Loading...
PERMIT NUMBER C52-14970 FOR USE OF SEWAGE COLLECTION / TRANSMISSION SYSTEM TO SERVICE 20 SINGLE FAMILY HOMES ,,- I I : '\ I, '\ \ \,i \'. L 1... \:'\ I ~, \,S" \ '\\\ \ ," '\ \L.~.. . ., \\\~}."V y.)' . -\~ J) oJ (,~~ \')llf ,/ .... \ \/ / .. State of Florida DEPARTMENT OF ENVIRONMENTAL REGULATION Pinellas County APPROVAL OF INSTALLATION AND USE OF A SEWAGE COLLECTION/TRANSMISSION SYSTEM - Edenville Subdivision FOR AGENCY USE ONL Y Mr. A. L.Shoemaker City Manager 112 Osceola Avenue Clearwater, FL 33518 Dear Mr. Shoemaker: Approval No,: Issued: Expires: Treatment Facility: C52-14970 November 20, 1978 June 1979 Clearwater East PCF In reference to your recent application to this department for approval of the installation of a sewage collection/transmission system to serve the following project: Project Name: Project Location. Lots 1-10, Block D Edenville Subdivision, Lots 1-10, Block E Evel n Avenue (between Druid Road and Maqnolia Drive) Clearwater, Florl a 20 sinqle family homes Population: 70 Flow: 7,000 GPD Project Description: Approval of construction only has been granted subject to the following conditions: 1. The design, installation and use of the facilities shall be in accordance with: your applica- lion dated November 14, 1978 ; the Water Pollution Control Federation "Manual of Practice No.9"; appropriate provisions of Chapters 403 and 471, Florida Statutes; and the rules and regulations of the Department of Environmental Regulation. 2. The approval is only for INSTALLATION of a wastewater collection/transmission system and does not relate to any water supply aspects. The engineer of record shall supervise the construction of the engineering features of the system. At the end of construction, but prior to use, the "Certification/Approval to Use" statement (found on Page 2) must be completed and submitted tot his department and a copy forwarded to the local pro- gram (if applicable) of your county. 3. This approval is based on the understanding that adequate reserve capacity, as stated in your application and certified by the trreatment plant owner, will be available at the Clearwa ter East PCF sewerage treatment plant so that the wastewaters generated by this project will be collected, treated and disposed of in compliance with Chapter 403, Florida Statutes and the rules and regulations of this department. 4. Individual connections that will increase flow to the sewage treatment facility are not in- cluded in this approval. ~'RECF\' NC)'J : 0 '( '"(, DER Form PERM ",9 (Feb 77) Page' of 2 ,(:ITY ' ..... " ~ \ ! : . I - I I 5. Before starting construction of this project, approvals from other federal, state, or local departments/agencies may be required. 6. Construction shall commence prior to 7. Where water and sewer mains cross with less than eighteen inches (18") vertical clearance, the sewer will be twenty feet (20' - 0") of either cast iron pipe or concrete encased vitrified clay pipe, centered on the point of crossing. 8. When a water main parallels a sewer main, a separation of at least ten feet (10' - 0") should be maintained where practical. Sincerely, District Manager CERTIFICATION/APPROVAL TO USE This is to certify that, with the exception of the deviations noted in the attached letter dated , the installation of this system has been completed and tested in accordance with the application and approved plans. The system, if properly maintained and operated, shall comply with the W.P.C.F. "Manual of Practice Number 9", Chapters 471 and 473, Florida Statutes, and the rules and regulations of the Department of Environmental Regulation. The initial three months of operation shall be under my engineering supervision. PROJECT ENGINEER CERTIFICATION DER APPROVAL TO USE Signature Date Signature of District Manager Date Florida Registration Number (Affix Seal) cc: Owner of Treatment Plant Project Engineer Local Program Records Center S. "Sandy" Lloveras, P.E. TBRPC FPSC DER Form PERM ",9 (Feb 77) Page 2 of 2 STATEOF FLORIDA rEPARTMENT OF ENVIRONMENTAL REGUU':TION RECEIPTFOH APPLICATION FEES AND MISCELLAI\lEOUS REVENUE -' Dilte 25648 "" Dollars $ Scurce of Revenue "~..