CPA2008-09003, ORD 8016-08 - October 21, 2008 CITY OF CLEARWATER COMPREHENSIVE PLAN AMENDMENT CP A2008-09003 ORDINANCE # 8016-08 AGENDA ITEM: F-2 CDB Meeting Date: Case #: Ordinance #: Agenda Item: October 21,2008 CP A2008-09003 8016-08 F-2 CITY OF CLEARWATER PLANNING DEPARTMENT STAFF REPORT COMPREHENSIVE PLAN AMENDMENTS REQUEST: Clearwater Comprehensive Plan Text Amendments INITIATED BY: City of Clearwater Planning Department BACKGROUND INFORMATION: This item involves an amendment to the Clearwater Comprehensive Plan to update the Capital Improvements Element related to the City's current FY08/09 Capital Improvement Program Budget pursuant to Florida Statutes Section 163.3177(3)(b) 1., and Florida Administrative Code section 9J-5.011. The fundamental purpose of a Capital Improvements Element is to ensure that the community is able to fund the public facilities supported in the Comprehensive Plan Elements in alignment with the community's (minimum five-year) schedule of the Capital Improvement Program (CIP) budget. The statutory requirements call for each local government to adopt amendments to its Comprehensive Plan which make corrections and modifications pursuant to the annual update to the Capital Improvement Program budget. These amendments are due by December 1 and are exempt from the twice a year limitation for large-scale amendments and require only one public hearing prior to transmitting it to the State Department of Community Affairs. As required by Florida Statutes 163.3177(2), this amendment package also includes the annual update to the Capital Improvements Element regarding the reference in Policy 32.7.6 to the School District's Five-Year Work Program of FY2008/09 through 2012/13 as adopted by the School Board on September 9,2008. ANALYSIS: Three amendments are proposed to the text of the Clearwater Comprehensive Plan in Ordinance No. 8016-08 as follows: Amendments - CAPITAL IMPROVEMENTS ELEMENT: (pages are gIven from Comprehensive Plan): The following are corrections and modifications that are being made: Page - 1 CP A2008-03002 . Capital Improvements Summary (page I-I): Deleted previous eight examples of CIP projects from FY1999/00 budget and updated with examples of five CIP projects for FY2008/09 through FY2013114 (six-year CIP program as adopted by Ordinance No. 8006-08 on September 18,2008). . Policy 32.1.2 (page 1-2), modified to add the City's six-year Capital Improvement Program (CIP) schedule to the element as "Schedule I-A". . Policy 32.7.6 (page 1-10), relative to the updated School District's Five-Year Work Program, is updated to "FY 2008/09 through FY 2012/13", as approved by the School Board on "September 9,2008". STANDARDS FOR REVIEW Pursuant to Community Development Code Section 4-603(F) no amendment to the Clearwater Comprehensive Plan shall be approved unless it complies with the following standards: 1. The amendments will further implementation of the comprehensive plan consistent with the goals. policies and obiectives contained in the plan. The proposed amendments to the Capital Improvements Element of the Clearwater Comprehensive Plan are consistent with and will further the implementation of the goals, objectives, and policies contained in the Comprehensive Plan elements associated with updated public facilities capital projects pursuant to the FY2008/09 through FY2013114 Capital Improvement Program Budget. 2. The amendments are not inconsistent with other provisions of the comprehensive plan. The proposed amendments are consistent with the provisions of the Comprehensive Plan. It updates the City's CIP six-year projects that are supported in other elements of the Comprehensive Plan. 3. The available uses. if applicable. to which the property mav be put are appropriate to the property in questions and compatible with existing and planned uses in the area. The proposed amendments are text amendments that are not directly related to a specific property. 4. Sufficient public facilities are available to serve the property. The proposed amendments are text amendments that are not directly related to a specific property. Page - 2 CP A2008-03002 5. The amendments will not adversely affect the natural environment. The proposed amendments seek to provide consistent and coordinated efforts pursuant to the City's CIP projects as identified within all the elements of the City's Comprehensive Plan. No projects adversely affect the natural environment, while some projects positively affect it. The latter includes CIP Project #96170 - Coastal Basin Projects and CIP Project #96739 - Reclaimed Water Distribution System. 6. The amendments will not adversely impact the use of property in the immediate area. The proposed amendments are text amendments that are not directly related to a specific property. SUMMARY AND RECOMMENDATION: The proposed text amendments meet state statutes and rules by making corrections and modifications in the Clearwater Comprehensive Plan Capital Improvements Element. These amendments are made pursuant to the City of Clearwater's FY2008/09 through FY2013114 Capital Improvement Program Budget (adopted on September 18,2008) and the Pinellas County School District's Five-Year Work Program FY2008/09 through 2012/13 (adopted by the School Board on September 9, 2008). The Planning Department recommends APPROVAL of Ordinance No. 8016-08 that amends the Clearwater Comprehensive Plan. Prepared by Planning Department Staff: ~&.vL Sandra E. Herman Planner III ATTACHMENT: Ordinance No. 8016-08 Page - 3 CP A2008-03002 RESUME SANDRA E. HERMAN 100 South Myrtle Avenue Clearwater, FL 33756 Telephone: (727) 562-4586 sandra.herman@myclearwater.com PROFESSIONAL EXPERIENCE City of Clearwater - January 1986 to Present (Starting from current position) Planner III - Planning Department . Primary responsibilities: Advanced professional level planning work of a difficult and responsible nature in connection with growth and orderly development of the City in accordance with the Comprehensive Plan and other statutes, ordinances and regulations related to land use. Administrative Support Manager (previously titled Special Projects Manager) - Development and Neighborhood Services Department . Primary responsibilities: Annual Department Budget - research for initiatives proposals, preparation and maintenance of the Budget for the department under the approval of the department director - FY07 $4.136M Budget / 54.5 FTE's / $4.046 Revenues Projected; Primary supervision of administrative support employees and their priorities including all financial work for the department, payroll, customer service, code enforcement casework input into the Tidemark Permit Plan system, and all other administrative support functions; Backup for the director and other managers in the supervision of department employees, and attendance in city meetings; Preparation and submittal of all City Council Agenda Items for the department; and special projects such as the City's Development Guides - Residential and Commercial (initial research, meetings, preparation, distribution - hard copy books, CD's and on the Internet, and periodic updates). Planning Administrator / Assistant to the Department Head - Central Permitting Department (included Planning and Development Services) . Primary responsibilities: Assistant to the Department Head: Directing and supervlSlng planners, zoning staff, and staff assistants involved with all planning functions - current and long range, including development plans in accordance with the land development regulations and the City's Comprehensive Land Use Plan; preparation of reports and agencies including the City Commission, Planning and Zoning Board, Development Code Adjustment Board, Pinellas Planning Council, Countywide Planning Authority/Board of County Commissioners, the State Departll1ent of Community Affairs and the Tampa Bay Regional Planning Council. Member of the administrative team for large redevelopments including the "Sunshine Mall" project. Coordinator for development reviews, working closely with developers, attorneys, architects, engineers and citizen groups. Permits Manager - Central Permitting Department (included Planning and Development Services) . Primary responsibilities: Supervision of permits counter staff working with occupational licenses and building permits; lead planner for the State mandated Occupational License Equity Commission project - successfully increasing occupational license fees and revenues by 10% ($140,000); supervision of planning staff and functions as listed above. Report preparation and presentation of cases to the City Commission and advisory boards. Senior Planner - Planning and Development Department · Primary responsibilities: Lead planner for the City in the 5-year Countywide Pinellas Planning Council Land Use Plan Consistency Program, and City representative and Chairperson for the Pinellas Planning Council's Planners Advisory Committee. Report preparation and presentations to the City Commission and advisory boards. Development Planner II - Planning and Urban Redevelopment Department . Primary responsibilities: Lead planner responsible for site plan reviews and subdivision plat reviews. Worked closely with applicants, attorneys, engineers and architects. Report preparation and presentation of cases to the City Commission and advisory boards. City of St. Petersburg - October 1974 - January 1986 Planner II - Planning Department . Primary responsibilities: Lead planner responsible for site plan reviews, special exceptions, and subdivision plat reviews. Worked closely with applicants, attorneys, engineers and architects. Report preparation and presentation of cases to the City's Environmental Development Commission and the City Council. Planner I - Planning Department · Primary responsibilities: Provide information and interpretation on zoning code regulations to developers, architects, attorneys, and the general public; preparation of notices for public hearings; and preparation of reports for vacations of rights-of-way and minor adjustments to subdivision plats. Draftsman - Traffic Engineering Department · Primary responsibilities: Engineering drafting of street and intersection plans in coordination with state and county plans, and graphic presentations for Traffic Engineering projects. EDUCATION Bachelor of Science, Visual Arts / Communications, Florida State University, 1974 Associate of Arts, St. Petersburg Junior College, 1972 PROFESSIONAL MEMBERSHIPS Florida Planning and Zoning Association, Inc. since 1982 American Planning Association, since 1986 ORDINANCE NO. 8016-08 AN ORDINANCE OF THE CITY OF CLEARWATER, FLORIDA, AMENDING THE COMPREHENSIVE PLAN OF THE CITY AS ADOPTED ON MAY 18, 2000, AS SUBSEQUENTLY AMENDED, AMENDING THE CAPITAL IMPROVEMENTS ELEMENT, MAKING CORRECTIONS AND MODIFICATIONS PURSUANT TO THE UPDATED SCHEDULE OF THE CITY OF CLEARWATER'S FY2008/09 THROUGH FY2013/14 CAPITAL IMPROVEMENT PROGRAM BUDGET ADOPTED ON SEPTEMBER 18, 2008, AND UPDATING THE REFERENCE IN POLICY 32.7.6 TO THE SCHOOL DISTRICT'S FIVE-YEAR WORK PROGRAM FOR FY2008/09 THROUGH 2012/13 AS ADOPTED BY THE SCHOOL BOARD ON SEPTEMBER 9, 2008; PROVIDING FOR SEVERABILITY; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the Local Government Comprehensive Planning and Land Development Regulation Act of Florida empowers and requires the City Council of the City of Clearwater to plan for the future development and growth of the City, and to adopt and periodically amend the Comprehensive Plan, including elements and portions thereof; and WHEREAS, the City of Clearwater adopted a Comprehensive Plan on May 18, 2000 by Ordinance Number 6522-00, subsequently amended; and WHEREAS, certain amendments are statutorily required, and others are advisable in order to harmonize the Comprehensive Plan with state law and good planning practice; and WHEREAS, amendments to the Comprehensive Plan of the City have been prepared in accordance with the applicable requirements of law, after conducting the appropriate planning analysis, and public participation through public hearings, opportunity for written comments, open discussion and the consideration of public and official comments; and WHEREAS, the Community Development Board, serving as the designated Local Planning Agency for the City, has held a public hearing on the proposed amendments and has recommended adoption of the proposed Comprehensive Plan amendments; and WHEREAS, per provisions of Florida Statutes Chapter 163, it is necessary to annually adopt an ordinance amending and updating the Capital Improvements Element of the Comprehensive Plan to maintain a financially feasible minimum 5-year schedule of capital improvements consistent with the plan; and Ordinance No. 8016-08 WHEREAS, the City Council finds it necessary, desirable and proper to adopt the amendments to the objectives and policies of the Comprehensive Plan in order to reflect changing conditions; now, therefore, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CLEARWATER, FLORIDA: Section 1. Amendments to the text of the Clearwater Comprehensive Plan attached hereto as Exhibit "A" are hereby adopted. Section 2. Severability. If any section, provision, clause, phrase, or application of this Ordinance shall be declared unconstitutional or invalid for any reason by a court of competent jurisdiction, the remaining provisions shall be deemed severable therefrom and shall remain in full force and effect. Section 3. This ordinance shall become effective when the Department of Community Affairs (DCA) issues a final order determining the adopted amendment to be in compliance, or the Administration Commission issues a final order determining the adopted amendments to be in compliance, in accordance with Section 163.3177, 163.3178,163.3184,163.3187 or 163.3189,163.3191, F.S., as amended. PASSED ON FIRST READING PASSED ON SECOND AND FINAL READING AND ADOPTED Frank Hibbard Mayor-Councilmember Approved as to form: Attest: Leslie K. Dougall-Sides Assistant City Attorney Cynthia E. Goudeau City Clerk 2 Ordinance No. 8016-08 ORDINANCE 8016-08 EXHIBIT A AMENDMENT 1- CAPITAL IMPROVEMENTS ELEMENT SUMMARY Amendfollowing Capital Improvements Summary of the Plan on Page 1-1 asfollows: Capital Improvements Summary: The following are examples of current capital improvement projects and funding sources proposed for public facilities supported in the Comprehensive Plan Elements and as specified in the City's six-year schedule of the Capital Improvement Program (CIP) budget adopted on September 18.2008: summarizes Capital Impro'.'ements Element . The $1.25 million Druid Road Improvements project is planned in 2008/09 for the completion of the Druid Road Trail section of the Pinellas Trail from Glen Oaks Park to the Memorial Causeway Bridge. Improvements include landscaping. sidewalks and bike paths. Funding is Pennv for Pinellas. . The City's Streets and Sidewalks Program is currently budgeted for $15.472 million on the six-year CIP schedule with a funding source of road millage. . The City proposes a total of $48.44 million of improvements within the City's Stormwater Infrastructure Program over the six-year CIP period. The funding. sources for this project are the Stormwater Fund and a future bond issue. . The $1.552 million Commercial Container Acquisition CIP project is planned through Solid Waste funds. . The $21.066 million Reclaimed Water Distribution Svstem CIP project is being funded through: $863.400 from FY '09 Bond Issue. $13.841 million from future bond issue. $4.833 from Sewer Revenue. and $1.529 million from Utility Renewal and Replacement. . Transportation,l Major Street Maintenance projects total $21.1 million over the next six years and include funding for the traffic calming program, street maintenance and resurfacing, beach streetscape, S.R. 60 beautification and North Greenv.'ood corridor enhancements. · The outdated Memorial Causeviuy Bridge .....111 be replaced '.vith a nevI $10 million architecturally