Loading...
CLEARWATER BEACH LIBRARY & RECREATION CENTER CONSOLIDATION - 07-0044-PR - CHANGE ORDER #1 CHANGE ORDER #1 PROJECT: Clearwater Beach Library & Recreation Center Consolidation CONTRACTOR: Oakhurst Construction Company 7497135th Street, North Seminole, FL 33776 DATE: January 24,2007 PROJECT NUMBER: PO REFERENCE NO.: 07-0044- PR DATE OF CONTRACT: CODE: SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT See attached sheet for decreases/ deducts/ new items. STATEMENT OF CONTRACT AMOUNT ACCEPTED BY: ORIGINAL CONTRACT AMOUNT CHANGE ORDER #1 $764,943.30 ($94,070.15) $670,873.15 Date: o~ / /-r:;- /~ I I CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA ~~--:n- William B. Horne, II City Manager Page 2 of 2 Change Order #1 Oakhurst Construction Company Date: o1j&/cJt Wka,{ L~LffA / Clearwater ~ Art Kader Asst. Director of Parks & Recreation ~4S' e Michael D. Quillen, P.E. ~ City Engineer t Clearwater Beach Library & Recreation Center Consolidation Project No. 07-0Q44..PR UNIT ITEM DESCRIPTION QTY UNIT COST TOTAL Decrease Items - 1 Base Bid 10% CONTINGENCY to 5% 1 LS $54,930.30 ($27,470.15) Net Total Decrease ($27,470.15) Delete Alternate Items: 2 Alt. 1 LS $16,000.00 ($16,000.00) SOCIAL HALL REMOVE AND REPLACE EXISTING FLOURESCENT LIGHT FIXTURES AND ADD INCANDESCENT RECESSED DOWN LIGHT FIXTURE AS INDICATED ON SHEETS A- 1.3, E-1.1 & E-1.2 AND ALL ELECTRICAL WORK TO MAKE LIGHTING SYSTEM IN SOCIAL HALL OPERATIONAL, EXISTING CEILING GRID AND TILES TO REMAIN 3 Alt. 1 LS $19,000.00 ($19,000.00) REMOVE EXISTING VINYL BASE COVE FLOOR TILE, PATCH, LEVEL GRIND EXISTING FLOOR TO A SMOOTH FINISH PRIOR TO REPLACING WITH NEW 24"X24"X 1/10" QUARTZ TILE OF THE SOCIAL HALL, LOBBY AREA AND A]HALL ADJACENT TO VENDING AND RESTROOMS INCLUDING INSTALLING NEW 4" BASE COVE, WAXING AND POLISHING FLOOR. 4 A Alt. PROVIDE TWO-ROOF HATCH ABOVE AIR 1 LS $4,000.00 ($4,000.00) CONDITION MEZZANINE ROOMS FOR SOCIAL HALL. 4 BAit PROVIDE ROOF HATCH ABOVE AIR 1 LS $5,000.00 ($5,000.00) CONDITION MEZZANINE ROOM ABOVE RESTROOM AREA. 5 Alt EXISTING SOUTH WOODEN LOUVER REMOVE 1 EA $8,000.00 ($8,000.00) ALL DETERIORATED WOOD AND REPLACE WITH ALL NEW MATERIAL AND PRE- FABRICATED ALUMINUM LOUVER (SEE SECTION DETAIL ON SHEET A-3.2) 9 10% CONTINGENCY OF ALTERNATE ITEMS 1 EA $14,600.00 ($14,600.00) Net Total Decrease Contract ($94,070.15) . . CLEARWATER BEACH LIBRARY & RECREATION CENTER CONSOLIDATION PROJECT NO. 07- 0044 - PR - CLEARWATER, FLORIDA CONTRACT DOCUMENT & TECHINCAL SPECIFICATION INDEX I I I I I I I I I I I I I -,- SECTION I - ADVERTISEMENT OF BIDS & NOTICE TO CONTRACTORS SECTION II - INSTRUCTION TO BIDDERS SECTION III - GENERAL CONDITIONS SECTION IV - CITY OF CLEARWATER - TECHNICAL SPECIFICAITONS CITY OF CLEARWTER - PRE-QUALIFICATION TO BID - FORMS ARCHTIECTS - TECHNICAL SPECIFICATIONS SECTION V - CONTRACTS BOND & BID FORMS