINTED
DISABLED PARKING SIGN
ON 1/8" THICK SHEET
ALUMINUM
-
-+
.11011,\11 n ~llIlI/\V\IA\
< 1 I < .' .'.
. I 11- '" . 0"
j I "
'ill-III :1 I.: VIII I I ~~;:~~-~~pC~~ ~~~
== I I, 11_ '" WITH A SUGHT RAISED WASH
-111== I I ,- APPROXIMATELY 1/2" ABOVE
- I I, ~ - "\ LEVEL OF TURF/SOD.
tJ
-of 8" {-
HANDICAPPED SIGN DETAIL
ENGINEERING
WHITE BORDER
& SYMBOL
BLUE BACKGROUNO
1 ,. 0" t
rll':?~
PARKING BY
DISABLED <D,
PERMI T
ONLY
r+
i
j//V A'/~
-F~ I /Cf-
~-~ ~-
// '/
7 /
//// //M
TOP&~~_I!2"
....
'\oR' ,':'f-
;'f=' . ~ t
6" "3 Dowel 4 Req.~ _ _
8" Brick Mdsonr~ - - - =
( =~ - Cd:; l~ ~
J INV..,j.l8 'v(Vo"p) ~ ii.l8j () I
I I?"';";:.'~;~( n I I
'4-12" O.cJEill. J I J
.,
BlACK BORDER
& LETTERS
WHITE BACKGROUND
BlACK BORDER
& LETTERS
WHITE BACKGROUND
$255 FINE
F.S. 318.18 a;
-
ALL LETTERS
," SERIES "c"
z "
:.... I.
~~
2" HOT DIPPED GALVANIZED
STANDARD WEICHT STEEL PIPE
...., ....-.
"\
(I)
~:,
.-..~
BA YFRONT UPLAND IMPROVEMENTS
CALL LOCAL PUBLIC
UTILITY NOTIFICATION
CENTE~
,.....-
..._.......".
t1IC."lCIlN~
'Y'OU 1lCAv"''1
12/90
-......
O6CIOPllON
CITY OF CLEARWATER, FLORIDA
REV. DATE
SITE DETAILS
sw;ng gate n~p.)
I
~1-'5 at 4' center
I ,;-d:op
l-' J::lIn
(t~p)
Grdde
I~
L 3e>lZ>0 p.&.I. concrete e.ldb with
fiber mesh reinr arcing -
monolithic, mln 6" thicknes5,
&"x&"/ le>xllZ> WillF.
CITY OF CLEARWATER, FLORIDA
PUBLIC WORKS ADt.4INISTRATION
ENGINEERING
B.V.O.
OR:A.~ BY I
CHECI<EO BY DUt.4PSTER ENCLOSURE
O.M. r
DESl~~O BY I
DAlE
6/01
IHDEX NO.
~
'Of'
SINGLE
m.
CITY OF CLEARWATER, FLORIDA
PUBLIC WORKS ADMINISTRATION
ENGINEERING
..~
APP.
REDAA1fltrf 8'1'
A.C.
CH[tkEO BY
I'lQ.
OE:SKiNED 8'1'
l'tG.
TYPICAL HANDICAPPED
SIGN DETAIL
DAlE
Mill
_x NO.
''''
IClI'I
It] WADETRIM
nus DRAWING IS COPYWRlnEN
CO Wade Trim Croup. Inc.
WADE TRIM PROJECT NUMBER:
.......... s. .. Z2D
17........... T-..R. S3I!JM
I1s..,..... ..,. FAX: 111.114.-
~_~Nct.:_
-.-......- ~ ...........................
CLW2067-01M
YL
EQ
LLG
SCH.t
AS
NOTED
11 08 0
......"
C W 067.01M
SHE"..,. C-18
...........,..
coos",",,,,,,
SlJPE~SIH(;ENCIN[[R
18"
~
"
PROPOSED SEA WALL CAP
2" PVC ELECTRICAL CONDUIT
EXISTING SEA WALL
RIP RAP BY OTI-lERS
NOTES,
- ALL REBAR TO BE .4. 2" CLEAR MIN.
- CONTRACTOR'S ATTENTION IS CALLED TO TI-lE
SEAWALL DEADMAN TI-lAT EXTEND LANDWARD
OF TI-lE SEAWALL. CONTRACTOR'S MEANS AND
METI-lODS SI-lALL TAKE TI-lESE DEADMAN INTO
ACCOUNT AND SI-lALL PROTECT DURING
DEMOLITION AND CONSTRUCTION OF PROPOSED
FACILITIES.
SEA WALL CAP TYPE I SECTION A-A
TYPICAL NTS
4 '
"
4
DOMUS BOLLARD DOSBI
PROPOSED SEA WALL CAP
2" FVC ELECTRICAL CONDUIT
PROPOSED 6" SIDEWALK
EXISTING SEA WALL
RIP RAP BY OTI-lERS
NOTES,
- ALL REBAR TO BE .4. 2" CLEAR MIN.
- CONTRACTOR'S ATTENTION IS CALLED TO TI-lE
SEAWALL DEADMAN TI-lAT EXTEND LANDWARD
OF TI-lE SEAWALL. CONTRACTOR'S MEANS AND
METI-lODS SI-lALL TAKE TI-lESE DEADMAN INTO
ACCOUNT AND SI-lALL PROTECT DURING
DEMOLITION AND CONSTRUCTION OF PROPOSED
FACILITIES.
SEA WALL CAP TYPE '2/3 SECTION A-A
TYPiCAL NTS
CONC~TE SI-lALL BE IN ACCORDANCE WITI-l FDOT STANDARD
SPECIFICATION 346 FOR EXTREMELY A66RESSIVE ENVIRONMENT,
TYPE II WITI-l FLY ASI-l, CLASS Iv WITI-l MAXIMUM CEMENT RATIO OF
/Zl.4/Zl AND CORROSION INI-lIBITOR
RECORD DRAWINGS
~CT I16INEat
SU~f.llf'w'lalNClo~EIII
REVISION
GRA TE. U.S. FOUNDRY
MODEL NO 6268, OR
PROPOSED GRADE EITI-lER~PPROVED EQUAL
SIDE OF CONC. RAMP
PROPOSED CONC RA PROPOSED CURB
'v~5. ~ RAN
EXISTING ASPI-lAk
PAVEMENT
PROPOSED CUR
EXISTING ASPI-lAL T TO REMAIN
CUT NOTCI-l INTO EXISTING CURB
TO CREATE SEAT FOR GRATE
EXISTING CURB TO REMAIN
EXISTING. SEE PLANS
IUlIIIII,IIIIIIIIWIII,
GRATE AS MANUFACTURED
BY:
NEENAI-l FOUNDRY COMPANY
NEENAI-l. WISCONSIN
1-~-558-5iZl15
OR ou.NER APPROVED EQUAL
GUTTER GRA TE DETAIL
TYPICAL
NTS
<(
5iZl' O.C. TYP
OMUS
BOLLARD DOSBl
OMUS
BOLLARD DOSBI
Ll <l " ..
.4
'11~~ffi~ffiillll1Mffi1Mffi1Mffi1Mffi1Mffi1Mffi~ffi1M~ffi1Mffi1Mffi1M~ffi1Mfij!!!
"=111==111:::111==111==111==111==111:::]11==111==111==111==111==111==111311==111==111
~II:::III:::III:::III:::]II:::]II:::III:::III:::III:::III:::III:::]II:::III:::III:::III:::II~
., 11:::111==111==111==111==111:::11 1:::111==11 1:::11 1:::111==111==111:::] 11==111==111
~III:::III:::III:::III:::III:::]II:::]II:::III:::]II:::III:::]II:::III:::III:::III:::
-, 11==11 E:::I I 1==111==1 11==111==111==111==1 11==11 1==11 1==1 1 1:::111==11'
~111:::111:::111:::111:::111311311:::111:::]11:::111:::11~'
-" 1=111:::111==111==111==111==111==111==111="
-" q II:::;illii=iillii=iill;;::;III='1 ,-
4"
6"
12"
111=111=111=111=111=111=111=111=111311=111=111-11311=111=111=111=111=1'
l=ill=ill==ill==ill==ill==ill==ill==ill==ill==W==ill==ill ill==ill==ill==W==ll1;,=' I
111=111=111=111=111=111=111=111=111=111=111=111= 11=111=111=111=111",
13 I 1==111=111=11 l:::i 11==111==111==111==111==111==111==111 111==11 1==111==11 I=-
111=-'" -"1=111==111==111==111==111==111== 11311==111==111-
-111=;Ulm1Mn=~m1MmIM IlilllllJ.!:='1 ' '
"'=111:::111:::111 I'"
<(
SEA WALL CAP DETAIL
TYPICAL
NTS
6"
14'
50D
GEOWEB
C'rEOTEXTILE LAYER
COMPACTED SUBc:.RADE
III -ill=II'
_mill'T"
Fill JlIMillW
- = = = = = = = = = = = = = = = = = = = = = = 1=111=
"1I:::III:::IIEIIEII13IEIIEIIEIIEII= ~IEIII:::II1311:::]II:::IIEIIEIIEIII:::]IEII13IEIIEIIEIIF'
~111~II:::IIEIIEIIEII13IEII13IEII13IEIIEIIEII1311:::]IEIIEIIFIII=III=III=III=II~""
"'-'II=III==III;:;;illii=iillii=iill311==111=lrl=llr=III==Ill~ill:::;III='" GEOWEB AS MANUFACTURED BY,
PRESTO PRODUCTS COMPANY
APPLETON, WISCONSIN
S2iZl-138-1118 OR ~-548-3424
OR Oll.NER APPROVED EQUAL
NOTE,
C'rEOWEB TO BE INSTALLED FER
MANUFACTURER'S INSTALLATION GUIDELINES
AND SPECIFICATIONS.
GEOWEB FIRE TRUCK EMERGENCY ACCESS
TYPICAL
1111 ...........
\,1 -.l,. sEA~~ ......-_
/$~"'~
, "d,,,, {'::.
%~ ---.-: ~~
\~~ .!/
--.....fv4rER ~ ,111\
...."...'" I"l
NTS
CITY OF CLEARWATER, FLORIDA
ENGINEERING
(D
BA YFRONT UPLAND IMPROVEMENTS
_ftClo.,Il,TI
_T~
l!l<<:AV,t,T'I:
CALL lOCAL RJeLIC
UTILITY NOTIFICATION
CENTER
=,....
1-_~_4"'"
11k....~~
YDUnc.t.VAT'I:
SITE DETAILS
^.
PROPOSED SIDEWALK
5'-iZl"
,;
~
, 0
^ ,
. '4
, "
. .
.^ ^ .
6"-1
6,.T
jo.
~
'.
, 4
, ~ "
^
~
,^ 4 .
.4 0 " 04~ ~
^ "
4, , 4 ~
,
"
,4
4 ,
"4 <,'"
"
."
^
o "0
CONCRETE SLAB FOR BENCI-l
PLAN
, ,
,IIUII=111311=111=111=111=111=111=111=IIH 11=111=111=111,--11'
-=111=111=111==111==111==11 EI 1 1=111==11 EI I 1'c':m==1 I Ell 1==1 "
SECTION -",-",- "-=111=111=111=111-'
BENCI-l AS MANUFACTURED BY,
WABASI-l VALLEY
MODEL, CN4iZl5R
COLOR, BLACK
SIL VER LAKE. IN
(260) 35>2 -2l1t>2
OR OWNER APPROVED EQUAL
BENCI-l CONCRETE SLAB DETAIL
TYPICAL
It] WADETRIM
~S.1uII12O
17. HIndInan AoId. TIII1II. R. DIM
.t.lIM........ _.. FAJe It..........
c.eIIII rI.......... No.:_
.............. ........................-......
BENCI-l
4" CONCRETE
NTS
THIS DRAWING IS COPYWRITIEN
C Wade Trim Group, Inc.
WJO[ TRIM PROJECT HUMBER:
CLW2067-01M
YL
EQ CHECKEO I'l' LLG """""'N>.
.......... BY """'..,. "".,.
CLW2067.01U
o.-.n: ORAWM owe. I'\W,lE SItf;[t NO. C-19
11 08 0
AS
NOTED
""""""''''''
CON51llUCTlON
SUPER\IISING EM;lfrI[[tl:
4"""."","
RECORD DRAWINGS
~CT EH61NE9l:
MPl!In"I5IICiI UClIHli:li:1III
j4"
CONCRETE BASE FOR COMPASS ROSE
TYFICAL NTS
FLORIDA STONE
MINNESOTA 6RANITE
TEXAS 6RANITE
VIR6INIA 6RANITE
CALIFORNIA 6RANITE
I
REVISION
1111~SE.A[::""-"'_
/$~"''\
~ ,\1/... {-~
~:J --= C!~
~~ ~ ik~
'\.~"4r(R ,,~l
-...........", ,;""'
CITY OF CLEARWATER, FLORIDA
ENGINEERING
CALL LOCAL RJeLlC
UTILITY NOTIFICATION.
C~T~':
,__...at-.....
r1fi....~....,..
YCUI)C.&V"'"
SITE DETAILS
GENERAL NOTES
CON5TRUCTI~ 5FECIFICATI~
Cll!J or Clean!tl!ter St4nc:UJrd Tedl'llcal SpecHlcatlona A"ld Contract Ooc:Ulllel"lll. L,lml EdIUOl"..
For D"'i9" Sland.lrd..
Sland.lrd Spec;licauore. Sea,
......cl"',""l"" rJ.c""/gov/~l.ipwalensin/Froduclionl.ldspecsrroex.as.p
Ct'ttp./Iwww.cledrwaler- r1L:Dl1'1fQav/~l'(pma/9'lQinJProducliDnl'ld,~carIf1t:te>cA~
Standard DetaU.. Se..,
......cI"',""I"" rl.comlgovldepl.ipwal""'<aln/Froducllonl.ldd6ll1r1dexAs.p
CltlpdAuu.ol.clearwal"" rl.coml""v/~l.ipwa/,"""lnIProducllonl'lddel_"s.pie
Cit~ "r Clearwal... Speclricali""" and D..ldil. shall "'V.. precedence.
2.
Florid.! Deparlmenl "r Transporlalk>n Rc>.dwa~ .nd Tr.mc D...I9" SI.nd.rd.. daled J......~ 2006.nd
St.nd.lrd Speclrlc.u""" r", Rc>ad .nd Bridge c.,.,.l1ucU"". daled 2004.
For de619" 'I.nd.lrd rodlrlcallon. Se..
