PERMIT C52-12915 FOR 8" GRAVITY MAIN
.'0
I
I
State of Florida
DEPARTMENT OF ENVIRONMENTAL REGULATION
APPROVAL OF INSTALLATION AND USE OF A
SEWAGE COLLECTION/TRANSMISSION SYSTEM
Countryside Landmark Dr. Extension
Pinellas County
FOR AGENCY USE ON L Y
Anthony L. Shoemaker
City of Clearwater
112 S. Osceola Ave.
Clearwater, Fla. 33516
Dear Mr. Shoemaker:
Approval No.:
Issued:
Expires:
Treatment
F acil ity:
CS2-129l5
September 27. 1978
January 1979
City of Clearwater
Northeast PCF
In reference to your recent application to this department for approval of the installation of a sewage
collection/transmission system to serve the following project:
Project Name:
Project Location.
Countryside Landmark Dr. Ext.
3/4 mi'. NW of intersection of SR 580 & Landmark Dr.
Project Description: 8" Gravity Main Population-:fione
Flow- none
Approval of construction only has been granted subject to the following conditions:
1. The design, installation and use of the facilities shall be in accordance with: your applica-
tion dated September 11, 1978 . ; the Water Pollution Control Federation
"Manual of Practice No.9"; appropriate provisions of Chapters 403 and 471, Florida
Statutes; and the rules and regulations of the Department of Environmental Regulation.
2. The approval is only for INSTALLATION of a wastewater collection/transmission system
and does not relate to any water supply aspects. The engineer of record shall supervise
the construction of the engineering features of the system. At the end of construction,
but prior to use, the "Certification/ Approval to Use" statement (found on Page 2) must
be completed and submitted tot his department and a copy forwarded to the local pro-
gram (if applicable) of your county.
3. This approval is based on the understanding that adequate reserve capacity, as stated in
your application and certified by the trreatment plant owner, will be available at the
Ci ty of Clearwa ter NE PCF sewerage treatment plant so that
the wastewaters generated by this project will be collected, treated and disposed of in
compliance with Chapter 403, Florida Statutes and the rules and regulations of this
department.
4. Individual connections that will increase flow to the sewage treatment facility are not in-
cluded in this approval.
DER Form PERM' '-9 (Feb 77) Page'. of 2 ~
~ [) 0'03 00 . t lei
5
I
I
5. Before starting construction of this project, approvals from other federal, state, or local
departments/agencies may be required.
6. Construction shall commence prior to
7. Where water and sewer mains cross with less than eighteen inches (18") vertical
clearance, the sewer will be twenty feet (20' - 0") of either cast iron pipe or concrete
encased vitrified clay pipe, centered on the point of crossing.
8. Whe~ a water main parallels a sewer main, a separation of at least ten feet (10' - 0")
shouidbemaintained where practical.
Sincerely,
??(J~ pt~
/~ District Manager
IT- P. David Puchaty
CERTIFICATION/APPROVAL TO USE
This is to . certify that. with the exception of the deviations noted in the attached letter dated
, the installation of this system has been completed and tested in accordance
with the application and approved plans. The system, if properly maintained and operated, shall comply
with the W.P.C.F. "Manual of Practice Number 9". Chapters 471 and 473, Florida Statutes, and the rules
and regulations of the Department of Environmental Regulation. The initial three months of operation
shall be under my engineering supervision.
PROJECT ENGINEER CERTIFICATION
DER APPROVAL TO USE
Signature
Date
Signature of District Manager
Date
Florida Registration Number
(Affix Seal)
cc: Owner of Treatment Plant
Project Engineer Edward Mazur, Jr.
local Program TBRPC
FPSC
Records Center
DER Form PERM 11.9 (Feb 77) Page 2 of:Z
-_.--,-:-- -'- - ----..,.:-....,..-'- ~"...,.....- - - - - --,""'- - -""';'7'""" -~ - -..... - - - - - - - :-,-.--:-- - -., -,-:-- - -'--': -- --- -- -:~--
STATE OF FLORIDA
DtARTMENT OF ENVIRONMENTAL REGUl1TION N?
