Loading...
04-28-2003 AGENDA COMMUNITY REDEVELOPMENT AGENCY 04/28/03 AGENDA COMMUNITY REDEVELOPMENT AGENCY MEETING April 28, 2003 1. Call to Order 2. Approval of Minutes: 03/03/03 3. Conceptually approve Capital Improvement Projects (CIP) for Downtown Clearwater 4. Authorize Agreement with Bellomo-Herbert and Co., Inc. to prepare Wayfinding and Signage construction documents in the amount of $27,380. for installation of directional and informational signs throughout the Community Redevelopment Area. 5. Executive Director (Assistant City Manager) Verbal Reports 6. Other Business 7. Adjoum Community Redevelopment 2003-0428 1 04/28/03 Community Redevelopment Agency Agenda Cover Memorandum Worksession Item #: Final Agenda Item # Cr<A "2> Meeting Date: 04-28.03 sUBJECT/RECOMMENDA liON: CONCEPTUALLY APPROVE Capital Improvement Projects for Downtown Clearwater o and that the appropriate officials be authorized to execute same, SUMMARY: As sections of the Downtown Plan have been developed, city staff has been presenting them to the Community Redevelopment Agency (CRA) for review and discussion. To date, the CRA has reviewed major concepts to guide the plan update, character districts and development potential, streetscape improvements and plans for Coachman Park. The Capital Improvement Plan (CIP) is the last key component to be submitted for review prior to finalizing the draft Downtown Plan. The attached CIP addresses streetscape and road improvements, public uses, utilities, and parks. Existing and potential funding sources have been identified and a description of each proposed project is included. Upon CRA agreement of the CIP items, funding sources and priorities, the CIP will become part of the Implementation ~tion of the Downtown Plan, which will be presented for approval on August 21,2003. Reviewed by: ~ Info Srvc Public Works DCM/ACM ,t'7i;t,r- Other I ~ Originating Depl: Planning Costs Department Gina L. Clayton Total User Depl: Current FY Funding Source: CI OP Legal Budget Purchasing Risk Mgmt Attachments: CIP and Project Descriptions . Other Submitted by: ""D _Y' ~ City Manager ~ .y. - Printed on recycled paper o None A ro rlation Code: Capital Improvement Proiects (CIP) The Clearwater Downtown Plan i nc1udes a variety 0 f significant Capital Improvement Projects, short- to long-tcnn in nature, addressing streetscape, road improvements, public uses, utilities and parks. Redevelopment Pro.iects/CI P Project Name FY Location Existing/Potential Cost Funding Source Wayfinding Sign 200312004 S.R. 60 & Highland CDBG*, TIF**, S750,OOO Package intersection directing General Fund traffic to Downtown; Court & Chestnut at their intersections with Missouri, Myrtlc, Osceola & Ft. Harrison; Drew at its intersection with Missouri, Ft. Harrison, Osceola & Myrtle Fort Harrison 2003/2004 The entire length of FDOT*** S8.6M Avenue/All. 19 Ft. Harrison within Resurfacin~ Clearwater Intersection 2003/2004 Based on traffic study Gas Tax and SlM Improvements after bridge opens Transportation Impact Fees Myrtle A venue 2004 Myrtle between North Stonnwater Utility S12M Reconstruction Ft. Harrison & Lakeview (including stormwater outfall from Town Lake to Clearwater Harbor) Station Square 2004/2005 The north side of Private and TlF $IM Park Cleveland between Redevelopment East Ave. & Garden Clearwater Beach 2004/2005 Turner to Oak to Pine lias County. $1.2M Connector Spur beach (2,000 feet Penny for Pinellas. (includes (Pincllas Trail) within Downtown) CMAQ**** entire project) GuJfto Bay and 2004/2005 GuJfto Bay & FDOT (for paving $l.5M Highland A venue Highland Intersection onJy), TIF and Gateway CDBG. Penny for Intersection Pinellas Improvement - I - Project Name FY Location Existing/Poten tial Cost Fundinl! Source Fort Harrison 2004/2005 Drew to Private, Pinellas S3.7M A venue Court/Chestnut County, Grants and Streetscape TIF Glen Oaks Park 2004/2005 Immediately south of Stomnvater