Loading...
2007 SIDEWALK PROJECT - 07-0023-EN - ADMINISTRATIVE CHANGE ORDER #2 ~. So ADMINISTRATIVE CHANGE ORDER # 2 PROJECT: 2007 Sidewalk Project CONTRACTOR: Southwest Contracting, Inc. 14159 Black Lake Road Odessa, FL 33556 July 2,2008 PROJECT NUMBER: 07-0023-EN PO REFERENCE NO.: ST 104073 DATE OF CONTRACT: February 11, 2008 CODE: 0315-92339-563700-541-000-0000 (A) 0315-92273-563700-541-000-0000 (B) SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT See attached sheet for decreases and additions to cOntract. STATEMENT OF CONTRACT AMOUNT ACCEPTED BY: ORIGINAL CONTRACT AMOUNT Administrative Change Order # 1 Administrative Change Order # 2 NEW CONTRACT AMOUNT $189,430.45 $0.00 ($16,520.37) $172,910.08 ATTEST: ~~~L.- E Cyn . a E. Goudeau, Date: William B. Home, II Southwest Contracting, Inc. Date: 1-11-tJD . . -~ . Witnesses: ~Ol1j,1 ili ,'0 Q ~~~ : City of Clearwater Gary A. 0 son, GC Public Services Director ~o:;, ~ Michael D. Quillen,~ City Engineer Decreases for Code 0315-92339-563700-541-000-0000 (A) Construct 6" Concrete Sidewalk (3,000 PSI w/Fiber Mesh reinforcing and 6/6 x 10/10 W e1ded Wire) Root Pruning Install Tactile Warning Surface (Truncated Domes) 10% Contingency 'j, - .-~.. Page 2 of2 Administrative Change Order # 2 2007 Sidewalk Project ITEM DESCRIPTION 2 3 4 7 QUANTITY UNIT UNIT COST TOTAL COST 2591.698734 SF $3.95 205 LF $5.00 (10,237.22) (10,237.21) ($1,025.00) 172 SF $41.95 1 LS $14,637.75 SUBTOTAL (Decreases) Code A: ($7,215.40) ($14,637.75) ($33,115.36) Increases for Code 0315-92339-563700-541-000-0000 (A) Construct 4" Concrete Sidewalk 1 (3,000 PSI w/Fiber mesh 3070.5 SF $3.10 SUBTOTAL Increases Code A: $9,518.55 $9,518.55 ($23,596,81) TOTAL NET (Decreases)/Increases Code A: Decreases for Code 0315-92273-563700-541-000-0000 (B) Remove and Replace 4" Concrete Sidewalk with Shell Aggregate Concrete Sidewalk 11 (3000 PSI w/Fiber mesh Install Tactile Warning Surface 13 (Truncated Domes) Remove and Replace 6" Concrete Driveway to Match New ADA Compliant Sidewalk (3000 PSI w/Fiber mesh Reinforcing and 6/6 x 10/10 21 Welded Wire) Increases for Code 0315-92273-563700-541-000-0000 (B) Remove and Replace 4" Concrete Sidewalk (3000 PSI 9 w/Fiber Mesh Reinforcing) 484 SF Remove and Replace 6" Concrete Sidewalk (3000 PSI w/Fiber Mesh Reinforcing and 10 6/6 x 10110 Welded Wire Mesh) 1835.2 SF 1000 SF $3.60 ($3,600.00) 78 SF $41.95 ($3,272.10) 828.779817 SF $5.45 SUBTOTAL (Decreases) Code B: ($4,516.85) ($11,388.95) $4.10 $1,984.40 $3.95 $7,249.04 ~ . '.... Remove and Replace 6" Concrete Sidewalk with Shell Aggregate (3000 PSI w/fFiber 12 Mesh Reinforcing and 6/6 x 951 SF $4.45 SUBTOTAL Increases Code B: Additions for Code 0315-92273-563700-541-000-0000 (8) Remove and Replace 6" Concrete Sidewalk with Shell Aggregate (3000 PSI w/Fiber Mesh and 6/6 x 10/110 Welded Wire. Includes Demolition of Abandoned Utility Vault, Additional Equipment, and 22 Additional MOT) 1 LS $5,000.00 SUBTOTAL Additions for Code B: TOTAL NET (Decreases)/Increases/Additions Code B: $4,231.95 $13,465.39 $5,000.00 $5,000.00 $7,076.44 TOTAL NET (DECREASES)/INCREASES/ADDITIONAL ITEMS ($16,520.37)