Loading...
PERMIT NUMBER DO52-36613 TO OPERATE SUBJECT POLLUTON SOURCE .. - . -"" ) I 1601 HIGHWAY 301 NORTH TAMPA, FLORIDA 33610 ~ l ~ -_.~~--- ~~ "'_~'._'____O _c;,~ \ ).__- ~ _ . _ __Id j ... 1> ; ',~ BOB GRAHAM GOVERNOR JACOB D. VARN SECRETARY DAVID PUCHATY DISTRICT MANAGER STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL REGULATION SOUTHWEST DISTRICT December 1, 1980 Pinellas County Clearwater Northeast Wastewater Treatment Plant Mr. Anthony L. Shoemaker City Manager City of Clearwater City Hall P.O. Box 4748 Clearwater, FL 33516 \..... ~T) \ ~- (JliJ . ~t,J \ L ).2.1$..,1'..... (p. jJ. X'.J/fJ- . 7; /1 ~. I ~,,...)- ; .. \ q. j\,/}q <Po' J.' .: ')P.,,'''' - - Y':-I" , dated 12/1/80 Dear Mr. Shoemaker: Enclosed is Permit Number D052-366l3 to operate subject pollutlon source issued pursuant to Section 403.087 , Florida Statutes. Should you object to this permit, including any and all of the con- ditions contained therein, you may file an appropriate petition for administrative hearing. This petition must be filed within fourteen (14) days of the receipt of this letter. Further, the petitlon must conform to the requirements of Section 28-5.201, Florida Administrative Code, (see reverse side of this letter). The petition must be filed with the Office of General Counsel, Department of Environmental Regulation, Twin Towers Office Building, 2600 Blair Stone Road, Tallahassee, Florida 32301. If no petition is filed within the prescribed time, you will be deemed to have accepted this permit and waived your right to request an administrative hearing on this matter. Acceptance of the permit constitutes notice and agreement that the Department will periodically review this permit for compliance, including site inspections where applicable, and may initiate enforcement action for violation of the conditions and requirements thereof. cc: Records Center TBRPC Sincerely, FPSC Robert A. Elefritz, P.E. Enclosure DER Form 17-1.122(66) l/2 I:, "-' RULl:S OF 'rUE ADMINJ STRATION COMMISSION MODEL RULES OF PROCEDURE CHAP'l'ER 28 - 5 DECISIONS DETEl~INING SUBSTANTIAL INTERESTS PAH'l' I I FOH.MAL PROCEEDINGS ~U-5.201 Initiation of Formal Proceedings. (1) Initiation of formal proceedings shall be made by petition to the agency responsible for rendering final agency action. The term petition as used herein includes any application or other document whicll expresses a request for formal proceedings. Each petition should be printed, typewritten or otherwise dup- licated in legible form on white paper of standard legal size. Unless printed, the impression shall be on one side of the paper only ~nd lines shall be double-spaced and indented. (2) All petitions filed under these rules should contain: (a) The name and address of each agency affected and each agency's file or identification number, if known; (b) The name and address of the petitioner or petitioners, and an explanation of how his/her substantial interests will be affected by the agency determination; (c) A statement of when and how petitioner received notice of the agency decision or intent to render a decision; (d) A statement of all disputed issues of material fact. If there are none, the petition must so indicate; (e) A concise statement of the ultimate facts alleged, as well as the rules and statutes which entitle the petitioner to relief; (f) A demand for relief to which the petitioner deems himself entitled; and (9) Other information which the petitioner contends is material. ******************** ^ peLition lIIay be denied if the petitioner does not state adequately a material factual allegation, such as a substantial interest in the agency determination, or if the petition is untimely. (Section 2l:S - 5 . 20 1 ( 3) (a), F AC ) DER Form 17-1.122 (66) 2/2 .., J r ;",- J- "* ~780f KtG"HWAY301 NORTH . TAMPA. FLORIDA 33610 ~ .f ~ t~; .~ STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL REGULATION SOUTHWEST DISTRICT J I BOB GRAHAM GOVERNOR JACOB D. VARN SECRETARY DAVIDPUCHATY DISTRICT MANAGER APPLICANT: Mr. Anthony L. Shoemaker, City of Clearwater City Hall P.O. Box 4748 Clearwater, FL 33516 City Manager PERM IT ICERTI FICA TlON NO. D052-366l3 COUNTY: Pinellas PROJECT: Clearwater Northeast Wastewater Treatment Plant This PYl}'it JS issued under the provisions of Chapter 403.087 , Florida Statutes, and Chapter - , Florida Administrative Code. The above named applicant, hereinafter called Permittee, is hereby authorized to perform the work or operate the facility shown on the approved drawing(s). plans, documents, and specifications attached hereto and made a part hereof and specifically described as follows: Operation of an 8.0 MGD activated sludge wastewater treatment plant with chlorinated effluent (5.0 MGD maximum) to Possum Branch and Lake Tarpon Canal with balance of effluent to spray irrigation. Replaces Permit No.: DC52-253l9 expired 6/1/80 Location: North of Highway 580, East of McMullen Booth Road Clearwater, FL Latitude: 2801'15" Longitude: 82042'0" Inf.Sta.No. 2404-2081 Eff.Sta.No. 2404-2082 Segment No. 24.4EA Station ID No. 52 M 05963 PAGE 1 OF 4 DEA FOAM 17-1,122(63) 1/4 (1/80) IX 0 O'~ :5 () () - 0 Co PERMIT NO.: APPLICANT: D052-36613 Mr. Anthony L. Shoemaker, City Manager GENERAL CONDITIONS: 1. The terms, conditions, requirements, limitations, and restrictions set forth herein are "Permit Conditions:, andas such are bind- ing upon the permittee and enforceable pursuant to the authority of Section 403.161( 11. Florida Statutes. Permittee is hereby placed on notice that the department will review this permit periodically and may initiate court action for any violation of the "Permit Con, ditions" by the permittee, its agents, employees, servants or representatives. 2. This permit is valid only for the specific processes and operations indicated in the attached drawings or exhibits. Any unautho- rized deviation from the approved drawings,exhibits, specifications, or conditions of this permit shall constitute grounds for revoca- tion and llnforcement action by the department. 3, If, for any reason, the permittee does not comply with or will be unable to comply with any condition or limitation specified in this permit, the permittee shall immediately notify and provide the department with the following information: (a) a description of and cause of non-compliance; and (b) the period of non-compliance, including exact dates and times; or, if not corrected, the antici- pated time the non-compliance is expected to continue, and steps being taken to reduce, el iminate, and prevent recurrence of the non- compliance. The permittee shall be responsible for any and all damages which may result and may be subject to enforcement action by the department for penalties or revocation of this permit. 4. As provided in subsection 403.087(6), Florida Statutes, the issuance of this permit does not convey any vested rights or any ex- clusive privileges. Nor does it authorize any injury to public or private property or any invasion of personal rights, nor any infringe- ment of federal, state or local laws or regulations. 5. This permit is required to be posted in a conspicuous location at the work site or source during the entire period of construction or operation. 6. In accepting this permit, the permittee understands and agrees that all records, notes, monitoring data and other information re- lating to the construction or operation of this permitted source, Which are submitted to the department, may be used by the depart- ment as evidence in any enforcement case arising under the Florida Statutes or department rules, except where such use is proscribed by Section 403.111, F .S. . 