PERMIT NUMBER C52-6071 GRAVTY SEWER INCLUDNG MANHOLES AND LATERALS FOR SERVICE TO 70 SINGLE FAMILY HOMES
,
I
,
. ~'. e \.tk,
t)tl\Va~~ ~
0, {fl"y
~'
State of Florida
DEPARTMENT OF ENVIRONMENTAL REGULATION
APPROVAL OF INSTALLATION AND USE OF A
P. 11 C t SEWAGE COLLECTION/TRANSMISSION SYSTEM
lne as oun y.
Beckett Lake Estates
Mr. Anthony Shoemaker
City of Clearwater
P.O. Box' 4748
Clearwater, Fla. 33516
FOR AGENCY USE ONLY
Dear Mr. Shoemaker:
Approval No.:
Issued:
Expires:
Treatment
FaCility: City of Clearwater
C52-6071
March 27, 1978.,
August 197tj
East
In reference to your recent application to this department for approval of the il"!stallation of a sewage
collection/transmission system to serve the foUowingprojedt: .
Project Name:
Project Location;
Beckett Lake Estates
Sect 1, T29S, R15E
Project Description; 70 Single Family Homes Population 245, people
No Flow - Dry Line
Approval of construction only has been granted subject to the following conditions:
1. The design, installation and use of the facilities shall be in accordance with: your applica-
tion dated De c emb e r 20. 1977 ; the Water Pollution Control Federation
"Manual of Practice No, 9"; appropriate provisions of Chapters 403 and 471, Florida
Statutes; and the rules and regulations of the Department of Environmental Regulation,
2. The approval is only for INSTALLATION of a wastewater collection/transmission system
and does not relate to any water supply aspects, The engineer of record shall supervise
the construction of the engineering features of the system, At the end of construction,
but prior to use, the "Certification/Approval to Use" statement (found on Page 2) must
be completed and submitted tot his department and a copy forwarded to the local pro-
gram (if applicable) of your county,
3, This approval is based on the understanding that adequate reserve capacity, as stated in
your application and certified by the trreatment plant owner, will be available at the
City of Clearwater East sewerage treatment plant so mat
the wastewaters generated by this project will be collected, treated and disposed of in
compliance with Chapter 403, Florida Statutes and the rules and regulations of this
department,
4, Individual connections that will increase flow to the sewage treatment facility are not in-
eluded in this approval.
DER Form PERM 11-9 (Fab 77) Page 1 of 2
~, r,>( p- ') I 'C'
l /" __) t
5.
Before starting construction of this project, approvals from other federal, state, or local
departments/alncies may be required.
Construction s all commence prior to I
t
6.
7. Where water and sewer mains cross with less than eighteen inches (18") vertical
clearance, the seWer will be twenty feet (20' - 0") of either cast iron pipe or concrete
encased vitrified clay pipe, centered on the point. of crossing.
8. Whe~ a water main parallels a sewer main, a separation ofpt least ten feet (10' '- 0")
shouidbe maintained where practical.
9. The last section of this system sh~ll not be installed with-
out prior approval from the Department of Environmental
Regulation.
CERTIFICATioN/APPBOVAL TO USE
This is to.certify that, with the exception of the deviations noted in the attached letter dated
, the installation of this system has been completed and tested in accordance
with the application and approved plans. The system, if properly maintained and operated, shall comply'
with the W,P.C~F. "Manual of Practice Number 9", ChapterS 471 and 473, Florida StatuteS, and the rules
and regulations of the Departrtlent of Environmental Regulation. The initial three months of operation
shall be under my engineering supervision.
Signature
DER APPROVAL TO use
cc:
Owner of Treatment Plant
Project EngillMf'
local Program
Gary' oM'. Cumbey
TBRPC
'FPSC
Central Files
DER Form PERM 11-9 (F~77) Page 2 of::Z
.c
."
t':__
'!'
~ ~;:~...
;;/~_._.__.:<~
t ;}- do-/~ i[~t!~~n}
c"-,b d - ) 0 /1 \\ ~ --;~ii:/ 1
"rTf, ':.~==:-:":"/
~'--J ~ .,;'" ',~\iIOt
STATE OF FLORIDA ", 'rSQUJ.HVIJ;:"',:I';'" .
DEPARTMENT OF ENVIRONMENTAL REGULAT'ION~;vN~..)t'"
APPLICATION FOR INSTALLATION OF~,_,
SEWAGE COLLECTION/TRANSMISSION SYSTEM
r
n
:.'