unique bridge that '..",ill include pedestrian facilities and serve as a Pinellas Trail spur to the beach in 2001. . Park De'lclopment will total $17 million oyer the next six years and include improvements to Ruth Eckerd Hull, the Long Center, North Greem'i'Ood Recreation Complex, Ross Norton Complex and development of the Harbor Bluff Waterfront Park. Ordinance 8016-08 Exhibit A · The construction of a $10.8 million high tech, state of the art, signature new Main Library will be constructed in 2002 in dO\.vnto'.'m. · The $2.8 million Memorial Causeway Civic Center is scheduled for construction in 2001 and \vill proyide community meeting space. Library space, police 5Ubstation, visitor information center and the Jolly Trolley station. · The To';m Pond, do';mtown storm facility, will provide an expanded stonmvater facility to resolve persistent flooding of streets and structlHes. The total cost ofilie project is 6.2 million and is scheduled f-or construction in 2002. · Sewer system improvements '.",ill total oyer $30 million the next six years and '.vill include water pollution control, sanitary se'Ner extensions and expansion and impro'/cment of ClHTent facilities. · Water system improvements total over $30 million the next six years and '.'fill include expansion of the r'0claimed water system, improvement of the water supply and treatment facilities, infrastructure impro'/ements and overall system ~{pansion. AMENDMENT 2 CAPITAL IMPROVEMENTS ELEMENT GOALS, OBJECTIVES AND POLICIES Amendfollowing Policy 32.1.2 of Objective 32.1 of Goal 32 on page 1-2 asfollows: ***** 32.1.2 The City shall be permitted to amend the Schedule of Capital Improvements two times during any calendar year and as allowed for emergencies, developments of regional impact and certain small-scale development activities pursuant to Florida Statutes 163.3187. The schedule of capital improvements included in the Clearwater FY2008/09 Capital Improvement Program Budget is incorporated as Schedule I-A of this Capital Improvements Element. ***** AMENDMENT 3 CAPITAL IMPROVEMENTS ELEMENT GOALS, OBJECTIVES AND POLICIES Amend following Policy 32.7.6 of Objective 32.7 of Goal 32 on page 1-10 as follows: ***** 32.7.6 The City hereby adopts by reference the School District's Five- Year Work Program for FY 2008/09 through 2012/13 FY 2007/08 through 2011/12, as adopted by the School Board on September 9.2008 11,2007. Ordinance 8016-08 Exhibit A CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY2008/09 POLICE PROTECTION This section includes all maior computer technology and eauipment needs for the Police Department. These items would typically be funded with General Fund dollars. Proiects in this section support the "Clearwater Provides the Infrastructure to Support 0/1 its Attributes" element of the City Council's Vision and the following related priorities: .:. Well Maintained Infrastructure .:. Efficient Responsive City Services .:. Communication Police Com outer Network LIP Gen Fd 250.000 250.000 250.000 250.000 250.000 250.000 1.500.000 Total Police 250.000 250.000 250.000 250.000 250.000 250.000 1.500.000 91147 Police Computer Network This proiect was originally established in the FY 1993/94 Capital Improvement Budget and provided for the Police Department's computer plan and network operations. The focus of the proiect includes upgrading the in-house computer systems' desktop computers. file servers. printers. and network hardware as new technology becomes available. Maintaining the Police computer in-house network as "state of the art" is of utmost importance, and the ever-changing nature of computer technology makes it impossible to be soecific regardina future purchases or needs. ANNUAL OPERATING BUDGET IMPACT Proiect FTE's 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 Police Com outer Network 121 0.0 88.700 1 77 .400 266.100 266.100 266.100 266.100 Total Police 0.0 88.700 177.400 266.100 266.100 266.100 266.100 121 Ooeratina costs are for debt service to be funded bv the General Fund City of Clearwater, FL Ordinance 8016-08 Schedule I-A 1 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY200S/09 FIRE PROTECTION This section includes all maior equipment and vehicle needs for the Fire Department. All Fire Department facilitv renovations and or new construction would also be included in this section. Eauipment and vehicles could be funded with General Fund or Lease Purchase dollars. with the debt funded by the General Fund. In addition. Pennv for Pinellas revenue can also fund a Fire Department vehicle as well as an emergency medical service vehicle. Any facility renovations and or new construction would typicallY be funded with Penny for Pinellas revenue. Proiects in this section support the "Clearwater is a Wonderful Place to Live" element of the City Council's Vision and the following related oriorities: .:. A Safe Clean Green Environment .:. Safe Comfortable Walkable Neighborhoods Proiects in this section also support the "Clearwater Provides the Infrastructure to Support 011 its Attributes" element of the City Council's Vision and the following related oriorities: .:. Well Maintained Infrastructure .:. Efficient Resoonsive City Services .:. Communication Proiects in this section also support the "Clearwater includes Special Places that Belong to Everyone in the Community" element of the City Council's Vision and the following related priorities: .:. A Quality Beach Environment 91218 Rre Engine Replacement LIP Gen Fd 450 000 450.000 450 000 450.000 450 000 450 000 91221 EMS Caoital Eauioment General Fd 15.000 15.000 15.000 15.000 15.000 75.000 LIP Gen Fd 145.000 140 000 285 000 91229 Reolace & Upgrade Air Packs LIP Gen Fd 125.000 750.000 875.000 91236 ~ UP Gen Fd 140.000 160.000 170.000 470.000 91247 Traffic Preemotion Control UP Gen Fd 75.000 75.000 150.000 91257 Auto Extemal Defibrillator prog General Fd 50.000 50.000 continued on next page City of Clearwater, FL Ordinance 8016-08 Schedule I-A 2 91218 Fire Engine Replacement This proiect provides for the replacement and equipping of one (1) Pumper each year from FY 2009/l 0 through FY 2013/14. These Pumpers will replace the fleet of 1999 units that will be at the end of their service life. This will also allow for procurement of new eauipment for each pumper. Maintaining up to date response vehicles along with required equipment. allows the department to maintain its level of service to the community and provide for the safety of our personnel. Funding for replacement is partially reimbursed bv the Countv since the equipment also serves the unincorporated area of the Clearwater Fire District. 91221 EMS Capital Equipment This proiect provides for the procurement of capital eauipment for the EMS svstem per County EMS agreement. The proiect will fund the replacement of Lifepak 12 cardiac monitor/defibrillators. which have a useful life expectancy of seven years. Additional eauipment includes electronic support equipment. radios. stretchers. splints. oxygen regulators. etc. 91229 Replace & Upgrade Air Packs The funding provides for the replacement of breathing apparatus needed for worn or damaged front line units. This proiect provides the purchase of self-contained breathing apparatus (SCBA) upgrade kits that have been approved throuah National Institute for Occupational Safety & Health (NIOSHI and the CDC (US Centers for Disease Control & Prevention) and includes an Accountability Monitorina System that provides for trackina firefiahters in hazardous environments. The new NFPA (National Fire Protection Association) 1982.2007 edition is now in effect. Our current SCBA's do not meet these standards and do not provide the needed protection in a terrorism event. The new recommended standards will allow the department to maintain eauipment to provide for the safety of our personnel. Funding in FY 2013/14 provides for purchases for anticipated chanaes to NFPA standards that may come about after the NFPA 2007 edition. City of Clearwater, FL Ordinance 8016-08 Schedule I-A 3 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY2008/09 Funding is partiallY reimbursed by the County since the eauioment also serves the unincoroorated area of the Clearwater Fire District. City of Clearwater, FL Ordinance 8016-08 Schedule I-A 4 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY2008/09 FIRE PROTECTION (continued) 91236 Rescue This proiect provides for the scheduled replacement of Fire/EMS first response vehicles. Funding will allow for the replacement of one (1) transport capable rescue vehicle everv other vear. Fundina for replacement is partiallv reimbursed bv the Countv since the equipment also serves the unincorporated area of the Clearwater Fire District. 91247 Traffic Preemption Control The proiect provides funding for the regular periodic installation additions to an automated traffic control svstem that will allow public safetv vehicles to more safely respond through intersections using in-vehicle control of traffic signals. with resulting decreases in response times to emergencv scenes. This important proiect will provide for the safetv of our response personnel as well as the citizens. Total funding of this proiect will allow faster response times which helps ensure the department maintains its level of service to the communitv. Funding will be partially reimbursed bv the Countv. as the system will help serve anv unincorporated resident of the Clearwater Fire District. 91257 Automatic External Defibrillator Programs The Department has 25-biphasic Lifepak SOO AED devices currently in key City facilities such as City Hall. MSB. Libraries. and Police. In FY 2012/13. the proiect will fund the replacement of Lifepak 500 AED's. which have a useful life expectancy of seven years. Funding for replacement is partially reimbursed by the County since the equipment also serves the unincorporated area of the Clearwater Fire District. 91259 Radio Replacements Pine lias County Communications has adopted the APCO (International Association of Public Safety Communicators) Proiect 25 communication standards. This will require that all portable and mobile radio equipment be digital by the year 2010. This proiect will provide funding for the upgrade. as well as additional portable and mobile radio eauipment that will replace existing units and uparade eauipment to make all Clearwater Fire & Rescue communication eauipment compliant with the new standard. Funding will be partially reimbursed by Pinellas County. as the equipment will help serve anv unincorporated resident of the Clearwater Fire District. 91261 Personal Protective Equipment This proiect provides funding for the complete outfittina of all personnel with the new Personal Protective Eauipment (PPE) that the Fire Department has started purchasing in the last Year. This proiect also provides for the National Fire Protection Association (NFPAl 1852 compliance and generates a revolving replacement schedule for the replacement of PPE that has reached its 5-year life expectancy. This PPE provides a high degree of protection for our firefighters along with providing many safety features that could assist members in case of an emergency at an incident. The excellent identification that is incorporated in this PPE also assists Incident Commanders with accountability and safetv. Funding for replacement is partially reimbursed by the County since the eauipment also serves the unincorporated area of the Clearwater Fire District. 91262 Self Contained Breathina Apparatus Upgrades - Fill Station This proiect provides funding for one self-contained breathing apparatus (SCBA) system FY 2012/13. This system will consist of a breathing air compressor: six (6) breathing air storaae cylinders and a facilitv type fill station. The system will allow for refilling of Fire Department SCBA units located on our emergencv response apparatus. Funding will be partially reimbursed by the County. as the system will help serve anv unincorporated residents of the Clearwater Fire District. 91263 Extrication Tools This proiect will provide fundina for the upgrade and additional vehicle extrication eauipment package that will replace existing units and upgrade eauipment to current National Fire Protection Agency (NFPAl recommendations. Funding will be partiallY reimbursed by the County. as the equipment will help serve any unincorporated residents of the Clearwater Fire District. City of ClearWater, FL Ordinance 8016-08 Schedule I-A 5 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY200S/09 FIRE PROTECTION (continued) 91264 Fire Hose Reolacement This oroiect orovides funding to ourchase reolacement fire hoses. Funding will be oartially reimbursed by the County. as the eauioment will helD serve any unincorporated residents of the Clearwater Fire District. 912>0< Rescue Squad Replacement This oroiect will orovide fundina for the ourchase and equipping of a replacement heavy rescue unit for the existing 1997 sauad unit in FY 2012/13. which will have exceeded it's useful life. The Deoartment has one squad unit and one soare vehicle. The squad is the deoartment's only heavy rescue unit and is resoonsible for all structure fires. vehicle extrications and technical rescue incidents. The squad carries a variety of soecialized equipment and the soecialized training the personnel have are essential in assisting mitiaation of comolicated emergency responses. Funding will be oartially reimbursed by the County. as the equioment will helD serve any unincorporated residents of the Clearwater Fire District. Proiect FTE's 2008/09 2009/10 2010/11 2011 /12 2012/13 2013/14 Fire Enqine Reolqcement 121 99.520 199.040 298.560 398.080 497.600 EMS Caoital Eauioment 121 0.0 32.070 63.030 63.030 63.030 Reolace & Uoqrade Airoacks 121 0.0 27.640 27.640 27.640 27.640 27.640 165.870 Rescue 30.960 30.960 66.350 66.350 103.950 72. 990 Traffic Preemotion Control 121 0.0 16.590 33.180 33.180 33.180 33.180 Rescue Squad Reolqcement 121 0.0 187.990 187.990 Total Fire Protection 58.600 174.710 358.280 488.760 813.870 1.020.660 (2\ ODeratina costs are for Debt Service to be funded bv the General Fund. City of Clearwater, FL Ordinance 8016-08 Schedule I-A 6 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY200S/09 NEW STREET CONSTRUCTION This section includes all new street construction proiects. Prior to the voter aooroval of the additional one-cent State sales tax. known as Penny for Pinellas. many of these proiects were funded with Local Ootion Gas Tax. Development Imoact Fees and Road Millage. Today. these oroiects are traditionally funded with Penny for Pinellas revenue. Proiects in this section suoport the "Clearwater Provides the Infrastructure to Supoort all its Attributes" element of the City Council's Vision and the following related oriorities: .:. Well Maintained Infrastructure .:. Efficient Transoortation Systems Proiect Fundina 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 Total 92146 Druid Road Imorovements ~ 1.250.000 1.250.000 Total New Street Construction 1.250.000 1.250.000 92146 Druid Road Imorovements This oroiect orovides for imorovements at various intersections alona Druid Road. Funding in FY 2008/09 will comolete the Druid Road Trail section from Glen Oaks Park to the Memorial Causeway Bridge. Imorovements include landscaping. sidewalks and bike oaths. Comorehensive Plan Obiective: (2.5) The City shall encouraae imoroved land use of transit oriented develooment olanning. (2.5.1) The city shall suooort the Pinellas Trail and examine opportunities for Trail extensions or sours to connect to reaional attractions and emoloyers. (6.11 Roadway improvements to obtain desired Levels of Service must be included in City proiects. [6.3) To meet desired level of service standards as set forth in oolicy 5.5.1 . ANNUAL OPERATING BUDGET IMPACT Proiect FTE's 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 Druid Road Imorovements III 0.0 5.000 5.250 .5...5lQ 5.790 6.080 6.380 Total New Street Construction 0.0 5.000 5.250 5.510 5.790 6.080 6.380 III Ooeratina costs are for maintenance. which will be outsourced and funded bv the General Fund. City of Clearwater, FL Ordinance 8016-08 Schedule I-A 7 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY2008/09 MAJOR STREET MAINTENANCE This section includes all maior street maintenance proiects for the City. Proiects in this section are normallv funded with Local Option Gas Tax and/or Road Millage. As defined by Florida Statutes, Local Option Gas Tax proceeds can be used for roadway and right-of-wav maintenance, as well as bridge maintenance and operations. Road Millaae revenues are established each year by Council policv and must be used to maintain the City's sidewalks and streets with the goal of maintaining a 10 to 15 year resurfacing cycle. Proiects in this section support the "Clearwater is a Wonderful Place to Uve" element of the City Council's Vision and the following related priority: .:. Safe Comfortable Walkable Neighborhoods Proiects in this section also support the "Clearwater Provides the Infrastructure to Support all its Attributes" element of the Citv Council's Vision and the following related priority: .:. Well Maintained Infrastructure Project Fundina 2008/09 2009 /1 0 2010/11 2011 /12 2012/13 2013/14 Total 92259 Traffic Calmina Proa Gas Tax 800,000 800,000 800,000 200,000 200,000 200,000 3,000,000 92273 streets & Sidewalks Road Millaae 2,682,150 2.600,340 2,547.430 2,547.430 2,547.430 2,547.430 15.472.210 92274 Bridae Maint & Improvements Gas Tax 600.000 800.000 650.000 1.250,000 1.300.000 1.300.000 5.900,000 Maior Street Maintenance Total 4,082.150 4.200.340 3.997.430 3.997.430 4.047.430 4.047.430 24.372.210 92259 Traffic Calming Program Proiect to promote traffic calmina within Clearwater neighborhoods and establishment of a methodologv for implementation. City staff to implement in succeeding years through capital programming. Specific proiects in FY 2008/09 will include Wood Vallev & Morningside. 