7. In the case of an operation permit, permittee agrees to comply with changes in department rules and Florida Statutes after a reasonable time for compliance, provided, however, the permittee does not waive any other rights granted by Florida Statutes or de- partment rules. 8. This permit does not relieve the permittee from liability for harm or injury to human health orwelfare, animal, plant, or aquatic life or property and penalities therefore caused by the construction or operation of this permitted source, nor does it allow the per- mittee to cause pollution in contravention of Florida Statutes and department rules, except where specifically authorized by an order from the department granting a variance or exception from department rules or state statutes. 9. This permit is not transferable. Upon sale or legal transfer of the property or facility covered by this permit, the permittee shall notify the department within thirty (30) days. The new owner must apply for a permit transfer within thirty (30) days, The permittee shall be liable for any non-compliance of the permitted source until the transferee applies for and receives a transfer of permit, 10. The permittee, by acceptance of this permit, specifically agrees to allow access to permitted source at reasonable times by de- partment personnel presenting credentials for the purposes of inspection and testing to determine compliance with this permit and department rules. 11. This permit does not indicate a waiver of or approval of any other department permit that may be required for other aspects of the total project. 12. This permit conveys no title to land or water, nor constitutes state recognition or acknowledgement of title, and does not constj- tute authority for the reclamation of submerged lands unless herein provided and the necessary title or leasehold interests have been obtained from the state. Only the Trustees of the Internal Improvement Trust Fund may express state opinion as to title, 13. Th is perm it also constitutes: ( ] Determination of Best Available Control Technology (BACT) ( ] Determination of Prevention of Significant Deterioration (PSD) ( ] Certification of Compliance with State Water Quality Standards (Section 401, PL 92-500) PAGE ~OF~. ,. - - ;;.~ DER FORM 17-1.122(63) 2/4 (1/80) ., ) f I'", :'10':' ~ I I PERMIT NO,: APPLICANT: D052-36613 Mr. Anthony L. Shoemaker, City Manager SPECIFIC CONDITIONS: 1. In accordance with the variance (DW-52-79) granted on May 25, 1979, the applicant shall: a. Take all steps necessary including the use of facility aerators to maintain the concentration of dissolved oxygen in Possum Branch at no less than 4 mg/l. b. Implement a water quality monitoring program designed to monitor the impacts of the discharge. Location: Site 1 - Upstream from outfall Site 2 - Briar Creek Blvd. Site 3 - Any accessible point between sites 2 and 4 Site 4 - Outfall to Lake Tarpon Canal Parameters Frequency Dissolved Oxygen Total Phosphorus as P Total N as NH3/N02N03/0rg N Fecal Coliform BOD TSS Weekly Bi-Monthly Bi-Monthly Monthly Monthly Monthly These results should be included with the City's monthly operating report. 2. The requirements of Chapter 17-16 F.A.C. regarding certified operators shall be met. 3. Monitoring shall be provided in accordance with Chapters 17-19 F.A.C. 3 4 PAGE_OF_. DER FORM 17-1.122(63) 3/4 (1/80) II PERMIT NO.: D052-36613 APPLICANT: Mr. Anthony L. Shoemaker, City Manager Expiration Date: May 2]...L 1981 '~ ~ Issuedthis'/---- dayof. . ...... .,19n 4 STATE OF FLORIDA DEPARTMENT OF ENV.IRONMENTAL REGULATION Pages Attached. cc: Records Center TBRPC FPSC Robert A. Elefritz, P.E. PAGE ---1- OF -L. W.K. Hennessey District Manager , I. I - DER FORM 17-1.122(63) 4/4 (1/80) . . - IDff~J I r"" ?: ) {) ,1 ~ I ' ~ . ., (iI_~ ~~.-....--~-~~ !! ~---c-\ ,.....--~::;- ......_-< -, \, \ ,. ..I' , L_. _ ---~-,-,"" ,I \ (f,f,. ..~ 1l5. , Io'rl.'" ....y','..; ~. \ "'1I\.-r1~ if' . Vf,t:../ '4Ir OF AJ:I'.~ STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL REGULATION ~~",~.-' :A !JUU.U L~tJJ I!~n\i '''. ..';,:, - ,,'.: ."" .: ~"".----.' ,. "',~.~""..~. "*:,te .-~. . . '.. " "'ld../.,:JJr:i::' APPLICATION TO OPERATE DOMESTIC WASTEWATER TREATMENT AND DISPOSAL SYSTEMS X Type application: (J Opention [x] Temporary Operation (I Construction Status Source: [xl New (I Existing (I Modification Source Name: Clearwater 8 MGD Treat"mpnt Facility County: Pinellas Source Location; Street: N of H1o(y. 580, E of McMullen Booth RCity: Clearwater Lat.: N28 0 ~ ' ~ .. Long.: W82 0 ~ ' ~ .. Appl. Name and Title: City of Clearwater Appl. Address: City Hall. P.O. Box 4748. Clearwater. Florida 33516 STATEMENT BY APPLICANT AND ENGINEER A. Applicant The undenigned ownet' or authorized representative- of Ci ty or Clp...rwatiP!T Signatu of toner or authorized representa . Anthony . Shoemaker, City Manager Name and Title (Please type) Date: Oct. 16, 80 Telephone No.: _ 813-442-6700: - Attach a letter of authoriution B. Professional Engineer Registered in Florida (where required by Chapter 471. F.S.) This is to certify that the engineering features of this pollution control project hIVe been designed/examined by me and found to be in conformity with modern engineering principles, applicable to the treatment and disposal of pollutants characterized in the pennit application. There is reasonable assurance, in my professional judgment, that the pollution control facilities. when properly maintained and operated, will discharge an effluent that complie-s with all applicable statutes of the State of Florida and the rules and regulations of the department. It is also agreed that the undersigned, if authorized by the owner, will furnish the applicant a set of instructions for the roper maintenance and operation of the pollution control facilities and, if applicable, pollution sour Signature: ..7t Name: Robert A. Elefritz, Jr., (Please Type) Mailing Address: P. O. Box 607 Ormor~ Beach, Florida 32074 P.E. Company PQme: Briley,. Wi 1 d t:. 0028408 Acta"',........9a Florida negistratlbn ~I').;. .-"-- '-' -_._-:-....- (Aff9A-S!~J-c Telephone No.: 904/672-5660 Date: October 7, 1980 '~ DER FO"lM17_-1122<21 P.~-t-ofa_'.' .. . I 1 DETAILED DESCRIPTION OF SOURCE A. Describe the nature and extent of the project. Refer to existing pollution control facilities, expected improvement in perfor- mance of the facilities and state whether the project will result in full compliance. Attach additional sheet if necessary, Project was covered under Construction Permits No. DC52-2l26A and DC-2126B. The original project was a 1 mgd interim treatment facility to serve the North service area of the city until completion of the 8 mgd Northeast Regional Secondary Facility. The interim treatment unit has become an int,egral, permanent ~art of the Regional Treatment facility. Is this application associated with or part of a Development of Regional Impact (DR I) pursuant to Chapter 380, Florida Sfatutes, and Chapter 22F-2, Florida Administrative Code7 _ Yes _ No B. Schedule of Project Covered in this Application (Construction Permit Application Only). Federally or State Financed Projects onlv: Planning Complete (Date): Not Applicable. Financing Program Complete (Date): Indicate other local, state and/or federal agency approvals and dates: All projects: Start of Construction (Date): Completion of Construction (Date): Not Applicable. C. Cost of Construction (Show a breakdown of costs for individual components/units of the plant serving pollution control purpose only). Information on actual costs shall be furnished with the application for operation permit. O. For this source indicate any previous DER permits: issuance dates, and expiration dates; and orders and notices. Construction Permit No. DC52-25319 dated 12/20/79 Expires 6/1/80 E. Indicate the relationship between this project and area regional planning for