......d<>I..ldl...rI.u.lrdde6lgn
CsENERAL
Florida Sldlul.. 553~1 m1~) r""lulres . mini.... "f 2 da!ji .nd . maximum "r 5 da!l' nc>Uce beror.. ."':1
excav.llort Call 5un6hlne St.I.. C\1e C.II Cenl.... "r Florida. Inc. (1.800.282.8881).
2. Locallona. elevallOl"l& dnd dlne'\6f0n6 or existing ulillUee., 6trucll.l"e& and ot.h!!r tedllM'et (Ire ahown
."",dlng I" the b...1 Inrormau"" .v.llable .1 the Ume "r the prep.r.u"" "r In.... plaM bul de> nc>1
f'U'p"'1 I" be .b..,lul"~ correct 1ho Cc>ntr.ctor shall 1i..1d v...ir~ the ex.CI Ic>c.U.,... ..1<!V.llore. .nd
dimens-iOf'l5 and other rectt\.l'e5 Afrecting t.he: work. prior to tSnJ conslr'uClion 'clivil~ in the ared.
3.
1ho CONTRACTOR ""II """'.. 1"'1 .11 r",,!"lred penoll. .r.. In I-dnd ber",.. ~ "r corel1ucU",,-
4.
Dald Scxrc...
.. 511.. dr.wing' ~ McKim .nd Creed. FT"Jecl Ne>. 0':l92.006~. daled ~~ ~. 200l
b. HoJdr"l3'.phic .nd T"I"'9'.pI1Ic ...-v~ ~ "'""'ge F. 1'c>ung. FT"jecl Nc>. fD3.13.e!'>31.t>1. dal..d March 1fD.
2006.
c. F\'''jecl C()fldlli"" Su-v~ ~ Sea &:1.1- Corp<>r.lk>n. F\'''jecl Nc>. 41.31.6&1. daled Oclc:>ber. ~
d. F\'''Jecl Cc>nd111"" Su-v~ ~ AmJ Ccl<p6 "r Eng_.. F\'''J<lc1 Nc>. DACuAl. daled April. 2002.
5. Su-v~ Inrormall""
.. _1ZG>llt.1 conlr,,1 and pr"J<lc1 ",lenldU"" I. based "p"" In.. US.c!i. Be.con .1 Mac Dill Air Force ea....
St.I.. pl.ne """,ermal... .r.. based "P"" the Ir...v...... Mercalor pr"jecU"" r", the We&1 Z<>roe "r
Florid.!. North American D.lum. ~''3. D.1d tC>UI'ce> 2 and 3 _.. ",Ienldled to the Ulotl Lone "r Florida
D.lum "r 1':l2~
b. V"'Iic.a1 contr"ll. baMd "P"" lIw CIl~ "r C"""ruoal.... benclwlark. "F.e!'>' .ith a pblithod ..I.sv.li"" "r &51
r....l. North American D.lun.~. (c.,.,y.....1on <>f NAVO~ O.lum I" N(;VO~1~ I. 0.&&1 r.set per lIw NOAA uoeboll..,
Chllo,/Iuuuulg."""..QC>V.blnlv....lc:c>n '""lpd~lI<'d.'il"v.b1nlv...lC()flie J.
c. Me.n ,"'" ...1.... v.1u<! .. ...1.bli6hed rrem lid<! inlerp<>1.U"" p<>lnl. '6~ .nd . 21~ ( llhllp./Idal.l.bIM",ie
. 1.25 r....1 NAVO~ See dal. 6ClUl'ce 2.
d. eally1<!lrlc Inr",mau"" lhlIl ma~ app.sar .......In hat been c<>mpllold rrem dal. tC>UI'Ce&.
... orr...."... ..""'.uore r..r.... lo MlW D.lum (fD/l)fD r.set MLW ..I.svali<>n ' -J.2!> r.set. NAVO~J. All upland
..""'.lIore r..r... I" NAVO~. orr...."... ..I.sv.u""" .r.. lI-oH ..1<!V.llon6 ...I....-d "r lIw .......Il
r. L<'C.lIon, ..I.sv.llore..nd dl......1on6 or lIw exl.llng ullllU.... 'lruCIU'''' .nd "lhor r"'lU'es .r.. ..."., I"
th! be&1 Inr""".uon .vallable .1 In.. Ume "r the prepar.llon "r theM pl..... bul de> nc>1 pu'f""1 I" be .b6"IuI"~
correcl. Thor.. ma~ be "lhor Impr",^","""I.. uUIIU.... ..Ic utl1ch .r.. .Illin lhe pr"Jecl ar... .nd u.tich "'ve been
""Ialled.nd corelrucled .ine.. lIw preparau"" "r theM pia.... 1ho CONTRACTOR ""II v....lr!j. pri<ot I"
corel1ucllCll\ lIw Ic>caU""'. ..I.sv.uore. and dl........ic>n6 "r .11 exl.ling ullllll.... .l1ucIU'... .nd "lhor r"'IU''''
(nl"'" '" nc>\ th:>wn "" !he&<! pi....) .rrecllng thI. IIICll1<. Ses dal. tC>UI'ce>.
(D
I<MI!.TGATI
_T'"
.ll:CAv..Te
BA YFRONT UPLAND IMPROVEMENTS
$COl.'
AS
NOTED
6.
Tho conlraclor ohall nc>ur~ lhe de619" p""r....IonaII.......:tI.I..~ "r ."':1 confllcl' ari.1ng dlring con.lrucll""
or ~ i"l>'ovement.s ~ on Ih!se plaM. It is dl~ to contractor', r,e,p0n5ibilil~ to ~It with the
D"'i9" F\'''r....;''''''1 ror making."':I inl"'pr<sI.U"" "r th! plant. """""'.... Ihl. dc>e& nc>1 r..llev.. In..
Cc>ntr.Clor "r hi. resP""Sibilil~ for C()flSlrucling lhe pr"jecll" .ce<>mpllsh the Inlent "r In. pl.n..
1.
1hs Contr.CI", I. I" malnl.1n exl.ling dr.lnag" pall....'" during corelrucllon. "',.... "1""""'1... th:>wn ""
In. pl."'.
8.
The Contractor ~II provide erosion conlrol/S<<linerllalion bdrrier iN!:f bales, sillation CU'lain, drd/or
"Iher m...... .ccepl.ble ~ In. de&lgn pr"r....;"""1 I" pr<!Venl .1I1.llon "r .dj.cerl pr"P"'I~. W....I.
storm ~ewer, and walerwa~.5 dl.ring con&lruc.lion.
'3.
O.II~ ln6pecllono '"~ lIw l..-bld1l~ barrier. .nd ...",1"" conlr,,1 d<!vlce& .r.. I" b.. made ~ lIw Contr.clor I"
in6ur.. .11 ~'I"'" .r.. runclloning pre>per~ .fl... r.lnr.1I even16 In c.... lhll ."':1 r.IIU'.. can be Immedlal..
correc.lIv~ 1IIl!l!6lJ"e6 Cl!n be UIlc..en.
1fD. Cc>ntr.Clor I" be r'"P""Slbl.. ror und<!<1.king the r"II""ing measur... aring c.,..l1uclk>n I" pr<!Venl
erO$ion and/or sedilll6nl"\ian.
.J 5<>11 I" be kepi mel.1 In rcogracled .r.... I" pr<!V...,11l rrem bec<>ming .Irb<>rne.
bJ Gr."ing should be p...rormed _.I"~ afl... finished grading I. c<>mpleled In .r.... _.. gr...I"9
1. r",,!"lred.
cJ 5111 .cr........ .nd/", ha~ b.1e& ""II be pl.ced upttr.... "r .11 .11.. dr.lnage dl6Ci-drg.. l<'c..lll""".
d.) "'"" "'~ or gr.vel b.gs """ be pl.ced upttr...m on .11 p.ved surr.ce>.
6) All erosion control tne45U"e5 thall be ilnplelnenled prior lO \hit $\"r\ or on site grading acllvities.
Il
Con\.rdclor 1& \0 lak.a 'Peel' I care uhsn GOnIt.ruc\1on acllvlllea arllS c!IdJc!lCS'illO tree& 60 lhal no dalftc!ge
shall become th! Ir...... An:j damage I" tr..... br.nc:1-e6 shall recelv.. . clean. flush cui .1 the main Inn.
12. 1hs Cc>ntr.Clor shall replace .1 hi. """ expense ""':l r"'lor.Uon caU6ed ~ th! C()flSlrucU"" .cllvlli... I" a
condition equallO or belter lhJn lhs original.
13. All equipmenl .I.ging and .I",.ge .r.... .r.. I" be kepi In . ne.1 .nd ord<!<~ ma....... wllh mini....
dl.I.roanc:.. I" exl.llng 9'<'Und C<'v....
14. c.,.,.lrucllon .1."'" <>vI I. Ie> be prcv1cled ~ th! Cc>ntr.Clor. Gr.ding.nd dr.lnage I" be .I.ked In the fI..ld
~/or unci<!< th! dlrecl oupervl.lon "r . RegI.I....ed L.nd6 s...veyor.
5. At.Su1l1 Inrormali"" I" be """'feted ~ the Cc>ntraclor utilizing. RegI.I...ed Land s...veyor. prior 10 final
.ccepl.nce. Record Dra.Ing', lwc> original plan cc>pl... .nd <>roe dl"'- CClllIpdlibl.. I" the Cil~ "r Cleanodl..... In
AUTO CAD (V.....1on 2fJ00). ""II b.s 6Ibnllled I" lIw Engine<< r", dl.lrlbull",,-
16. IWdlcap .19""g.. .nd Wiping per CII~ '"~ CIea'""I.... 6f"'CIFlCdllono .nd dm.I". lalesl edlll""-
11. lWdic.ap r.mps shall hav.. F .o.oJ. lruncdled dc>me6. per F .o.oJ. De&lgl St.nd.lrds. 1ncIex 304. p.g.. & "r
6. Sea I1r1< pr"vlc:led ~. llhllpd"'-.d<>1.6I.te.rlusirdde6i!:1M'cllRTDSlfDel3fD4pdfie
1&. All Fir.. 51.nd PIp<! '!lil"". shall Met ""PA 303 Requlr.smenl..
It] WADEThIM
THIS DRAWN:> IS COPYWRnTEN
C Wode Trim Group, Ine.
WADE TRIM PROJECT NUMBER:
-..-...
C.......RoIlI, T.....FL...
11........ . tat FAX: 11UI4.IIID
_"'_110:_
.............. ..........................,......
CLW2067-01M
YL
OESlGH[OBY EQ CHECKED Itl' LLG
"""""'''' """''''. JOe"'.
ClW2067.01M
~T( OAAWN DWG. NN,l( SHEET NO. C-20
11 08 0
--
COOS""""""
5UPDM$lNG EtfGlN(ER
OWNER'S REQUIREMENTS
SITE DESCRIPTION
PROJECT NAME AND LOCATION:
BA YFRONT UPLAND IMPROVEMENTS
CLEARWATER. FLORIDA 33756
OWNER NAME AND ADDRESS:
CI TY OF CLEARWA TER
100 MYRTLE AV.
CLEARWATER. FLORIDA 33756
DESCRIPTION:
THIS PROJECT WILL CONSIST OF:
CONSTRUCTION OF A NEW SEAWALL CAP AND SIDEWALKS.
RESURFACED PARKING LOT. FORCE MAIN. LANDSCAPING.
IRRIGA TION AND SITE AMENITIES.
NO PERMANANT IMPACTS WILL OCCUR AND NEARBY
SEAGRASSES WILL BE SEALED OFF FROM TURBIDITY AND
SEDIMENT BY FLOATING TRUBIDITY CURTAINS
CN NUMBERS
1. PRE-CONSTRUCTION = N/A
2. OURING CONSTRUCTION ~ N/A
3. POST-CONSTRUCTION ~ N/A
SOILS:
SEE SECTION 1 OF ERP APPLICATION
SI TE MAPS:
SEE COVER SHEET
SITE AREA:
NAME OF RECEIVING WATERS: CLEARWA TER
HARBOR/INTRACOASTAL WATERWAY
CONTROLS
THIS PLAN UTILIZES BEST MANAGEMENT PRACTICES TO CONTROL
EROSION AND TURBIDITY CAUSED BY STORM WATER RUN OFF.
THE CONSTRUCTION PLANS HAVE BEEN PREPARED TO INSTRUCT
THE CONTRACTOR ON PLACEMENT OF THESE CONTROLS. IT IS
THE CONTRACTORS RESPONSIBILITY TO INSTALL AND MAINTAIN THE
CONTROLS PER THESE PLANS AS WELL AS ENSURING THE THE
PLAN IS PROVIDING THE PROPER PROTECTION REQUIRED BY
FEDERAL STATE AND LOCAL LAWS.
REFER TO "CONTRACTORS REQUIREMENTS' FOR THE TIMING OF
CON TROL/MEASURES.
CERTlFlCA TION OF COMPLIANCE WITH
FEDERAL. STATE AND LOCAL
REGULA TlONS
IN AN EFFORT TO ENSURE COMPLIANCE WITH FEDERAL. STATE AND
LOCAL LAWS REGARDING EROSION AND TURBIDITY CONTROLS, THE
FOLLOWING PERMITS HAVE
BEEN OBTAINED.
C.O.E. DREDGEjFlLL PERMIT
SI\F\\\ID
~pe""
RECORD DRAWINGS
I """"'OT
!l.PERVI5tG IN:ilN."':
GENERAL
THE CONTRACTOR SHALL AT A MINIMUM IMPLEMENT THE CONTRACTOR'S
REQUIREMENT OUTLINED BELOW AND THOSE MEASURES SHOWN ON THE
EROSION AND TURBIDITY CONTROL PLAN IN ADDITION THE CONTRACTOR
SHALL UNDERTAKE ADDITIONAL MEASURES REOUIRED TO BE IN
COMPLIANCE WITH APPLICABLE PERMIT CONDITIONS AND STATE WATlER
QUALITY STANDARDS. PENDING ON THE NATURE OF MATERIALS AND
METHODS OF CONSTRUCTION THE CONTRACTOR MAYBE REOUIRED TO
ADD FLOCCULANTS TO THE RETENTION SYSTEM, PRIOR TO PLACING THE
SYSTEM INTO OPERATION.
SEOUENCE OF MAJOR ACTlVI TIES:
THE ORDER OF ACTIVITIES WILL BE AS FOLLOWS:
1. INSTALL STABILIZED
CONSTRUCTION ENTRANCE
2. INSTALL SILT FENCES AND HAY
BALES AS REQUIRED
3. CLEAR AND GRUB FOR
DIVERSION SWALES/DIKES AND
SEDIMENT BASIN
4. CONSTRUCTION SEDIMENTATION
BASIN
CON TlNUE CLEARING AND
GRUBBING
5. STOCK PILE TOP SOIL IF
REOUIRED
PERFORM PRElIMINARY GRADING
ON
6. SI TE AS REQUIRED
7. STABILIZE DENUDED AREAS AND
B STOCKPILES AS SOON AS
PRACTICABLE
NOTE~RTlCAL CONSTRUCTION OF THE PICNIC
SHEL TERS WILL BE TAKING PLACE DURING
THE SEQUENCE STEPS LISTED ABOVE.