92273 Streets & Sidewalks (replaces the Streets. Sidewalks & Bridges proiect) This proiect provides continuous maintenance for deterioration prevention of City streets and sidewalks by allowing approximatelv 20 to 30 miles of streets to be maintained vearlv. This yearlv street maintenance includes asphalt pavement milling. pavement resurfacing and pavement remarking. The proiect also provides for the maintenance, repair and construction of sidewalks on a continuous, as needed basis. Comprehensive Plan Obiective: (6.1) Roadway improvements to obtain desired Levels of Service must be included in City capital budgets. 92274 Bridge Maintenance & Improvements This proiect provides for a continuous, annual maintenance program to keep the City's bridges inspected and in good repair as well as providing for the complete replacement of bridges as necessary. Comprehensive Plan Obiective: (6.1) Roadwav improvements to obtain desired Levels of Service must be included in City capital budgets. City of Clearwater, FL Ordinance 8016-08 Schedule I-A 8 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY2008/09 INTERSECTIONS This section includes improvements to intersections as well as new signal installation and signal renovation. These proiects are funded with Transportation Impact Fees, Road Millage and Local Option Gas Tax. The Road Millage funding in the Signal Renovation proiect is used in coniunction with maior intersection improvements and road widening proiects. The Transportation Impact Fee revenue is required to be used for capital improvements and the expansion of transportation facilities. Local Option Gas Tax proceeds can be used for roadway and right-of-way maintenance. Proiects in this section support the "Clearwater is a Wonderful Place to Live" element of the City Council's Vision and the following related priority: .:. Safe Comfortable Walkable Neighborhoods Proiects in this section also support the "Clearwater Provides the Infrastructure to Support all its Attributes" element of the City Council's Vision and the following related priority: .:. Well Maintained Infrastructure Proiects in this section also support the "Clearwater Includes Special Places that Belong to Everyone in the Community" element of the City Council's Vision and the following related priorities: .:. A Quality Beach Environment .:. A Vibrant Downtown that's Mindful of its Heritage Improvements Trans Imp 50,000 50,000 50.000 50.000 50.000 50.000 300,000 92552 Sianal Renovation Gas Tax 45.000 45.000 45.000 45.000 45.000 45.000 270.000 92553 New Sianal Installations Trans Imp 40,000 40,000 40,000 40,000 40.000 40.000 240,000 92558 Intersection Improvements Trans Imp 200.000 200,000 200.000 200.000 200.000 200,000 1.200,000 Gas Tax 55.000 55.000 55,000 55,000 55,000 55.000 330 ,000 Rd Millaae 45.000 45.000 45,000 45.000 45.000 45,000 270,000 435,000 435.000 435.000 435.000 435.000 435.000 2.610.000 Total Intersections 92551 City-Wide Intersection Improvements The proiect provides intersection improvements of a minor nature to facilitate traffic flow, such as radii. right turning lanes, and minor channelization. which often accompany the new signalization of an intersection. Comprehensive Plan Obiective: {6.11 Roadway improvements to obtain desired Levels of Service must be included in City capital budgets. City of Clearwater, FL Ordinance 8016-08 Schedule I-A 9 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY2008/09 INTERSECTIONS (continued) 92552 Signal Renovation Renovation of substandard signalized intersections is reauired to meet the standards set by the national and State of Florida mandates to increase safety and reduce liability, This oroiect also orovides money to support the costs of relocating traffic signal equioment due to road widening oroiects or intersection imorovement oroiects where the cost of such relocation cannot be included in the cost of that proiect. Comorehensive Plan Obiective: The FOOT has established minimum ooerating standards for urban minor arterials and minimum standards for State principal arterials. Clearwater intends that these standards be recognized as the minimum acceotable standards for State arterial roads, and should serve as a guideline for reviewing development aoplications. (6.1) Roadway improvements to obtain desired Levels of Service must be included in City capital budgets. 92553 New Signal Installations The proiect provides for new traffic signals installed at oreviously unsignalized intersections that meet traffic signal warrants. Comorehensive Plan Obiective: The FDOT has established minimum ooerating standards for urban minor arterials and minimum standards for State principal arterials. Clearwater intends that these standards be recognized as the minimum acceotable standards for State arterial roads, and should serve as a guideline for reviewing develooment aoolications. (6.1) Roadway imorovements to obtain desired levels of service must be included in City capital budgets. 92558 Intersection Imorovements These are intersection improvements of a relatively maior nature to facilitate traffic flow by increasing the capacity of the intersection. Specific oroiects in FY 2008/09 will include intersections at Court & Chestnut with various cross streets as deemed necessary following the new bridge ooenina. Comprehensive Plan Obiective: ( 6.3) To meet desired level of service standards as set forth in oolicy 5.5.1. City of Clearwater, FL Ordinance 8016-08 Schedule I-A 10 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY2008/09 PARKING The Parking section includes proiects for the maintenance of the City owned parking aarages. as well as City owned oarking lots. These oroiects are usually funded with Parking Fund revenue. Also included in this section would be any new Parking Garages. These types of proiects would traditionally be funded with Parking Fund revenues and/or a Parking Bond Issue. Proiects in this section suoport the "Clearwater Proyides the Infrastructure to Suooort all its Attributes" element of the City Council's Vision and the following related oriority: .:. Well Maintained Infrastructure Proiect Fundina 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 Total 92630 Parking Lot Resurfacina Parkin a Fd 50.000 50.000 50.000 50.000 50.000 50.000 300.000 92632 Parking Garage Maintenance Parkin9 Fd 75.000 75.000 75.000 75.000 75.000 75.000 450.000 and Reoair 92636 Parking Lot Imorovements Parkina Fd 100.000 100.000 100.000 100.000 100.000 100.000 600.000 Total Parkina 225.000 225.000 225.000 225.000 225.000 225.000 1.350.000 92630 Parking Lot Resurfacing The proiect orovides for the resurfacing of various City Parking System lots as determined necessary by Engineerina. 92632 Parking Garaae Maintenance & Reoair The Garden Ayenue and Municioal Services Comolex oarking garages both reauire maintenance and reoair. By oerforming this scheduled maintenance. long-term serviceability and safety issues will be addressed. 92636 Parking Lot Imorovements The oroiect provides for interior imorovements. both functional and aesthetic. to all oarking system facilities. Parking facility locations will begin with the beach lots and expand to include all parking system facilities and on-street oarking. Imorovements include items such as brick oavers. oarking meters. oarking revenue control eauipment and sian uogrades. City of Clearwater, FL Ordinance 8016-08 Schedule I-A 11 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY2008/09 MISCELLANEOUS ENGINEERING This section includes miscellaneous engineering type of proiects that are related to the Engineerina function. The smaller proiects are typically either funded with General Fund revenue or Lease Purchase dollars if the proiect is equipment or yehicles. Proiects in this section could also include maior construction proiects that don't easily fit in another categorv. Le.. the replacement of the Memorial Causeway Bridge. when active. was included in this section. The larger construction proiects have been funded with Penny for Pinellas proceeds. Proiects in this section support the "Clearwater Provides the Infrastructure to Support all its Attributes" element of the City Council's Vision and the following related priority: .:. Well Maintained Infrastructure Proiect Fundina 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 Total 92822 Miscellaneous Engineerina General Fd 35.000 35.000 35.000 35.000 35.000 35.000 210.000 ~ Variable Message Boards Gas Tax 80.000 80.000 Total Miscellaneous Enaineerina 115.000 35.000 35.000 35.000 35.000 35.000 290.000 92822 Miscellaneous Engineering Establishes a proiect to provide funding for miscellaneous contractual services related to new road construction, public transit facilities, storm drainage. rights-of way. sidewalks. drainage structures, signal installation, or landscapina including unplanned requests by other departments. 92838 Variable Message Boards This proiect provides funding for the replacement of four (4\ variable message boards that are utilized by Traffic Operations for the control of traffic during special events and road detours. City of Clearwater, FL Ordinance 8016-08 Schedule I-A 12 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY2008/09 PARKS DEVELOPMENT The Parks Development section includes the largest amount of quality of life projects in the Capital Improvement Program. Proiects in this section include all the proiects that support the Parks & Recreation function. excluding land acauisition. Many of these proiects are maintenance proiects that provide the necessary funding to maintain our parks. and our park facilities. in good condition. These maintenance proiects are typically funded with General Fund revenue. Equipment and vehicle proiects in this section would be funded with Lease Purchase dollars. The maior construction of new Parks & Recreation facilities or maior renovation of existing Parks & Recreation facilities have been funded with Penny for Pinellas proceeds. grants. donations and impact fees such as recreation facility. recreation land and open space. Also. included in this section is a proiect for the maintenance of the Harborview Center. This proiect is funded with Harborview Fund revenue. Proiects in this section support the "Clearwater is a Wonderful Place to Live" element of the City Council's Vision and the following related priorities: .:. A Safe Clean Green Environment .:. Safe Comfortable Walkable Neighborhoods Proiects in this section also support the "Clearwater is a Wonderful Place to Play" element of the City Council's Vision and the following related priority: .:. A Variety of Cultural and Recreation Offerings Proiects in this section also support the "Clearwater Provides the Infrastructure to Support all its Attributes" element of the City Council's Vision and the followina related priorities: .:. Well Maintained Infrastructure .:. Efficient Responsive City Services Proiects in this section also support the "Clearwater Includes Special Places that Belong to Everyone in the Community" element of the City Council's Vision and the following related priority: .:. A Vibrant Downtown that's Mindful of its Heritage 93204 Concrete Sidewalk & Pad Reoairs & Reolacement General Fd 55.000 55.000 55.000 60.000 60.000 60.000 345.000 93205 Bright House Networks Field Infrastructure Reoairs/ Imar General Fd 50.000 50.000 50.000 50.000 50.000 50.000 300.000 93213 Park Amenitv Purchase. Reoair & Reolacement General Fd 75.000 75.000 75.000 80.000 80.000 80.000 465.000 210.000 210.000 210.000 175.000 225.000 225.000 1.305.000 City of Clearwater, FL Ordinance 8016-08 Schedule I-A 13 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY2008/09 continued on next page City of Clearwater, FL Ordinance 8016-08 Schedule I-A 14 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY2008/09 PARKS DEVELOPMENT (continued) Plavground & Fitness Eauip General Fd 150.000 150.000 150.000 175.000 175.000 175.000 975.000 Purchase & Replacement 93247 Fitness Eauip Replacement General Fd 25.000 25.000 25.000 30.000 30.000 30.000 165.000 93262 Fencina Replacement prog General Fd 125.000 125.000 125,000 130.000 130.000 130,000 765.000 93271 Swimmina Pool R&R General Fd 60.000 80.000 80.000 80.000 100.000 100.000 500.000 93272 Recreation Trails Pennv 360.000 360.000 FRDAP Grant 200.000 200.000 State Grant 160.000 160.000 93277 Harborview Infrastructure Harborview 100.000 100.000 100.000 100.000 100.000 100.000 600.000 Reooirs & Imorovements 93278 Lona Center Infrastructure General Fd 50.000 60,000 60.000 60.000 60.000 70.000 360.000 Reooirs 93286 Parkina Loti Bicvcle Path General Fd 50.000 50.000 50.000 60.000 60.000 60.000 330.000 Resurfacina & Imorvmnts 93602 Soecial Events Eauip SP Event Rev 30.000 30.000 30.000 30.000 30.000 30.000 180.000 Reooirs & Replcmt 93604 Boardwalks & Docks General Fund 75,000 75.000 75.000 100.000 100.000 100,000 525.000 Reooir & Replacmt City of Clearwater, FL Ordinance 8016-08 Schedule I-A 15 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY2008/09 continued on next page City of Clearwater, FL Ordinance 8016-08 Schedule I-A 16 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY200S/09 PARKS DEVELOPMENT (continued) 93611 Multi Terrain Loader LP-Gen Fd 58,(0) 58,(0) 93612 McMullen Tennis Corrolex (new soft courts) Gen Fd Ret Emg FRDAP Grant 200,(0) 200.(0) 200,(0) 200,(0) 936xx Lona Center Miracle Reid Pinellas Ctv Lona Crr Found aWl for Youth FRDAP Grmt 250,(0) 50,(0) 10.(0) 200.(0) 250,(0) 50,(0) 10.(0) 200,(0) 936xx Joe DiMaggio Soorts Corrolex Renovations Pinellas Cly Outside kJenO{ Donations 2,(0),00) 500,(0) 2,(0).00) 500,(0) Total Paks Develooment 2,110,500 4,167,500 957.500 1.045.000 1.065.000 1.075.000 10.420.500 93203 Carpenter Field Infrastructure Repairs and Improvements This proiect provides for the phased repairs and improvements needed at the Carpenter Field Complex, including fence replacement. field renovations, building repairs, parking lot restructuring. entryway improvements. etc. This proiect will allow for the Carpenter Complex to continue to be maintained in a maior league professional manner. Comprehensive Plan Obiective: (28.1.5.2l A repair. remodeling, renovation or replacement of obsolete or worn out facilities that contribute to achieving or maintaining standards for levels of service. 