sewage treatment. List steps to be taken for this sewage treatment plant to become part of an area wide sewage program. This facility was constructed as an interim treatment facility and has become an integral part of the Clearwater Northeast Regional Secondary Treatment facility in accordance with the Water Quality Management Plan for the Tampa Bay Basin. F. Indicate EPA-NPDES permit, effective date and expiration date: Permit No. FL: 0011607 (NPDFC::-Tn1-pr;m Facility 1/29/76 Issue Date 1/29/81 Expiration Date 5/25/81 DW-52-79 DER Variance 5/25/79 DER FORM 17-1122(2) Palle2 018 I , DOMESTIC WASTEWATER TREATMENT PROCESS A. GENERAL ,. Present Population of Area to be Se",ed: 2. Population Served by Existing Pfant: Type and number of Units: 3. New Design Population to be Served: Type and number of Units: 4. Present Approved Capacity of Plant: 5. New Design Capacity Proposed: B. TREATMENT AND DISPOSAL UNITS 92 ,000 estimated city population 12 , QUO 66,000 1 8 MGD MGD 1. List the sequence of treatment units and disposal systems and specify the number, dimensiom, cap<<ity .-t design criteria. Use additional sheet if necessary. COnventional activated sludge secondary treataent Treatment or Disposal Unit 1. Mechanical. screens 2. Aerated grit removal 3. Primary settling 4. Aeration tanks 5. Secondary settling 6. Chlorine contact Dimensions, Areas. CaPKities and Other Descriptive Data Design CriW"ill 2 Wlits each with 20 mgd peak capacity 4 tanks, total volume 7800 cu. ft. 10 min. detention @ 8 mgd 2 tanks, 75 ft. diameter 2.6 hrs. detention at 8 mqd. Design loading 910 gpd/sq. ft. 8 tanks, 240.,.0.00. cu. ft. total 5.4 hrs. detention at 8 mgd. 39 'Avg. daily pounds BOD/1OOO cu.ft. 4 tanks, 75 ft. diameter 4.9 bra. detention at 8 mgd. Surface loading at 450 gpd/sq. ft. 2 tanks, 23,330 cu.ft. 31.4 minutes detention at 8 mgd. 2. Advanced Waste Treatment!Tertiary Treatment provided for: 1 mqd spray irrigation in underdrained fields. [xl Nitrogen Removal lie! BOD/Suspended Solids Remowal l7 mgd additional secondary effluent [xl Phosphate Removal ( ! Other (Specify): J" ''to stream discharge.) o,lorination: Points of Application: pre-chiorination ~ secondary effluent chlorination, and chlorination '""". I . 0 prior to spray irrigation. ..... onne osage: 4,000 !bs/day chlorinator. Sufficient dose to achieve 1 ppa residual for List Sludge treatment unit.: spray irrigation. Aerobic digester c. D. DER FORM 17-1.122121 Page 3 of 8 , I , E. Volume. Composition. and Site and Method of Ultimate Disp0sa4 of Sludge (Provide name and address of carrier, if applicable.) Digested sludge will be disposed of by landsp:reading. Planning is currently underway for future sludge drying beds. F. Method(s) and location(s) of flow measurement. Venturi flowmeter located between the grit re.oval chamber and the primary tanks. G. D81Cribe practices to be followed to ensure adequate treatment ..s disinfection during emergencies suc:n as power loss and equipment failures causing shut down of pollution abatement equipment: The plant has dual pover feed capability fro-. the Florida Power Corporation and therefore, no engine generator sets have been provided. H. Laboratory: List tests for which equipment/chemicals are provided: Laboratory equi~nt and facilities have been installed to conduct the following tests: BOD Suspended, total, and volatile solids Phosphorus Nitrogen Dissolved OXygen pH Chlorine Besidual. ColifoDDS DEA FORI\II11-1.122121 Pege4 o~e I , DOMESTIC WASTEWATER CHARACTERISTICS Information furnished in this section for Construction Permit shall be based on reasonable prediction and good professional juc9nent. However, ~ data shall be submitted when applying for an operation permit.. A.. flow (MGOI Average Daily Flow for proposed project: .976 existinq avq. flow, 8 mqd design flow B. Water QlQlity Characteristics: Based on operating reports for months of August 1979 throuqh August 1980. 