RECEIPT FOR APPLICATION FEES AND MISCELLANEOUS REVENUE
23887
. Received from
__ _..-........ _'__ --!'~_...... ..,.....'_ _'_ _ _'_ _ _..:.- _ _ _ _ _,_ _ __ _,~'..........i;,:;,;;;I-,_ '--il_.... ___._ _............ ........'_ _ - __ _ _--' _ -,- _ _ -.... "..., _ _ -.;_-.;.......:;,_~...:-...
'..~
....
Countryside (Landmark Dr. Ext.)
525-603.10 /)
I [,~ ......^...
~ l!J
. ('C"D !t Ii'
SOU ././ a~
1'1-;10/, 191a
~S1'
1'~/l1j:) D/S l;
:.q trIer
"
"..
1]0\ ,r-I, ~-~, ~
1\"'"-__" ..< "., '. . ..'C
. ,n . /../."........,. .....k'..." . '.'...'...........,....
i".;;~1 - - ..-' a .' f"j),
~_ ;<i
U---5.;:.;L~~{~ Cj
~. ".' .~:-.'-.r/.
--..~~.
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL REGULATION
APPLICATION FOR INSTALLATION OF
SEWAGE COLLECTION/TRANSMISSION SYSTEM
Source Name
Countryside (Landmark Dr. Ext.)
County. Pinell~._
Source Location: Street See Attached Pl an
28 0 01
Clearwater
82 0 44
07
City
Long.:
Lat:
16
App. Name and Title:
AppL Address:
City of Clearwater
112 S. Osceola Avenue, Clearwater, Florida 33516
A.
STATEMENTS BY APPLICANT AND ENGINEER
City of Clearwater
Applicant
I, the owner/authorized representative of'"
am fully aware that the statements made in this application for approval of wastewater collection/transmission facilities
are true. correc( and complete to the best of my knowledge and belief. Further. I agree to retain the aasi=J1 < nginear. !H-
aR8tl<9?'-professional engineer registered in Florida, to supervise construction and the initial three months of operation
of the facility. I also agree to maintain and operate the facilities in compliance with the provisions of Chapter 403 Flo.
rida Statutes, and all applic~ble rules and regulations of the Department of Environmental Regulation. I understand
that an approva.l'. if gran. te..d. . by the Departm. zent is nontransfe.r.able..and will promptly notify the Department upon sai.d or
legal transfer of..{t; ap~r~yed facilities. / ~\ _
S;,nod. .. !l~w l..Ltj>:X J'~t-" ._cLli..U . 0,,, (l~hWJ-- a {i/ / '? 1 r
N dT'1 Anthony L. Shoemaker, City Manager
ame an It e.
"'Attach a letter of authorization. If applicant is a corporation. a Certificate of Good Standing must be submitted with
application. This may be obtained for a $5.00 charge, from the Secretary of State, Bureau of Corporate Records,
Tallahassee, Aorida 32304. .
-...
B. PROFESSIONAL ENGINEER REGISTERED IN FLORIDA
I hereby certify that the enginee~ing features of this wastewater collection/transmission system have been designed by
me, in accordance with Chapter 403 Florida Statutes and Chapter 17-6, Rules of the Florida Department of Environ-
mental Regulation :'/7.
lLZ.. .. 2280 U.S. Hwy 19 N Suite 165
Signature MaJllllg Address: -el ear Wd tel', -fl 01 i da 33S1 S
Edward Mazur, Jr.,
(Please Type)
Company Name: Post, Buckl ey, Schuh & Telephone No.:__
Jernlgan, Inc.
Name_
725-3614 .
Florida Registration Number:
(Affix Seal)
21318
August 21,1978
Date:
DER Fonn PERM 14-3 (Apt 76) Page 1 of 4
r'
:;.
I
I
. "
,.
DIRECTIONS:
(1) All items must be completed in fuII in order to avoid delay in processing of this application.
(2) All information 10 he typed or prin Il',1 in ink.