93204 Concrete Sidewalk. Pad Repairs and Replacement This proiect provides for the removal and replacement of damaged concrete sidewalks. curbs. and pads and courts in various parks around the City as well as provides for new sidewalks for safety and accessibility reasons. Comprehensive Plan Obiective: (24.1) Improve the public's access to parks and recreation sites. 93205 Community Sports Complex Infrastructure Repairs and Improvements This proiect provides for the phased repairs and improvements needed at the Community Sports Complex according to the Joint Proiect Agreement (JPA) between the City of Clearwater and the Phillies. This proiect will allow for the Community Sports Complex to be maintained in a manner to meet current maior league professional standards. Comprehensive Plan Obiective: (28.1.5.2) A repair. remodelina. renovation or replacement of obsolete or worn out facilities that contribute to achieving or maintaining standards for levels of service. City of Clearwater, FL Ordinance 8016-08 Schedule I-A 17 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY2008/09 PARKS DEVELOPMENT (continued) 93213 Park Amenity Purchase. Repair and Reolacement This proiect oroyides for the ourchase. reoair and reolacement of such items as park identification signs. rules signs. Dark benches. trash receptacles. water fountains. grills. basketball goals. soccer and football goals. bleacher systems. and the like. at various Parks & Recreation facilities and sites. Comorehensive Plan Obiective: (24.1) Improve the oublic's access to Darks and recreation sites. 93229 Tennis and Basketball Court Resurfacina This proiect provides for the scheduled resurfacing of tennis and basketball courts to orevent deterioration. Tennis courts tentatively scheduled to be resurfaced in FY 2008/09 include Bay Park Coachman Ridge and Forest Run Parks. Comprehensive Plan Obiective: (24.1) Imorove the oublic's access to Darks and recreation sites. 93230 Playground and Fitness Eauioment Purchase and Reolacement This oroiect orovides replacement of olayground eauioment and the purchase of new equipment at the City's 32 playgrounds. Included in this oroiect is the appropriate safety resilient surfacing. Playgrounds tentatively scheduled to be reolaced in FY 2008/09 include Cherrv Harris Park and Morningside Playground. This oroiect also includes phased replacement of fitness court eauipment. Equipment tentatively scheduled for reolacement includes Norton Recreation Center. As equipment is added and/or replaced. it is evaluated to assure it meets ADA reauirements. Comorehensive Plan Obiective: (24.1) Improve the public's access to Darks and recreation sites. 93247 Fitness Eauipment Replacement This proiect orovides for the ohased replacement of old. worn out and over used fitness equipment at the City's fiye (51 fitness centers. Proiects for FY 2008/09 may include, but not be limited to, equipment at the North Greenwood Recreation Complex, Clearwater Beach Recreation Center, and Countrvside Recreation Center. ' Comorehensive Plan Obiective: (28.1.5.2) A repair, remodeling, renovation or reolacement of obsolete or worn out facilities that contribute to achieving or maintaining standards of levels of service. 93262 Fencing Replacement Program This oroiect includes ohased reolacement of old. worn out and rusted fencing at the various recreation sites. The largest amount of fencina to be replaced on an annual basis exists at the fifty (50) ball fields. which includes backstops and duaout fencing. Fencing is replaced as needs arise. and replacements com Diy with all current code requirements. 93271 Swimming Pool Renovations and Reoairs This proiect will provide for the renovation and enhancement of the various oools in the City, for facility imorovements. leisure 0001 enhancements such as slides, activity pools and long-term maintenance such as marciting and repair of gutters, tile and decking. FY 2007/08 and 2008/09 funding are needed to orovide marciting and deck replacement at Morningside 0001. Comorehensive Plan Obiective: (28.1.5.2) A reoair. remodeling, renovation or reolacement of obsolete or worn out facilities that contribute to achieving or maintaining standards for levels of service. 93272 Recreation Trails This oroiect provides for the construction of recreation trails throughout the city for walkina, iogging, inline skating and bicycling. May include but not limited to' oroiects such as Memorial Causeway, Turner Street. and Ream Wilson Clearwater Trail. Penny funding for FY 2008/09 is needed to orovide partial funding for a portion of the Landmark Drive Trail and improyements at Lake Chautauqua Nature Preserve. Comorehensive Plan Obiective: (24.3) To correct deficiencies in the suoolY of core system parkland and facilities (24.3.81. New or exoanded facilities that reduce or eliminate deficiencies in levels of service for existing demand. City of Clearwater, FL Ordinance 8016-08 Schedule I-A 18 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY2008/09 PARKS DEVELOPMENT (continued) 93277 Harborview Infrastructure Reoairs and Improvements This proiect provides for the phased repair and reolacement of caoital items at the Harborview Center. In order to keeo this facilitv as a qualitv and successful Convention facility. a orogram of caoital improvement repairs and replacements will need to occur each year (Le. reolacement of caroeting. air conditioner replacements. eauioment reolacement. oainting. reoair roof leaks. etc.). Proiects for FY 2008/09 may include roof and air conditions repairs. as well as reolacement of caroeting and other flooring material. Comprehensive Plan Obiective: 128.1.5.2) A repair. remodeling. renovation or reolacement of obsolete or worn out facilities that contribute to achieving or maintaining standards for levels of service. 93278 Long Center Infrastructure Reoairs This proiect will provide for the reolacement and repairs of various capital items at the Long Center. This caoital oroiect reolaces the annual sinking fund included in the oast Lona Center agreement with the City. Some of the infrastructure items that will need to be repaired or replaced include furnishings. eauioment. pool. parking lot. driveway. ballfield. etc. Comprehensive Plan Obiective: (28.1.5.2) A reoair. remodeling. renovation or reolacement of obsolete or worn out facilities that contribute to achieving or maintaining standards for levels of service. 93286 Parking Lot/Bicycle Path Resurfacing/Improvements This oroiect includes regularlY resurfacing of parking lots and bicycle paths to orevent deterioration and may include minor improvements to those parking lots and bicycle oaths beina resurfaced. Comorehensive Plan Obiective: Improve the oublic's access to oarks and recreation sites. 93602 Soecial Events Equipment Repairs & Reolacement This is a maintenance proiect for the soecial events division of the Parks and Recreation Deoartment similar to other ongoing maintenance proiects. This oroiect provides for the ourchase. repair and replacement of such items as sound equipment. chairs. tables, tents. etc. used by the Soecial Events Division for special events. grand openings, dedications. celebrations, etc. The equioment used by this Division wears out from heavy use and a orogram is needed to reolace this equioment Comorehensive Plan Obiective: (28.1.5.2) A reoair. remodeling. renovation or replacement of obsolete or worn out facilities that contribute to achieving or maintaining standards for levels of service. 93604 Boardwalks & Docks Reoair & Replacement This oroiect provides funding for the reoair and/or replacement of boardwalks. docks and viewing olatforms in various oarks and beach access ooints. There are over 49.000 sauare feet of wooden boardwalks. docks and viewing platforms throughout the City. including such parks as Moccasin Lake. Crest Lake and Ed Wright and areas such as Turner Street Dock. Maanolia Street Dock and wooden access boardwalks to Sand Key and Clearwater Beach. The maiority of these are over 20 years old and will need reolacement within the next few vears. Reolacement with recycled oroducts will occur wherever oossible to extend the life of the reolacements. Comorehensive Plan Obiective: (28.1.5.2) A reoair, remodelina. renovation or reolacement of obsolete or worn out facilities that contribute to achieving or maintainina standards for levels of service. 93610 Bulldozer This oroiect orovides fundina for the ourchase of a D6N-CA T Bulldozer. This eauioment will primarilY be used to maintain the sand on Clearwater Beach. This eauipment will allow staff to re-grade the beach to keeo the sand at normal baseline elevation. imorove beach conditions to help minimize sand displacement onto sidewalks and roadways and also be used for storm c1eanuo activities. This eauioment can also be used by Public Services. City of Clearwater, FL Ordinance 8016-08 Schedule I-A 19 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY200S/09 PARKS DEVELOPMENT (continued) 93611 Multi Terrain Loader This proiect provides fundina for the purchase of a multi terrain loader. This equipment will primarilv be used to maintain the sand on Clearwater Beach. However, it will also be used to assist with excavation and grading of various park properties, athletic facilities and parking areas. This smaller piece of eauipment will allow sand to be removed from behind the sand walls and in the tight spaces alona the beach by design proiect and will allow for the larger eauipment on the beach to grade and keep sand at baseline elevation, thus limitina future sand build up. 93612 McMullen Tennis Complex (new soft courts) This proiect provides funding for the construction of four new lighted clay courts and tennis amenities at McMullen Tennis Complex. The additional courts will accommodate the need for additional clay courts and also allow maior tennis tournaments to be held in Clearwater. Any additional operating costs will be offset by additional revenue. Comprehensive Plan Obiective: (24.1) Improve the public's access to parks and recreation sites. (24.3) To correct deficiencies in the supplY of core system parkland and facilities (24.3.8). New or expanded facilities that reduce or eliminate deficiencies in levels of service for existing demand. (28.1.5.3) New or expanded facilities that reduce or eliminate deficiencies in levels of service for existing demand. 936xx Long Center Miracle Field This proiect will provide for the construction of a miracle field with amenities at the Long Center. which can be used by children and adults with physical and mental challenges. The miracle field will be constructed with a svnthetic surface so that children and adults in wheelchairs. walkers and other devices can play baseball and softball. which they cannot currently do in North Pinellas County. Additional amenities will include an increase of over 85 parking spaces, lighting, dugouts. bleachers, water fountains, landscaping and other misc. park improvements. The City plans to partner with Pinellas County, the Long Center Foundation. Clearwater for Youth and the State of Florida to name a few. Comprehensive Plan Obiective: (28.1 .5.3) New or expanded facilities that reduce or eliminate deficiencies in levels of service for existing demand. 936xx Joe DiMaggio Sports Complex Renovations This proiect provides for the renovation and improvements of the Joe DiMaggio Sports Complex by constructing seven (7) new soccer fields and one (1) maior league baseball field. In addition, there will be restrooms. concession building. press box, improved parking to accommodate the need for overflow parking for Bright House Networks Field and other park amenities. The City is hoping to partner with the County. State and Federal Government. as well as, local co-sponsor groups to fund this proiect. which would also include any additional operating expenses associated with construction. Phase I of the proiect in FY 2009/10 includes the construction of four {41 new fields, liahtina for the existing field to the south and installation of a new restroom/concession building. Comprehensive Plan Obiective: {28.1.5.21 A repair, remodelina. renovation or replacement of obsolete or worn out facilities that contribute to achieving or maintaining standards of levels of service. City of Clearwater, FL Ordinance 8016-08 Schedule I-A 20 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY200S/09 PARKS DEVELOPMENT (continued) Proiect FTE's 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 93610 Bulldozer 121 161 0.0 45.340 45.340 45.340 45.340 45.340 93611 Multi Terrain Loader 121 161 0.0 12.830 12.830 12.830 12.830 12.830 Total Parks DeveloDment 0.0 58.170 58.170 58.170 58.170 58.170 Q 121 Oaeratina costs are for debt service to be funded bv the General Fund. 161 Oaeratina costs are for Fleet Maintenance. City of Clearwater, FL Ordinance 8016-08 Schedule I-A 21 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY2008/09 MARINE FACILITIES The Marine Facilities section includes oroiects that suooort the Marine ooerations. Most of the proiects in this section are maintenance oroiects. which are funded on an annual basis to keeo the related infrastructure in good condition. Proiect fundina sources for the maintenance proiects are based on the ooeration the oroiect suooorts, Le., Beach Guard operations are funded by the General Fund, Marina ooerations are funded by the Marina & Aviation Fund and Pier 60 and Sailing Center operations are funded by the General Fund. Any construction or maior renovation of facilities are tyoically funded the same way or with Penny for Pine lias proceeds or Soecial Development Fund revenue. Proiects in this section suooort the "Clearwater is a Wonderful Place to Learn" element of the City Council's Vision. Proiects in this section also support the "Clearwater is a Wonderful Place to Play" element of the City Council's Vision and the following related oriority: .:. A Variety of Cultural and Recreational Offerings Proiects in this section also suooort the "Clearwater Provides the Infrastructure to Suooort all its Attributes" element of the City Council's Vision and the following related priorities: .:. Well Maintained Infrastructure .:. Efficient Transoortation Systems Proiects in this section also supoort the "Clearwater includes Special Places that Belong to Everyone in the Community" of the City Council's Vision and the followina related oriorities: .:. A Quality Beach Environment .:. A Vibrant Downtown that's Mindful of its Heritage City of Clearwater, FL Ordinance 8016-08 Schedule I-A 22 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY200S/09 General Fd 10.000 10.000 5.000 5.000 5.000 5.000 40.000 Marine 140.000 200.000 200.000 200.000 200.000 200.000 1 .140.000 Marine 10.000 10.000 10.000 10.000 10.000 10.000 60.000 Marine 25.000 25.000 25.000 25.000 25.000 25.000 150.000 Marine 20.000 20.000 20.000 20.000 20.000 20.000 120.000 Marine 85.000 85.000 85.000 85.000 85.000 85.000 510.000 General Fd 100.000 100.000 100.000 100.000 100.000 100.000 600.000 General Fd 15.000 15.000 15.000 15.000 15.000 15.000 90.000 405.000 465.000 460.000 460.000 460.000 460.000 2.710.000 MARINE FACILITIES (continued) 93403 Beach Guard Facility Maintenance This proiect provides funding for the replacement. as well as. the continuous maintenance of the Beach Guard towers and structures. Continuing in 2008/09. two (2) towers will be replaced. 93409 Marina Renovations This proiect orovides fundina for the oossible future develooment of a new Marina building and slio renovations at the current Clearwater Municioal Marina building site. More specific details will be available in the future as the oroiect is defined. 