PERMIT C52-6544 FOR SANITARY SEWER 8" MANHOLES SERVICE LINES AND CONNECTIONS FOR SERVICE TO 121 VLLA HOMES AND PATIO HOMES
I
I
. p) 4lf:./1g
~~ .L'
~\\1i_^CJ.i( \)
()~V\ ,1.~ \J~
'O~~
~o~1 \..} v '.
v\~
State of Florida
DEPARTMENT OF ENVIRONMENTAL REGULATION
APPROVAL OF INSTALLATION AND USE OF A
SEWAGE COLLECTION/TRANSMISSION SYSTEM
Pinellas County
Village On the Green Phase 3
FOR AGENCY USE ONLY
Anthony Shoemaker
City of Clearwater
112 S. Osceola Ave.
Clearwater, Fla. 33516
Approval No.:
Issued:
Expires:
Treatment
Facility:
C52-6544
April 26. 1978
February 1979
City of Clearwater N
Dear Mr. Shoemaker:
In reference to your recent application to this department for approval of the installation of a sewage
collection/transmission system to serve the following project:
Project Name:
Project Location.
Village on the Green Phase 3
Intersection of Oakleaf & Bay Berry Dr.
Population 303 people
Flow 30,300 GPD
Approval of construction only has been granted subject to the following conditions:
Project Description: 121 Villa Homes &
Patio Homes
1.
The design, install~tion and use of the facilities shall be in accordance with: your applica-
tion dated Aprll 13, 1978 ; the Water Pollution Control Federation
"Manual of Practice No.9"; appropriate provisions of Chapters 403 and 471, Florida
Statutes; and the rules and regulations of the Department of Environmental Regulation.
2.
The approval is only for INSTALLATION of a wastewater collection/transmission system
and does not relate to any water supply aspects. The engineer of record shall supervise
the construction of the engineering features of the system. At the end ()f construction,
but prior to use, the "Certification/ Approval to Use" statement (found on Page 2) must
be completed and submitted tot his department and a copy forwarded to the local pro-
gram (if applicable) of your county.
3.
This approval is based on the understanding that adequate reserve capacity, as stated in
your application and certified by the trreatment plant owner, will be available at the
Ci ty of Clearwater NE sewerage treatment plant so that
the wastewaters generated by this project will be collected, treated and disposed of in
compliance with Chapter 403, Florida Statutes and the rules and regulations of this
department.
4.
Individual connections that will increase flow to the sewage treatment facility are not in-
cluded in this approval.
DER Form PERM "-9 (Feb77) Page' of 2
-"', /) :,',".)
''._./ .
<
I
I
5. Before starting construction of this project, approvals from other federal, state, or local
departments/agencies may be required.
6. Construction shall commence prior to
7. Where water and sewer mains cross with less than eighteen inches (18") vertical
clearance, the sewer will be twenty feet (20' - 0") of either cast iron pipe or concrete
encased vitrified clay pipe, centered on the point of crossing.
8. When a water main parallels a sewer main, a separation of at least ten feet (10' - 0")
should be maintained where practical.
._-~~~
District Manager
CERTIFICATION/APPROVAL TO USE
This is to. certify that, with the exception of the deviations noted in the attached letter dated
, the installation of this system has been completed and tested in accordance
with the application and approved plans. The system, if properly maintained and operated, shall comply
with the W.P.C.F. "Manual of Practice Number 9", Chapters 471 and 473, Florida Statutes, and the rules
and regulations of the Department of Environmental Regulation. The initial three months of operation
shall be under my engineering supervision.
PROJECTENGINEER CERTIFICATION
DER APPROVAL TO USE
Signature
Date
Signature of District Manager
Date
Florida Registration Number
(Affix Seal)
cc: Owner of Treatment Plant
Project Engineer Edward Mazur, Jr., P. E.
Local Program TBRPC
FPSC
CEntral Files
DER Form PERM 11.9 (Feb 77) Page 2 of:2
. i
J \,j
'f
..-
'~f.~.