TIMING OF CONTROLS/MEASURES
9. INSTALL UTILITIES. STORM
SEWER. CURBS & GUTTERS
10. APPLY BASE TO PARKING
AREAS
11. COMPLETE GRADING AND
INSTALL PERMANENT
12. SEEDING/SOD AND PLANTING
COMPLETE FINAL PAVING
13. REMOVE ACCUMULATED
SEDIMEN T FROM BASINS
14. WHEN ALL CONSTRUCTION
ACTIVITY IS COMPLETE AND
THE SITE IS STABILIZED.
REMOVE ANY TEMPORARY
DIVERSION SWALES/DIKES
AND RESEED/SOD AS
REQUIRED
ALL
AS INDICA TED IN THE SEQUENCE OF MAJOR ACTIVITIES. THE SILT FENCES
AND HAY BALES. STABILIZED CONSTRUCTION ENTRANCE AND SEDIMENT
BASIN WILL BE CONSTRUCTED PRIOR TO CLEARING OR GRADING OF ANY
OTHER PORTIONS OF THE SITE. STABILIZATION MEASURES SHALL BE
INITIATED AS SOON AS PRACTICAL IN PORTIONS OF THE SITE WHERE
CONSTRUCTION ACTIVITIES HAVE T1EMPORARIL Y OR PERMANENTLY
CEASED. ONCE CONSTRUCTION ACTlVI TV CEASES PERMANEN TL Y IN AN
AREA, THAT AREA WILL BE STABILIZED PERMANENTLY IN ACCORDANCE
WITH THE PLANS AFTER THE ENTIRE SITE IS STABILIZED. THE
ACCUMULA TED SEDIMENT WILL BE REMOVED FROM THE SEDIMENT TRAPS
AND THE EARTH DIKE/SWALES WILL BE REGRADED/REMOVED AND
STABIUZED IN ACCORDANCE WITH THE SEDIMENT AND EROSION CONTROL
PLAN.
CONTROLS
IT IS THE CONTRACTORS RESPONSIBILITY TO IMPLEMENT THE EROSION
AND TURBIDITY CONTROLS AS SHOWN IN THE SEDIMENT AND EROSION
CONTROL PLAN. IT IS ALSO THE CONTRACTORS RESPONSIBILITY TO
ENSURE THESE CONTROLS ARE PROPERLY INSTALLED. MAINTAINED AND
FUNCTIONiNG PROPERLY TO PREVENT TURBID OR POLLUTED WATER FROM
LEAVING THE PROJECT SITE. THE CONTRACTOR WILL ADJUST THE
EROSION AND TURBIDITY CON TROLS SHOWN ON THE SEDIMEN T AND
EROSION CONTROL PLAN AND ADD ADDITIONAL CONTROL MEASURES. AS
REQUIRED TO ENSURE THE SITE MEETS ALL FEDERAL. STATE AND LOCAL
EROSION AND TURBIDITY CONTROL REQUIREMENTS IMPOSED ON THE
PROJECT SITE BY THE REGULA TORY AGENCIES.
EROSION AND SEDIMEN T CON TROLS
STABllIZA TlON PRACTICES
1. STRAW BALE BARRIER: STRAW BALE BARRIERS CAN BE USED
BELOW DISTURBED AREAS SUBJECT TO SHEET AND RILL
EROSION WITH THE FOlLOWING LIMITATIONS:
A. WHERE THE MAXIMUM SLOPE BEHIND THE BARRIER IS 33
PERCEN T.
B. IN MINOR SWALES OR DITCH LINES WHERE THE MAXIMUM
CONTRIBUTING DRAINAGE AREA IS NO GREATER THAN 2 ACRES.
C. WHERE EFFECTIVENESS IS REQUIRED FOR LESS THAN 3
MONTHS
O. EVERY EFFORT SHOULD BE MADE TO LIMIT THE USE OF STRAW
BALE BARRIERS CONSTRUCTED IN LIVE STREAMS OR IN SWALES
WHERE THERE IS THE POSSIBILITY OF A WASHOUT. IF
NECESSARY. MEASURES SHALL BE TAKEN TO PROPERLY
ANCHOR BALES TO INSURE AGAINST WASHOUT.
2. FILTER FABRIC BARRIER: FILTER FABRIC BARRIERS CAN BE
USED BELOW DISTURBED AREAS SUBJECT TO SHEET AND RILL
EROSION WITH THE FOlLOWING LIMITATIONS:
A. WHERE THE MAXIMUM SLOPE BEHIND THE BARRIER IS 33
PERCENT.
B. IN MINOR SWALES OR DITCH LINES WHERE THE MAXIMUM
CONTRIBUTING DRAINAGE AREA IS NO GREATER THAN 2 ACRES.
3. BRUSH BARRIER WITH FILTER FABRIC: BRUSH BARRIER MAYBE
USED BELOW DISTURBED AREAS SUBJECT TO SHEET AND RILL
EROSION WHERE ENOUGH RESIDUE MATERIAL IS AVAILABLE ON
SITE.
4. LEVEL SPREADER: A LEVEL SPREADER MAYBE USED WHERE
SEDIMENT -FREE STORM RUNOFF IS INTERCEPTED AND
DIVERTED AWAY FROM THE GRADED AREAS ONTO UNDISTURBED
STABILIZED AREAS. THIS PRACTICE APPLIES ONLY IN THOSE
SITUA TIONS WHERE THE SPREADER CAN BE CONSTRUCTED ON
UNDISTURBED SOIL AND THE AREA BELOW THE LEVEL
RECONCENTRATE AFTER RELEASE.
5. STOCKPILING MATERIAL: NO EXCAVATED MATERIAL SHALL BE
STOCKPILED IN SUCH A MANNER AS TO DIRECT RUNOFF
DIRECTLY OFF THE PROJECT SITE INTO ANY ADJACENT WATER
BODY OR STORM WATER COLLECTION FACILITY.
6. EXPOSED AREA LIMITATION: THE SURFACE AREA OF OPEN.
RAW ERODIBLE SOIL EXPOSED BY CLEARING AND GRUBBING
OPERATIONS OR EXCAVATION AND FILLING OPERATIONS SHALL
NOT EXCEED 10 ACRES. THIS REQUIREMENT MAY BE WAIVED
FOR LARGE PROJECTS WITH AN EROSION CONTROL PLAN WHICH
DEMONSTRATES THAT OPENING OF ADDITIONAL AREAS WILL NOT
SIGNIFICANTLY AFFECT OFF SITE DEPOSIT OF SEDIMENTS.
REVISION
\111~~EAL::;"-:"_
l$~;.A,\
~ ,d,,... f~
~n '-'-: ""~
~~ ~ ~~
~'V-p. sl
---..~"nER .( ,1\"
....,""...",',1
STORM WATER POLLUTION
PREVENTION PLAN
10. TEMPORARY GRASSING: THE SEEDED OR SEEDED AND
MULCHED AREA (S) SHALL BE ROLLED AND WATERED OR
HYDROMULCHED OR OTHER SUITABLE METHODS IF REQUIRED TO
ASSURE OP TIMUM GROWING CONDITIONS FOR THE
ESTABLISHMENT OF A GOOD GRASS COVER.
11. TEMPORARY REGRASSING: IF. AFTER 14 DAYS FROM SEEDING.
THE TEMPORARY GRASSED AREAS HAVE NOT ATTAINED A
MINIMUM OF 75 PERCENT GOOD GRASS COVER. THE AREA WILL
BE REWORKED AND ADDITIONAL SEE APPLIED SUFFICIENT TO
ESTABLISH THE DESIRED VEGETATIVE COVER.
12. MAIN TENANCE: ALL FEATURES OF THE PROJECT DESIGNED AND
CONSTRUCTED TO PREVENT EROSION AND SEDIMENT SHALL BE
MAINTAINED DURING THE LIFE OF THE CONSTRUCTION SO AS TO
FUNCTION AS THEY WERE ORIGIN ALL Y DESIGNED AND
CONSTRUCTED.
13. PERMANENT EROSION CONTROL: THE EROSION CONTROL
FACILITIES OF THE PROJECT SHOULD BE DESIGNED TO MINIMIZE
THE IMPACT ON THE OFFSITE FACILITIES.
14. PERMANENT SEEDING: ALL AREAS WHICH HAVE BEEN
DISTURBED BY CONSTRUCTION WILL. AT MINIMUM. BE SEEDED.
THE SEEDING MIX MUST PROVIDE BOTH LONG- TERM VEGETATION
AND RAPiD GROWTH SEASONAL VEGETATION. SLOPES STEEPER
THAN 4: 1 SHALL BE SEEDED AND MULCHED OR SODDED.
STRUCTURAL PRACTICES
1 TEMPORARY DIVERSION DIKE: TEMPORARY DIVERSION DIKES
MA Y BE USED TO DIVERT RUNOFF THROUGH A
SEDIMEN T - TRAPPING F ACllI TY.
2. TEMPORARY SEDIMENT TRAP: A SEDIMENT TRAP IS USUALLY
INSTALLED IN A DRAINAGE WAY AT A STORM DRAIN INLET OR AT
OTHER POIN TS OF DISCHARGE FROM A DISTURBED AREA WITH THE
FOLLOWING LIMIT A TlONS.
A. THE SEDIMENT TRAP MAY BE CONSTRUCTED EITHER
INDEPENDENTL Y OR IN CONJUNCTION WITH A TEMPORARY
DI VERSION DIKE.
3. OUTLET PROTECTION: APPLICABLE TO THE OUTLETS OF ALL
PIPES AND PAVED CHANNEL SECTIONS WHERE THE VELOCITY OF
FLOW AT DESIGN CAPACITY OF THE OUTLET WILL EXCEED THE
PERMISSIBLE VELOCITY OF THE RECEIVING CHANNEL OR AREA.
4. SEDIMEN T BASIN: WILL BE CONSTRUCTED AT THE COMMON
DRAINAGE LOCATIONS THAT SERVE AN AREA WITH 10 OR MORE
DISTURBED ACRES ATONE TIME. THE PROPOSED STORM WATER
PONDS (OR TEMPORARY PONDS) WILL BE CONSTRUCTED FOR
USE AS SEDIMENT BASIN. THESE SEDIMENT BASINS MUST
PROVIDE A MINIMUM OF 3.600 CUBIC FEET OF STORAGE PER
ACRE DRAINED UNTIL FINAL STABILIZATION OF THE SITE. THE
3.600 CUBIC FEET OF STORAGE AREA PER ACRE DRAINED DOES
NOT APPLY TO FLOWS FROM OFFSITE AREAS AND FLOWS FROM
ONSITE AREAS THAT ARE EITHER UNDISTURBED OR HAVE
UNDERGONE FINAL STABILIZATION WHERE SUCH FLOWS ARE
DIVERTED AROUND BOTH THE DISTIJRBED AREA AND THE
SEDIMENT BASIN. ANY T1EMPORARY SEDIMENT BASINS
CONSTRUCTED MUST BE BACKFILLED AND COMPACTED IN
ACCORDANCE WITH THE SPECIFICATIONS FOR STRUCTURAL FILL.
ALL SEDIMENT COLLECTED IN PERMANENT OR TEMPORARY
SEDIMENT TRAPS MUST BE REMOVED UPON FINAL
STABllIZA TlON.
OTHER CONTROLS
WASTE DISPOSAL
WASTE MATERIALS
ALL WASTE MATERIALS EXCEPT LAND CLEARING DEBRIS SHALL
BE COLLECTED AND STORED IN A SECURELY LIDDED METAL
DUMPSTER. THE DUMPSTER WILL MEET ALL LOCAL AND STATE
SOLID WASTE MANAGEMENT REGULATIONS. THE DUMPSTER
WILL BE EMPTIED AS NEEDED AND THE TRASH WILL BE
HAULED TO A STATE APPROVED LANDFILL. ALL PERSONNEL
WILL BE INSTRUCTED REGARDING THE CORRECT PROCEDURE
FOR WASTE DISPOSAL. NOTICES STATING THESE PRACTICES
WILL BE POSTED AT THE CONSTRUCTION SITE BY THE
CONSTRUCTION SUPERINTENDENT. THE INDIVIDUAL WHO
MANAGES THE DAY-TO-DAY SITE OPERATIONS. WILL BE
RESPONSIBLE FOR SEEING THAT THESE PROCEDURES ARE
FOLLOWED.
HAZARDOUS WASTE
ALL HAZARDOUS WASTE MATERIALS WILL BE DISPOSED OF IN
THE MANNER SPECIFIED BY LOCAL OR STATE REGULATION OR
BY THE MANUFACTURER. SITE PERSONNEL WILL BE
INSTRUCTED IN THESE PRACTICES BY THE SITE
SUPERINTENDENT. THE INDIVIDUAL. WHO MANAGES
DAY- TO-DAY SITE OPERATIONS. WILL BE RESPONSIBLE FOR
SEEING THAT THESE PRACTICES ARE FOLLOWED.
SANITARY WASTE
ALL SANITARY WASTE WILL BE COLLECTED FROM THE
PORTABLE UNITS AS NEEDED TO PREVENT POSSIBLE SPILLAGE.
THE WASTE WILL BE COLLECTED AND DISPOSED OF IN
ACCORDANCE WITH STATE AND LOCAL WASTIE DISPOSAL
REGULATIONS FOR SANITARY SEWER OR SEPTIC SYSTEMS.
OFFSITE VEHICLE TRACKING
A STABILIZED CONSTRUCTION ENTRANCE WILL BE PROVIDED TO
HELP REDUCE VEHICLE TRACKING OF SEDIMENTS. THE PAVED
STREET ADJACENT TO THE SITE ENTRANCE WILL BE SWEPT
DAILY TO REMOVE ANY EXCESS MUD. DIRT OR ROCK TRACKED
FROM THE SITE. DUMP TRUCKS HAULING MATERIAL FROM THE
CONSTRUCTION SITE WILL BE COVERED WITH A TARPAULIN.
CITY OF CLEARWATER. FLORIDA
ENGINEERING
<D
_'TGAtl!
-~
l!)lC,AV,",TI!
CALL LOCAL PUBLIC
UTILITY NOTtFlCA liON.
CENTER
......-
1......."R'-",,.
.....~~
Y~VCCAo"""fI!