- Revenue Code Application Number By -~--~-----~~---------------------- --------------------- '- '" -r ""I. , I I .. .. '" 1" ~ \)rn \~\\. . llll'f" \91'0 ~O'.J 14" D\S1R\CL y.J(S1 '$OU"\}{ MEb ..,.j)\ STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL REGULATION APPLleATION FOR INSTALLATION OF SEWAGE COLLECTION/TRANSMISSION SYSTEM Edenvill~ Subdiv~~on; Lots 1-10. Blk. "D & Lots 1-10, Blk. "E" Street F,uelyn .A't~nue 27 0 57 . ,~_..~.........-' Source Name County Pine lIas Lat: 22 .. N. City Clearwater. Florida 82 0 43 Long,: 43 w. Source Location: AppL Name and Title: The City of Clearwater AppL Address: 112 Osceola Avenue, Clearwater, Florida 33518 P.O. Box 4748 STATEMENTS BY APPLICANT AND ENGINEER A. Applicant . I, the owner/authorized representative of* The C1.tv of Clearwater am fully aware that the statements made in this application for approval of wastewater collection/transmission facilities are true, correct and complete to the best of my knowledge and belief. Further, I. agree to retain the design engineer, or another professional engineer registered in Florida, to supervise construction and the initial three months of operation of the facility. I also agree to maintain and oper e . . .~s in compliance with the provisions of Chapter 403 Florida Statutes, and all applicable rules and !~ulations f e Depar~me~f Envir~nmental Regulation. I und~rstand that an approval, if granted by the Department.ls nontransfe I and will prom y notify the Department upon said or legal transfer of the approved facilities, I \ /t~ Signed Date NOV 2 1978 Name and Title A. L. Shoemaker, City Manager * Attach a letter of authorization, ~ --\ Signature EGISTERED IN FLORIDA engin ring features of this wastewater collection/transmission system have been designed by me, 403 lorida Statutes and Chapter 17-6, Rules of the Florida Department of Environmental Regu- B. Mailing Address: 3210 U.S. 19 North Clearwater. Florida 33515 N Santiago "Sandy" Lloveras ame (Pleese Type) Company Name: Lloveras, Baur & Stevens Florida Registration Number: (A ffixSeal) 8508 Telephone No,: 811-784-'Nh5 Date: October 12, 1978 DE R Form PE AM 14-3 (Dec. 77) Page 1 of 4 -- . ,. ~J .. I I -. " DIRECTIONS: (1) All items must be completed in full in order to aviod delay in processing of this application, (2) All information to be typed or printed in ink. (3) Four (4) copies of this application and a check for twenty dollars, made out to State of Florida, Department of Environ- mental Regulation, will be submitted with this application when sent to the appropriate District/Subdistrict office. (4) If the project is located in an area under the jurisdiction of a local pollution control and or planning agency, furnish those agencies with a copy of this application prior to submitting to the Department of Environmental Regulation. Enclose copies of those agencies remarks with application. The planning agency will certify that the proposed project is in conformance with the comprehensive area wide water quality management plan as approved by the Department. (5) This application to be accompanied by one set of engineering drawings, specifications and design data as prepared by a Professional Engineer registered in Florida, under Chapter 471, Florida Statutes. The basis for design will be the W.P.C.F. Manual of Practice, Number 9, and other criteria as approved by this Department. (6) Attach 8%" x 11" sketch of the proposed project showing location of the treatment plant and effluent