TRAFFIC SIGNAL AGREEMENT PIERCE BOULEVARD CONNECTOR FROM MEMORIAL CAUSEWAY TO COURT STREET
FIoi.i~:~~::'\1 Department of ITranSDortation
'."'<_""'-'.1.' ,"'..""'.- -: ~ _ , ...
REUBIN 0'0. ASKEW
GOVt:RNOR
.~\ /.- .
\.~~;;;:( '. 1
~,., ',~
Iii".
)Jff
WAl TER l. REVell
SECRETARY
P. O. Box 124~
BaJdow, FloJUCLt 33830
May 14,1973
Mtt. Max Ba.tft{~
CLty Engine.eA
CLty 015 Cle.aJwJa.teA
C.c.e.aJlWateA, FtoJUda 3351 8
Re.: Job Nl.lmbeJ1. 15000-1707, B. 1.
No. 116630, PieAce. Boule.vand
bJr.om MemoJUaf. Highway (SR 60)
.to COLtJt.t S:tJLe.e.t.
Ve.aJL MtL. Ba.tile.:
End0.6e.d JA a 6ully e.xe.cute.d joint pJr.oje.c:t agJr.e.eme.nt ooJr. .the. above.
Jte.6eAe.nce.d joh fpJt .the. c-Uy' f., M1e.o.
The. above. job nLtmbeJl ha..6 be.e.n va.U.da.te.d; theAe.60Jr.e., we. may pJr.oce.e.d
wUh .the. e.n vifto nm e.n.t..11. f., tat em e.nt a..6 -6 00 n a.6 we. Jr.e.cu v e. the. Jr.e.po Jt.t
that ,the. c.J;ty i6 having pJte.pMe.d on .the. e.nvVLOnl'lJe.n..ta.e. e.615e.~~ that
:the. pMje.d will have..
Y oWL6 :t:Jr.uly,
vrSTRICT TRAFFIC OPERATIONS
i) ,-tf--
-.j.. vl.,('}..t(
)
./
G. G. Loti,
PJtog~ Engine.eA
GG L/ 6 b
~
~: <;-t ..
r r-~7~/ OF ClL~kNAT[R 1
i :i'iG r:4;:~isn'l/..:_.~ r
t r." Q ,II: 1:, 'n I
':- . ':;: ~ ti "iiLf,. j.' I
.. MAY 161913 :: I
j,;.i'" . ..".
. ,) .~.~ ~ .\/~ l,l Llerl-~.~;~Z'.i:3,;J1\{j\G
: ~ l r '. : ,. : ,.
....------.. -......
C. ~. .~~~!a
,1ty J<.ngn'f'er _-I./.J:C!.!.____.....,
A ..,,'t (':<" J'-' "''-'' IJ l--
'.,'~"""'-~ ' ~. '>-./. ~;"""r,,' ----------H-- ~
UVlrE::~3!JL:er _____________-
p. (... \';1. L; t -______h____
"cc: MJr.. John BwuU..n
C'hicf ";''':~ r 7"'.; ~1 ___________" tt:;--,
[:i::cretary __._______---___~_ i/'
j.-," : " ~ ,..:J c: -. ,.... .,.... , ..
... .-.-....... "-"'.~i.--........ ...._'...'.. ----------_.
~
II
..".....
,. '-".;.,:...',;"'-:>,.~ . ;
'~'-',;.,;~~~~".;.:~'~l.~~:jj.~ ~~'~~,"~"",-;~~~~,,~~q,,;;:-
.~',;,... ". t; ",-'
Form 281-'10
I
A~;)fl . .
. 'MEMORANDUM
DATE. April 30, 1973
State ot Florida Department ot Transportation
TO J. Wade Noda
Comptroller
FROM G. B. Dobson, General Counsel
COPIES TO Hal Conley
C. W. Monts De Oca
CITY OF CLEARWATER
SU:an:CT TRAFFIC. SIGNAL AGREEfJ'lENT
Job No. 15000-1707
County: Pinellas
Attached are four copies of a Joint Project Agreement
between the Department and the City of Clearwater pro-
viding for installation of a traffic signal at the
Pierce Boulevard Connector from Memorial Causeway (SR 60)
to Court Street in the City of Clearwater, Florida.