(3) Four (41 copil's of this application :lI1d a l'heck for twenty dollars. made out to State tlf Florida , Department of Environmental
Rl').:ul:'lion, will he slIhmillL'd with this appliL'ation when sent to the appropriate District/SubdislriL't uffice.
(4) If Ihe projel"t is '.....aled in an area under the jurisdiction uf a local pollution control and/or planning agency, furnish those agencies
wilh a wry of this application prior to submilling to the Department of Environmental R~gulation: Enclose copies of those agencies re-
marks wilh application. The planning a!!ency will certify that the proposed project is in cQnformance with the comprehensive area wide
waler quality maRiI!!ement plan as approlied,by the Department.
IS) This application to be accompanied by one set of engineering drawings, specifications and design data as prepared by a Professional
Engineer registered in Florida, under Chapter 471, Florida Statuies. The basis for design will be the W. P. C. F. Manual of Practice, Num-
ber 9. and other criteria as approved by this Department.
(6) Allach 8'h" x 11' sketch of the proposed project showing location of the treatment plant and effluent disposal area. its relationship
to the entire service area, and how it ties into the existing system. .
ALL INFORM~ TION TO BE TYPED OR PRINTED IN INK
ALL COPIES OF THE APPLlCA nON TO BE SIGNED BY; THE APPLICANT, PROJECT ENGINEER AND THE OWNER
OF THE SEWAGE TREATMENT PLANT.
(I) County Pinellas
(2) Date of application August 21, 1978
(3) Applicant (name and title)~ ty of C1 earwater
(4) M:liling Address---1l2 S
442-6131
Os.ceola Avenue, Clearwatf>r, Florida'
Zip
::n516--
(5) Telephone Number
(6) Description of establishment to he served:
a. Name Countrysi de (Landmark Dri ve Ext.)
b. Localion(specific). Approx. 3/4 mil~ northwest of intersection of SR 580 & Landmark Drive
c. Type: single family homeL~X:--. apartments~. mobile homes__, motel_,
other (describe)
d. Total number of units
*
*
GPO/unit
Flow:
e. Number of units per connection
1
-........ ~
f. Number of bedrooms per uniL
2, 3 & 4
g. Population per unit
2.4
h. Number of connections
~
I. Total population to be served
*
Flow:
100
GPCD
j. Expected av.:rage daily now _
*
'*
GPM.
GPO,
..
(7) Details of proposed project:
a. List lengths. sizes and material .::omprising proposed sewer construction mains. Gravity
fefce
2628 L.F. 8" V.C.P., 7 manholes
. .
Is this application associated with or part of a Development of Regional Impact ( DRI ) pursuant to Chapter 380, Florida Statutes, and
Chapter 22F.2, Florida Adminis~ative Code? .........yes ..X.NO .
nJ:J) J:"",, PJ'IHA 14-1 (A.nr 71;\ P....., nf4
* See Attachment (2)
l
(~) a. Pumping station data:
Location
and/or No.
I
I
Design Flow GPM
Min. Max. Avg.
GPM
t-~-
F
Pump De~ign Characteristics
TDH GPM r TDH -
No pump station
proposed within this
project.
.b.'. Emergency provisions (include treatment and disposal of.o\,erflow):
(9) Construction schedule of proposed project:
Start Date
September 1978
Estimated completion date
November 1978
Expected date of connection to STP
N/A - See Attachment (2)
(10) Estimated costs (show breakdown by components) S.ee Attachment (l)
(11) Sewage treatment plant serving this project:
a. Name
Northeast Pollution Control Facility
b.. Localion(specific) N.E. corner SARA 580 & C.R. 1
County Pi n911as
c. Owner
City of Clearwater
Telephone 44'> 6131
d M'I' dd P.O. Box 4748, Clearwater, Fl.
. al mg a ress
Zip
-.....'
33518
Phil J'anocha
e. Plant supervisor '
f. Certilied operator
z
class of cerlilication
A
. Not certified
g. Full time operator
x
, ~arttime ,operator
h. Plant innuent loading and tre~tment data:
. (I) Flow (MGD)
. Average last 12 months
Average last 30 days
.478
.478
..