Utility, $4.3M Stomnvater the Downtown area at SWFWMD Retention Facility the intersection of Court & Betty Lane Memorial 2004 - Chestnut to the east FOOT Grant and $500,000 Causeway Bridge 2006 end of the Memorial Special Landscaping Causeway Bridge Development Fund Cleveland Street 2004 - Between Osceola and Penny for Pinellas, $3.7M Streetscape 2006 Myrtle TIF and Private Cleveland Street 2005 Between Fredrica & FOOT $870,000 and Gulf to Bay Highland Repaving Cleveland Street 2005 Between Island Way FOOT $960,000 & Memorial & Ft. Harrison Causeway Repaving Main Fire Station 200512006 Originally planned to Penny for Pinellas $4.6M rebuild on existing site. Currently reviewing available property on the S. Ft. Harrison corridor between Court& Lakeview Osceola Avenue 2005 - East side of North Parking fund and $11 - Parking Garage 2007 Osceola between Private 15M (750 - 1,000 Drew & Laura (in the spaces) area of the AM South .- building) Coachman Park 2006/2007 Coachman Park - Park portion: $14.5M Redevelopment expanded to include General Fund and ($7.5M) and 450 the existing park sitc Penny for Pinellas space Garage and the area on the ($7M) south side of Garagc portion: Cleveland Private and Parking S vstcm Downtown 2006/2007 Coachman Park on Revcnue Bond and $SM Marina the north and south Private sidcs of the bridge - 2 - Project Name FY Location Existing/Poten tial Cost Funding Source Pincllas Trail and 2006/2007 East A venue betwecn Grants $3M East A vcnue Drew & Oruid widening New City Hall 2006/2007 Vacant site to the Sale revenue from S 13.5M (building S7.5M, south of the MSB existing site, fumishings $2M, along Pierce between General Fund and land $lM & 200 South Myrtle & East Bonds parking spaces Avenue $3M) Osceola Avenue 2005 - Osceola between Private and Pincllas S3M Strcetscape 2010 Orew & Court County Cleveland Street 2007 - Between Highland & TIF and CDBG S8.6M and Gulf to Bay 2015 Myrtle Strcctscape Commercial 2010+ Per Master TIF. Bond and TBD Streets "A" and Strcetscape Plan Penny for Pinellas lOB" Court/Chestnut 2010+ Per Master TIF. Bond and TBO Beach Corridors Streetscapc Plan Penny for Pinellas Streetscape (from bridge to SR 60 & Highland intersection * ** *** **** Community Oevelopment Block Grant Tax Increment Financing Florida Oepartment of Transportation Congestion Mitigation and Air Quality Improvement ~ Project Descriptions: \Vavfindinl! Si2n Packal!e: In anticipation of the 2004 opening of the Memorial Causeway Bridge, the City is pursuing the preparation of construction drawings and specifications for the Wayfinding Signagc component of the overall downtown Strcetscape package.. It is anticipated that these new directional and infonnationaJ signs would be in place by February 2004. - 3 - Fort Harrison Avenue/Alt. 19 Resurfacin2: An FOOT resurfacing project is currently underway on Fort Harrison Avenue from Drew Street south to the City of Largo and will be complcted by latc 2003. This will be followed by an FDOT Fort Harrison A venue resurfacing project from Orew Strcet north to the City of Dunedin to be completed by mid-2004. At that time the northcrn phasc of the Fort Harrison A vcnue rcsurfacing projl:ct and the Myrtle A vcnue projcct will have been complctcd and thc State Road 595 (Alternatc U.S. 19) designation will bc rcassigned from Fort Harrison A vcnuc to Missouri A venue, Court Street and Myrtle Avenue. Concurrently, thc wcstem tcrminus of thc S.R. 590 designation on Drew Street will move from Fort Harrison Avcnuc east to Myrtlc Avenuc. Intersection Improvements: Various improvcments to downtown intcrscctions, primarily signal timing modifications and/or turn lanes arc proposed. Thc location of the actual intcrscctions will be dctcnnined following a traffic analyscs to be conducted subscquent to the opening of the new Memorial Causeway Sridgc and transference of thc State Road 595 (Altcrnate U.S. 19) designation from Fort