93413 utilities Service Reolacement The proiect provides for continuous repair and/or replacement of deteriorated electrical wiring. and water service at the City's Municioal Marina and Island Estates Marina to continue to maintain the City-owned marinas in usable conditions. 93429 Dock R&R The proiect provides for continuous repair and/or reolacement of deteriorated docks at municioal docking facilities and island Estates Marina. utilizing the Marine Services section and equipment to continue to maintain the City-owned marinas in usable conditions. 93490 Fuel System R&R City of Clearwater, FL Ordinance 8016-08 Schedule I-A 23 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY2008/09 The oroiect provides for continuous repair and/or reolacement of deteriorated fuel lines. disoenser and underground oollutant storage tanks at the municipal marina. utilizina contractors to continue to maintain City-owned marina fuel system in usable conditions. 93496 Marine Facility Dredgina and Maintenance This oroiect is a combination of the former "Waterway Maintenance" and "Seminole Ramo Dredging" proiects. This proiect will orovide fundina for any facility that the Marine and Ayiation Deoartment is resoonsible for that reauires maintenance and/or dredging. This includes such things as reolacement of City-owned aids for navigation and informational signs: removal of derelict yessels. etc.: procurement of piling and sign material to fabricate signage and buoys utilizina Marine Services staff: procurement of equioment to continue to maintain. waterways in a usable condition: reoairs/reolacement of floating docks. ramos and oilinas. This oroiect will also fund dredgina of areas that the Marine and Aviation Deoartment is responsible for to allow for continued safe and usable condition at City-owned docks. 93497 Docks and Seawalls This is a continuous maintenance program to keep the City's several thousand feet of seawalls at street ends and docks. other than at Marina facilities. in aood repair. 93499 Pier 60/Sailina Center Maintenance This oroiect oroyides fundina for the continuous repair and/or reolacement of electrical services. water service. fire orotection equioment and structural components of the Pier and Sailing Center. City of Clearwater, FL Ordinance 8016-08 Schedule I-A 24 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY2008/09 AIRPARK FACILITIES The Airpark Facilities section includes proiects that support the Airpark operations. These proiect range from maintenance proiects to the maior renovation of facilities. These proiects are tvpically funded with Marine & Aviation Fund revenue or grant revenue from the Florida Department of Transportation. Proiects in this section support the "Clearwater is a Wonderful Place to Learn" element of the City Council's Vision. Proiects in this section also support the "Clearwater is a Wonderful Place to Play" element of the City Council's Vision and the followina related priority: .:. A Variety of Cultural and Recreation Offerings Proiects in this section also support the "Clearwater Provides the Infrastructure to Support all its Attributes" element of the City Council's Vision and the following related priorities: .:. Well Maintained Infrastructure .:. Efficient Transportation Systems Aviation 10.000 10.000 10.000 10.000 10.000 10.000 60.000 10.000 10.000 10.000 10.000 10.000 10.000 60.000 94817 Airpark Maintenance and Repair This proiect will provide funding for maintenance and repairs at the Clearwater Airpark. City of Clearwater, FL Ordinance 8016-08 Schedule I-A 25 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY2008/09 LIBRARIES The Libraries section includes proiects that support the Library operation. The purchase of library materials as well as computer software proiects. are typicallv funded with Library Cooperative funding or General Fund revenue. Eauipment purchases would be lease purchased and maior construction or renovation of facilities has been funded with Pennv for Pinellas. grants and donations. Proiects in this section support the "Clearwater is a Wonderful Place to Play" element of the Citv Council's Vision and the following related prioritv: .:. A Varietv of Cultural and Recreation Offerinas Proiect Fundina 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 Total 93527 Books and Other Librav tv\aIerials Librav CooP 694.480 715.310 736.770 758.870 781.640 805.090 4.492.160 Total Ubraies 694.480 715.310 736.no 758.870 781.640 805.090 4.492.160 93527 Books and Other Library Materials This proiect is for the acauisition of books. periodicals. audiovisuals. online database subscriptions and other library materials for the Main. East. Countryside. Beach. and North Greenwood Libraries. The Pinellas Public Library Cooperative provides annual funding. some of which will be used in to purchase library materials to serve County residents using City libraries. City of Clearwater, FL Ordinance 8016-08 Schedule I-A 26 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY2008/09 City of Clearwater, FL Ordinance 8016-08 Schedule I-A 27 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY2008/09 GARAGE The Garage section includes oroiects for the replacement of motorized equipment as well as replacement eauipment for the radio system. These proiects are funded either with Garage Fund revenue or through a Lease Purchase contract paid by the Garage Fund. Proiects in this section support the "Clearwater Provides the Infrastructure to Support all its Attributes" element of the City Council's Vision and the following related priorities: .:. Well Maintained Infrastructure .:. Communication 94232 Radio User Eauioment L/P-Gara<;le Fd 50.000 50.000 100.000 Reolacement Proaram 94233 Motorized Eauioment Garaae Fund 65.920 67.900 69.940 72.040 74.200 76.430 426.430 Reolacement-Cash 94234 Motorized Eauioment LIP-Garage Fd 2.699.900 2.780.900 2.864.330 2.950.260 3.038.770 3.129.930 17.464.090 Reolacement-L/P Total Garaae 2.815.820 2.898.800 2.934.270 3.022.300 3.112.970 3.206.360 17.990.520 94232 Radio User Equipment Replacement Program This on-aoina Lease Purchase oroiect will fund a program to phase-in the replacement of the old portable radios. mobile radios, control stations. accessories, radio tower equipment. infrastructure eauipment. and options (such as radio chargers. spare batteries, belt clips, etc.). 94233 Motorized Equipment Replacement-Cash This proiect is for the replacement of motorized vehicles and eauipment to cost less than $25,000 per vendor per transaction. The eauipment is for all City Departments. responsible for all City business. Future years are based on a proiected increase of approximatelY 3% per annum. 94234 Motorized Eauipment Replacement-Lease/Purchase This proiect is for the replacement of motorized vehicles/eauipment estimated to cost $25.000 or more per vendor per transaction. The eauipment is for all City Departments, responsible for all City business. Future years based on a proiected increase of approximately 3% per annum. City of Clearwater, FL Ordinance 8016-08 Schedule I-A 28 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY200S/09 GARAGE (continued) FTE's 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 0.0 11.060 22.120 22.120 22.120 22. 120 11.060 0.0 597.110 1.212.130 1.845.600 2.498.080 3.170.130 3.265.230 608.170 1.234.250 1.867.720 2.520.200 3.192.250 3.276.290 ,e funded by the Garaae Fund. City of Clearwater, FL Ordinance 8016-08 Schedule I-A 29 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY200S/09 MAINTENANCE OF BUILDINGS Proiects in this section provide funding for the maior maintenance of Citv facilities. The funding is provided by the Fund that owns the specific facility that reauires maintenance. The facilities are outlined in the proiect scopes. Proiects in this section support the "Clearwater Provides the Infrastructure to SUPDort all its Attributes" element of the City Council's Vision and the following related priority: .:. Well Maintained Infrastructure City of Clearwater, FL Ordinance 8016-08 Schedule I-A 30 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY200S/09 Proiect Fundina 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 Total 94510 Air Conditioners -City General Fd 100 .000 103.000 106.090 109 .270 112.550 115.930 646.840 Wide Reolacements Garaae 15.000 15.000 15.000 15.000 15.000 15.000 90.000 utility R&R 35.000 35.000 Gas 10 .000 10 .000 Marine 20.000 20.000 Adm SYCS 10 .000 10.000 94512 Roof Reoairs General Fd 10.000 10.000 10.000 10.000 10.000 10 .000 60.000 Gas 5.000 5.000 94514 Roof Reolacements General Fd 100.000 100.000 100.000 100.000 100.000 100.000 600.000 94517 Painting of Facilities General Fd 100.000 100.000 100 .000 100 .000 100.000 100.000 600.000 Utility R & R 39.000 39.000 Stormwater 4.000 4.000 Gas 10.000 30.000 40.000 Garage 30.000 30.000 94519 Floorina for Facilities General Fd 25.000 25.000 25.000 25.000 25.000 25.000 150.000 Utility R&R 25.000 10.130 35.130 Stormwater 3.300 7.800 11. 100 94524 Long Center Maior Penny 700.000 700.000 Infrastructure Imorvmts Gen Fd Ret Erna 2.100.000 2.100.000 93269 Liaht Reolacement & General Fd 75.000 75.000 75.000 80 .000 80.000 80.000 465.000 Reoair Total Maintenance ot Buildinas 2.593.300 1.175.930 474.090 459 .270 467 .550 480.930 5.651.070 City of Clearwater, FL Ordinance 8016-08 Schedule I-A 31 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY2008109 MAINTENANCE OF BUILDINGS (continued) 93269 Light Replacement and Repair This proiect includes the phased re-Iamping, replacement and repair of lighting systems including light fixtures, poles. service panels and wiring at various Parks and Recreation sites. Proiect may include. but not limited to the following locations in FY 2008/09 locations may include: Frank Tack Park. McMullen Tennis. and miscellaneous service replacements, pole replacements and security lighting. 94510 Air Conditioners-City Wide Replacements The proiect provides for the replacement of several air conditioning systems that are in need of replacement due to aae. deterioration. and excess energy usage. For FY 2008/09 facilities may include: East Library. Shuffleboard Club, Countryside Library. Engineering Field Office, and miscellaneous small units. 94512 Roof Repairs The proiect includes roof repair of various City buildings as needed to prevent water damage to interiors of buildings. For FY 2008/09 facilities may include: Countryside Library, Morningside Pool Building, and Ross Norton Pool. 94514 Roof Replacements This proiect includes roof replacements of various City buildings. For FY 2008/09 facilities may include: Municipal Services Buildina and the Police Department. 94517 Painting of Facilities This proiect includes scheduled painting and waterproofing of City facilities. In FY 2008/09 facilities may include: Pier 60 Pavilion. Main Library, Countryside Sports Complex. North Greenwood Aquatics Center, Municipal Services Building (metal work) Sand Key Fire Station. Gas Sales and Graphics. 94519 Flooring of Facilities This proiect includes the scheduled replacement of worn or damaged floorina. In FY 2008/09 facilities may include: Public Services Buildinas "B" and "C". and miscellaneous small replacements. 94524 Long Center Maior Infrastructure Improvements This proiect provides funding for maior building improvements to the Lona Center facility. This could include air conditioning replacement, roof replacement. painting. maior electrical repairs; as well as, repairs to the fire sprinkler systems, replacement of pool Iiahts and elevator repairs. The additional funding in FY 09 will provide for the installation of a new energy savings eauipment including air conditionina. Iightina and new exhaust and dehumidifier system in the pool area that will pay for itself over the next 20 years and yield a proiect savings of more than $130,000 over the life of the proiect. City of Clearwater, FL Ordinance 8016-08 Schedule I-A 32 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY200S/09 MISCELLANEOUS The Miscellaneous section includes proiects that do not fit into another category. The maiority of the proiects in this section are technology proiects that are either managed by the Information Technology Department or funded by the Administrative Services Fund. Other proiects in this section include two environmental proiects funded by the General Fund and one vehicle funded by the Customer Service Department. Proiects in this section support the "Clearwater Provides the Infrastructure to Support all its Attributes" element of the City Council's Vision and the following related priority: .:. Well Maintained Infrastructure Project Funding 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 Total 94736 Geographic Information Sys Adm Svcs 25,000 25,000 25,000 25,000 25,000 25,000 150,000 94761 Pollutant Storage Tk Rem/ Replacement-Gen Fund General Fund 20,000 20,000 20,000 20,000 20,000 20,000 120,000 94856 Accela Permitting & Code Enforcement Upgrade Adm Svcs 25,000 25,000 25,000 25,000 50,000 50,000 200,000 94803 Environmntl Assmt & Clean General Fund 50,000 50,000 50,000 50,000 50,000 50,000 300,000 City of Clearwater, FL Ordinance 8016-08 Schedule I-A 33 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY2008/09 MISCELLANEOUS ( continued) Proiect Fundina 2008/09 2009 /1 0 2010/11 2011/12 2012/13 2013/14 Total 94829 CIS Uoarade Adm Svcs 100.000 100.000 100.000 50.000 50.000 50.000 450.000 94839 Roadway & Traffic Gas Tax 300.000 20.000 320.000 Asset Mamt Total Miscellaneous 945.000 615.000 595.000 545.000 595.000 570.000 3.865.000 94736 Geograohic Information System, This oroiect has been established to link location based data from the City's numerous databases in an enterprise geographic information system (GIS), The develooment of a GIS will greatlY increase the accessibility of infrastructure. capital asset. and customer information through an intuitive map-based query application. The system will also enable public and orivate access to mapoed information via the Internet. Funding includes costs for hardware and software as well as data collection and data conversion services. 94761 Pollutant Storage Tank Removal/Reolacement-General Fund This proiect is proposed to keeo the City's oollutant storage tank locations in comoliance with the current Florida Deoartment of Environmental Protection Pollutant Storage Tank Rules. and to reduce the ootential risk of groundwater contamination. Exoenses from this fund include tank maintenance. reoair. reolacement and routine expenses related to tank insurance and compliance. and fees associated with emergencv soill resoonse. 94856 Accela Permitting & Code Enforcement Uograde This oroiect orovides funding to keep the Tidemark System uo to date. ooerating at ootimum condition and to pay for uparades as needed. This oroiect encompasses hardware. software and orofessional services. 94803 Environmental Assessment and Clean-uo This oroiect has been established to orovide funding for the assessment and remediation of contaminated sites owned or acauired by the City. This oroiect is intended to meet the current state reauirements set forth in Chaoters 62-761. 