'\)':'1 ,00' STATE OF FLORIDA
~P\\ - .c\R\~PARTMENT OF ENVIRONMENTAL REGULATION
.c.:~ \" uP . APPLICATION FOR INSTAllATION OF
SOU" \"1' Ji\N'.?~ SEWAGE COllECTION/TRANSMISSION SYSTEM
I
VILLAGE ON THE GREEN
PHASE 3
525-079.11
;
--
~urce ~Jm.:-
VILLAGE ON THE GREEN PHASE 3
County
PINELLAS
SOllra LO"::llion: StreeL SEE ATTACHED PLANS
Lat: 28 0 01 ,
15
City
Long.:
CLEARWATER
84 0 44
05
App. ~Jme and TIlIc,'l CITY OF CLEARWATER
Appl. .-\ddress: 2 S. OSCEOLA AVE. CLEARWA'ftR, FLORIDA 33516
STATEMENTS BY APPLICANT AND ENGINEER
A.
Applicant -
I. the owner/authorized representative 01'* C JTY OF CLEARWATER .
<!m fully a ware that the statements made in this application for approval of wastewater collection/transmission facilities
are true, correct and complete tothe best of my knowledge aOlI belief. Further. I agree to retain the design engineer. or
another professional engineer. registered in Florida, to supervise constructiun and lhe initial three months of operation
of the facility. I also agree to maintain and operate the facililies in compliance with the provisions of Chapter 403 Flo. .
ridJ Statutes, and all applic~ble rules and regulations of the Department of Environmental Regulation. I understand
that an approval, if nled by the Department is 0 tra will promptly notify the Department upon said or
legal transfer of t pprove aciliti . .
:\ame and Title_ .
'"Attach a letter o"l}~gftltioff.. I~lt>~., ~or~Q-ln.II~MfKe of Good Standing must be submitted with
application. This may be obtained for a 55.00 charge, from the Secretary of Stale, Bureau of Corporate Records.
. Tallahassee, Florida 32304, .
Date
Y-/Y/1'-
Signed_-
B. PROFESSIONAL ENGINEER REGISTERED IN FLORIDA
I hereby certify that the engineering features of this wastewater collection/transmission systeq1 have been designed by
me. in accordance with Chapter 403 rida Statutes and CI pter 17.6. Rules of the Florida Deparlment of Environ-
mental Reg
Sifllature-
MailiM. ~ddr~~: Post~ Buckley, Schuh & Jernigan, I
~U8U u.-S. Hwy 19 N.. Suite 165 .
Clearwa~~r, Florida 33515 ___.
~a rile u___~~wa rd __~_~-il~ .
< \,lease Iype)
Comp.Jn.... !\ame: filS t_,-J3.Y.G.!slgYL-.S~b.l,.lh &
.. - Jernigan, Inc.
Telephone ;\0.:__ 8131725-36ll____~-
Flllrid;.i Rcgi,tration Number: . ___ 2131~______ Date:_____Marcl'!-J-~~_-li7Ji.------------.-
(:Vf1\: Seal)
DER Form PERM 14-3 (Apr 76) Page 1 of 4
l_~"'ll'l;"~"I!\.'f
I
I
J
" i~
DlREC:rIO~S:
(I) All ilem~ must be completed in full in order to avoid delay in proce>Sing of this 3?plication.
<<2) All infllrmation III be typed Ilr prin":.! in ink.
13) Fllur .41 cllri~'s Ill' this application ;Hld;1 check for twenty dolbrs. r::;:~e OUI:o 513te of Flllrid:t . Dep:lrtment of fnliironmental
Ih'fllb:illn. willl>e sllhlllitl~'d Wilh Ihis ;ll'pli~'alilln when s~'nt Illth" app:JiHi;:l~ Di,ui.:t'511b.lisrrict ufli,c.
