PERMIT NUMBER C52-14970 FOR USE OF SEWAGE COLLECTION / TRANSMISSION SYSTEM TO SERVICE 20 SINGLE FAMILY HOMES
,,-
I
I
: '\ I, '\ \ \,i
\'. L 1... \:'\ I
~, \,S" \ '\\\ \
," '\ \L.~.. . ., \\\~}."V y.)'
. -\~ J)
oJ (,~~ \')llf ,/
.... \ \/
/
..
State of Florida
DEPARTMENT OF ENVIRONMENTAL REGULATION
Pinellas County
APPROVAL OF INSTALLATION AND USE OF A
SEWAGE COLLECTION/TRANSMISSION SYSTEM
- Edenville Subdivision
FOR AGENCY USE ONL Y
Mr. A. L.Shoemaker
City Manager
112 Osceola Avenue
Clearwater, FL 33518
Dear Mr. Shoemaker:
Approval No,:
Issued:
Expires:
Treatment
Facility:
C52-14970
November 20, 1978
June 1979
Clearwater East PCF
In reference to your recent application to this department for approval of the installation of a sewage
collection/transmission system to serve the following project:
Project Name:
Project Location.
Lots 1-10, Block D
Edenville Subdivision, Lots 1-10, Block E
Evel n Avenue (between Druid Road and
Maqnolia Drive) Clearwater, Florl a
20 sinqle family homes Population: 70
Flow: 7,000
GPD
Project Description:
Approval of construction only has been granted subject to the following conditions:
1. The design, installation and use of the facilities shall be in accordance with: your applica-
lion dated November 14, 1978 ; the Water Pollution Control Federation
"Manual of Practice No.9"; appropriate provisions of Chapters 403 and 471, Florida
Statutes; and the rules and regulations of the Department of Environmental Regulation.
2. The approval is only for INSTALLATION of a wastewater collection/transmission system
and does not relate to any water supply aspects. The engineer of record shall supervise
the construction of the engineering features of the system. At the end of construction,
but prior to use, the "Certification/Approval to Use" statement (found on Page 2) must
be completed and submitted tot his department and a copy forwarded to the local pro-
gram (if applicable) of your county.
3. This approval is based on the understanding that adequate reserve capacity, as stated in
your application and certified by the trreatment plant owner, will be available at the
Clearwa ter East PCF sewerage treatment plant so that
the wastewaters generated by this project will be collected, treated and disposed of in
compliance with Chapter 403, Florida Statutes and the rules and regulations of this
department.
4. Individual connections that will increase flow to the sewage treatment facility are not in-
cluded in this approval.
~'RECF\'
NC)'J : 0 '( '"(,
DER Form PERM ",9 (Feb 77) Page' of 2
,(:ITY '
..... "
~
\
! :
. I
-
I
I
5. Before starting construction of this project, approvals from other federal, state, or local
departments/agencies may be required.
6. Construction shall commence prior to
7. Where water and sewer mains cross with less than eighteen inches (18") vertical
clearance, the sewer will be twenty feet (20' - 0") of either cast iron pipe or concrete
encased vitrified clay pipe, centered on the point of crossing.
8. When a water main parallels a sewer main, a separation of at least ten feet (10' - 0")
should be maintained where practical.
Sincerely,
District Manager
CERTIFICATION/APPROVAL TO USE
This is to certify that, with the exception of the deviations noted in the attached letter dated
, the installation of this system has been completed and tested in accordance
with the application and approved plans. The system, if properly maintained and operated, shall comply
with the W.P.C.F. "Manual of Practice Number 9", Chapters 471 and 473, Florida Statutes, and the rules
and regulations of the Department of Environmental Regulation. The initial three months of operation
shall be under my engineering supervision.