CONTRACTOR'S REQUIREMENTS
GOOD HOUSEKEEPING
THE FOLLOWING GOOD HOUSEKEEPING PRACTICES WILL BE FOLLOWED
ONSITE DURING THE CONSTRICTION PROJECT.
AN EFFORT WILL BE MADE TO STORE ONLY ENOUGH PRODUCT
REQUIRED TO DO THE JOB.
ALL MATERIALS STORED ONSITE WILL BE STORED IN A NEAT.
ORDERLY MANNER IN THEIR APPROPRIATE CONTAINERS AND, IF
POSSIBLE. UNDER A ROOF OR OTHER ENCLOSURE.
PRODUCTS WILL BE KEPT IN THEIR ORIGINAL CONTAINERS WITH THE
ORIGINAL MANUF ACTURER'S LABEL.
SUBSTANCES WILL NOT BE MIXED WITH ONE ANOTHER UNLESS
RECOMMENDED BY THE MANUFACTURER.
WHENEVER POSSIBLE. ALL OF A PRODUCT WILL BE USED UP
BEFORE DISPOSING OF THE CONTAINER.
MANUF ACTURER'S RECOMMEND A TIONS FOR PROPER USE AND
DISPOSAL WILL BE FOLLOWED.
THE SITE SUPERINTENDENT WILL INSPECT DAILY TO ENSURE
MA TERIALS ONSITE RECEIVE PROPER USE AND DISPOSAL.
HAZARDOUS PRODUCTS
THESE PRACTICES ARE USED TO REDUCE THE RISKS ASSOCIATED
WITH HAZARDOUS MATERIALS.
. PRODUCTS WILL BE KEPT IN ORIGINAL CONTAINERS UNLESS THEY
ARE NOT RESEALABLE.
ORIGINAL LABELS AND MATERIAL SAFETY DATA WILL BE RETAINED;
THEY CONTAIN IMPORTANT PRODUCT INFORMATION
IF SURPLUS PRODUCT MUST BE DISPOSED OF. MANUFACTURER'S
OR LOCAL AND/OR STATE RECOMMENDED METHOD FOR PROPER
DISPOSAL WILL BE FOLLOWED.
PRODUCT SPECIFIC PRAC TlCES
THE FOLLOWING PRODUCT SPECIFIC PRACTICES WILL BE FOLLOWED
ONSI TE:
PETROLEUM PRODUCTS
ALL ONSITE VEHICLES WILL BE MONITORED FOR LEAKS AND
RECEIVE REGULAR PREVENTIVE MAINTENANCE TO REDUCE
THE CHANCE OF LEAKAGE. PETROLEUM PRODUCTS WILL BE
STORED IN TIGHTLY SEALED CONTAINERS WHICH ARE
CLEARL Y LABELED. ANY ASPHALT SUBSTANCES USED
ONSI TE WILL BE APPLIED ACCORDING TO THE
MANUFACTURER'S RECOMMEND A TlONS.
FERTILIZERS
FERTILIZERS USED WILL BE APPLIED ONLY IN THE MINIMUM
AMOUNTS RECOMMENDED BY THE MANUFACTURER. ONCE
APPLIED. FERTILIZER WILL BE WORKED INTO THE SOIL TO
LIMIT EXPOSURE TO STORM WATER. STORAGE WILL BE IN A
COVERED AREA. THE CONTENTS OF ANY PARTIALLY USED
BAG OF FERTILIZER WILL BE TRANSFERRED TO A SEALABLE
PLASTIC BIN TO AVOID SPILLS.
PAINTS
ALL CONTAINERS WILL BE TIGHTLY SEALED AND STORED
WHEN NOT REQUIRED FOR USE. EXCESS PAINT WILL NOT
BE DISCHARGED TO THE STORM SEWER SYSTEM BUT WILL
BE PROPERLY DISPOSED OF ACCORDING TO MANUFACTURES'
INSTRUCTIONS OR STATE AND LOCAL REGULATIONS.
CONCRETE TRUCKS
CONCRETE TRUCKS WILL NOT BE ALLOWED TO WASH OUT OR
DISCHARGE SURPLUS CONCRETE OR DRUM WASH WATER ON
THE SI TE.
SPILL CONTROL PRACTICES
IN ADDITION TO THE GOOD HOUSEKEEPING AND MATERIAL
MANAGEMENT PRACTICES DISCUSSED IN THE PREVIOUS SECTIONS
OF THIS PLAN. THE FOLLOWING PRACTICES WILL BE FOLLOWED FOR
SPILL PREVEN TlON AND CLEANUP:
MANUFACTURERS' RECOMMENDED METHODS FOR SPILL CLEANUP
WILL BE CLEARLY POSTED ON SITE AND SITE PERSONNEL WILL
BE MADE AWARE OF THE PROCEDURES AND THE LOCATION OF
THE INFORMA TlON AND CLEANUP SUPPLIES.
MATERIALS AND EQUIPMENT NECESSARY FOR SPILL CLEANUP
WILL BE KEPT IN THE MATERIAL STORAGE AREA ONSITE.
EQUIPMENT AND MATERIALS WILL INCLUDE BUT NOT BE LIMITED
TO BROOMS. DUST PANS. MOPS, RAGS. GLOVES. GOGGLES, LIQUID
ABSORBENT (I.E. KITTY LITTER OR EQUAL), SAND. SAWDUST, AND
PLASTIC AND METAL TRASH CONTAINERS SPECIFICALLY FOR THIS
PURPOSE.
ALL SPILLS WILL BE CLEANED UP IMMEDIA TEL Y AFTER DISCOVERY.
THE SPILL AREA WILL BE KEPT WELL VENTILATED AND
PERSONNEL WILL WEAR APPROPRIATE PROTECTIVE CLOTHING TO
PREVENT INJURY FROM CONTACT WITH A HAZARDOUS
SUBSTANCE.
SPILL OF TOXIC OR HAZARDOUS MATERIAL WILL BE REPORTED TO
THE APPROPRIATE STATE OR LOCAL GOVERNMENT AGENCY.
REGARDLESS OF THE SIZE OF THE SPILL.
EROSION AND SEDIMENT CONTROL INSPECTION AND MAINTENANCE
PRACTICES
THE FOLLOWING ARE INSPECTION AND MAINTENANCE PRACTICES THAT
WILL BE USED TO MAINTAIN EROSION AND SEDIMENT CONTROLS.
NO MORE THAN 10 ACRES OF THE SITE WILL BE CLEARED ATONE
TIME WITH OUT WRITTEN PERMISSION FROM THE ENGINEER.
ALL CONTROL MEASURES WILL BE INSPECTED BY THE
SUPERINTENDENT. THE PERSON RESPONSIBLE FOR THE DAY TO
DA Y SITE OPERA TIDN OR SOMEONE APPOINTED BY THE
SUPERINTENDENT. AT LEAST ONCE A WEEK AND FOLLOWING ANY
STORM EVENT OF 0.25 INCHES OR GREATER.
ALL TURBIDITY CONTROL MEASURES WILL BE MAINTAINED IN GOOD
WORKING ORDER; IF REPAIR IS NECESSARY. IT WILL BE INITIATED
WITHIN 24 HOURS OF REPORT.
BUILT UP SEDIMEN T WILL BE REMOVED FROM SILT FENCE WHEN IT
HAS REACHED ONE - THIRD THE HEIGH T OF THE FENCE
SILT FENCE WILL BE INSPECTED FOR DEPTH OF SEDIMENT, TEARS.
TO SEE IF THE FABRIC IS SECURELY ATTACHED TO THE FENCE
POSTS. AND TO SEE THAT THE FENCE POSTS ARE FIRMLY IN THE
GROUND.
THE SEDIMENT BASINS WILL BE INSPECTED FOR THE DEPTH OF
SEDIMENT. AND BUILT UP SEDIMENT WILL BE REMOVED WHEN IT
REACHES 10 PERCENT OF THE SEEDING CAPACITY OR AT THE END
OF THE JOB.
DIVERSION DIKES IS WALES WILL BE INSPECTED AND ANY BREACHES
PROMPTLY REPAIRED.
TEMPORARY AND PERMANENT SEEDING AND PLANTING WILL BE
INSPECTED FOR BARE SPOTS. WASHOUTS. AND HEALTHY GROWTH
A MAINTENANCE INSPECTION REPORT WILL BE MADE AFTER EACH
INSPECTION. A COpy OF THE REPORT FORM TO BE COMPLETED
BY THE INSPECTOR IS ATTACHED. THE REPORTS WILL BE KEPT ON
SITE DURING CONSTRUCTION AND AVAILABLE UPON REQUEST TO
THE OWNER, ENGINEER OR ANY FEDERAL. STATE OR LOCAL
AGENCY APPROVING SEDIMENT AND EROSION PLANS, OR STORM
WATER MANAGEMENT PLANS THE REPORTS SHALL BE MADE AND
RETAINED AS PART OF THE STORM WATER POLLUTION PREVENTION
PLAN FOR AT LEAST THREE YEARS FROM THE DATE THAT THE
SITE IS FINALLY STABILIZED AND THE NOTICE OF TERMINATION IS
SUBMITTED. THE REPORTS SHALL IDENTIFY AND INCIDENTS OF
NON-COMPLIANCE.
THE SITE SUPERINTENDENT WILL SELECT UP TO THREE INDIVIDUALS
WHO WILL BE RESPONSIBLE FOR INSPECTIONS. MAINTENANCE AND
REPAIR ACTIVITIES. AND FILLING OU T THE INSPECTION AND
MAINTlENANCE REPORT.
PERSONNEL SELECTED FOR INSPECTION AND MAINTENANCE
RESPONSIBILITIES WILL RECEIVE TRAINING FROM THE SI TE
SUPERINTENDENT. THEY WILL BE TRAINED IN ALL THE INSPECTION
AND MAINTENANCE PRACTICES NECESSARY FOR KEEPING THE
EROSION AND SEDIMENT CONTROLS USED ONSITE IN GOOD WORKING
ORDER.
NON-STORM WATER DISCHARGES
IT IS EXPECTED THAT THE FOLLOWING NON-STORM WATER
DISCHARGES WILL OCCUR FROM THE SITE DURING THE
CONSTRUCTION PERIOD:
WA TER FROM WA TER LINE FLUSHING.
PAVEMENT WASH WATERS (WHERE NO SPILLS OR LEAKS OF TOXIC
OR HAZARDOUS MATERIALS HAVE OCCURRED).
UNCONTAMINA TED GROUNDWATER (FROM DEWATERING EXCAVATION).
ALL NON-STORM WATER DISCHARGES WILL BE DIRECTED TO THE
SEDIMENT BASIN PRlOR TO DISCHARGE.
I CERTIFY UNDER PENALTY OF LAW THAT I UNDERSTAND THE TERMS
AND CONDITIONS OF THE GENERAL NATIONAL POLLUTANT DISCHARGE
ELIMINATION SYSTEM (NPDES) PERMIT THAT AUTHORIZES THE STORM
WATER DISCHARGE ASSOCIATED WITH INDUSTRIAL ACTIVITY FROM THE
CONSTRUCTION SITE IDENTIFIES AS PART OF THIS CERTIFICATION.
SIGNA lURE
ADDRESS:
WADE TRIM INC.
8745 HENDERSON ROAD, SUITE 220.
TAMPA FL 33634
It] WADETRIM
THIS DRAWING 1$ COPYWRITTEN
<C Wade Trim Group. Inc.
WADE TRIM PROJECT NUMBER:
......... ..-
"46~""'T"",fLD1D4
,,--......... FAX::..........
~fI...........No.:_
.............. .... .................-.......
CLW2067 -01 M
BA YFRON T UPLAND IMPROVEMENTS
STORMWA TER POLLUTION PREVENTION PLAN
0fI!AUN5Y YL Dt:&tlINEC~o OE<XED 8'1'" CR CONTRACT NO.
"'...., IIlJR\IEYI!!D5Y OO<X NO. ........
AS """..... 5I-EETNO.
NOTED 0....""""05/19/0 C-21
"""""'"0""'
CONSTIU:::To.I
~ENriM::EIIt 0'"
/
~~~"
---- ------ ",,'~
------ ~
____ 0 '~'"""
'"
~
r::~,~ I
~~~ II
~>y,
I", JII/
"-~~ /
"-" I
'~
~ /
II
/
"" I
'-.,-.,~.~
I
/
/
, I
I /
, " / /
',~/ I
I /
/ /
/ /
/ I
I I
! II
I
/
/
/
/
\,
'r"
RECORD DRAWINGS
....~ SG"'l'(
C:~,
-'--, '~::""
/' II
t~'.", .
"'-"', "'-.,"-.. ;/ 1/
~_ ~ I /
"<~ /
'1'
/ /
(::" .' j/ /
"",-"~
"/
,
/
I
I
\
1
I
)
J
~
----
8"PVC
INV ),19
€I
MATCHUNE
.......~............
TO'SHEETL-2 '::. "
~~ ~" '.
~ ~ '
~,,~~\ '
(>~:;i~\:'>~~
0, / / !
~> (>~>># /
",' , III I
1'/ I
/ / I
I
I
/
I
"~ -~--
,
/
/
,
......~..
CK RATED E
D FOR FIRE TRU
EE DETAIL S EET
I
I
I
I
I J
fitl
I I
~ I I
, '"II ~.sgg~;] J1 I
11:6~0 SF. I
~ I ~I
--, II t \ I II
I, I ~1" Ii
\ Il I
\ I II I
\ ~I !
1 If. II
I ~/ Ii \
"-1' / / I
/ /
II
/
St02
-r-=--=-
\ I
\
\1
l~
rt
\11 \~f\'r \ . \ ~
\, 21 ',,' \ " \, /0 ~,
· \\\"~~,. ~'t,. ,,~ \"'~ WAD:
--~-",~/--i,---l \~
SEA
~-8
\
~
/. . /
/./
I): I
/.
'" '" ... ....
... .... ... ...
- - - . -: : > <;
<::::::::::::)
. . : . : . : . : . : . :/
. . : . : . : . :~
. : . : : : : : : : : : : : : : : : :~
. . . . . . . . . . . . .)
: : : : : : : : : : : : : : : : : : : : : : : : :1
.... ... .... .... ... .... .... .... .... ... ... /-,-'
I
/
I
/
/
/
/
//
/
/
SEA WALL -----...
"
x
()
MATCHLlNE
.............
6 DER 1 TO SHEET L-2
ES5.
-4 TYP.