(~l If the "r"je~.t is "";lled in;1Il area under the jurisdiction III' a lu.:;:1 pdlu:ion control :lndfor planning :Igenq': furnish those agencies
wilh a "ory of this application prior 10 sllbmitlin!! to the Dep:lrtment of En,'ironment31 Regul:1tion. Enclose copies of those agencies re-
marks with applicatilln. The pbnnin!l a!!ency will certify that the propc;<d project is in ':Qnformance with the comprehensive area wide
walt:r quality management pbn as appro\cd by the Department.
15) Thisapplicationlo be accompanied b)' one sel of engineering d~awi~~\, s;:>ecific~tior.s and design data as prepared by a Professional
Engine.:r registered in Florida. under Chapter 471. Florida Stalutt:s. Th~ basis io, de;ign will be the W. P. C. F. ~lanu31 of Pra.:tice. Num-
ber 9. and other criteria as approved by this Department.
(6) Attach 8~/:";Ii II' sketch of the propllsed proje~.t showing location cf the treatment pbnt and emu~nt disposal arc::a. its relation'hip
to Ih~ entir~ service area, and how it ties into the e:\isting s)'stem.
ALL INFORMATION TO BE TYPED OR PRINTED IN INK
ALL COPIES OF THE APPLICATION TO BE SIGNED BY; THE APPLICANT, PROJECT El'lGINEER AND THE OWNER
OF THE SEWAGE TREATMENT PLANT.
PINELLAS
(1) County
(2) Date of application f1a rch 15, 1978
(3) Applicant (name and litle)_ CITY OF CLEARHATER
(4) 1\bilingAddresL--112 S. OSCEOLA AVE, r.1 FAR\~ATER) FLORIDA-
(5) Telephone Number_442-6131
Zip 3351 fi
(6) Description of establishment to he served:
a. Name__ VILLAGE ON ~~~REEN ~HASE ~
b. Location (specific)_ INTERSECTION OF OAKLEAF & ,BAYBERRY. DRIVE ~
c. Type: single family homeL__. apartments___, r.1obile IIL';T}eL~, motel_,
X other (describe)
VILLA HOMES & PATIO HOMES
121
Flow:
250
GPD/unit
d. Total number of units
e. Number of units per connection
3 & 4
f. Number of bedrooms per uniL
2
g. Population per uniL_
2.5
h. Number of conneclions_ 50
\
\
-,
'\
\
't
I. Tot:!1 population to be served_
303
Fjow:
100
GPCD
J' Exp~cted awrage daily flow
21 .04 (Avg.)
GP\1
30,300
GPD
(7) D<.'iails uf prop0sed pfllj<.'CI:
:!. list 1<.'llglhs. sizes and material ..:omprising proposed se\'o~~ ,::,'"s:ru,'!io;1 mains. Cuvit)"
Foret.' __ 2649 8 ~,,-. C. ~_.~l_~_l18B~~~ES__~____
Is this application associated with or part of a Development of Regioml Impact ( DRI ) pursuant to Chapter 380, Florida Statutes, and
Chapter 221'-2, Florida Administrative Code? .........yes ....X...No
DER Form PERM 14-3 (Apr 76) Page 2 of 4
'J
, ~ ,f 8) a. Pumping stalinn data:
location
and/or No.
I
I
','
Design Flow GPM
Min. Max. Avg.
Pump Design C1uracteristks
GP~t TDH__ _ GP~' ...... TDH
J~JP~~~oposed
_YD~e~_is-project
-t-~
I
I
..,---- ---1---,
I I
-r-
I;; t--
I ---t---
; _J
~-: Emerge~cy provisions (include treatment and disposal of overflov.:):
..
-------------------------------------------
(9) Construction schedule of proposed project:
Start Date
April 1978
Estimaled completion date
December 1978
Expecled date of connection to STP
October 1978
(10) Estimated costs (show breakdown by components)
SEE ATTACHMENT (l)
(II) Sewage treatment plant serving this project:
a. Name North~ast Pollution Control Facility
. 'Ii N.E. Cor. SR
b. Location (specI IC)
City of Clearwater
c. Owner
580 & CR 31
County
Pine11as
442-6131
Telephon~
P.o. Box 4748, Clearwater, Fla.