PROJECT ENGINEER CERTIFICATION
DER APPROVAL TO USE
Signature
Date
Signature of District Manager
Date
Florida Registration Number
(Affix Seal)
cc:
Owner of Treatment Plant
Project Engineer
Local Program
Records Center
S. "Sandy" Lloveras, P.E.
TBRPC
FPSC
DER Form PERM ",9 (Feb 77) Page 2 of 2
STATEOF FLORIDA
rEPARTMENT OF ENVIRONMENTAL REGUU':TION
RECEIPTFOH APPLICATION FEES AND MISCELLAI\lEOUS REVENUE
-'
Dilte
25648
"" Dollars $
Scurce of Revenue
"~..-
Revenue Code
Application Number
By
-~--~-----~~----------------------
---------------------
'-
'" -r
""I.
,
I
I
.. ..
'"
1"
~
\)rn
\~\\.
. llll'f"
\91'0
~O'.J 14"
D\S1R\CL
y.J(S1
'$OU"\}{ MEb
..,.j)\
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL REGULATION
APPLleATION FOR INSTALLATION OF
SEWAGE COLLECTION/TRANSMISSION SYSTEM
Edenvill~ Subdiv~~on;
Lots 1-10. Blk. "D &
Lots 1-10, Blk. "E"
Street F,uelyn .A't~nue
27 0 57
. ,~_..~.........-'
Source Name
County
Pine lIas
Lat:
22 ..
N.
City Clearwater. Florida
82 0 43
Long,:
43
w.
Source Location:
AppL Name and Title:
The City of Clearwater
AppL Address:
112 Osceola Avenue, Clearwater, Florida 33518
P.O. Box 4748
STATEMENTS BY APPLICANT AND ENGINEER
A. Applicant .
I, the owner/authorized representative of* The C1.tv of Clearwater
am fully aware that the statements made in this application for approval of wastewater collection/transmission facilities are
true, correct and complete to the best of my knowledge and belief. Further, I. agree to retain the design engineer, or another
professional engineer registered in Florida, to supervise construction and the initial three months of operation of the facility.
I also agree to maintain and oper e . . .~s in compliance with the provisions of Chapter 403 Florida Statutes, and all
applicable rules and !~ulations f e Depar~me~f Envir~nmental Regulation. I und~rstand that an approval, if granted
by the Department.ls nontransfe I and will prom y notify the Department upon said or legal transfer of the approved
facilities, I \
/t~
Signed
Date
NOV
2 1978
Name and Title
A. L. Shoemaker, City Manager
* Attach a letter of authorization,
~ --\
Signature
EGISTERED IN FLORIDA
engin ring features of this wastewater collection/transmission system have been designed by me,
403 lorida Statutes and Chapter 17-6, Rules of the Florida Department of Environmental Regu-
B.
Mailing Address: 3210 U.S. 19 North
Clearwater. Florida 33515
N Santiago "Sandy" Lloveras
ame
(Pleese Type)
Company Name: Lloveras, Baur & Stevens
Florida Registration Number:
(A ffixSeal)
8508
Telephone No,: 811-784-'Nh5
Date: October 12, 1978
DE R Form PE AM 14-3 (Dec. 77) Page 1 of 4
--
. ,. ~J
..
I
I
-.
"
DIRECTIONS:
(1) All items must be completed in full in order to aviod delay in processing of this application,
(2) All information to be typed or printed in ink.
(3) Four (4) copies of this application and a check for twenty dollars, made out to State of Florida, Department of Environ-
mental Regulation, will be submitted with this application when sent to the appropriate District/Subdistrict office.
(4) If the project is located in an area under the jurisdiction of a local pollution control and or planning agency, furnish those
agencies with a copy of this application prior to submitting to the Department of Environmental Regulation. Enclose copies
of those agencies remarks with application. The planning agency will certify that the proposed project is in conformance with
the comprehensive area wide water quality management plan as approved by the Department.
(5) This application to be accompanied by one set of engineering drawings, specifications and design data as prepared by a
Professional Engineer registered in Florida, under Chapter 471, Florida Statutes. The basis for design will be the W.P.C.F.
Manual of Practice, Number 9, and other criteria as approved by this Department.
(6) Attach 8%" x 11" sketch of the proposed project showing location of the treatment plant and effluent disposal area, its
relationship to the entire service area, and how it ties into the existing system.