~
NORTH ARROW
20" PALM
Jf
20' 10' 0'
~--
10' 20'
40'
I
~o 0
1
\
~~
~ 12" PALM
~Jf
\
\
~
0:cJ
o
o
o
o
o
o
0'"
o =
:~
OE
o
or
:~
o
o
o
o
o
o
o
OO(
OJ
oJ
K
/
~ /
2" RCW /
METER EL~~;'
U / I<l
/
/ @
/
/
\
\
,O~
c
~
o
\
o
~
"
"
"
"
------------------- "" \
----------------- ~
--------------~-- --------
'T~" ........__
REVISION
e,y OATE
",I~SEAL:.:--...~..
l$?M"'"""
~ "d" {'::.
~n -...:.. 15~
~~ ~ ~~
'\~ ~l
~......t-4;[R :i ,II"
............, ""
CITY OF CLEARWATER, FLORIDA
ENGINEERING
CD _6T_TI
-""
.!l<C,ol,vATI
BA YFRONT UPLAND IMPROVEMENTS
CALL LOCAL RJeLlC
UTILITY NOTIFICATION
CENTER:
TOl,.L"'"
1_.<lN.<I""
1'WoI,.q1ool(:lUlt6111l!!1'Ole
TCUEJl'C.ilVAta
LANDSCAPE PLAN
\
\
c
THr5 DRAWiNG IS COPYWRmEN
C Wode Trim Group, Inc.
WADE TRI'" PROJECT Nl..lWER:
CLW2067-01 M
.....WN "
YL
OE:SIGHEO BY RO Cl-fECk!D BY SHE
_NO.
"'" NO
CLW2067.01~
"""NO'L_l
AS
NOTED
o.-.Tf DR.\IiIIW DWO. NMlE
05 19 0
..........,""
~
SuPElMSMl EMCJN([R
MATCHlINE
7......................
TO !'T ~-3" . . . . . . . . . . . . . . . . .
1...........
. . .
. .
.3...r... ...
, .
,
I ,
LM I (.'(
, <
< D
I ,<~
I ','
<)c
ID i
I
I ",
",
, ,
,
:
/\:" ::
l... ~~".::j
'. I! ~'.
"~'" !~e,,,,o.,,
Ii. . '~<
/ ~ " ""~-11:,",-~
/ / '-." ~.{ss ~
.!; ,if
/1,
I ./
/
"'.
::t~C~~~E ~~:.. .. .. . .'~. . ~:;.
TO SHEET L-1
RECORD DRAWINGS
.\
ILsOD l--r\
JI&.IWSF. t 1;:e.";-/
N >>"\" A1
1RlJ~ RA TED GJE~6
!!!l / UNDE SOD FOR FI
J/ / TRlJ ACCESS. SEE DE
- - - - ~ SI-lEE D-4. TYF.
................ .......~.
eIP'I:~ 1!iN6....~
fiT ClATf:
\III~~(AL":~...--__
/$~"'"\
.. ,d" f'::.
~~ ~.. ~~
't~ -- ~ ~
'\.:'-,qrF:R ~~l
.................. ,;",1
CITY OF CLEARWATER, FLORIDA
ENGINEERING
AS
NOTEO
REVISION
MATCHUNE
~....F...........
\ ~ TO SHEET L-3
I ~" ~
~ b
\ \
~ ----------------~
f \----
<' \
1
1
\
\
\
LIGHTiNG
l-J LIGHTING
~
NORTH ARROW
20' 10' 0' 10' 20'
~--
40'
I
LIGHTING
LIGHTING
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
LIGHTING
G
8
LIGHTING
LIGHTING
~; -.J
0,
:~
I......:..:tf ,<.< ,< ..........:: :.' ....,... /?'.. :::" .~. ,': ;;'.< .Co' Co .~ ," .' >^ ~~<~
I ..v^.-.... I ~ ~
0' CONC~ I
I
~~L-;;;mNG~ ~
0, ,,~ t
e
5f~"
3fL"
I
----L-__~~~~~~~~~~_ ?
~ 8 ~ --~__
"" --------------@ ~
'Sf"
')f"
)f:L"
12" PALM
~
16" PALM
~
)fL"
'9"
e
THiS DRAWING tS COPYWRIITEN
o Wade Trim Group, Inc.
It] WADET~
~"""220 .,
1745............... r.....R. .
11''''~.IIIM FAX:tt.....-
~dAullCldalllanND.:._
................. ........................_--..0.
CLW2067-01M
WADE TRIU PROJECT Nl.At8ER:
MATCHLlNE
................
TO SHEET L-1
12" PALM
(l;)
ORA... 8Y
......TI(iA.TlI!
""""00
"""""'..
YL
OESlGHEDsY RO SHE CONTIW:T NO.
.......
CLW2067.01M
.". ORAWN --. SHEETI<<l. L-2
05 19 0
BA YFRONT UPLAND IMPROVEMENTS
CALL LOCAl AJBLlC
UTILITY NOTIFICATION
C~T';:
,_..w.....,.,
~...1oII:lI.ItS1IEl'Ol'le
TClIl~V"'Te
LANDSCAPE PLAN
Af'PROI/(D fOIl
CONSfIl:UCTlOH
SUPEIMSINCENGIN(ER
/............
: 1::::::: ::::::::::::.
.( . . ~~~ii..............
TO SHEET L-2
RECORD DRAWINGS
5UI"'E~SM:iI etGlN!i.1II
MA TCHLlNE
..................
. 'TOS/;/EETl-4-' . . . . .
MATCHLlNE
..........................
TO SHEET L-4
!
!
!
~'6 PALM
I //.....7....
/ l( : : : : :I : :: . .
I ......{.........
I / ........
\ / . r. .
--+-- --~--:r :: . . . .
\ /I : . : . r-:-~-:-.-:-:~:-:~-~.J~~-:~_:__:
;( ....r...
/1 ..::(..
I (>. }'.'
II . . . . .r . . . . . .
I ! i::.f::..
1;1 t::.F:.....
/ It> >/: .: .: .: .:
fL..! ;...1......-
I ICTV---------.ltrv~CT,.. ,.. ....
I ! . . f ~--- C~T\i .
II .... . .
Ii. ....
r ..
I I....r..
(: : ( .
\:::t:'
. RI
: . :/. : . : . : . : . : . : . :
: I :
:i::::::::::::'
.:r.:.:.:.:.: .
.'/.'
.: i::::::::::::.R1
~~SlGNS /
(lW. 1HIS Nl1JFJf!Il-!
n!
Os '1 Os
!
~zoo~
~~~~ I
~~; i
~z
...,~ 11 !
:;g~
~~~ I
~~ I
~rTl I
~ i
"Ir:: 15" PA~M
STORM
GRAff INLET
,
<
,<
< ,
Os 1 (
< ,
"
< ,
~) 25
,< .
< ,
,<
< ,
,<
< '
,<
, ,
,<
r
PAL r
r
r
I
CJ
11---_
I ----------
I
I
I
I
I
18"SD--------- ------[}___________
LM g
\ I~ II LIGHTING MATCHLlNE
.~... .....................
TO SHEET L-2
REVISION
"" ...........
'" -{ S(Al."~ ---_
l!';M""-
~ . '"'''' {~
~:J '~ !~
~~ ~ &:t
'\.:'-'41"ER ~~/\
............ ",t'
CALL LOCAL F\JBLlC
UTILITY NOTIFICATION
CENTER
=,-
.__u;..'"
t1M...~1IIIl'Ofll!
....OUllJoOC.<W...fe
ID
.......~11E
=~
CITY OF CLEARWATER, FLORIDA
ENGINEERING
BA YFRONT UPLAND IMPROVEMENTS
LANDSCAPE PLAN
It] WADETRIM
~
NORTH ARROW
20' 10' 0' 10' 20'
~--
-,.......
I7...HIndnon:...... r....R.. S3IS4
11j1.1l1l2__.a4 FN::..1.......-:t
~,,~frh.:_
~ ................luldIIaIIrI.......
DRAWN '"
YL
OESIGHI:D BY RO
SIJflY[Y[OIlY
AS
NOTED
"""""'0""
alN"'IUCIIDN
tl.l.TE DftAWN
05 '9 0
SUPE~ENGlNOCll'
40'
I
THIS DRAWNi IS COPYWRlTTEN
C Wode Trim GrouP. Inc.
WADE TRIM PROJECT NUWBER:
CLW2067-01 t.4
CHECkED 8'1'
SHE
..,,"".
CLW 067.01 M
'H""""L_3
/
/
I
I
I
I
, /
I I 1 /
il I /
If / /
/ I /,
I I f
1/ 1/7
\ I
\
\
\
!
/
RECORD DRAWINGS
.....- OY
~C1eMtJ,Mel't
llUf"E~INCIoI!NCiINEIIi"
~~ /
~\ /
ty
1\
/ \ DE-
I \ -----tUE---"E--UE-
f_UE~UE---"E \
U(_ur.- \
uG[ ____\JE- !
/ I,
I
/
I
/
/
//
_- L-
I I
I I
/
-
~
I /
/
1/
/
/
I
!
REVISION
/
!
I
!
EXISTING
ALUMINUM
DOCK
\?
\\
\c
~
/
I
I DE_UE-
UG[ -r
/
';
'/'
,/
, ;'
, ,
'I
'/, '
<!
, /,
I.
UE--
UE-
<
I!
J
~o PAL"
~
NORTH ARROW
w
>
~
20' 10' 0'
'rt.I-.-
40'
I
10' 20'
~
r
~
c==-=~
~
--
---------------
========-
~~ ----------- Q
~ ~
."
"
0" OAK
OAK
(5
<
'"
.~
,tv
(
OAK ~-
7" PALM
9" PAlM ~
~ 7"PAlM
_____:f-. 6" PALM
~7'-;-PAlM -.Jf - - - - -
~
GI
I ~~~C:\';~N~4 El=319
I / 15" RCP E IN V, EL=o3.29
il NE INY. EL=3.54"
_____________-0------15 RC.f'-------
24" RGP-------
I g~ATE EL=5.44
12" RCP W INV_=3.54
1111~~( A;':-~-__
/b~""-
'\: ,d,,, ~~
~() ----: 2i~
':.~ --ss.. ~~
\. ~ ~l
-:........'--41"ER ~ ,II'
............ ",.
G)
....._N
_T~
t!)lIC.fl.......'lI
CITY OF CLEARWATER, FLORIDA
ENGINEERING
BA YFRON T UPLAND IMPROVEMENTS
CALL LOCAL PUBLIC
UTILITY NOTIFICATION
C~T~
,.............,.
.........~~
TOUvoe.<lV"'''
LANDSCAPE PLAN
It] WADETRIM
THIS DRAWlr<<; IS COPYWRfTTEN
o Wade Trim Group. Inc.
WADE TRI!.t PROJECT MAtBER:
_~"'220
1745.......... RaId. T..... R. IIlII4
I1J"'~.'" FAX:111..11C..SlllO
~flfAulladiallDnND..:_
.............. ........................."......
CLW2067-01 M
""'ON "' YL DESlGNtD8V RO CHEC1<ED BY SHE """""" NO.
_NO .... NO.
AS C W2067.01M
NOTED ,,,,....... .... '"'" SHaT NO. L-4
05 19 0
APPROIItDrOlI;
COHSTAUCTlOH
SUPEIMSING tNGINEER
TlllEO AI'O lOOSEtEO
NATI~ &oIL e.ACJl':J"lLl
~
Ti'U'oI'( Sl-tAL.L ee 6TRAIGl-lT AND
ttlTI-lOJT CURvE6, FREE OF SCARS.
~.AA:K5 .6NO eooT5
5 LAYERS OF euFa..Al"'.
!o . 2...~-Jt"'. ~ CATTEN&.
COI'+IECT'EO W1f1.l 2-)1..(- STEEL eAN06.
0' 2".."-""'. WClOOEN STAKES
.. &oIL SAlJCER ~
l"'lANTINC. a.Q.E.
RilOOfeALL
)"I"U..CI-l LAYER
FERTilIZER fAelET5
EX15TlNGo lI'lOlSTUReleO &OIL
PALM PLANTING DETAIL
CLEARWATER INDEx No. ~ ~. lor I
Rd...... 3/3(f)/~ '
N.T..&.
-=
MJt.e~ ). FlIlIOt1 STe16
). t1.lLCIol LATER
EXI!oT~ t.NOI6ll..1ReED eotL
Sf..JRUB t C;ROUNDCOVER PLANTING DETAIL
CLEARWATER INDEx No. ~, &loll or I
~. '11~,,"
N.TS.
FERTILIZATION NOTES
51-lRUB5 AND TREE5
GROUNDCOVER AREA5
GENERAL LANDSCAPE NOTES
<;FREAD
TI-E LANDSCAPE CONTRACTOR &l-4AlL GRADE PLAN.TI"G eeos. AS REGlUlREO, TO pROviDe POSITI\I"E
DRAINAGe AND PRCt10Te OPTIM.I'1 PLANT GROWT~.
2. AlL REcot11ENDEO TREES AND PLANT HA TERlAl& tLIILL BE GRADED AS f'llR6E~ GRACE NO. I OR
BETTER AS OUTLINED ey TI-E: FLORIDA DEP.ARTHE:NT OF AGRIOJL1\.lIIii!E AND ~ER SERVlCE&,
DiviSION OF Pl,.ANT INDU&TRT' ~DE& AND STANDARDS FOR t<lJRSER"I' PLANTS-, U~ EDITION,
f99& AS REv1SED FRCt1 TIME TO TIME.
3. ALL PlANTINC"a tMALL BE DONE: IN ACCORDANCE tLllfI.t Ti-E FLORIDA t<lJRSER"r'NEN'S AND GRX::lUI:R'$
A&6OCIATIONS APF'RO'v1:D PRACTICES.
4. ALL PLANTS &wALL BE FERTILIZEO Wl1l-l A6RIFOION 2CZl-10-!o TABLETS. AS PER TIoE MAI'lFACT\JRER6
SPECIFICATIONS N CON.JI.NCTION UJlrw NOTE. 50.
S. TloIE PLANTy..,jG SOIL $-lALL aE TloE APPRCl'XIt1ATE PROPORTION5 A5 FOLLOWS. ~ SAt<> AND ~
~IC MATERIAl CON6ISTN:i OF NATIVE PEAT, WELl~oeCOl'1PO&EP &AU.OU&T, LEAF MOLD AND
TOP SOIL IT 5I-t4LL PROv1DE A GOOD PliABlE AND moROUGl-L Y MI><EP HEPll.l"1 Wlfl.t AOEGlJATE
AERATION. DRAlNA6E AND WATER-J.<<:)LDINI:j, CAPACITY. IT ~Al..L AL60 BE FREE OF ALL ExTRANE0U5
DE6RI&,6lJCI.I AS ROOTS. STONE&. WEEDS, ETC.
h. ALL PLANTIN::;iI AREAS SJ.fALL. RECEIVE A 3- LAYER OF PlNEeARIC:. MJLCJ.4. 1~.2- PARTICLE SIZE, lLI-IICJ.l 1&
TO ee WATERED-IN APTER INSTALLATIOi
,. TJ.lE PLANT MATERIAL ~EDULE 15 PREseNTEO FOR TIoE CONvENIENCE OF TWE LANDSCAPE
CONTRACTOR. IN fl.tE EveNT OF A DISCREP'ANCY' eEl'UEEN TWE PLAN AND TJ.lE PlANT KEY. T~E
PLAN 5I-IALl PREvAIL.