I
~'i;'
'f, :',
,:.1, " ,~
"
OEe
?')
nTT
Source Name-. Beckett Lake Estates ( formerly
Sunset Point Road Property)
Source location: StreeL Sunset Point Road
County _
pinellas
Lat:
o
City
long.:
Clerlrwrlter
o
App. Name and Title:
Appl. Address:
Anthony Shoemaker, City Manager
P.O. Box 4748, Clearwater, FL
City of Clearwater
33516
STATEMENTS BY APPLICANT AND l:.1':GINEER
A.
Applicant
I. the owner/authorized representative of* Ci ty of Clearwater
am fully aware that the statements made in this application for approval of wastew:!!~r collection/transmission facilities
are true. correct and complete to the best of my knowledge and belief. Further. I agree to retain the design engineer. or
another professional engineer registered in Florida. to supervise construction and the initial three months of operation
of the facility. I also :)gree to maintain and operate the facilities in compliance with the provisions of Chapter 403 Flo-
rida Statutes. and all applicable rules and regulations of the Department of Environmental Regulation. I understand
,'1." .n 'PPt:!:. g"nled by .he 0."" n' is nnn. emble .nd will prumplly nOlify Ihe o.",,'menl upon soid 0'
legal transfer f le app ved facilities.
Signed.___ _ Date '/J)../ ~o /7')
I ' /
Name and Title. Anthon Shoemaker, City Manager __
*Attach a letter of authorization. If applicant is a corporation. a Certificate of Good Standing must be submitted with
application. This may be obtained for a 55,00 charge, from the Secretary of State, Bureau of Corporate Records.
Tallahassee. Florida 3230.t
B. PROFESSIONAL ENGINEER REGISTERED IN FLORIDA
1 hereby certify that the engineering features of this wastewater collection/transmission system have been designed by
me, in accordance witl Chapter 403 Fl 'da Statutes and Chapter 17-6. Rules of the Florida Department of Environ-
mental Rcgulati n
Mailing Addn::ss: 9450 Gan<:!y B1 vd.
Suit...e 10.6
St. Petersburg, FL 33702
Namc__._.
Florida Rcg,istralion Number:_ 18838
(Affix Seal) \ ' .
Telephone No.: 576-1188
223-4333
/;'/;&/11
(St.Pete. )
(Tampa} --
Company Name:__G.~b_ey & Fair, Inc.
Date:
DER I=orm PERM 14-3 (Apr 76) Page 1 of 4
I
I
,.
DIRECTIONS:
(II All itcm, must be completed in full inurdcrto avoid dclay in processing of this application.
,2, All inrl'rmalhln tll hc typed llr printed in ink,
,:;, I'llllrtoll ,."pies ,)1' this appli.:alillll and a chel'k f,lr tl\enl} dl.llar'. nude lI11t tll St;IlC ,.r ....orida . D~partmcntllf f-:mironlllcntal
Rl'~llblion. will he submittcd wilh this ;'ppll.:atiun whcn scnt III the ;Ipproprialc Uislril"t'Sul,djstrict orfi.:c.
lol) If Ihc prujel'l is IlIcated in an arca und.:r the .iurisdic'lillll IIf :11\)I'al pullutioll cllntrnl alllJ;llr planning agency. furnish thuse a~ncies
wllh a .:npy ..I' this applil"atilln pri..r In sublllillin~ to th,' Ikparlmenlof Lnvirnlllllclltal Rcgulatilln, Endusc ':Ilpies Ill" thosc agcncies re-
marks wilh applic-alinll. The I'lannin~ a~cno,;y will certify lhat the proposed project is irfconfurmanee with the comprehensive area wide
\\ater lJuality manal!emcnt plan as appru\ed by the Department.
(5) Thisapplkatiun to be accompanied by one set of engineering drawings. speciticatitins and desi~n data as prepared by a Professional
Engineer registered in Florida, under Chapter 471. Florida Statutes. The basis for design will be the W. P. C. F. Manualof Practice. Num-
h,'r 9. and uther ,'riteria as appruved by this D.:partment.
(61 Attach 8V:" x II' sketch II!" the prupos.:d project showing location of the treatment plant and efl1uent dispo~1 area., its relationship
tll thc cntire scndl'e area. and how it ti!:s into the existing system.
ALL INFOR,\I~ TION TO BE TYPED OR PRINTED IN INK
ALL COPIES OF THE APPLICATION TO BE SIGNED BY; THE APPLICANT, PROJECiENGINEER AND THE OWNER
OF THE SEWAGE TREATMENT PLANT.