Harrison Avcnue to Missouri Avenue, Court Street and Myrtle A vcnue. Mvrtle Avenue Reconstruction: Thc City is finalizing plans to reconstruct and resurface Myrtle A vcnue throughout the downtown arca. Construction is scheduled to be complete in mid-2004 at which time the State Road 5 95 (Altemate U.S. 1 9) designation will be r eassigncd from Fort Harrison A venuc to Missouri A vcnuc, Court Strcct and Myrtle A venuc. In addition, thc western tenl1inus of thc S.R. 590 designation on Drew Strcct will move from Fort Harrison Avcnue cast to Myrtlc Avenue. Station Square Park Redevelopment: As part of the Cleveland Street strcctscape and wayfinding signage improvcments, it is thc intcntion of the City to encourage thc redevelopment of this important downtown urban spacc. It may be possible to initiate this projcct concurrent with the proposed rcdevelopmcnt of the Station Square parking lot as part of a significant, mixed land use project. Clearwater Beach Connector Spur (Pinellas Trail): The Clearwater Beach Connector Spur will provide a multi-use trail facility connecting Clearwater Beach, Downtown and the Pinellas Trail. Approximately 2,000 feet of the Connector Spur is located within the downtown area between the intersection of Tumer Street and East Avenue (part of the proposed Pincllas Trail and East Avenue Widening project) and the new Mcmorial Causeway Bridge (presently under construction). - 4 - Gulf to Bav and Hh!hland Avenue Gateway Intersection Improvement: Oncc the Memorial Causeway Bridge is open in 2004, a substantial portion of existing traffic utilizing Cleveland S trcct will move 0 nto Court S trcet r csulting is a significant reduction in traffic downtown. This reduction may rcsult in certain negative impacts on downtown businesses. In addition, future traffic might mistakenly utilizc Cleveland Street, which will terminatc at Osceola Avenue, as a route to the beach. Therefore, the City, acknowledging the levcl of importance of this "Gateway" interscction, wiII implement this portion of the downtown streetscape indicating the correct routes to eithcr the Downtown or Beach to motorists. Fort Harrison Avenue Streetscape: As a major "Gateway" thoroughfare within our Downtown, the City intends to implcmcnt this portion of thc downtown strcetscape as soon as possible. To that cnd, the City will initiatc the preparation of construction drawings, specifications, and partial construction of this scgmcnt in 2003/2004. Glen Oaks Park Stormwater Detention Facilitv: Locatcd immediatcly south of thc Downtown arca at the intcrsection of Court Strcct and Betty Lane, the Glen Oaks Park Stomlwater Detention Facility is a 20-acre flood control and water quality project which will remove 78 residenccs from the 100-year floodplain. Approximately one half 0 f these residenccs are located within the downtown area. In addition, IOO-year flood levels will bc reduced on streets within this arca. The project will also include amcnities including two multi-purpose ball ficlds, restrooms, playground, walking trails and associated parking. Memorial Causeway Bridee (landscapine) The City and FOOT are constructing the new Memorial Causeway Bridge to rcplace the cxisting drawbridge at the foot of Cleveland Strcet. Thc new bridgc will tie into the Court! Chestnut Strect corridor. There will be no access to the bridge from Clcveland Strect or Drew Street. The bridge is schedulcd to opcn to traffic in Oecembcr 2003 with dcmolition of thc cxisting bridge to follow. In early 2004, whcn construction is completc on the new Memorial Causeway Bridge, the State Road 60 designation will be reassigned from Cleveland Strcet to Court and Chestnut strcets. Extcnsive landscaping will be locatcd along Court Street up to the waterfront and will continuc on the west end of thc bridge along the causeway to thc beach. Thc landscaping will be coordinated with cxisting landscaping already in placc along the