GBD:ph
Attachments
"
.~
I, I '
COUNTY TRAFFIC
SECTION JOB SR OPERATIONS COUNTY MUNICIPALITY
NO. ' NO. ' NO. NO. NAME
15000 1707 Pinellas Clearwater
JOINT PROJECT AGREEMENT
TRAFFIC OPERATIONS PROJECT
THIS AGREEMENT, made and entered into thi s~7~ay of
~L 19 13. by an~ between the STATE OF FLORIDA
DEPARTMENT OF TRANSPORTATION, an Agency of the State of Florida, hereinafter
ca 11 ed the II Depa rtmen t II and the
City of Clearwater
FLORIDA, hereinafter called the IIPublic Body.1I
WIT N E SSE T H:
WHEREAS, the undertaking of a traffic operations project, hereinafter
referred to as the "Project,1I is necessary for the safe and efficient highway
transportation at the location or locations as described in Exhibit "A,II
attached hereto; and
WHEREAS, the Public Body by resolution attached hereto and made a
part hereof, has determined that it is in the public interest for the Public
Body to participate in the cost of said Pr~ject to the extent specified in the
Department's policy.
NOW, THEREFORE, THIS INDENTURE WITNESSETH: That inconsideration
of the premises and the mutual covenants contained herein to be undertaken
by the respective parties hereto, the parties and each of them, mutually agree
and covenant as follows:
1. The Department shall be responsible for the preparation of
plans and specifications, securing necessary equipment and materials, con-
struction of the project including installation of equipment, supervision of
construction and installation, and inspection of the completed project at those
locations shown in Exhibit IIA" attac~ed hereto and made a part hereof. The
Department may at its own discretion either purchase the equipment and materials
':~,.,"~.~..~~~~:~....,~;~r';" ~.~~ ~ ~ ~~:"~';~~~~d',~.-l ~~'~~;k'~~'~~'~~;:'~\' :.~.~" ~~.~ ,~,~.....,~_~_ _j,,::-'.~-~::=~:::-~~::'~'=:k',~':;:::1~' "_~;';~.;~,~J.~.~:;~~.~,-~~~..:2!.i~~;i~'~:"'~;:~:'~;;-s~~ii;':'~~--;~'~:...'~'
I
"....t ~',
~, ~,.: -
i
! -
I
and install the same with its own forces, contract with a responsible con-
tractor or contractors to provide all the materials and labor for the com-
. pletedProject, or if so specified in Exhibit flAil of this agreement, the
Department will purchase all the equipment and materials listed in said
exhi bit and the Public Body wi 11 at i tSDwn expense; insta1"1 said equi p-
ment and materials to the satisfaction of the Department.
2. The type and make of equipment or materials purchased or in-
stalled will be at the Department's discretion but the Department will pro-
vide equipment and materials that are compatible with any other equipment
with which said equipment must operate asa system and will insofar as
practical, honor requests by the Public Body relative to specific types or
makes of equipment or materials.
3. The Public Body shall pay to the Department that prorate share
of all of the total costs incurred by the Department on the Project as speci-
fied in Exhibit "A," The public body will deposit with the Department its
prorata share of the costs of any phase of the Project as listed in Exhibit
IIA" prior to the commencement of any work or the allocation of any funds for
the particular phase of work.
4. The Department will schedule the Project for completion at the
earliest practical date.
5. The Public Body hereby agrees to indemnify, defend, save and
hold harmless the Department from all claims, demands, liabilities and suits
of any nature whatsoever arising out of, because of, or due to the breach of
this agreement by the Public Body, its agents or employees or due to any act,
or occurrence, or omission of commission of the Public Body, its agents or
employees. It is specifically understood and agreed that thi s indemnification
agreement does not cover or indemnify the Department for its one negligence
or ~reac~ o~ contrac:.
..
------......~-,~.,...-~-- .