62-770 and 62-777 of the Florida Administrative Code. reauiring the City to meet mandatory taraet clean-uo levels. This requires mandatorv target c1ean-uo levels of sites where contamination could affect a potable water supply or could oose a health or safety risk to the public. This oroaram also reduces the ootential risk of off-site contamination to orivate orooerty and the ootential for third oarty liability claims against the Citv. 94814 Network Infrastructure and Server Renewal and Replacement This oroiect will replace network hardware (switches and routers) and upgrade several enterprise system servers on the City's com outer network. The City's. wide area network incorporates more than eG 55 different access locations throughout Clearwater. Much of the infrastructure equioment is aging and not caoable of handling the increased volumes of data as the City's com outing systems grow. These upgrades will imorove oerformance and efficiency of the network and systems. and enable tiered management of network traffic. The proiect will also fund the purchase of network and bandwidth management software. a new fiber switch and new router blades. Beginning in FY '08. this proiect will fund the maintenance of the Police network and infrastructure maintenance. City of Clearwater, FL Ordinance 8016-08 Schedule I-A 34 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY2008109 MISCELLANEOUS (continued) 94824 IT Disaster Recoverv This oroiect will establish an off-site business ooerations center for mission critical systems necessary to maintain City ooerations (Le.. Finance. Customer Service. Asset Management. GIS. payroll. etc.). The proiect will include the purchase of backup equipment to store data and run systems from a remote location. and establish necessarv connectivity. In FY 2008/09. the oroiect will provide funding to outfit backup data centers at General Services and Fire Station 48. 94827 Telecommunications Uogrades This oroiect will orovide funding for the upgrade of telecommunications equioment including Nortel switches. handsets and software. The additional funding in FY 2008/09 will provide fund for ACD (automated call distribution) caoabilities. the purchase of new switches and the uograde of the ohone systems at MSB. PD and General Services. 94828 Financial Systems Uogrades This proiect provides funding to keep the financial systems (PeopleSoft. Ross and Risk Manaaement) uo to date. operating at optimum condition and to pay for uoarades as needed. This proiect encomoasses hardware. software and orofessional services. 94829 CIS Upgrades This proiect provides funding for uoarades of the Customer Information System (CIS), This system suoports City utilities. 94839 Roadway & Traffic Asset Manaaement This oroiect orovides funding for the automated asset management (AIM) system. This system will help manaae and maintain the existina and future infrastructure. but will also leverage other developing City technology. When complete. the system will identify the most aooropriate oroiects based on comprehensive information. The system will also provide a workflow for maintenance that can reduce cost by efficiency and oreventative maintenance. ANNUAL OPERATING BUDGET IMPACT Proiect FTE's 2008/09 2009/1 0 2010/11 2011/12 2012/13 2013/14 Network Infrastructure & Server R & R 121 Q.Q 88.700 1 77 .400 266.100 266.100 266.1 00 266.100 IT Disaster Recovery 121 Q.Q 17.740 26.610 35.480 26.610 26.610 17.740 Telecomm Uoorades 121 Q.Q 17.7 40 26.610 35.480 26.610 35 480 35.480 Total Miscellaneous 0.0 124.180 230.620 337.060 319.320 328.190 319.320 121 Ooeratina costs are for debt service to be funded bv the Administrative Services Fund. City of Clearwater, FL Ordinance 8016-08 Schedule I-A 35 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY2008/09 STORMWATER UTILITY This Stormwater Utility section includes oroiects that support the Stormwater Utility operations of the City. All oroiects are included in the Rate Study approved by the City Council in June 2006. Proiects in this section support the "Clearwater Provides the Infrastructure to Support all its Attributes" element of the City Council's Vision and the following related priorities: .:. Well Maintained Infrastructure .:. Efficient Responsive City Services City of Clearwater, FL Ordinance 8016-08 Schedule I-A 36 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY200S/09 Proiect Fundina 2008/09 2009/1 0 2010/11 2011/12 2012/13 2013/14 Total 96124 Storm Pioe Svstem Stormwater 800,000 800,000 Imorovements Future Bond Issue 900,000 900,000 1 ,000,000 1.000.000 1.100.000 4,900.000 96168 Stormwater Svstem Stormwater 500.000 600,000 328,720 700.000 700.000 800 .000 3.628.720 Exoansion Future Bond Issue 271.280 271.280 96169 Stevenson Creek Stormwater 1.060.000 569.990 1.816.510 263.970 1.468.360 353.050 5.531.880 Future Bond Issue 1.610.010 1 ,983.490 3,206.030 1.131.640 2,146.950 10.078.120 96170 Coastal Basins Stormwater 921.680 570,000 450.000 263.970 305.720 2,511 ,370 Proiects FY '09 Bond 678.320 678.320 Future Bond Issue 2.630.000 1.550,000 2.211.030 1.094.280 1.600.000 9,085,310 961 xx TV Truck & Camera L/P-Strmwtr 300.000 300.000 961 xx Vaccon Sewer L/P-Strmwtr 300.000 300.000 Cleaner 961xx Alliaator Creek Stormwater 450.000 263.970 305.720 1.019.690 Watershed Proiects Future Bond Issue 2,830,000 2.711.030 1.694.280 2.100.000 9,335.310 Total stormwater 3.960.000 7.180.000 10.880.000 10.620.000 7.700.000 8.100.000 48.440.000 96124 Storm Pioe Svstem Imorovements This oroiect provides for reoair and restoration of stormwater svstem comoonents and for technical evaluation of storm water oroblems. A significant portion of this proiect will be lining or replacement of existina deteriorating oipe. Comorehensive Plan Obiective: ( 19.6) Continue to provide sound fiscal management of the stormwater management systems to include maintenance. ooeration and construction in accordance with the watershed management olans and concurrent with its imolementation. City of Clearwater, FL Ordinance 8016-08 Schedule I-A 37 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY2008/09 STORMWATER UTILITY (continued) 96168 Stormwater System Exoansion (replaces Storm System Expansion) This oroiect orovides for reduction of structure. street and orooerty flooding or imorovements to water auality through property acauisition and/or expansion of the existing stormwater system. Property acquisition may be exercised where it is determined that flooding may be alleviated or area for water auality treatment is provided. Comprehensive Plan Obiectives: (19.3) Lower high water profiles during starm events. as necessary. to reduce house flooding occurrences and to lessen the resulting adverse effects on public health, the natural environment. public and private property. (19.4) Continue the imolementation of the most cost effective and efficient plan to reduce the occurrence of street flooding where safety issues and traffic problems exist as orioritized and set forth in the Caoitallmprovement Element. and listed in the stormwater management plans. 96169 Stevenson Creek Watershed Proiects (replaces Stevenson Creek Implementation Proiects) This oroiect orovides for the implementation of water quantity and quality proiects within the Stevenson Creek watershed. including those identified in the Stevenson Creek Watershed Management Plan, to abate structure and street floodina, improve water quality, add, upgrade or restore Stormwater infrastructure and complY with mandated operation. maintenance and reoorting requirements. FY 2008/09 will include Sorina Branch and Turner Street box culverts. Comprehensive Plan Obiective: (19.2) The City of Clearwater shall continue to develoo watershed manaaement olans which should seek to identify, evaluate and imolement the most cost effective and cost efficient orograms for Stormwater management. including Stormwater auantity and auality. These olam should also address any oroiects included in the Pinellas county Stormwater Management Plan (SWMP) for the implementation of all Stormwater manaaement. as well as recommended funding sources. 96170 Coastal Basin Proiects (reolaces Coastal Basins Improvements) This proiect provides for the implementation of water auantity and quality oroiects within the City's coastal basins to abate structure and street flooding, imorove water quality. add. uograde or restore Stormwater infrastructure and comoly with mandated operation. maintenance and reporting reauirements. FY 2008/09 will include Trooic Hills outfall improvements. Comprehensive Plan Obiectives: (19.31 Lower high water profiles during storm events. as necessary, to reduce house floodina occurrences and to lessen the resulting adverse effects on oublic health, the natural environment. oublic and orivate orooerty. [19.5) Protect and enhance the auantity of receiving waters by the use of "Best Management Practices" in accordance with the adopted watershed management olans. 961 xx TV Truck & Camera This oroiect orovides funding for an additional TV truck with a camera. The eauioment will record data and monitor the City's 120-mile stormwater drainage svstem and facilitate the identification of old and deterioratina oioe. Comorehensive Plan Obiective: ( 19.6) Continue to orovide sound fiscal management of the stormwater management systems to include maintenance, operation and construction in accordance with the watershed management plans and concurrent with its imolementation. 961 xx V accon Sewer Cleaner This oroiect orovides funding for an additional Vaccon Sewer Cleaner to accommodate the reauired increase maintenance of new pollution control boxes in the downtown and beach areas. Comprehensive Plan Obiective: (19.6) Continue to orovide sound fiscal management of the stormwater management systems to include maintenance. operation and construction in accordance with the watershed management plans and concurrent with its imolementation. City of Clearwater, FL Ordinance 8016-08 Schedule I-A 38 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY200S/09 STORMWATER UTILITY (continued) 961xx Alligator Creek Watershed Proiects (replaces Alligator Creek Implementation Projects-Phase II) This proiect provides for the implementation of water quantity and quality proiects within the Alligator Creek watershed. Including those identified in the Alligator Creek Watershed Management Plan, to abate structure and street flooding, improve water quality, add, upgrade or restore Stormwater infrastructure and comply with mandated operation. maintenance and reporting requirements. Comprehensive Plan Obiective: (19.2) The City of Clearwater shall continue to develop watershed management plans which should seek to identify, evaluate and implement the most cost effective and cost efficient programs for Stormwater management. including stormwater auantity and quality. These plans should also address any proiects included in the Pinellas County Stormwater Management Plan (SWMP) for the implementation of all stormwater management. as well as recommended funding sources. ANNUAL OPERATING BUDGET IMPACT Proiect FTE's 2008/09 2009/1 0 2010/11 2011/12 2012/13 2013/14 TV Truck & Camera 121 131. 161 lQ 118.650 121.190 123.850 126.580 Vaccon Sewer Cleaner 121 161 0.0 94.370 95.690 97.080 98.540 100.020 Total Stormwater Utilitv 1.0 94.370 214,340 218.270 222.390 226,600 121 Ooeratina costs ore for debf service to be funded by the Stormwater Utility Fund. 131 Ooeratina costs ore for oersonal services. 161 Ooeratina costs ore for Fieet Maintenance. City of Clearwater, FL Ordinance 8016-08 Schedule I-A 39 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY2008/09 GAS SYSTEM The Gas System section includes oroiects that support the Gas System operation for the City. The maioritv of these proiects are maintenance oroiects to maintain the system. Also. included in this section are also several proiects for the continued expansion of the system. All proiects are funded by the Gas Fund. Proiects in this section support the "Clearwater Provides the Infrastructure to Support all its Attributes" element of the City Council's Vision and the following related priorities: .:. Well Maintained Infrastructur.e .:. Efficient Responsiye City Services Proiect Fundina 2008/09 2009 /1 0 2010/11 2011 /12 2012/13 2013/14 Total 96358 Environmental Remediation ~ 150.000 150.000 150.000 150.000 150.000 750.000 96365 Line Relocation Pinellas-Maint QQ.s. 250.000 250.000 250.000 250.000 250.000 1.250.000 96367 Gas Meter Change Out-Pinellas Gas 210.000 210.000 210.000 210.000 210.000 210.000 1.260.000 96374 Line Relocation Pine lias-CaD Gas 300.000 300.000 300.000 300.000 300.000 1.500.000 96376 Line Relocation Pasco-Maint Gas 100.000 100.000 100.000 100.000 100.000 100.000 600.000 96377 Pine lias New Mains & Svc Lines Gas 200.000 1.200.000 1.200.000 1.300.000 1.300.000 1.300.000 6.500.000 96378 Pasco New Mains & Svc Lines Gas 300.000 3.200.000 3.500.000 3.300.000 3.300.000 3.300.000 16.900.000 96379 Gas Meter Chanae Out-Pasco ~ 210.000 210.000 210.000 210.000 210.000 210.000 1.260.000 96381 Line Relocation Pasco-Coo Gas 300.000 300 .000 300.000 900.000 96384 Building Renovation Gas 125.000 125.000 125.000 125.000 125.000 125.000 750.000 96385 Gas Main Extensions General Fd 200.000 200.000 200.000 200.000 200.000 1.000.000 Total Gas System 1.645.000 5.945.000 6.245.000 6.145.000 6.445.000 6.245.000 32.670.000 City of Clearwater, FL Ordinance 8016-08 Schedule I-A 40 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY2008/09 GAS SYSTEM (continued) 96358 Environmental Remediation This project will orovide funding for cleaning uo the old aas olant site as may be required by the Florida Department of Environmental Protection. The site is located between Jones Street on the south. Maole Street on the north. Myrtle Avenue on the east. and Railroad Avenue on the west. The Florida Deoartment of Environmental Protection will be providing us. at some future date. their reauirements for the remediation on the oroperty. Other enyironmentallocations reauiring remediation will also be funded from this oroiect. as the reauirement is determined. Funding for this will be recovered through the Environmental Imoosition Adiustment clause in the Gas System rates. Comprehensive Plan Obiective: To proYide a safe and efficiently gas system that meets State and Federal regulations. 96365 Line Relocation Pinellas - Maintenance This is a continuina oroiect to fund the remoyal of abandoned aas lines as required by the State Deoartment of Transportation. Comprehensive Plan Obiective: To orovide a safe and efficient c;:1as system that meets State and Federal regulations. 96367 Gas Meter Change Out - Pinellas To orovide funding for continually maintaining accurate gas meters in Pinellas County to maximize gas revenues. Comorehensive Plan Obiective: To provide a safe and efficient gas system that meets State and Federal regulations. 96374 Line Relocation Pinellas - Caoitalized This is a continuina oroiect to relocate gas mains for road construction and uogrades to the mains. This portion of the oroiect involves work that adds to the value of the gas system and is therefore capitalized. Comorehensive Plan Obiective: To provide a safe and efficient gas system that meets State and Federal regulations. 96376 Line Relocation Pasco - Maintenance This is a continuing proiect to fund the removal of abandoned aas lines as reauired bY the State Department of Transoortation. Comprehensive Plan Obiective: To orovide a safe and efficient gas system that meets State and Federal regulations. 96377 Pine lias New Mains and Service Lines This oroiect will provide for extension of gas mains and services as well as new mains and services within Pinellas County. It will fund related activities such as caoital reolacement of obsolete cast iron and galvanized mains. Iiauid prooane service. Comorehensive Plan Obiective: To orovide a safe and efficient gas system that meets State and Federal regulations. 96378 Pasco New Mains and Service Lines This oroiect will orovide for extension of gas mains and services as well as new mains and services within Pasco County. It will fund related activities such as caoital replacement of obsolete cast iron and galvanized mains. liauid oropane service. Comprehensive Plan Obiective: To provide a safe and efficient aas system that meets State and Federal reaulations. 96379 Gas Meter Chanae Out - Pasco To provide funding for continually maintaining accurate gas meters to maximize aas revenues. Fundina of this proiect will come from available aas system revenues. Comorehensive Plan Obiective: To orovide a safe and efficient gas system that meets State and Federal regulations. City of Clearwater, FL Ordinance 8016-08 Schedule I-A 41 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY200S/09 GAS SYSTEM (continued) 96381 Line Relocation Pasco - Caoitalized This is a continuing oroiect to relocate gas main for road construction and uogrades to the mains. This portion of the proiect involves work that adds to the value of the Gas System and is therefore caoitalized. Fundina for this proiect will come from available gas system revenues. Comorehensive Plan Obiective: To provide a safe and efficient aas system that meets State and Federal regulations. 