(I) CounlY
Pinellas
(1) Daleoiapplication December 16, 1977
(3) Applicant (name and title) An,,!:honv Shoemaker, Ci tv Manager
(4) Mailingp.,ddress P.O. Box 4748, Clearwater, Florida
(5) Telephone Number 442-6131
City of Clearwater
33516
Zip
(6) Description of establishment to be served:
a. Name,
Beckett Lake Estates Subdivision
b. Location (specitlc). Section 1, T29S, RISE, Pinellas County
c. Type: single family homeL~. apartments__, mobile homeL___. moteL__,
other (describe)
d. Total number of units
70
Flow:
350
GPO/unit
e. Number of unils per connectiun
1
/
f. Numher of bedrooms per unit
3
g. Population per uniL_
3.5
h. Number of conncctions.
70
i. Total population to be servcd
245
Flow:
100
GPCD
,I. Expc':lcd aYl:ragc daily now
17
GPM
24,500
GPO
(7) Details of proposed project:
a. List kngths. sizes and material comprising proposed sewer construction mains. Gravity 317 O.~L ~~--=-J!:.. VCP
Force _.lion...e
- -- ---------. ..--.--...-----,--
Is this application associated with or part of a Development ,of Regional Impact ( DRI ) pursuant to Chapter 380, Florida Statutes. and'
Chapter 22F -2, Florida Administrative Code? .........yes ...,~..,No
DER Fonn PERM 14-3 (Apr 76) Page 2 of 4
"
- ....
1(,'"
'): '
I
I
(8) a, Pumping station data:
Loca t ion
and/or No,
Design Flow GPM
----r- Min, I Max. ~,
I I t----::
I I
. I t-
I I I
t---~-=*
GPM
Pump Design Characteristics
TDH GPM TDH
__m_~/A
b, Emergency provisions (include treatment and disposal of overflow):
N/A
(9) Construction schedule of proposed project:
Start Date February, 1978
Estimated completion date June, 1978
Expected da te of connection to STP Ju1 y, 1978
(10) Estimated costs (show breakdown by components) Gravity sewer, including
manholes and laterals - $36,000.00
(I]) Sewage treatment plant serving this project:
a, Name East Pollution Control Facility
b, Location (specific) S. R. 60 at Tampa Bay
c. Owner
City of Clearwater
d. Mailingaddress P.O. Box 4748, Clearwater, Florida
e. Plant supervisor
Phil Janocha
f. Certified operator ~____c1ass of certification
A
. Not certified
g. Full time operator X
, Part time operator
h, Plant influent loading and treatment data:
(I) Flow (MGD)
Average last] 2 months
Average last 30 days
4.29
4.10
(2) Anticipated flow upon completion of this project
4.31
(3) Anticipated flow from all projects approved but not yet connected
4.34
Plant design average
5.0
DER Form PERM 14-3 (Apr 76) Page 3 of 4
Avg. Last
12 Mos.
Avg. Last
30 Days
Projected upon
completion this
project
Projected all
projects appd.
but not tied in
PLANT DESIGN AVG.
I
I
. , " ~- "
.' ,:..~--
,~
(4) Treatment efficiency
1nfl uent
Ibs,fday
5 Day BOD-.---~ Total Susp. ~Iid~'-'--"~'-
T-~ Ern'--'--- per'Z~~lt-~nnuent--'----Elll.------1--" P~rc~nt
-r-,b''/d'' ~ R,d.,t;on 1 1",-/d" 1b..ld, , I R,d''''on
. 3--_----:..
112..,,(1-
eesa
88.
6703
870
.
hereby certify that the above
referenced plant has adequate reserve capacity to accept the wastewaters from this project and will provide the
necesSary treatment and disposal as required by Chapter 403. Florida Statutes and all rules and regulations or the
Departl11ellL Further, the undersigned verifies that his treatment plant is operating under a valid permit.
No, 'l'P52-2387 ,Dated, Kov .18. 1174.. _, issue
of the proposed project will not be in violation of any co d" ions of sai
Signed
the D~partment. and the connection
mit.
Name and Title
A. L. lIb.........r, City.JIaA..Uti'
Type or Print
*Attach letter of authorization. *Tb1s approval 1asranted wl'th tile clear uacterstandiq
'tbat auch approval <104IfI Dot ..an that the CltJ of Clearwater will
aut....tlcall' lIIaue bulld1na pen1't11 "0 the ..eloper Identified :lathla
appllcatloD ..all Clt, a.".. treataent plant e.,..ltl_ ar. apportioned
aad allocate. by a Bulldl.. feralt "vl.w eo.altte., &ad approved '" the
Clt,. ........ before Buildlq Ji'lIl"alta caa be la...d, to ...ur. tbat
plant 0.pa01tl_ an DOt a.c..ded, aDd to lMV. that all c_t~n
have all equal opportUDi tJ to obt&1I1 such eervJ:...
CJOi02V
DER Fonn PERM 14-3 (Apt 76) Page 4 of 4