8. PLANTS ~All MEET SIZE, CONTAINER. AND 5PACINr5: 5PECIFICATIONS.,iJH'T' MATERIAL NOT MEETING
5F'ECIFICATIONS 5UALl eE FO!EHOvED AND REPLACED AT TJ.lE CONTRACTOR'S EXPENSE.
'9. AlL TREE AND ~B LOCATIONS ARE 6UeJECT TO o-fANGE. ALL LOCATION& $-tAlL eE APPROvED
BY TJ.lE CITY PROJECT MANAGER PRIOR TO F'LANTIt<<i.
10. Ti-IE LANDSCAPE CONTRACTOR: 5I-IAl.L BE RE5PCN&IBLE FOR EXAMINIl"ti RJLL Y eoTJ.l TIoE SITE AND
TWE 610 DOClNENTS. DISCREPANCIE& IN TJ.lE DOClNENT& OR 1l-E ACTUAL SITE CONDITIONS SJ.lALL
BE REPORTED TO T~ CITY PROJECT MANAGER IN lLRlTING AT TIoE TIME OF 610DIt<<i OR DI5COVERY. NO
ACCC\NT SJ.lALL ee ....ADE AFTER C~TRACT COMR..ETION FOR FAILURE TO REPORT euc~
cavlTION, OR: FOR ERROR& ON Tl-IE FART OF TI-lE LANDSCAF'e CONTRACTOR AT TI-lE TIME OF
BIDDI"G.
IL T~ LANDSCAPE CONTRACTOR $.4ALL BE RESPCN&IBLE FOR SEOJRlf'IO AlL NECESSARY
~ICAeLE PERMITS AND LICENSES TO PERFOFOM TJ.lE WORK SET FORn.t IN TJ.l15 PlAN SET AND
TJ.lE 5PECIFICA TION5.
12. PlANT MATERIAl.. 5I-t4LL BE aiD AS SPECIFIED l.NLES5 t.t4AvAILA6LE, AT lLI-IlCI-l TIME TJ.lE CITY
~CT MANAGER WILL ee: NOTIFIED 6Y TELEPl-KlNE AND IN WRlTn-<<:i OF INTENDED CJ..lANGES.
13. ANY.AND ALL QUESTIONS CONCE~ING 11-IE PLAN SET AND/OR SPECIFICATIONS SI-lALL ee
DlRECTEO TO T~ CITY PROJECT MANAGER AT ('21) Soh2.4131.
14. TJ.lERE SJ.lALL BE NO AODITtONS, DELETION& OR 5UB$TlT\JTION& W1TJ.k:lUT TJ.lE URITTEN APPROVAL
OF Tl-4E CITY PROJECT MANAGER
15>. TI-lE LANDSCAPE Ca-lTRACTOR SMALL GUARANTEE. iN WRITING:, PLANT 5URVlvAe!LITY FOR A PERIOD
OF TU.ELIIE (tV MCNTI-l5 FROM FINAL ACCEPTANCE ay ft.lE CITY PROJECT MANAGER
1&. ALL OIMENSIa-lS TO 6E FIELD-C/o.IECKED BY TJ.lE LANDSCAPE CONTRACTOR: PRIOR TO LANDSCAPE
MATERIAL IN6TALLATlON. DISCREPANCIES S~ALL Be REPORTED IM'1EDIATEL Y TO Tl1E CITY PROJECT
MANAGeR
11. Al..L MATERiAL5 MUST BE AS SPECFIED aN fl.IE lAN05CAPE PlAN. IF MATERiAlS OR LABOR 00
NOT ADJ.lERE TO SPECIFlCATIONS, TI-{fY WILL BE REJECTED SY TJ.lE CITY PROJECT MANAGER: WlTI-l
PROPER IN5TALLATION CARR;[EO OUT BY LANDSCAPE CGlNTRACTOR AT NO ADDITIONAL COST.
\8. ALL PEfIOMIT5 NECESSARY ARE TO se PROVIDED BY TWE INST Al..Ln-<<:i CONTRACTOR LNLE55
On.lERWfSE SPECIFICALl Y STATED IN Twe: 6PECIFICATION5.
~ NO CONTRACTOR IDENTIFICATION 6IGNS SI-lAlL BE PERMITTED CN TI-{E PROJECT, EXCEPT FOR: TI-lE
PROJECT I~TIa-l Sk:iN6.
20. E>dSTING: 500 5~ALL BE REMOvED AS NECE55ARY TO .ACCCt1OOATE NEW A..AN.TINGS.
2L ANY EXISTlNa 60D AREAS TJ.lA.T ARE l..NECE55ARIL Y DI&TUReeD DURING TI-IE LANDSCAPE INSTALLATION
51-tA1..L BE RESODDED TO MATCI-l EXISTING.
22. TI-lE LANDSCAPE CONT~TOR: WILL BE RE5F'C:N&leLE FOR ~E COLLECTICN, REMC'vAL. AND PROPER
DISPOSAL OF ANY AND ALL DEBRIS GENERATED OURII'<<:. TI-lE INSTALLATION OF TI-l15 P'ROJECT.
ALL TREES AND MRIe6 6I-iALL BE FERTILIZED WlTW
~AGR:FORM- 2lZ)-&-~ PLANTING TAel..ET& AT TIt"E OF
IN6TALLATION AND PRfOR TO COMPl.ETION OF PIT
BACKFILLING. T AeLET5 ~L fie PLACED LNIFOf;ML yo
ARa.ND TIoE ROOT MA&6 AT A DEPTl-l ~T IS eeru.eEN TIoE
MIDDLE AND eoTTOH OF TlE ~T MA&$.
APPLICATION RATE.
LD.3,TlJJll GAlLON CAN. I _ 21 GRAM TAeLET
"GALLON CAI'i: 2. 21 GRAM TAeLETS
S GALLON CAN; , - 21 GRAN T ABLET6
1 GALLON CAN: ~ _ 21 GRAM TABLETS
Le.6ITREE6: 3 - 21 G:RAI'1 TAe-LETS EACI-t 1/2" OF CALlF'E~
PALMS: 1 - 21 GRAM TAeL.ET6
ALL GRiC1l..NDCOVE~ AReA6 ~.Al...L RECEIvE
FERTIl.IZATION WlT~ .OZMOCOTE- TIME RELEASE
FE~TILIZER A6 PER MAN.FACTURER'6 6PECIFICATION&_
I-lEICsI-lT
L~.TII
NOTES:
t At.\, .WOOO ~t.ft '!PRUCe OR PINE -NOT PRE55URE
TREATED.
2. CRO&5 TIES ~ALL NOT CR055 OVER W::>OOY ROOT&.
3. REMOvE ALL STRIN:j, 410R WfRE URAF'PED ARC'll.ND TRlH<.
4. REMOvE ALL STRAP5, ROPES, WIRE, 410R: 5TR~S U$ED TO
LIFT Twe: ROOTBALL
So. REMOvE ALL euRL.AP 4/OR WIRE FROM TI-lE TOP OF THE ROOT
BALL.
6. TOP OF ROOTeALL TO BE SET 2~ eELCUJ F1N1Sl-l 5URRICll.NDINa
FINISJ.l GRADE.
I""tJLCI-l 3" F~ TRI.J'i{
r-tJLCI-l 3~ DEPT,",
TILLED AND
LOO5ENED NATI\I"E
SOIL BACKFILL
lJ'.lDISTUReED &OIL
2.2-X~~ STAKE WlLONC;, TAPER
MIN. Ie. INTO l.NDISTURBEO SOIL
LANDSCAPE SCf..JEDULE
SYMBOL QUANTITY BOTANICAL NAME COMMON NAME DE5CRIPTlON
AC 220 ANNUAL COLOR ANNUAL COLOR I GALLON, FULL, 18" o.C.
AM !"> ADONIDIA MERRILLlI CI-lRI5TMA5 PALM 10' CLEAR TRUNK, FULL I-lEAD
CQ 4 CLERODENDRON QUADRILOCULARE TREE FORM 5TARBUR5T l' X!">', 5TD., TREE FORM, 25 GAL.
DE 353 DURANTA ERECTA GOLD MOUND DURANT A 3 GALLON, 16" I-lT X 14" 5PR, FULL, 30" Oc.
--
I-lR 124 I-lIBI5CU5 R05A-5INEN5E I-lIBI5CU5 3 GALLON, 24" I-lT X 24" 5PR, FULL, 36" Oc.
LI 23 LAGER5TROEMIA INDICA 'MU5KOGEE' MU5KOGEE CRAPE MYRTLE 30 GAL., 2" CAL, 10'-12' I-lT X 5'-6' 5PR, FULL, MUL TI
L12 14 LAGER5TROEMIA INDICA 'NATCI-lEZ' NATCI-lEZ CRAPE MYRTLE 30 GAL., 2" CAL., 10'-12' I-lT X 5'-6' 5PR, FULL, MULTI
LJ 32 LIGU5TRUM JAPONICUM TREE L1GU5TRUM 8'X 8' MULTI-TRUNK,TREE FORM, CONTAINER, 2" CAL.
LM 1100 LIRIOf'E MU5CARI 'EMERALD GODDE55' EMERALD GODDE5S LIRIOPE I GALLON, 12" I-lT, FULL, 18" OC.
MC 106 MUI-lLENBERGIA CAPILLARI5 MUI-lL Y GRA55 3 GALLON, 16" I-lT X 14" 5PR, FULL, 30" o.C,
PD 6 PI-lOENIX DACTYLlFERA 'MEDJOOL' MEDJOOL PALM 12' CLEAR TRUNK, FLORIDA FANCY, NO DEFECT5
PM ~ PODOCARf'U5 MACROPI-lYLLA PODOCARf'U5 3 GALLON, 18"-24" 1-l1. X 24" 5PR., FULL, 36" O.G.
QV 4 QUERCU5 VIRGINIANA LIVE OAK 1= GAL., 14'-16' I-lT. X 6'-1' 5PR.. FULL
RI 620 RI-lAPI-lIOLEPI5 INDICA INDIAN I-lAWTI-lORN 3 GALLON, 12" I-lT X 16" 5PR, FULL, 24" O.C.
TA 2':14 TRACI-lEL05PERMUM A51A T1CUM MINIMA JA5MINE I GALLON, FULL, 18" o.c.
TJv 1461 TRACI-lEL05PERMUM JA5MINOIDE5 VARIEGATUM' VARIEGATED MINIMA JA5MINE I GALLON, FULL, 18" O.c.
V5 66 ViBURNUM 5U5PEN5UM VIBURNUM 3 GALLON, 12" I-lT X 16" 5PR, FULL, 24" O.C.
WR 43 UJA51-llNGTONIA ROBU5TA WA51-llNGTONIA PALM NO BOOT5, 12' CLEAR TRUNK, FULL I-lEAD
50D I 51.200 CYNODON DACTYLON BERMUDA 41':1
50D 2 8,000 5TENOTAPI-lRUM 5ECUNDATUM 5T. ALJc.U5TINE
MI5CELLANEOU5 ITEMS
168CY PINE BARK MULCI-l 3" DEPTI-l FOR ALL PLANT BED5
51-lREDDED BARK MULCI-l AND INDiviDUAL TREE5, 1-2" PARTICLE 51ZE
IRRIGATION
EXI5TING IRRIGATION 5Y5TEM SOUTI-l SIDE OF CLEVELAND 5TREET TO BE REPAIRED AND
MODIFIED BY CITY TO PROviDE 100% COVERAGE FOR NEW PLANTING5.
It] WADETRIM THIS DRAWING IS COPYWRlTTEN
o Wade Trim Group, Inc,
WADE TRIM PROJECT Nl.lM8ER:
_"_2lII
1741__ _R...... CLW2067-01M
1111"'''''__ FAX:.I1UK.111O
".....~~No.:_
.....-......- ........................"........
RECORD DRAWINGS llll~S[AL':;;---__ CD ~:a DRAWN '" YL I)[S!GMEO flY RO CHECKEO flY SHE co
i~~ CITY OF CLEARWATER, FLORIDA VOCAVAl'I BAYFRONT UPLAND IMPROVEMENTS """ SUIM'rEO BY """.... .......
Il.RYEYEDeT' ~ ,d,... {':t CALL LOCAL PUBLIC AS W2067.01M
~~ ~--= . a~ ENGINEERING UTILITY NOTIFICATION NOTED .", ..... owe. NMl[ ....,....L-5
~ ~ .ffl CEN.TE~ 05 19 0
~CT~1NR:1t -- LANDSCAPING DETAILS APPlKM:o rOA
--.....~4.,.ER ~ rl" .......-....".
.......~-- """"""""'"
5lPE~Ki aG"'EIt REVISION .............. "", TCII,II!)C,Ilr,VA,. SUPE~[NGlN[ER
2~X2"X4'
CRO&$ MEMBER
2-2.50-
DRYWALL SCREWS
TREE PLANTING DETAIL
CLEARWATER INDEX No.~. SoI-l. I or I
~.3/W/~
N.T.5
Al.L~R
TO ee TRfANGU.._ SPAClNc1.
seE PLANT LI6T FOR (OCJ
5f"AC""-
....C"
~-r~
...
- ~ 1OACl<C#"-""'eEOL'"
PLANT SPACING DETAIL
(24" OFFSET)
CLE~TER INDEX No, W3, 61-1.. 2 or 2
Rsv. 81e>!lo/tD!l
N.T>>,
----
-------
/
('>~
~>>"
---- "<:~.,~
~~,
24 INCH STEEL PIPE (PIPE
TURNS AND GOES DOWN)
;
/
/
/
/
/
/
/
/
I
f
I
\
I
)
/
/
~
----
/
I
I
I
/
/
;
\\)
/) :j/
, ;
, I
, 1
, !
, I
. ~",." !
--r
n.1
RECORD DRAWINGS
5Uf"I!:~lf>lN5-Et-<<OlNl!l~
SE~GRAS~
CD: 8upvC
'"0 INV 3.19
;~;~
~ -----f'M----------r~
-----Ht------~M_
REVISION
1,11 ................