96384 Building Renovation This proiect orovides funding to purchase orooerty in Pasco County as well as to renovate the building at Myrtle Avenue to include the Sales Office and Showroom. This capital oroiect will save the rental costs of the current Sales office. Ooerating costs will be reduced by rental exoense: all other operating costs will be offset from one location to the other. Funding for this proiect will come from ayailable gas system revenues. 96385 Gas Main Extensions This proiect provides funding for the extension of natural gas mains in existing residential communities within the City of Clearwater. These extensions are funded by the General Fund and do not meet feasibility under the Gas System seven-year paYback formula. Comprehensive Plan Obiective: To orovide a safe and efficient gas system that meets State and Federal reaulations. City of Clearwater, FL Ordinance 8016-08 Schedule I-A 42 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY2008/09 SOLID WASTE The Solid Waste section includes proiects that support the Solid Waste operations of the City. Included in this section are proiects for facility maintenance and maior repairs. vehicle and container replacements. as well as the implementation of a commercial weight based system. All proiects are funded by either Solid Waste revenue or throuah Lease Purchase contracts paid by the Solid Waste Fund. Proiects in this section support the "Clearwater is a Wonderful Place to Live" element of the City Council's Vision and the following related priorities: .:. A Safe Clean Green Environment .:. Safe Comfortable Walkable Neighborhoods Proiects in this section also support the "Clearwater Provides the Infrastructure to Support All its Attributes" element of the City Council's Vision and the following related priorities: .:. Well Maintained Infrastructure .:. Efficient Responsive City Services Proiect Fundina 2008/09 2009 /1 0 2010/11 2011 /12 2012/13 2013/14 TOTAL 96426 Facilitv R&R Solid Waste 55.000 55,000 100,000 105,000 315,000 96442 Vehicle Replacements LIP-Sol Wst 160.000 170.000 180.000 190.000 190.000 190,000 1 ,080,000 96443 Residential Container Solid Waste 110.000 110.000 110.000 110,000 141.000 150.000 731.000 Acauistion 96444 Comm Container Acauistion Solid Waste 240,000 240,000 250,000 250.000 282,000 290.000 1 ,552,000 964xx Comm Weiaht Based Mgmt Svs LIP-Sol Wst 150,000 150,000 Total Solid Waste 510,000 670.000 595,000 605.000 713.000 735.000 3.828.000 96426 Facility R&R This proiect provides for the repair or modification of site and land improvements. buildings, machinerv and eauipment at the two (2) Solid Waste facilities. Maior emphasis on maintenance and extending useful lives of fixed assets is reauired to ensure minimum downtime. The Transfer Station requires replacement of necessarv components to maintain and upgrade the original equipment installed in 1971. The current available balance in the proiect will provide funding for this proiect for the next several Years. Comprehensive Plan Obiective: (18.3) Continue to. provide sound fiscal management for solid waste collection. disposal and recycling as it develops. 96442 Vehicle Replacements This proiect provides for the replacement of Solid Waste maintenance and operating expense (M&Ol owned vehicles. and other motorized eauipment on an on-going basis. Planned for FY 2008/09 is the replacement of one roll-off vehicle and one front-end loader. City of Clearwater, FL Ordinance 8016-08 Schedule I-A 43 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY2008/09 Comprehensive Plan Obiective: (18.3) Continue to provide sound fiscal management for solid waste collection. disposal and recycling as it develops. City of Clearwater, FL Ordinance 8016-08 Schedule I-A 44 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY200S/09 SOLID WASTE (continued) 96443 Residential Container Acauisition This proiect includes the replacement of approximately 5-10% of the 26.800 automated containers in the field. and the acquisition of new 90-gallon automated containers to meet the anticipated less than 1 % annual growth of residential customers. Experience indicates that 2.700 containers will be reauired annually. at a current cost of approximately $59 each. Also included in this proiect is the cost of replacement parts. when automated containers can be repaired. Comprehensive Plan Obiective: (18.3\ Continue to provide sound fiscal management for solid waste collection. disposal and recyclina as it develops. 96444 Commercial Container Acquisition This is an on-going proiect for the purchase and replacement of roll-off containers. compactors and dumpsters for approximatelY 3.200 commercial accounts. This proiect includes the replacement of containers damaged or deteriorated during their normal useful life of five IS) vears: and the acquisition of additional compactors. roll-ofts and dumpsters to meet system growth. Comprehensive Plan Obiective: (18.3) continue to provide sound fiscal management for solid waste collection. disposal and recYcling as it develops. 964xx Commercial Weiaht Based Manaaement System This proiect provides for the development and implementation of a commercial solid waste system that more eauitably charges the commercial customers for the appropriate cost of disposal. Currently, rates for commercial containers (dumpsters) are based on cubic yard capacity while disposal charges are based on weight. With technology being developed and tested now. commercial customers would be charaed for their disposal cost based on the actual weight of their refuse when implemented in FY 2009/10. Comprehensive Plan Obiective: (18.3) Continue to provide sound fiscal management for solid waste collection, disposal and recYcling as it develops. ANNUAL OPERATING BUDGET IMPACT Proiect FTE's 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 Vehicle Replacements 121 35.390 72. 990 112.800 154.820 196.840 203.470 Comm Weiaht Based Mamt Svs 121 33.170 33.170 33.170 33.170 33.170 Total Solid Waste 0.0 35.390 106.160 145.970 187.990 230.010 236.640 121 Oaeratina costs are for debt service to be funded bv the Solid Waste Fund. City of Clearwater, FL Ordinance 8016-08 Schedule I-A 45 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY200S/09 UTILITIES MISCELLANEOUS The utilities Miscellaneous section includes Utilities proiects that support more than one utilities operation. These proiects ore typically funded by one or more of the utilities operations depending on which operation the proiect supports. The proiects in this section support the "Clearwater Provides the Infrastructure to Support 0/1 its Attributes" element of the City Council's Vision and the following related priority: .:. Well Maintained Infrastructure Proiect Fundina 2008/09 2009 110 2010/11 2011/12 2012/13 2013/14 Total 96516 CitY-Wide Aerial Photoaraohy Water Sewer Stormwater 6.000 6.000 6.000 6.000 6.000 6.000 12.000 12.000 12.000 96523 Public Utilities Adm Utility R&R 26.000 26.000 26.000 26.000 26.000 26.000 156.000 Building R&R Total PWA/Utilities Miscellaneous 26.000 26.000 44.000 26.000 26.000 44.000 192.000 96516 City Wide Aerial PhotographY The Public Works Department maintains 0 100% scale atlas of aerial photographY. which is updated on the desirable schedule of eyery four (4) years. The aerial atlas is widely used by the public and many diyisions of the City for information and planning. The Engineering Division uses the aerials in coniunction with permitting. construction drawings. and as an important source of historical information. The aerial atlas presently in use was flown in December 2007. 96523 Public Utilities Administration Building R&R This proiect provides funding for the building and eauipment upgrades for the Public Utilities Complex to include the Public Utilities Administration Building. Motor Shop. Meter Shop and Supervisors Building. City of Clearwater, FL Ordinance 8016-08 Schedule I-A 46 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY2008/09 SEWER SYSTEM The Sewer System section includes proiects that support the Sewer System operations for the City. All proiects. except the proiects funded with Lease Purchase, are included either in the current Rate Study or a future Rate Study. Proiects in this section support the "Clearwater Provides the Infrastructure to Support all its Attributes" element of the City Council's Vision and the followina related priorities: .:. Well Maintained Infrastructure .:. Efficient Responsiye City Services Project Funding 2008/09 2009/10 2010/11 2011 /12 2012/13 96615 Odor Control Utility R&R 72.520 149,940 96619 WWTP Generator Replacement FY '09 Bond Issue 1,126,400 Future Bond Issue 1,000,000 96630 Sanitary Sewer Extensions Sewer Impact 575,000 500,000 500,000 500,000 500,000 96634 Sanitary Utility Relocation 463,710 750,000 250,000 28,630 221 ,370 Sewer 183,520 Utility R&R 266,680 96645 Laboratory Upqrade and R&R Utility R&R 57,960 59,700 61,000 Sewer 56,270 62,800 96654 Facilities Upqrade & Improvement FY '09 Bond Issue 90,830 Future Bond Issue Sewer 468,830 Utility R&R 995,430 24,070 475,930 622,000 500,000 96664 Water Pollution Control R&R FY '09 Bond Issue 1.159,700 Future Bond Issue 1.176,030 1.113,230 1.912,460 857,310 2013/14 500,000 500,000 64,700 31. 720 645,750 396,280 480,000 Total 222,460 1,126,400 1,000,000 3,075,000 212,150 2,451,760 178,660 183,770 90,830 1.153,720 1,138,650 1,867,640 1,159,700 5,539,030 3,927,230 3,892,220 3,072.870 3,718,890 2,170,110 2,618,450 19,399,770 City of Clearwater, FL Ordinance 8016-08 Schedule I-A continued on next page 47 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY2008/09 SEWER SYSTEM (continued) Project Funding 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 Total 96665 Sanitay Collect & FY 'CJ1 Bond Issue 2.162.00J 2.162.00J Transmission R&R Future Bond Issue 2.868.600 3. 765.00J 5.429.fro 4.271.fro 3.663.700 19.998.900 96666 WWTP East Bypass & FY 'CJ1 Bond Issue 62.00J 62.CXXl NE Pump Future Bond Issue 1.548.400 4O.00J 1.588.400 96670 Pollutant StoraQe Utility R&R 7.880 8.120 8.300 24.300 Tank R&R - WPC Sewer 7.650 8.550 8.810 25.010 96686 Pump Station FY 'CJ1 Bond Issue 1.321.00J 1.321.CXXl Replacement Future Bond Issue 1.110.00J 2,228.00J 2.794.00J 645.00J 1.465.00J 8.242.CXXl 966xx NE WWTP Thermal Future Bond Issue 2, 157.370 2.157.370 Dryers 966xx WWTP UV Disinfect Future Bond Issue 1.823.260 1.823.260 96202 WWTP Screw Pump Utility R&R 846.910 302.950 157.390 255.900 1.563.150 Replacement Total Sewer 8.326.790 9,730,050 9,073,990 12,108,380 7,351,360 11.n6,59O 58,367,160 96615 Odor Control This oroiect orovides funding for the enclosure of channels/tanks to minimize air volumes for treatment. Comprehensive Plan Obiective: (14.2) Accomolish advanced wastewater treatment imorovements at all water pollution control facilities in accordance with FDEP and USEP A reauirements. 96619 WWTP Generator Replacements This proiect provides fundina for the reolacement of the back up generators (two (2) per vear) at the East. Marshall Street and Northeast WWTP's. City of Clearwater, FL Ordinance 8016-08 Schedule I-A 48 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY200S/09 Comprehensive Plan Obiective: (17.2) The City shall continue to produce advanced wastewater treatment (A WT) improvements at all water pollution control facilities in accordance with FDEP and USEP A reauirements. City of Clearwater, FL Ordinance 8016-08 Schedule I-A 49 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY2008/09 SEWER SYSTEM (continued) 96630 Sanitary Sewer Extensions This proiect provides new sanitary sewer service to residents within the City of Clearwater service area. Comprehensive Plan Obiective: (17.1) To maintain adequate levels of service for existing and future populations. 96634 Sanitary Utilitv Relocation The proiect provides funding for the relocation of sanitary sewer infrastructure to accommodate roadwav improvements bv Florida DOT. Pinellas County. and the City of Clearwater. Proiects include: US 19 (Whitnev to Seville). US 19 (Sunset Point to Countryside Blvd), US 19 (Seville to SR 60), Sunset Point Road (US 19A to Keene), McMullen Booth at Drew Street. Nurserv Road (Belcher to US 19). Belleair Road at Keene Road. Progress Energv Trail. Pine lias Trail, Druid Trail, SR 60/Memorial Causeway (east of Island Wav to Ft. Harrison), Beach Walk, Osceola Streetscape and Pine lias County railroad crossing improvements at Hercules Avenue and Belleair Road. Comprehensive Plan Obiective: (17.1) To maintain adeauate levels of service for existing and future populations. 96645 Laboratory Upgrade and R&R The proiect provides for the repair, replacement and upgrade of the existing laboratory instrumentation to meet state and federal testing requirements for wastewater. bio-solids. reclaimed water. and environmental monitoring. stormwater treatment and potable water. Comprehensive Plan Obiective: (17.1) To maintain adequate levels of service for existing and future populations. 96654 Facilities Upgrade and Improvement The proiect orovides funding for future improvements and upgrades at the City's three (3) AWT plants and bio-solids facilitv. Comprehensive Plan Obiective: (17.2) The Citv shall continue to produce advanced wastewater treatment (A WT) improvements at all water pollution control facilities in accordance with FDEP and USEP A reauirements. 96664 Water Pollution Control R&R The proiect provides for the design. repair. rehabilitation, and replacement of Water Pollution Control Plant and bio-solids facilitv items such as sludge chains. pumps, motors. associated plumbing. instruments, and minor facility repair to retum or maintain the Water Pollution Control facilities to or at designed capability. Comprehensive Plan Obiective: (17.1) To maintain adequate levels of service for existing and future populations. 96665 Sanitary Collect and Transmission R&R The proiect provides general system wide condition insoections. rehabilitation and new appurtenances. Comprehensive Plan Obiective: (17.1 ) To maintain adequate levels of service for existing and future populations. 96666 WWTP East Bvpass and Northeast Pump This proiect provides funding for modifications for East WWTP Anoxic Tank Bvpass System for FY 2009/10. and RAS Pump Station improvements and upgrading of the second anoxic flow solit at Northeast in FY 2013/14. Comprehensive Plan Obiective: (17.2) The City shall continue to oroduce advanced wastewater treatment (A WT) improvements at all water pollution control facilities in accordance with FDEP and USEP A reauirements. 96670 Pollutant Storage Tank R&R - WPC This proiect orovides for the systematic replacement of below ground tanks and maintenance of new above ground tanks at all pollution control plants. Comprehensive Plan Obiective: (17.1) To maintain adeauate levels of service for existing and future populations. City of Clearwater, FL Ordinance 8016-08 Schedule I-A 50 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY2008/09 SEWER SYSTEM (continued) 96686 Pump Station Replacement This proiect provides funding to inspect. rehabilitate or replace existing pump stations systems. their related force mains and telemetry systems to adhere to current industry and regulatory requirements. Comprehensive Plan Obiective: (17.21 The City shall continue to produce advanced wastewater treatment (A WT) improvements at all water pollution control facilities in accordance with FDEP and USEP A requirements. 