1- Effluent * Spray Fie1d (Af1l!r Qllorination) ~ter Influent Per Cent ppm Aww. Design Removal Removal ppm Capacity IbsJday IbI./day 5-day BOO 158 3.6 29.3 1259 97.7 -- Total Solids: Total: Volatile: Suspended Sol ids: Total: 161.5 5.4 43.9 1270 96.1 --- - ---- ---- - --~~- Total Nitr09l!'1 (N)" 1.6 12.9 ------- ...... - - Tout~us(P). 1.2 9.9 Other. - . "This requirement. if necessary, will be specified in construction permit. C. Average Qllorine Residual in Effluent 1.5 ppm O. List industrial wastes, if any, treated in combination with domestic wastes: N/A *Secondary Effluent Characteristics ppm Effluent (After Chlorination) Design Removal Capacity lbs./day Per Cent Removal. Parameter Influent ppm Avq. lbs./day 5-day BOD 158 7.5 61.0 1225 95.2 Suspended Solids 161.5 11.8 96.0 1219 92.7 DER FOR~ 17-1.122(2) P8ge5of8 I 1 ULTIMATE EFFLUENT DISPOSAL A. Type of Receiving Body of Water 1. Surface Waters: Fresh Salt or Brackish 2. Ground Waters: Surface or Sub-surface Irrigation Ponding and Percolation Recharge Wells B.. if discharge is to surface waters complete the following: Possum Branch & Tarpon Outfall Cana Name of Water Body bel 1 ( I 2 ( I 3 [ I 4 [ ] 5 1 mgd spray irrigation with underdrain flow mixed with secondary effluent that is discharged to creek 1. Drainage Ditch R wer Landlocked Lake Tidal Estuary [ J 1 [ ) 2 [ I 3 [ I 4 Small Stream Man-made Canal Lake with Outlet Ocean or Gulf Ixl 5 rl6 [ I 7 [ 18 Outfall discharge line to 2. Identify and describe the drainage path of effluents to major body of water: Possum Branch which drains to Lake TarPOn Canal which in turn drains to ~ar~ty Harbor and Old Tampa BaY. 3. Florida's Water Ouality and Use Classification of the receiving waters: Possum Branch Class II, Old Tampa Bay 4. Minim~~~~I~~erage flow of the receiving bodies of water for 1o.year period: None MG/WK 5. Degree of dilution provided by receiving waters of minimum flow: C. Description of Outfall to Area Surface Water DiSCharge into channel None 1. Approx imate water depth at outfall during low flow: Outfall is level with stream bottom 2. Approximate depth below outfall invert: 3. Diameter of outfalt: 36 inch concrete pipe 4. Approximate dista~ of outfall from shoreline: Located on shore line D. If discharge into ground waters is involved during treatment or disposal, furnish the following information: 1. Surface or sub-surface irrigation: Eventua1ly discharged to creek. a) Description of disposal structure(s) Pipe, risers, spray heads and 900 gpm pumps and underdrain system. Underdrain water discharged via outfall. b) Area under irrigation Total: 82 acres Per rotation: approximately 12 acres c) Irrigation rate: 3 inches per week. This rate will be satisfactory with the underdrain -svstem orovided... . d) l'en:oration~ate: 501.1 Conservat1.on Services reports ind1.cate that the effluent will IPerco1at:.e adeau..rt.elY..with underdrains which have been installed. e ""Vltlmate olsposaronunace Slhrsunaee runoff: . surrounded by a peripheral ditch,!,here is no surface runoff, the ent1.er spray area is f) Cover crop, type: Argentine Bahia and nursery plants. 2. Seepage Ponds: (for each surface impoundmentl al Area of Pond(s): N/A bl Design Depth of Water in the Ponds: cl Percolation Rate: d) Indicate any overflow during rainfall: el What is groundwater table elevation at its highest point during the year? What is the elevation of the pond bottom? fI Number and location of groundwater monitoring wells: OER FORM 17-1.122(21 Page6of8 t I , . .' -. 