ALL INfORMATION TO BE TYPED OR PRINTED IN INK
ALL COPIES OF THE APPLICATION TO BE SIGNED BY: THE APPLICATION, PROJECT ENGINEEFtAND 'THE OWNER
OF THE SEWAGE TREATMENT PLANT. .
Pinellas
October
(1) County
(2) Date of application
(3) Applicant (name and title) City
P.O. Box
(4) Mailing Address
12, 1978
of Clearwater, Florida
4748, Clearwater, Florida
442-6131
Zip
33518
(5) Telephone Number
(6) Description of establishment to be served:
a. Name Edenville Subdivil=:ion; T.orl=: 1-10, R1k. 'n"& Lots 1-10, Blk. "E"
b. Location (specific) Evelyn Avenue (between Druid Road & Magnolia Drive)
, mobile homes .,
. ,motel
Flow:
350
.
GPD/unit
Number of connections
3.5
1
70
Flow:
100
GPCD
g.
h;
Population per unit
j,
Total population to be served
j. Expected average daily flow
4.Q
GPM 7000
GPD
(7) Details of proposed project:
a.
List lengths,. sizes and materiarcomprising proposed sewer construction mains. Gravity.. 509L. F . M. 0 . L. ,8 ,"V. C. P
Force
None
Is this application associated with or part of a Development of Regional Impact (DRI) pursuantto Chapter 380, Florida Statutes,
and Chapter 22F-2, Florida Administrative Code? _Yes ----X...-No
DER Form PERM 14.3 (Dee, 77) Pege 2 of 4
.. .."\---:.;.........,
--_..:'
,
I
0- <
(8) a, Pumping station data: none
}
Location
and/or No.
Design Flow GPM
'Min.
Max.
Avg,
b. Emergency provisions (include treatment and disposal of overflow):
(9) Construction schedule of proposed project:
Start Date
November, 1978
Estimated completion date
Expected date of connection to STP
~rch, 1979
(10) Estimated costs (show breakdown by components)
$6,500.00
(11) Sewage treatment plant serving this project:
a.
Name
Clearwater
East Pollution CQntro1
60 and Bayshore Dr.
Clearwater
I
GPM
TDH
Pump Design Characteristics
TDH
GPM
February, 1979
Facility
b.
Location (specific) S . R .
City of
c.
Owner
d,
P.Q. aox 4748, Clearwater, Fl.
Phil Janocha
Mailing address
e,
Plant supervisor
f. Certified operator
x
class of certification
x
g. Full time operator
x
, Part time operator
h, Plant influent loading and treatment data:
(1) Flow (MGD)
Average last 12 months
Average last 30 days
~.62
4.51
(2) Anticipated flow upon completion of this project
4.52
(3) Anticipated flow from all projects approved but not yet connected
5.0
Plant design average
DER Form PERM 14-3 (Dec. 77) Pege 3 of 4
County
Telephone
, Not certified
4.55
Pine 11as
442 6131
Zip
33518
(12) Statement, sewage treatment plant owner:
The undersigned, owner/authorized representative * of
City of Clearwater
hereby certify that the above
referenced plant has adequate reserve capacity to accept the wastewaters from this proje~t and will provide the necessary
treatment and disposal as required by Chapter 403, Florida Statutes and all rules and regulations of the Department. Further,
the undersigned verifies that his treatment plant is operating under a valid permit.
No.TP 52-2387 ,Dated, 11/19/74 ,i?~edbY th;ZeJ. f ment..1md the c nnection
of the proposed project will not be in violation c1f any conditions of said permi~,,'" _ / .
Signed R ' ~
Name and Title A. L__ .Shoemaker
Tvpe or Print
* Attach letter of authorization.
This approval is granted with the clear understanding that such approval
does not mean that the City of Clearwater will automatically issue
building permits to the developer identified in this application, as all
City sewer treatment plant capacities are apportioned and allocated by
a Building Permit Review Committee, and approved by the City Manager,
before Building Permits can be iSsued, to assure that plant capacities
are not exceeded, and to insure that all customers have an equal
opportunity to obtain such s~rvice.
City Manager
o J0705 V
DE R Form PE RM 14.3 (Dee, 77) Page 4 of 4