966xx NE WWTP Thermal Dryers This proiect provides for the installation of bio-solids dryers for the disposal of dried bio-solids to meet FDEP and EP A class A regulations. Comprehensive Plan Obiectiye: (17.21 The City shall continue to produce advanced wastewater treatment (A WTI improvements at all water pollution control facilities in accordance with FDEP and USEP A reauirements. 966xx WWTP UV Disinfection This proiect provides funding for the installation of UV disinfection systems at all three (3) plants. including lamp systems and electrical modifications. Comprehensive Plan Obiective: [17.2) The City shall continue to produce advanced wastewater treatment (AWT) improvements at all water pollution control facilities in accordance with FDEP and USEPA requirements. 96202 WWTP Screw Pump Replacements This proiect provides funding for modifications and improvements to the existing Archimedes Screw Pump facilities at the Northeast WWTP for 2008/09. followed by improvements at the Marshall Street WWTP in FY 2009/10 and the East WWTP in FY 2011/12 and FY 2012/13. Work includes adding submersible pump capabilities to the internal recycle process at all three plants. Comprehensive Plan Obiective: (17.2) The City shall continue to produce advanced wastewater treatment [AWTI improvements at all water pollution control facilities in accordance with FDEP and USEPA reauirements. City of Clearwater, FL Ordinance 8016-08 Schedule I-A 51 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY2008109 WATER SYSTEM The Water System section includes proiects that support the Water System operations for the City. All proiects. except the proiects funded with Lease Purchase, are included either in the current Rate Study or a future Rate Study. Proiects in this section support the "Clearwater Provides the Infrastructure to Support all its Attributes" element of the City Council's Vision and the following related priorities: .:. Well Maintained Infrastructure .:. Efficient Responsive City Services 96721 System R&R -Maint 25,000 25,000 25,000 75,000 75,000 utility R&R Water 25,000 25,000 25,000 96739 Reclaimed Water Distribution System FY '09 Bond Issue 863,400 Sewer Revenue 3,847,100 Future Bond Issue 2,921,470 985,670 1.649,150 863,400 4,832,770 81.020 3,189,390 6,000,000 13,841.030 Utility R & R 368,980 1.160,610 1,529,590 96740 Water Supply & Treatment Utility R&R 300,000 300,000 325,000 325,750 376,530 378,820 2,006,100 96741 System R&R - Capitalized Utility R&R 250,000 850,000 239,300 250,000 250,000 850,000 2,689,300 96742 Line Relocation - Capitalized Utility R&R 550,000 234,340 165,660 954,570 1,145,430 250,000 250,000 1,000,000 3,238,910 1.311.090 Future Bond Issue 96743 Meter/Backflow Repl /Change Out Utility R&R 650,000 650,000 650,000 650,000 650,000 650,000 3,900,000 96744 System Expansion Water Impact Water 250,000 ----150,000 250,000 250,000 119,210 130,790 81.910 168,090 1.201.120 298,880 6,735,500 5,396,470 6,224,120 2,200,750 6,151.530 9,153,820 35,862,190 continued on next oaae City of Clearwater, FL Ordinance 8016-08 Schedule I-A 52 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY2008/09 WATER SYSTEM (continued) Proiect Fundina 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 Total 96752 Water Service Lines FY '09 Bond Issue 500.000 500.000 Future Bond Issue 500.000 500.000 500.000 500.000 500.000 2.500.000 96757 Water Pick-uo Trucks LIP-Water 33.780 34.770 68.550 96758 Fluoride in Water SYS Future Bond Issue 1.307 .590 1.307.590 96760 Elevated Water Tks FY '09 Bond Issue 250.000 250.000 96764 Reverse Osmosis FY '09 Bond Issue 4.562.600 4.562.600 Exoansion - Res # 1 Future Bond Issue 2.236.250 4.987.000 7.223.250 96767 Reverse Osmosis FY '09 Bond Issue 2.552.300 2.552.300 @ Reservoir #2 Future Bond Issue 1 .516.830 1.117.230 15.178.160 7.852.040 25.664.260 Water Revenue 3.571.770 3.571.770 96768 Rebate-WeILLake. Water 50.000 50.000 50.000 150.000 Pond lria Abd Utility R&R 50.000 50.000 50.000 150.000 96770 HYdra Stoo System LIP-Water 36.000 36.000 967xx RO Pick-uo Trucks LIP-Water 40.000 40.000 Total water System 14.720.180 9.699.550 12.913.120 17.928.910 18.125.340 11.051.410 84.438.510 Total Sewer 8.326.790 9.730.050 9.073.990 12.108.380 7 .351.360 11.776.590 58.367.160 96721 System R&R - Maintenance This is an on-going program relating to maintenance. repair or replacement of water mains. service lines. valves. fire hydrants. miscellaneous eauipment. and damaged facilities. Work involves maintenance. repair and replacement of facilities that do not involve uparading. Comprehensive Plan Obiective: (21.3) Continue to maintain the water system in a safe. sound and efficient manner on a daily basis. City of Clearwater, FL Ordinance 8016-08 Schedule I-A 53 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY2008/09 WATER SYSTEM (continued) 96739 Reclaimed Water Distribution System This oroiect oroyides for the continued expansion of the City's Reclaimed Water System based on the Reclaimed Water Master Plan. Comorehensive Plan Obiective: (21.2) To orovide adeauate quantities and aualities of water services to all customers in the Clearwater service area; for the City's water system to be comoatible with the environment; and also seek to conserve and orotect sensitive natural resources. 96740 Water Suooly and Treatment This oroiect provides funding for maintenance. replacement. and uoarade of suoplY facilities. Comorehensive Plan Obiective: (21.2) To provide adeauate quantities and aualities of water services to all customers in the Clearwater service area; for the City's water system to be compatible with the environment: and also seek to conserve and orotect sensitive natural resources. 96741 System R&R - Capitalized This oroiect involves the repair and replacement of water mains. service lines. valves. fire hydrants. and facilities equipment. etc. that are upgraded during the repair/replacement orocess. Funding for caoitalized labor. equioment and material for in-house work is included. Comprehensive Plan Obiective: (21.3) Continue to maintain the water system in a safe. sound and efficient manner on a daily basis. 96742 Line Relocation - Caoitalized This is an on-going oroiect to relocate water mains and related facilities conflicting with public works proiects of various govemmental entities and which are upgraded during relocation. Funding for caoitalized labor. eauioment and material for in-house work is included. Planned work includes US 19 (Sunset to Countrvside). US 19 (Whitney to Seville), US 19 (Seville to SR 60). US 19 @ SR 60 Sunset Point (Alt US 19A to Keene). McMullen Booth at Drew Street. Nursery Road (Belcher to US 19\. Belleair Road at Keene Road. Proaress Energy Trail. Pine lias Trail. Druid Trail. SR 60/Memorial Causeway (east of Island Way to Ft. Harrison). Beach Walk. Osceola Streetscaoe and Pinellas County railroad crossing improvements at Hercules Avenue and Belleair Road. Comprehensive Plan Obiective: (18.4) To orovide sound fiscal management for the operation and maintenance for ootable water service in the City's service area. 96743 Meter/Backflow Replacement/Change Out This is an on-aoing oroject to reoair/reolace water meters. backflow prevention devices. and accessories to assure accurate flow measurement. maximum revenues. and orooer ooeration. Comprehensive Plan Obiective: 121.3) Continue to maintain the water system in a safe. sound and efficient manner on a daily basis. 96744 System Expansion This oroiect orovides funding and caoitalizes Water Division labor. eauioment and material exoenses relating to additions to Clearwater's distribution system. including new meters. backflow prevention devices. main extensions. etc. Location of work areas is determined by customer demand. Comorehensive Plan Obiective: (21.1) To maintain adeauate levels of service for existing and future pooulations. 96752 Water Service Lines This oroiect is to upgrade the City's existing galyanized water service lines that are in poor condition. Comprehensive Plan Obiective (21.1) To maintain adeauate levels of service for existina and future pooulations. 96757 Water Pick uo Trucks This oroiect orovides funding for the ourchase of two (2) additional 1-ton pick uo trucks. The vehicles will be used to perform required annual inspections of the Reclaimed Water System as contained in the Reclaimed Water Master Plan in years 2006-2012. City of Clearwater, FL Ordinance 8016-08 Schedule I-A 54 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY2008/09 WATER SYSTEM (continued) 96758 Fluoride in Water System This proiect provides funding for the City of Clearwater treatment ad distribution system to be modified to include fluoride iniection at each of the City's reservoirs. Comprehensive Plan Obiective: (21.3) Continue to maintain the water system in a safe. sound and efficient manner on a daily basis. 96760 Elevated Water Tanks Upgrade This project provides funding for the renovation and related distribution system work for water and fire protection concerns and the removal of the Del Oro tank in 2009. Comprehensive Plan Obiective: (21.3) Continue to maintain the water system in a safe. sound and efficient manner on a daily basis. 96764 Reverse Osmosis Plant Expansion - Reservoir # 1 This proiect provides funding for the expansion of the City's existing RO Plant potentially adding one (1) MGD in water production. This includes wells. raw water piping and plant eauipment. Comprehensive Plan Obiective: (21.2) To provide adequate quantities and aualities of water services to all customers in the Clearwater service area. 96767 Reverse Osmosis Plant at Reservoir #2 This proiect provides funding for brackish wells. raw water pipelines. 3.5 MGD brackish RO Plan with brine disposal to iniection well. Additional operating costs for this project will not begin until 2014. Comprehensive Plan Objective: (21.2) To provide adeauate auantities and aualities of water services to all customers in the Clearwater service area. 96768 Rebate-Well. Lake. Pond Irrigation Abandonment This proiect provides funding for the Well. Lake. Pond Irrigation Abandonment proaram that was approved by the City Council May 3. 2007. This program provides a homeowner a rebate if they are willing to properly abandon a private well. lake or pond irrigation system. when establishing reclaimed water service at their residence. Comprehensive Plan Objective: (21.2) To provide adeauate auantities and aualities of water services to all customers in the Clearwater service area: for the City's water system to be compatible with the environment: and also seek to conserve and protect sensitive natural resources. 96770 Hydra Stop System This device is used to install a valve without shutting down a water main. This system would eliminate many of the boil water notices we post. the completelY shutting down a water main for tie-ins or cut & caps. and hirina a contractor to make taps. 967xx RO Plant Pick-up Trucks This proiect provides fundina for two (2) additional 1/2 ton pick-up trucks to be used by the additional personnel to investigate plant arms (operational and chemical) at other Water Treatment Plants and to collect water samples as needed. City of Clearwater, FL Ordinance 8016-08 Schedule I-A 55 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY2008/09 WATER SYSTEM (continued) ANNUAL OPERATING BUDGET IMPACT Proiect FTE's 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 Reclaimed Water Distribution 2.0 56.900 59.500 62.800 66.100 69.500 73.100 System 131 141 ISl Water Pick UP Trucks 121. 161 0.0 9.370 9.270 9.270 18.760 18.760 9.490 Elevated Water Tanks Uparade Ill. 141 0.0 35.280 37.040 38.890 40.840 42.880 45.020 Reverse Osmosis Plant Expansion - Reservoir # 1 111. 141. ISl 0.0 498.400 523.820 550.520 Reverse Osmosis Plant @ 8.0 2.299.870 Reservior #2 III 131 141 ISI RO Pick-up Trucks 121 161 0.0 12.690 Hydra Stop System 121 0.0 7.960 7.960 7.960 7.960 7.960 Total Water System 10.0 109.510 113.770 118.920 632.060 662.920 2.990.690 III Ooeratina costs are for maintenance. 121 Oceratina costs are for debt service to be funded bv the Water & Sewer Fund. 13\ Ooeratina costs are for oerson 01 services 141 Oceratina costs are for utilities. 161 Oceratina costs are for Fleet Maintenance. ISI Oceratina costs are for chemcials and/or other oceratina succlies. City of Clearwater, FL Ordinance 8016-08 Schedule I-A 56 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY2008/09 RECYCLING The Recvcling section includes proiects that support the Recycling operations of the Citv. Included in this section are proiects for the replacement of eauipment and containers as well as the promotion of recvcling participation. All proiects are funded bv either Recycling Fund revenue or through Lease Purchase contracts with the debt paid by the Recvcling Fund. Proiects in this section support the "Clearwater is a Wonderful Place to Live" element of the Citv Council's Vision and the following related oriorities: .:. A Safe Clean Green Environment .:. Safe Comfortable Walkable Neighborhoods Proiect Fundina 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 Total 96804 Recvclina Container Recvclina 49.000 50.000 99.000 Acauistion 96805 Recvclina Expansion R&R Recvclina 47.000 50.000 97.000 & Participation Pro9rams 96806 Recvclina Eauioment L/P-Recvclin9 160.000 220.000 290.000 290.000 290.000 300 .000 1.550.000 Reolacement Total Recyclina 160.000 220.000 290.000 290.000 386.000 400.000 1.746.000 96804 Recycling Container Acquisition This proiect provides for the purchase and replacement of recvcling bins, carts/containers and dumpsters for the City's three Recvcling Programs - Residential. Multi-Familv and Commercial. The current available balance in the proiect will orovide funding for this proiect through FY 2011 /12. Then new funding will once again be required. Comprehensive Plan Obiective: (18.3) Continue to provide sound fiscal management for solid waste collection. disposal and recvclina as it develops. 96805 Recvcling Expansion. R&R and Participation Programs This oroiect oromotes participation in recvclina and sustains processing and marketina as well as, the orofitabilitv of the three recvcling orograms. State Grant funds that assisted in establishing this proiect are no longer available. In FY 2008/09, funding will provide for the placement of dividers/partitions at the Processing Center: in FY 2009/10, funding will provide for shelter maintenance and in FY 2010/11. funding will provide for partial resurfacing of the orocessihg floor in the Processing Center. In FY 2011 /12, funding will provide for the final resurfacing of the processing center floor. The current available balance in the oroiect will provide funding for this proiect through FY 2011/12. In FY 2012/13, funding for the replacement of the magnetic separator conveyor and security system addition will be provided. In FY 2013/14, funding will orovide for replacement of the surveillance svstem and modification or replacement of the Global Positioning Svstem (GPS). Comprehensive Plan Obiective: (18.3) Continue to provide sound fiscal management for solid waste collection, disposal and recyclina as it develops. City of Clearwater, FL Ordinance 8016-08 Schedule I-A 57 CAPITAL IMPROVEMENTS ELEMENT SCHEDULE I-A CAPITAL IMPROVEMENT PROGRAM FY2008/09 RECYCLING (continued) 96806 Recycling Eauipment Replacement This oroiect provides a reserve for the replacement of M & 0 automotive equipment for all three recycling programs, on an on-going basis. Planned for FY 2008/09. replacement of the 2000 exoress van and 2001 Sterling Roll-off Truck. The current available balance in the proiect will fund proiects. Comorehensive Plan Obiective (18.31 Continue to provide sound fiscal management for solid waste collection. disposal and recycling as it develops. ANNUAL OPERATING BUDGET IMPACT Proiect FTE's 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 RecvclinQ Equipment Replacement /21 35.390 84.050 148.190 212.330 276.470 307.430 Total Recyclina 0.0 35.390 84.050 148.190 212.330 276.470 307.430 /21 Ooeratina costs are tor debt service to be funded bv the Recvclina Fund. City of Clearwater, FL Ordinance 8016-08 Schedule I-A 58