'E. Environmental Data on Pollution Source 1. Character of Area Within One Mile of Plant: Residential 2. Distance from the Nearest Municipality: Inside the City of Clearwater 3. Owner of Land (if different from applicant): (Same) 4. Availability of Space for Expansion of Plant: City owns 32Q acres on which the plant is sited 5. If disposal is to groundwater as described in Section D above, complete the following: N/A al Description of the geohydrology of gr~ndwater in the disposal area: bl Direction of the groundwater flow: c) Description of the chemical characteristics and uses of the area groundwater: d) Indicate the number of potable water supply wells within 500 feet of effluent disposal area, the depths of those wells and their approximate distances and direction from the disposal area: None el List all lakes, ponds and all other sources of surface water within one mile of the disposal area. List their uses and the water elevations of the water bodies, their approximate distance and direction from the disposal area: ADDITIONAL DATA FOR TEMPORARY OPERATION PERMIT (For Exiltlng Sources Not Meeting Department Standards) N/A Jultificatlon for Temporary Operation Permit Request A. Attach additional sheets responding to the following items: 1. The facts and reasons which support that: a. the applicant has a wastl! lor which no feasible and acceptable mlfthod of treatment or disposal is known and the applicant is making a hona fide effort through research and other means to discover and implement such a method; b. the applicant needs permission to pollute the waters within the state for a period of time necessary to complete rewarch, planning. construction. installation or operation of an approved abatement facility or alternate waste disposal system; c. there is no present reasonable, alternative means of disposing of applicant's waste other than by discharging into waters of the state; d. the denial of a temporary operation permit would work an extreme hardship upon the applicant: e. granting of a temporary operation permit will be in the public interest; f, the schedule for meeting compliance outlined in c. is reasonable; g. the discharge will not be unreasonably destructive to the quality of the receiving waters. 2. The damage or harm resulting. or which may result, to the quality of the receiving water should the department grant atem- porary operation pennit or an extension to an existing temporary operation permit. 3. Any advantages or disadvantages to residents and the environment in the affected area resulting from the department granting or denying a temporary operation permit or an extension to an existing temporary operation permit. B. Technical Data: 1, Manner of discharge: 2, Receiving body of water: 3. Use of receiving body of water: 4. Condition of receiving body of water: 5. Nature of discharge: 6, Volume of discharge: 7. Frequency of discharge: 8. Quantity of discharge: DEA FORM 17'1.12212) Page 7 of 8 II ;. I 9. Ouality of Discharge: RAW Lbs/day BOD5 Lbs/day Total SuspendedSolids PPM DO at outfall Lbs/, day Total Phosphorous, P Lbs/day Total Nitrogen, N Lbs/day Total Kjeldahl N 10. Proposed Time Discharge is Required: 11, Reasons for Time Required: I FINAL 12. Reasons why conditions of Chapter 403, Florida Statutes and Chapter 11.3, Florida Administrative Code have not been met: C. Plans for meeting full compliance to Chapter 403, F ,s., and Chapter 17.3, F .A,C. Schedule of Increments of Progress to meet compliance: 1. Date when planning is expected to be complete 2, Date when engineering will be complete 3. Date construction application will be submitted to upgrade or replace the ex. isting plant or build lift station and force main to phase out the present fa. cility, 4. Date contract will be let 5. D1Ite construction will commence 6. Date construction is to be complete and so certified 7. Date that wastewater collection/transmission/treatmentleffluent disposal sys- tems will be certified "in compliance" to your permit (cross out inappropriate components) O. Who will he responsible fOI ovelscleing that the alxlVe time schl.'tJule will be met? NAME_______ (Print or type) TITLE ADDRESS PHONE Signature OER FORM 11.1.122(2) Page8of8 Date