(2) Anticipated flow upon completion of this project
660
1.092
(3) Anticipated flow from all projects approved but not yet connected
Plant design average_
1.0
DER Form PERM 14-3 (ApI.76) Page 3 of 4
~ ..
, I
._-,,-.....
--- -l~
o.
(4) Treatment efficiency
Pr
pr
b
PlA
-
5 Day BOD ~ Total Susp. Solids
- --.-r----- --- ----- -- -.----- -.-.- ------
Innuenl Ern. Percent Influent Em. Percen(
, Ihs.fday Ibs./day Reduction Ibs./day Ibs.lday Reduction
Avg. Last
12 Mos. 874 48 94.5 842 36 95.7
Avg. Last 622 44 92.9 786 24 97.0
30 Days
Projected upon
completion this 1206 66 94.5 1162 50 9~.7
project
ojected all
ojects appd. 1996 109 94.5 1923 82 95.7
ut not tied in
NTDESIGN AVG. 2086 207 90.0 2086 209 90.0 .
(12) Statement, sewage treatm~nt plant owner: .
The undersigned. owner/authorized representative* of
City o~ CIARrw~tA~
hereby certify that the above
referenced plant has adequate reserve capacity to accept the wastewaters from this project and will provide the
necessary (reatment and disposal as required by Chapter 403, Florida Statutes and all rules and regulations of the
Departmellt. Further, the undersigned verifies that his treatmen( plant is operating under a valid permit,
176 52 2516 3-9-76
No. , Dated, . issued by)he Department, and the connection
of the proposed project will not be in ,violation of any condiri~ns of said per it. . ~-
/ J - :" l' '.' I'" -.....,
", , /. ~, ..,~:
Signed _ i ~ < .' .' ,y\ ,-J ,.y
Name and Title ~.. L. Shoemaker, Ci ty Mana~e~
Type or Prin(
*Attach letter of authorization. This approval is granted with the clear understanding
that such approval does not mean that the City of Clearwater will
automatically issue building permits to the developer identified in
this application as all City sewer treatment plant capacities are
apportioned and allocated by a Building Permit Review Committee
and approved by the City Manager, before Building,Permits can ~ issued,
to assure that plant capacities are not exceeded, and to insure that all
customers have an equal opportunity to obtain such service.
DER Form PERM 14-3 (Apr 76) Page 4 of 4
I
I
ATTACHMENT (l)
(10) Estimated Cost - Continued
Sanitary Sewer {8").............. ....... .$19,500.00
Ma n ho 1 es . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 ,900 . 00
TOTAL $24,400.00
--:
"
.
.
I
I
ATTACHMENT (2)
The 8"" sanitary sewer to be constructed with this project will not
convey sanitary sewage until the adjacent tracts (Tract 54, 55, and 67) are
constructed. This is not anticipated for at least 6 months from the
time of construction of Landmark Drive. When the adjacent tracts are
completed the sewage g~nerated from each will be as follows:
Av'g. Daily
Tract # # Units # People* Sewage (GPM)
54 176 422 29.3
55 45 108 7.5
67 159 382 26.5
TOTALS 380 912 63.3
* Assumed 2.4 ppu
Assuming a peak flow rate of 4.0, the anticipated peak discharge
from this area will be approximately 0.56 CFS. The minimum slope indi-
cated by the attached drawings is 0.40 percent, which results in a cap-
acity of 0.76 CFS. Therefore. the proposed 8" sanitary sewer will be
capable of transporting the anticipated sewage from the adjacent tracts.
-... >
,
~
I
r
'4! ~ .~,~
DREW ST. SR.590
N
~
c:
"")
o
\f)
.~
.4'
)
SR. 584 m
>=
~
CURLEW RD ::r:
.c:::
:::l.
...
...
o
'")
::>
PROJECT
LOCATION
MAIN ST.
S R 580
~
.~
;'7
U
r')
'3'1
III
SUNSET POINT RC,
a::
lJ)
S. R 588
S.R. 590
Tampa
--... ,
80.1
S. R. 60
GULF iO BAY BLVD.
S.R.60