,Ill -{ S(AL..... ...--_
"'$~,^",,-
~ "I,,,, {~
%~.., ~ ~
~f),", --- 'v~\'~
-:.-_......."'i[R ,\ ,III'
'-"'1111'
nl
"
"
"
"
"
"
"
20H PALM 11
Jf"
"
"
"
"
"
"
"
"
"
"
"
"
"
~"
=-w,;o
1 ::
"
1 "
"
"
1" "
"
"
"
<( "
"
"
1 ::
~ "
l ~
, i\
\ ::
, ::
\"' ::
"
\ ::
, \\
A'rt~4 :!
), \ )::
(~\ <'"
; ) ::
~V []
\
\
, '"
\ 10"~A
. /
~ \//
\ ~~ ,--
~/ '\ F~
// j ~
///\ \ C
\
i
\
\
\
\
\
\
~ \ 04"
\. \
\ \~"
\\
~
'~St
,......,..~
">
"">"
'~
"\
s~ J02A
lB"RCP
INV=;20
o
'/
SEA WALL
>:f
~t 1
''M----FM-------f~
~M---r-t.r
t,
-+
<!)
....-e:~n....Tf!
!lEPOIiIl!""OO
Ex<:...........TE
CITY OF CLEARWATER, FLORIDA
ENGINEERING
BA YFRONT UPLAND IMPROVEMEN TS
CALL LOCAL PUBL Ie
UTILITY NOTIFICATION
CENTER
lOLLflIIR
t.-.,,)t-"T\lII
..-.t..~lleOlIte
YOUI!)lCAVATe
ELECTRICAL PLAN
\
MATCHLlNE
............
tTO SHEET E-2
..2d' 10' 0'
o 0/ ~_-
'SfM
\
c
YL
RO
AS
NOTED
DIll( OAA_ owc. NAI,I(
05 19 0
APPRCM:oroll'
COlIISTRUCT~
ALAN M.. SCHWAB, P..E..
SUPER\IlSINGENGINEEII'
10'
20'
40'
j
SEAL
ALAN M_ SCHWAB. P.E
license Number 61.31.3
CR
CONTRACl NO.
""" NO
ClW2067..01M
SHEET NO.
E-1
MATCHLlNE
:9. ....................j
TO ~~........ ~~~KE~~~ . .
1 . . . . . . . 21&tl1BGND, ~'c .
. . .
. . .
..
MA TCHLlNE
...~...f-Ji.............
.' I \ TO SHEET E-3
~ " I 0? >:F
( EL 1TRIC ::;,
',eJ I ~
,." I ------------------[)
( ---~---
):1,'
" \
E {i I \
\
LIGHTING
u LIGHTING
,.
\ . . .
\::......
\ :SE.AGRA;S.
/ \.
LIGHTING
20' 10' 0' 10' 20'
~--
40'
I
~~---------------------------------------------
:21
II
1
0,
LIGHTING
:n
(j
El
LIGHTING
:n:
LIGHTING
I
"-
~
:: :: " " .'.........::....~...:..3;f..,.c..':.....t:(. "1<'...,,: .;::,<.........<::..:..........>:1:. >:I: '>:f .;;;"<"::~".: ..::......,...::2/
., . . . . '. .tir . .. .'.' , . I;::F >:I:
. . . . . -_.~>. I >:I: >:I:
~K ------- I
I
~
6. C
~-L~NG-
~
---------~
CLEVELAND ST. I
----------------- ~
------ .,
~-------
\
\\
\\
3fLM
:ifM
6' WIDE CONe WALK
):I,
12R PALM
:if"
16" PALM
Jf
f Q: " 8" WA TER
~ ~ '''&_f"r)<t ~___
'eM. -. ~ fM--FM-----r--n,u.' 'JP J1<' ,~ty0
~, ,:.p~EP~N ~
I ','" 10~M
1\ \(""", 1""
\ '\ 12~M
I \ "T"
I :
'~"
SEAL
ocro
<:
I
Jf
19"
It] WADE'fRIM
AlAN M. SCHW~. P.E
Lice....se Number 61Jl,3
MATCHLlNE
...............
TO SHEET E-1
~1.Sul.220
81.t5...........Ro8d, T~R. 338M
:~~~3~ ,
...~ 1IlMlp1tlllonlNpl...~d........
RECORD DRAWINGS
REVISION
r'" .............._
/~" SEAL--.... ...-_-:,.
"(j~,^~
~ ,d,,.. {~
~~ ---.:. g~
\~-p. ~ J:l
-:.-...~,q iER ~ /1'"
"'''''''''''' ",1
CITY OF CLEARWATER, FLORIDA
ENGINEERING
<D =l~
BA YFRON T UPLAND IMPROVEMENTS
YL
OESIGN(08Y
RO
CH[C1(EDBY
CR
COHTRACl NO.
$UPE~$1NCo eNC:OlNl!~~
CALL LOCAL PUBLIC
UTILITY NOTIFICATION
C~~T~~
,__.0;1_<11'"
MN.... wc:un 5ef'ORli
...OI.Irxc...."...1l:
"''''
AS
NOTED
!lATE OAAWN ()WC. fllMlE
05 19 0
... ,.
ClW2067.01M
SHEfT NO"E_2
ELECTRICAL PLAN
~OVEorOR
CONSTRUCTION
ALAN M. SCHWAB, P.E.
SlJPER\IISINGENG/f<IE[R
~EAGR~SS.j-
MAT.cHUNE, "
................
TO SHEET E-2
RECORD DRAWINGS
I
(
I
\'
.J
1--
I~
/1
/1
I
I
II
I n~'
I
'/. .
:)
. J'
. I
MATCHLlNE
...................
ro SH'EeTE.-4' " , . . .
MATCHUNE
..........................
TO SHEET E-4
ErF
I><J
.(.
::-:,-_.1. . . . . . . . 5O~o.c.JlYPl
.,.:t-~~-.-~. .'.' .-: -:-~ ~ -"':...na;'~_:.._:_._~
~
,. .j-... ...........,.,.,.
so
"'
SEAGRA$S ...
;; ';
::'
J:
.....".. .
20' 10' 0'
'.1-.-
10'
20'
40'
I
16"W---~->-- 12"w
WTR
FO!)
-------"
T~..J.INE I
'C'W ---..........L
I"""""""" 11------------_
OAK PARKINC SIGNS
J-CT1lP 1IHIS N!1IDfj!,
!~ Os Q~
/ c-] 1~ WATER lINES---......
~~~g~:"TIE EL, S3:-~~~~~~~~~~-~~~~~~~~~~~~--~---
c Vll'l INV[RllS INIID..CIl3:5IIH1J.J[
~ :z :- STRUC1\JRE FULL OF
-., 1; 11 CONCRETE
~gUl
r~~
O'LlCP
~;!'
<o~
t
QSANITARY
LIFT
STATION
:{
----------______~____~~!~_~~~~:W____J
STORM
G~MIii.. INLET
GRAT[ INLET
y----.---------
I
I
I
I
I
~
SEAL
- lS"SD---------------D-___________
It] WADETRIM
THIS DRAWING IS COPYWRlTTEN
(t) Wade Trim Group, Inc.
-j
G~G~G-G~G~G-G-G-
LIGHTING MATCHLlNE
.....................
TO SHEET E-2
AInIiIIInot5.&*220
8745 HIndnon fad, T~ R. 33834
81'.8I2.83OltMlla...IlUIU FAX: 81U84.5811O
c.rwcnd AuIlortaIon No.:_
_.~ IUaIllflllllllaNNplOll.ludIIbIr6......,.
WADE TRIM PROJECT NUf.1BER:
CLW2067-01 M
AlAN f.l. SCHWAB. P.E.
License Number 61313
5C.Pfi~~ eMGlIo.IEl!1I!
REVISION
\111~~(AL~::""__
/~~"""'-
~ v ...d/... {':.
~C) ........:: 1';%
\~f) ~ $/
-=--....::..qrER 5>1\\
""...... JI'/
CITY OF CLEARWATER, FLORIDA
ENGINEERING
ID
.....e:&TIGATI!
"""""00
El<CA,VATI!
[lAAWN BY YL OESIGNE:OSY RO CHtCKEDElY CR
BA YFRONT UPLAND IMPROVEMENTS $UIlv(T'EDElY "'''''
CLW2067.01M
AS lMT[ DRAWN SH[(TNO
NOTED 05 19 0 [-3
ELECTRICAL PLAN ~ROV[DrOR
CONSTRUCTION ALAN M. SCHWAB P.E.
SUPEIMSINC (~I>l[[1l
PROJ!!CTENG-NEER
CALL LOCAL AJBLlC
UTILITY NOTIFICATION
CENTER
T"'-L~
1_..>>'.'"
..-...>IO.I't&~
YQll!XC'O'...."TI!
~~ /
~\ /
%'y
/\
/ \ \ UE_UE------uE-UE-
J--UE-UE--t
UGE _UE_UE_UE-j_UE- ) \
/ I I~
/ ;/ I l-:-:
I I III + +
/ + +
~ I !t + + +j
~~u~ 1/+ + + i +
x;i if !
! + + + + + + + + + + + / rf---
T.} \ + + + + j + 1)1
11_\: + > + + + + + ~ I
! l_~~~~:~~M / / /t
//~: f
/ ~/-~ ;'I
~~' ..-
/f:~ + .
I!: : :
/
/
L
+{ <
<1+
j + + i
.... SEAGRASS /
+~~ + + +
J- +.++1+
+\: </+ +
l+ ++;:
+ .1- +
1+ +! +
+ J :i: : : +
-----"E-
-uE
_h=j-
~ /
/ / ! /
I I I .
/ I '
1//
1//
/ /
I / ';
/ / /
,r Ii
/1
I
I
\
\
\
/
/
~
\
\
~ll;'~+ +
\~
\~
c<
\'i
/
/
/ --------"E-
UE-U[
-rUE-
>
g
UGE
~
I
I
I
~
r
Q
~
<<
+ +/
+ + +
+/+
+ +
+ ! +
+ +
GI
rGRATE EL=6.75
I lNV, EL=J25
-10'
0' 10' 20'
SEACRASS
e,
40'
CONe, ~K
~:Jtw=---M:Jtflf------+d:Jtflf------+d:Jt~M~
-M~__
~~~
------
-----;~f___
T AFFlC MET
'H
no
'2 ...-----'
0'. OAK
"-SEAGRASS ....
o
IRRIGA TIOw'
CON TROL BOx
1
ill
'"
~
I
\
/__I\CRASS ~
12
h~'ON 0
OAK
p:
/
I
7
=fa PALM
REC.&
/
//
//
'll//
"'?-c
~ GI ~
7" PAW ~ ("RATE El ~7 54
X ~ 1.0 " / 24' RCP W INV El~J'9
g" PALM ".. 15~ RCP E lNV EL =3 29 :
1tC.. if NE INV EL =3 54
......."l"1IIli 7" PALM ~ ___________--G------ 15" RC-P------J-.-
~6~RIl?\!LM________ 24" RC.p-----;---r{~~.w ..
7" PALM ~ 1,--------'iLt-,J;--~-----------------~-------16
" 2" .~ff:lf- \ :
" 4~1"r 1 I
e, I
--~~ -"'-------~~~-~-~-----~----------------- 20"W -------~---~_.!..../~ i
"" c~ ~ ",,~.. ""i i
~~Jlr~ EL=11S"~ GI : :
~cp ~ r4"V EL ""062" I GRATE El ",,544 : :
;0 ~M~ ~lNv EL=175 y / 12 RCP W INV""J54 I I
~',. ;:;~/l.v El~215 .K;; / : :
~- ~~g:INV VCI I I
"! ~ 1~ Z ~11f....f~.f~I:U. : I
/ < rl ~ I"T1 < I JCA:W11LtNtI354 I :
. ....~........................ .
TO SHEET E-3
JIO!l~ +~(
50+ o.c. .cw.
-- -f~:~:-.-+-._+-~-~~:-~-:,_L+- L:-,"-:_+_-:_ '20;1W-
PUNG
o + + I: :;: + + + + + + + + + + + + +
+/+)+ + +
:/1: + :~TC~IN~ +
............................
TO SHEET E-3
SEAL
/
RECORD DRAWINGS
5Uf"f1tVlSINCliI!:NCioN!'1!1'II'
It] WADETRIM
WAOE TRIJ.l PROJEClI NUMBER
I
CLW2067+01M
............ 5. Su1122Q
174S~RoC, T~A. 33834
113.182._".481.8824 FAX: 813.184.5880
c.re:. 01............ No.: 3612
~ 1IMI8~.........t6........
AlAN M. SCHWAB. p.E
license Number 6131.3
REVISION
1111~~(AL":-:"'--_
/u~q,"",-
~ ,d/... {~
~~ "'-: 8~
~-p'--z... ~/
~-,,:"1r[R 5 ,II"
--",#, Iffl
CALL LOCAL PUBLIC
UTILITY NOTIFICATION
C~T~
'._.0......',.,
!1!1.-0~~
...-OUE><c..v..tt
<D
IoIVE&TII:ioAtl!
-,~
E><CAVA'"
,.,,"'''' OiSIGHEOBY RO CHECKED BY CR COHfR,\CT NO.
Yl
BA YFRONT UPLAND IMPROVEMEN TS ClW2067.01M
AS o,o,TEOflAI'fN SHEET NO.E_4
NOTED 05 19 0
ELECTRICAL PLAN APPROVED (OR
COt<STRUCTK>>l ALAN M. SCHWAB, P.E.
SLlf>ERVlSfofG ENGINEER
CITY OF CLEARWATER, FLORIDA
ENGINEERING
PROGRESS ENERGY
COlONw.. 22' BLACK
OtRECT BURIAL
CONCRETE POLE
GRADE LINE
Qr.CORATIVE LIGHT DEVI.IL
STREET PARKING LIGHT, CONDUITS
AND H,o,NDHOLES INSTALLED
AND MAtNT AH>JEO BY
PROGRESS ENERGY
NOT TO SCAlE
RECORD DRAWINGS
PROGRESS ENERGY
SANlBEL OUTDOOR
PREUIER OECORATtVE
POST TOP LIGHT
REVISION
'<~~'fW~~(AL:-':-q~"",-
~ .) ,d,/ {- ~
~~ -~- ;}
~:~,q liR~' v~/
""'--'//"011111'
8
NEw lUMEC DQIv1U<:; 80LL,l,f'.;[j
LIJMEC PRODUCT #: DOSBJJ2F240BK/TX
NOT TO SCAlE
CITY OF CLEARWATER, FLORIDA
ENGINEERING
STREET
LIGHT
POWER
PANEL
01<
-l
o
CNO
2'" C, WIRE
SIZE AS
INDICATED
ON THE
PLANS
[ CD _"..re
UFORE "OIl
ll.Jo<C"'......lll.