sides of and within islands on Court Strect and cxisting landscaping part of the beach roundabout. Cle\'eland Street Streetscape: As the primary "Main Street" within our Downtown, the City intends to implement the construction of the downtown streetscapc for Cleveland Street from Myrtle to Osccola Avenues as soon as possible. To that end, the City will be initiating the prcparation of construction drawings, specifications, and thc partial construction of this segment in 2003/2004. - 5 - Cleveland Street and Gulf to Bav Repaving: FOOT is currently preparing plans to resurface Cleveland Street between Frederica Avenue and Highland Avenue. The construction date is in Fiscal Year (FY) 2005. Cleveland Street and Memorial Causewav Rel>avinl!: FDOT is currently preparing plans to resurface Cleveland Strcet between Fort Harrison Avcnue and its western tenninus. Main Fire Station: Funded by Penny for Pinellas, this projcct encompasses the rcnovation and modernization of thc main fire station locatcd downtown. Thc improved and cxpanded facility will mcet current standards and better providc for the nceds of a diverse population. In addition, a review of possible alternate locations farther to the south is being considered in order to provide a consistent standard of coverage for the entirc Clearwater community. Funding for the project will be partially reimbursed by Pinellas County since these resources will also serve the unincorporated areas of the Clearwatcr Fire Oistrict. Osceola Avenue Parkinl! Garal!e (750 - 1.000 spaces): Oue to the strategic location of this primc rcdevelopment sitc (Superblock), a public/private partnership may enable the construction of a major downtown parking garage to service the block's redevelopment potcntial, and the redevclopment activities which might occur on the parcels lying west of Osceola Avenue. This parking garage will also provide additional parking for the new public library, currently under construction. Coachman Park Redevelopment and Garal!e: As part of the future redevelopment of thc prime downtown parcels lying adjacent to Osceola Avenue, the City is planning to construct a park which will act as a significant downtown waterfront destination. The Coachman Park Amphitheater will be enlarged and relocated on site and Drew Street will terminatc at the water providing for a pedestrian promenade a long t hc waters edge and waterfront restaurant which could be leased to a private operator. A unique interactive fountain would be built as a major focal point. Cleveland Street, west of Osceola Avenue, would be closed and converted into a meandering pedestrian pathway between Oowntown and the water. As part of this project, the City may construct or enter into a public private partnership to construct a garage in the less appealing southern portion of this IS-acre sitc near the start of the new bridge. In addition, the current surface parking would bc removed in favor of a large "great lawn." Downtown Marina: The City has awarded a consulting contract for the purpose of analyzing the regulatory proccss for permitting the future construction of a 150 - 200 slip waterfront marina. The marina would be publicly owned and operated accommodating both power and sail crans with a mix of pennanent and transient slips. A limited number of tourist relatcd fcrries and pleasure crafts would be allowed, howcver, commercial fishing operations would bc prohibited. - 6 - Pinellas Trail and East Avenue widening:: The portion of the Fred E. Marquis Pinellas Trail along East Avenue constitutes the last remaining unimproved se gment 0 f the t rai 1. The p roj eet p rovides for t he a ddi tion 0 fa multi-use trail facility and roadway improvements for approximatcly 0.7 miles within the East Avenuc right-of-way betwccn Orcw and Druid Streets including the replacement of the southbound lane of East Avcnuc and the sidewalk on thc west side of East Avenue with