33518
d. Mailing address
Zip
Phil Janocha
e. Plant supervisor'
x
r. Certified operator ____ class of certification
A
. Not certified
x
g. Full time operator
. . Part time .operator
h. Plant influent loading and treatment data:
(I) Flow (MOD) .368
Aver3~e last 12 months___ '-'
~ : 469
Average last 30 days - ------
(2) Anticipated flow upon completion of this project
.371
.799
(3) Anticipated flow from all projects approved but nut yet connecteJ_
1.0
Planl design average ---
DER Form PERM 14.3 (Apr 76) Page 3 of 4
'.
I
.' ...-- ,
- -... -1-
t
i
(4) Treatment efficiency
5 Day BOD Total Susp. Solids
Jn~~;i- _...- - -r---------u- ---r--'- ---.--- --,----,--- . --- --
Ern. Percent Influent Em. I. Perc~nt
.. _ Ihs./day Ibs.iday I Reduction ib~./day I Ibs./day : Reduction
- - I
Avg. La t 780 I . I
37 682 I
:95.3 I. 28 95.9
12 Mos. I ! I
Avg. Last . 1 I
1080 63 :94.2 873 I 39 95.5
30 Days !
Projected upon I
I
.:ompJetion this 786 37 195.3 687 28 95.9
project
Projected all 195.3
projects appd. 1694 80 1480 60 95.9
bUl not tied in
PL ~~T DESIGN A VG. 2086 209 ;90.0 2086 209 90.0
!
(J 2) Statement, sewage treatm~nt plant owner:
*
The undersigned, owner/authorized representative. of
City of Clearwater
hereby certify that the abo'we
referenced plJnt has adequate reserve capacity to acee?t t:ie wastewaters from this project and will pro...ide the
necessary treatment and disposal as required by Chap~er ~J3. Florida StalUles and all rules and regulations of the
Department. Further, the undersigned verifies thai his treatmc:nt plant is oper:Jting under a valid permit.
DC-52-25l6 3/9/76
No. , Dated,
of the proposed project will not be in violation of any
Signed
Shoemaker, City Manager
Type or Print
-Attach Ictler of authorilation. *This approval is granted with the clear understanding
that such approval does not mean that the CiLY of Clearwater will automat-
ically issue building permits to the developer identified in this application
as all City sewer treatment plant capacities are apportioned and allocated
by a Building Permit Review Committee, and approved by the City Manager,
before Building Permits can be issued, to assure that plant capacities are
not exceeded, and to insure that all customers have an equal opportunity
to obtain such service.
\
..
I
~_V""G'N'"
::0;
I DOUGLAS'"
i IAVC-...
r ~
IINION.'l
I
I
i
~
,
~ TO OUNEOI" S
__ -:= R $8(1.
PROJECT
LaC AT/O..I
-'"
TO s,n.TT HA!'f80" / ~
-. y __CR48
/ ., /:; -- -7
;< /,If
ST.
!l1I"!I~1 POINT
C'LcARWATER"'1
--~~- -'- ~
p..w, " I
'"',
...
...,
-~I
I.,
:t:.
C'ULF TO e..., BLV,;).'/c
~
...
...
..
...
'"
~
Q
~
...
i
____ ~~ORE'"
':OAI'T S r
~T
SIr 60
T() '~M""
VICINITY
MAP
!J90
.
c:i
~
'"'
...
~
...
.=t
~
;
N
~
.
,
"
I
I
ATTACHMENT (l)
(10) Estimated Cost - Continued
Sanitary Sewer {8").....................,..... ..$19,735.03
Manho 1 es . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . , . . . . . 9,630.00
Service Lines and Connections................... 4,000.00
TOTAL $33,095,03