~'"'.. '-~-~: ='=:::='::"":':-:-:'.=::
- ~."""7.' ..
:~~:~" ,~,-;.=.~"~,~:~:;;..~ _~~, ::'r~':'"'~ ._ -',-:......~'~~":~',~:-'~~~_....-,
.. _'. ,,' ,; ,,-;, , . .,JP~. ~ " .;:, ,......u.:~...~;~.ij....~.~~...--:...~
:JJ...,............._~~-~. .~'"_...............~'.-A....~~......, ._.J.;~t;.:.,.;k,..,..,.),........J~~,~.__...6....~ ~.... , - -
..-.. .," . "...'
~_4'~
..
I.
I
'to
6. It is mutually agreed that the Department's Director of
Road Operations shall decide all questions, difficulties and dis-
putes of any nature whatsoever that may arise uI)der, or by reason
of this agreement, the prosecution and fulfillment of the service
hereunder and the character, quality, amount and value thereof;
and his decision upon all claims, questions and disputes shall be..
final and conclusive upon the parties hereto.
IN WITNESS WHEREOF, the parties hereto have caused these
presents to be executed, the day and year first above written.
.
As to
/t. IK~
Department
STATE, OF FLORIDA
DEPAR5rE~ OF T~S~;~AlION
BY: ~ Ule#-? ..~
Director of Admlnistra on
ATTEST: g ~..
Executive
_~(SEAL)
HU .
. )
'J i i'C;(7)
t} I I ~,_\{'jCL
W\i( '. II
:, ij \j
PUB~
;~~ ~ ... ER,
Title
FLORIDA
~"1'73
(Date) ~
ity Clerk
Approved s to form, Legality
and Execution.
~:; '-
(SEAL)
ATTEST:
Approved:
Director of Road
~~
' j,(";,, . I
.. . . t i .1 5
Operations
~ ~,"-r~m ,~. ,=-_',~~)7..._.~~.~f~'_'."'_~i.O~~:.G:~~~:~~::'~ '~n~~i~,~~-~.t'&Y..;Ai.~~~: ~,~,.~~~:-~. ~ ",:~~:IT!.'~~= -:~~ ~~~"~ ,;~.%~~t:=rr~: -'~~~~~,tfffifl(f~'1ff:!i:'A_~;.~~4tf~ff;:':i:''''11rotlr:I';i'I'111
'- I"~
,
J
~
"
I
I
!
\ '
EXHIBIT "A"
JOINT PROJECT AGREEMENT
TRAFFIC OPERATIONS PROJECT
This Exhibit "A" forms an integral part of that certain traffic
operations project agreement between the STATE OF FLORIDA DEPARTMENT OF
TRANSPORTATION AND ..~ 'U}{)J ~U1..U)
Dated O~d1 197~.C I ,
p
Project:
STATE
JOB
NO.
SR
NO.
TRAFFIC
OPERATIONS
NO.
LOCATION:
15000-1707
Pierce Boulevard Connector
from Memoria1Causeway (SR 60)
to Court Street.
The Public Body (~\*) (will not) install equipment and materials at
its own expense. If installation is performed by the Public Body, the Depart-
ment will provide under terms of this agreement the following equipment and
materials:
.
COST PARTICIPATION BY THE PUBLIC BODY:
The Public Body will, in accordance with Para. 3 Of this agreement, pay
the foll owing percentages of the total costs incurred by the Department on each of
the following phases of work of the project;
Phase
of
Work
Estimated
Cost to be
Incurred by
Department.
Percent of Total Cost
Incurred by Department
to be paid by Public
. Body from (local) .
(Secondary) (other)Funds
Estimated
Cost to
Public
Body
,
Preliminary Engineering
-.i5..oo.a.__
_______Jgg~___________
_!~!.Q.Q.Q.---
R/W Acquisition
Alternate I (Use if Const. is
by Department)
Construction & Supervision ----------
---------------------- ----------
f
I
"I
Alter~ate II (Use if Const. is
by Public Body)
I Materials ~ Supervision ----------
I --------------___~____ __________
I
~:l.
--~