a landscaped, asphalt surface consistent with the Pinellas Trail standards in 2006/2007. Betwcen Tumer and D rcw Strcets thc southbound traffic lanc of East Avcnue and the sidewalk on the west side of East A vcnuc will bc removed. The Pinellas Trail will be reconstructed in thc ccntcr of this area with landscaping on eithcr side. New Citv Hall: Recently thc City Commission has madc thc decision to makc available the City Hall sitc for r cdcvclopment i.l it ism adc part 0 f a I arger site in c onccrt with t he two adjoining propcrties owncd by the Calvary Baptist Church. Making the City Hall site availablc for private devclopment would rcquire a rcferendum. At this time, it is anticipatcd that a new City hall would be largely funded from the proceeds of a futurc sale. In addition, it is expected that City hall might be built on the partially vacant lot lying south ofthe MSB. Osceola A ven ue Streetscar>e: Oue to the array of prime rcdevclopmcnt parcels along Osceola Avenue (Calvary Baptist Church, City Hall, Harborview, and the Superblock), it is expccted that this streetscape segment would be implemented as projects come on line. Cleveland Street and Gulf to Bav Streetscape: This segment of Clcveland Street from Myrtle Avenue east to Gulf to Bay will be improved in futurc years as new developments arc implcmented. Commercial Streets "A" and "8": Thcse constitutc sccondary local strcets, which will be improved subsequcnt to new infill redevclopment projects built adjaccnt to them. Court/Chestnut Beach Corridors Streetsc3pe: With the opening of the Memorial Causeway Bridge, these east-west major arterials will become the primary route to and from thc beaches. It is anticipated that, as new infill projects are develop on the land parccls adjacent to these streets, the City and potential developers of these propcrties would participate in the implcmentation of a new streetscape. - 7 - Capital Improvement Proiects (CIP) The Clearwater Downtown Plan includes a \"ariety of significant Capital Improvcmcnt Projects. short- to long-term in nature. addressing streetscapc. road impro\"cments, public uses, utilities and parks. Redevelonment Pro.iects/CIP Arranged by Type of Proiect Proiect Nnme FY Cost Street Repaying/Resurfacin!! Fort Harrison A\'cnue/Alt. 19 Resurfacing 2003/2004 $8.6M M vrtlc A venue Reconstruction 2004 $ I 2 tv1 Clevcland Strcet and Gulf to Bay Repaving :W05 $870.000 Cleveland Street & Memorial Causeway Repaving 2005 $960.000 Intersection Improvcments 2003/2004 $IM Utilities nnd Infrnstructure Osceola A venue Parking Garage (750 - 1,000 spaces) 2005 - 2007 S II - 15M Pump Station # 16 2003/2004 $698.500 Pump station # 12 2003/2004 $1 86,000 Glcn Oaks Park Stormwater Rctention Facilitv 2004/2005 $4.3M Streets cape Improvcments/Landscapinl! \Vayfinding Sign Package 2003/2004 $750.000 Gulf to Bay and Highland A venue Gateway Interscction Improvemcnt 2004/2005 $1.5M Fort Harrison Avenue Streetscape 2004/2005 $3.7M Memorial Causeway Bridge Landseaping 2004 - 2006 $500.000 Cleveland Street Streetscape 2004 - 2006 $3.7M Osceola A venue Streetscape 2005-2010 $3M Cleveland Street and Gulf to Bay Streetscape 2007-2015 $8.6M Commercial Streets "A" and "B" 2010+ TBD Court/Chestnut Beach CorridorsStreetscape 2010+ TBD Parks and Recreation Facilities Clearwater Beach Connector Spur (Pinellas Trail) 2004/2005 $1.2M (includes entire project) Coachman Park Redevelopment ($7.5M) and 450 space Garage 2006/2007 $14.SM ($7M) Downtown Marina 2006/2007 S5M Station Square Park Redevelopment 2004/2005 SlM Pine lias Trail and East A venue widening 2006/2007 $3M Public Uses . New City Hall (building $7.5M, furnishings $2M, land $lM & 200 2006/2007 $13.SM parking spaces $3 M) Main Fire Station 2005/2006 $4.6M '" "'* "''''II< "''''II<. Community Oevelopment Block Grant Tax Increment financing Florida Oepartment of Transportation Congestion Mitigation and Air Quality Improvement - I -