CALL LOCAL RlBLlC
UTILIT'( NOT1FICATI0f\l
C~~T~~
"_'.>>'."01>
--.:~v~;o-
12" OEEP BED or
PEA ROCK OR
CRuSHED STONE ~
FOR ORAlNAGE:
COHoolT FROt,C
PREvIOUS LIGHT POlE
(2'. SCHEDUlE 40 -
PVC)
- <lROuNO ROO
HANOHOLE DETAIL
NOT TO SCAlE
STREET
LIGHT
PULL BOX
STREET
LIGHT
POLE
''"C,2#12
+1#6 GND
STREET
LIGHT
PULL BOX
2"C, WIRE
SIZE AS
INDICATED
ON THE
PLANS
,'"C, 2#12
+1#6 GND
2" C. WIRE
SIZE AS
INDICATED
ON THE
PLANS
BOLlAROS LIGHT
CONOUrT TO NEXT LICHT
-PIllE
(2" SCHEDUlE 40 PVC)
CON)l.IT TO UGHT POLE
- PRQWlE STUB OUT 24"
fROW SlOE or HANOHOU:
(1" SCHEDUlE 40 PVC)
STREET
LIGHT
POLE
} TO NEXT LIGHT
POLE
PUU BOX ON
THE SAME
CIRCUIT
It] WADETRIM
95% COMPACTED
CRANVAlR
BACKFILL
R8nMunce 5, Suitt 220
8146I-h1nd1non~ T...FL 33834
813.882.838tV88U9U.9624 FAX: 813.884.5990
CeftIcnt of Auf1ottzMIon No; 3692
WW.~.OOIR EllMnQ~an.bnddond~
BA YFRON T UPLAND IMPROVEMENTS
ELECTRICAL DETAILS
SC,o,L(
N'9I!Q\I[orol!
CONSTRUCTION
4~ M1NIf,lUM
SANO
ElEODlNG
AS
NOTED
0" WlIll' RED Ill'TECTABlE POL"1l<'lU:N( -- I
MARIONG TAP( TO READ .'CAUTlON BUR1ED
ELECTRtCAI. llN(S.'
~
COfloorr
(1'tl'1CAl.)
C9J:1Q.lIIT TRENCHING DETAIL
NOT TO SCAlE
THIS DRAWING IS COPYWRITTEN
(0 Wade Trim Group, Inc
WADE TRIM PROJECT NUMBER
CLW2067-01 M
YL
OESIGt4EOsY
RO
o.o.TE ORA,WN
05 '9 0
ALAN M. SCHWAB, PE
SVPOMSINC E'fGrNE(1!
24..
SEAt
ALAN M_ SCHWAS. PE
L;cer>se Number 61313
CHECKED BY
I
,"
I
CR
''''''''
CLW2067.01M
SHEET NO_ [-5
GENERAL ELECTRICAL NOTES
(APPLY TO All DRAWINGS)
PANEL: lP 2 100A BUS 1. THE CONTRACTOR SHAll VISIT THE JOB SITE AND THOROUGHLY CHECK THE FIELD
-'
VOLTAGE: 240/120 VAC, PHASE: 1, WIRE: 3, MAIN: 60 AMP, RMS SYMMETRICAL AMPS: 22k, MOUNTING: SURFACE CONDITIONS AND THE EXISTING ELECTRICAL INSTALLATION AND UTILITIES
CKT BKR LOAD VA PH VA LOAD BKR CKT (ELECTRICAL AND TELEPHONE) PRIOR TO SUBMITTING HIS BID.
.
~ 20A/2P BOLLARDS (NORTH) 448 A 0 SPACE SPACE 2 2. OTHER PROJECTS ARE OR MAY BE UNDER CONSTRUCTION AT THIS SITE, AND
~ 448 B 0 SPACE SPACE 4 THIS CONTRACTOR SHALL COORDINATE WITH THEM SO AS NOT TO DELAY THEIR
5 20A/2P BOLLARDS (SOUTH) 336 A 0 SPACE SPACE 6 SCHEDULES OR IMPEDE THEIR WORK.
r----y- 336 B 0 SPACE SPACE 8
I--C-.. SPACE 3. COORDINATE ALL NEW ELECTRICAL UNDERGROUND WORK WITH NEW AND EXISTING
9 SPACE 0 A 0 SPACE SPACE 10
.J.!.........SPACE SPACE 0 B 0 SPACE SPACE 12 UNDERGROUND UTILITIES BEFORE INSTALATION. SEE CIVIL DRAWINGS. CONTRACTOR
---~-- SHALL COORDINATE THE REMOVAL OF THE EXISTING SERVICE WITH INSTALLATION OF
I TOTAL: 1568 0 NEW TO MAINTAIN CONTINUOUS UNINTERRUPTED SERVICE.
A- 784 B=784
l TOTAL CONNECTED LOAD: 1568 4. ALL UNDERGROUND CONDUITS AND/OR DUCT BANKS SHALL BE INSTALLED 24"
MINIMUM BELOW GRADE (UNLESS OTHERWISE SHOWN ON PLANS) AND SHALL SLOPE
(MINIMUM 3" PER 100') TO MANHOLES, HANDHOLES, CABLE VAULTS, OR OTHER
BOLLARD PANEL SCHEDULES STRUCTURES.
5. ALL UNDERGROUND CONDUITS AND/OR DUCTS IN DUCT BANKS SHALL BE P.v.C.
6. PROVIDE WATERTIGHT HUBS AT CONDUIT ENTRANCES TO ALL ENCLOSURES MOUNTED
OUTDOORS.
7. GROUND CONDUCTOR SPLICING AND BONDING SHALL BE ACCOMPLISHED BY THE USE
P/...NEi_ LP-IA 100A au'; OF EXOTHERMIC WELDING.
v'OL T2.,GE 240/120 VAC PHAS[ I. WiRE .3. MAIN: 60 & 80 AMP Rtv~S 'SYMMETRICAL lIMPS 22k MOUNTING SURFACE
CKT BKR LOAD VA PH VA L o.P,O BkR (V,T 8. PROVIDE A PULL STRING IN ALL CONDUITS. CONDUITS SHALL BE CAPPED AFTER
I 20A/IP PROMENADE RECEPT,\CLES 720 A /20 PROMENADE RECEPTACLES 20A/ I P INSTALLATION TO PREVENT THE ENTRANCE OF FOREIGN MATTER.
L
, 20A/IP PROMENADE RECFPTACLES 720 a 720 PROMUJADE RECEP !ACLES 20A/ I P 4 9. COORDINATE THE EXACT LOCATION OF ALL LIGHTING WITH LANDSCAPING BEFORE
J
~ 20A/IP PROMENADE RECEPTACLES 720 A. -:2:J PROMENADE RECEPTACLES 20A/ I P 0 INSTALLATION.
20A/IP PROMENADE RECEPTACLES 720 B 720 PROMENADE RECEP I A.CLFS 20A/IP 8
9 20A/IP PROMENADE RECFFTACLES 720 Po 720 PROMENADE RECEPTACLrs 20A/ I P 10 10. EXPANSION OR EXPANSION/DEFLECTION FITTINGS SHALL BEPROVIDED FOR ALL
11 20A/1P MULTI SPACE METER (SOUTH LOT) ? B 2S L iCH liNG CONP-CDR CCNTROL CIRCUIT 20A/IP CONDUITS CROSSING EXPANSION JOINTS.
13 20A/1P MULTI-SPACE METER (SOUTH LOT) ? A - FEEDER 8REAKt.R 60A/2P 14
ZOA./ I P SPARE 0 8 TO LP-18 -
1:., . 16
TOTAL: ? 3625 INSTAllATION AND TESTING .
I
A-? B=? !
TOTAL CONNECTED LOAD: ? COMPLY WITH DETAILS FOR REINFORCEMENT AND FOR ANCHOR BOLTS, NUTS, AND
WASHERS. VERIFY ANCHOR-BOLT TEMPLATES BY COMPARING WITH THE ACTUAL POLE
BASES FURNISHED. I
PROMENADE/TICKET CENTER LIGHT PANEL SCHEDULES EQUIPMENT SPECIFICATIONS USE WEB FABRIC SLINGS (NOT CHAIN OR CABLE) TO RAISE AND SET POLES.
MOUNT POLE TO FOUNDATION WITH LEVELING NUTS. AND TIGHTEN TOP NUTS TO
PULL BOXES: CONSTRUCTED OF POLYMER CONCRETE AND DESIGNED TO ANSI TIER 15 TORQUE LEVEL RECOMMENDED BY POLE MANUFACTURER.
LOADING REQUIREMENTS. PULL BOXES SHALL BE GASKETED AND NOMINALLY SIZED AT SECURE POLES LEVEL, PLUMB, AND SQUARE.
13"W x 24"L x 12"D AND SHALL HAVE AN OPEN BOTTOM. A HEAVY-DUTY GASKETED ATTACH LUMINAIRES AND SUPPORTS TO ALLOW AIMING FOR INDICATED LIGHT
BOLTED COVER SHALL BE PROVIDED WITH EACH PULL BOX. COVERS SHALL BE
MARKED "ROADWAY LIGHTING". ALL FASTENER HARDWARE SHALL BE STAINLESS STEEL. DISTRIBUTION.
MANUFACTURED BY QUAZITE. OR ENGINEER APPROVED EQUAL. LAMP LUMINAIRES WITH INDICATED LAMPS ACCORDING TO MANUFACTURER'S WRITTEN
INSTRUCTIONS. REPLACE MALFUNCTIONING LAMPS.
GROUND RODS: 3/4" x 10' LONG. HIGH STRENGTH STEEL CORE WITH A MINIMUM INSPECT EACH INSTALLED UNIT FOR DAMAGE. REPLACE DAMAGED UNITS.
OF 10 MILS OF ELECTROL YTICALL Y BONDED COPPER. MANUFACTURED BY BLACKBURN, VERIFY NORMAL OPERATION OF LIGHTING UNITS AFTER INSTALLING LUMINAIRES AND
ERITECH, OR ENGINEER APPROVED EQUAL. ENERGIZING CIRCUITS WITH NORMAL POWER SOURCE. MEASURE LIGHT INTENSITIES AT
NIGHT WITH PHOTOMETERS THAT ARE CALIBRATED TO NIST STANDARDS. CHECK
INTENSITY AND UNIFORMITY OF ILLUMINATION. CHECK EXCESSIVELY NOISY BALLASTS.
CONDUIT: ALL CONDUIT INSTALLED ABOVE GROND SHALL BE GALVANIZED RIGID STEEL PREPARE A WRITTEN REPORT OF TESTS. INSPECTIONS, OBSERVATIONS AND
(GRS). GRS CONDUIT SHALL BE HOT -DIPPED GALVANIZED INSIDE AND OUT. GRS VERIFICATIONS INDICATING AND INTERPRETING RESULTS. REPLACE OR REPAIR
CONDUIT SHALL BE UL LISTED AND MANUFACTURED IN ACCORDANCE WITH UL 6 AND MALFUNCTIONING FIXTURES AND COMPONENTS AND THEN RETEST. REPEAT PROCEDURE
ANSI caD. 1 STANDARDS. GRS CONDUIT SHALL BE MANUFACTURED BY AlliED OR UNTIL UNITS OPERATE PROPERLY. GIVE ADVANCED NOTICE TO ENGINEER OF DATES
ENGINEER APPROVED EQUAL. ALL CONDUIT BELOW GROUND SHALL BE RIGID SCHEDULE AND TIMES FOR FIELD TESTS.
40 PVC. RIGIID PVC CONDUIT SHALL BE MANUFACTURED IN ACCORDANCE WITH NEMA
TC-2 AND UL-651 STANDARDS. ALL PYC FITTINGS AND CONDUIT SHALL BE SUPPLIED
BY THE SAME MANUFACTURER. MANUFACTURED BY CARLON, CONDUX. OR ENGINEER
APPROVED EQUAL.
WIRE: WIRE SHALL CONSIST OF COPPER CONDUCTORS, WITH 600 VOLT THHN/THWN
INSULATION CONFORMING TO UL 44. MANUFACTURED BY OKONITE, SOUTHWIRE, OR
ENGINEER APPROVED EQUAL.
MOUNTING STRUT: MOUNTING STRUT SHALL BE GALVANIZED STEEL, MANUFACTURED BY r""
UNISTRUT OR ENGINEER APPROVED EQUAL.
LIGHT POLE LUMINAIRE AND ASSOCIATED CONDUIT AND HANDHOLES: PROVIDED AND
INSTALLED BY PROGRESS ENERGY. SANIBEL SERIES POST TOP LUMINAIRE, WITH 175 It] WADETRlM I THIS DRAWING IS COPYWR'TT~N
WATT METAL HAYLlGHT LAMP, TYPE III OPTICS, 120 VAC BALLAST, AND PAINTED COVER. l.C Wade Tnrn Group, In,:
THE DECORATIVE POLE SHALL BE COLONIAL SERIESE. 22' HIGH POLE, PAINTED BLACK, WADE TRIM PROJECT NUMBER'
~6,SUI&220
CONCRETE POLE AND WILL BE DIRECT BURIAL. 0745 Herdnon IbKt. T-.. R. 338M CLW2067-01M
813..81l2.838IV888MU824 FAX: 113.8&4.5990 _'__H
c.dIcIliIoIAutIIxtl.IIanNo.:3512 ALAN M. SCHWAB, P.E.
-~ ..............OII.~~.......... l;ce....se Number 61313
RECORD DRAWINGS ,,1 ............... f @ -,- DRAWN BY OESICNf09y CH[CI([DB'Y CONtRACT NO
/~~""- CITY OF CLEARWATER, FLORIDA I!iEFOIII:E"OJ BAYFRONT UPLAND IMPROVEMEN TS Yl RO CR
! DRA.lINBl !><CA.,.....'E ,""-, SURVEYED BY Eloo.; NO ..,...,
Sl.IRvE'rEDBY .-- l-- ,'()~ d, ..)... ~
t ~ -'-=- }J CALL LOCAL AJBL Ie AS ClW2067.01M
Il1!!vIZ!u.Eoey ENGINEERING UTILITY NOTIFICATION NOTED ",n ,,,- OS/19/0! owc. NAUf SH((f NO. E 6
CENTER
PROJECT e.....INEE!l:' O....TE ~-:~jrElt.5~/ TOllfll!f:l': ELECTRICAL DETAILS
AF'PRO'<'fC 6Y HI"'lD'-.01."''lC> APPfKM:OfQR
5llPER',,~NG EI>lGIEER D....TE REVISION .- D....TE -.../".... ,0,1 ...... '1& ~ eB'ORE CONSTRUCTION ALAN M. SCHWAB PE
5vPf.:RVlSINCE!K:INEER "'''