disposal area, its relationship to the entire service area, and how it ties into the existing system. ALL INfORMATION TO BE TYPED OR PRINTED IN INK ALL COPIES OF THE APPLICATION TO BE SIGNED BY: THE APPLICATION, PROJECT ENGINEEFtAND 'THE OWNER OF THE SEWAGE TREATMENT PLANT. . Pinellas October (1) County (2) Date of application (3) Applicant (name and title) City P.O. Box (4) Mailing Address 12, 1978 of Clearwater, Florida 4748, Clearwater, Florida 442-6131 Zip 33518 (5) Telephone Number (6) Description of establishment to be served: a. Name Edenville Subdivil=:ion; T.orl=: 1-10, R1k. 'n"& Lots 1-10, Blk. "E" b. Location (specific) Evelyn Avenue (between Druid Road & Magnolia Drive) , mobile homes ., . ,motel Flow: 350 . GPD/unit Number of connections 3.5 1 70 Flow: 100 GPCD g. h; Population per unit j, Total population to be served j. Expected average daily flow 4.Q GPM 7000 GPD (7) Details of proposed project: a. List lengths,. sizes and materiarcomprising proposed sewer construction mains. Gravity.. 509L. F . M. 0 . L. ,8 ,"V. C. P Force None Is this application associated with or part of a Development of Regional Impact (DRI) pursuantto Chapter 380, Florida Statutes, and Chapter 22F-2, Florida Administrative Code? _Yes ----X...-No DER Form PERM 14.3 (Dee, 77) Pege 2 of 4 .. .."\---:.;........., --_..:' , I 0- < (8) a, Pumping station data: none } Location and/or No. Design Flow GPM 'Min. Max. Avg, b. Emergency provisions (include treatment and disposal of overflow): (9) Construction schedule of proposed project: Start Date November, 1978 Estimated completion date Expected date of connection to STP ~rch, 1979 (10) Estimated costs (show breakdown by components) $6,500.00 (11) Sewage treatment plant serving this project: a. Name Clearwater East Pollution CQntro1 60 and Bayshore Dr. Clearwater I GPM TDH Pump Design Characteristics TDH GPM February, 1979 Facility b. Location (specific) S . R . City of c. Owner d, P.Q. aox 4748, Clearwater, Fl. Phil Janocha Mailing address e, Plant supervisor f. Certified operator x class of certification x g. Full time operator x , Part time operator h, Plant influent loading and treatment data: (1) Flow (MGD) Average last 12 months Average last 30 days ~.62 4.51 (2) Anticipated flow upon completion of this project 4.52 (3) Anticipated flow from all projects approved but not yet connected 5.0 Plant design average DER Form PERM 14-3 (Dec. 77) Pege 3 of 4 County Telephone , Not certified 4.55 Pine 11as 442 6131 Zip 33518 (12) Statement, sewage treatment plant owner: The undersigned, owner/authorized representative * of City of Clearwater hereby certify that the above referenced plant has adequate reserve capacity to accept the wastewaters from this proje~t and will provide the necessary treatment and disposal as required by Chapter 403, Florida Statutes and all rules and regulations of the Department. Further, the undersigned verifies that his treatment plant is operating under a valid permit. No.TP 52-2387 ,Dated, 11/19/74 ,i?~edbY th;ZeJ. f ment..1md the c nnection of the proposed project will not be in violation c1f any conditions of said permi~,,'" _ / . Signed R ' ~ Name and Title A. L__ .Shoemaker Tvpe or Print * Attach letter of authorization. This approval is granted with the clear understanding that such approval does not mean that the City of Clearwater will automatically issue building permits to the developer identified in this application, as all City sewer treatment plant capacities are apportioned and allocated by a Building Permit Review Committee, and approved by the City Manager, before Building Permits can be iSsued, to assure that plant capacities are not exceeded, and to insure that all customers have an equal opportunity to obtain such s~rvice. City Manager o J0705 V DE R Form PE RM 14.3 (Dee, 77) Page 4 of 4