CHANGE ORDER NO. 1 TO PROFESSIONAL SERVICES AGREEMENT /FORMER CLEARWATER MANUFACTURED GAS PLANT SITE ',J I I . , \ CITY OF CLEARWATER, FLORIDA d/b/a CLEARWATER GAS SYSTEM and ENVIRONMENTAL CONSULTING & TECHNOLOGY, INC. CHANGE ORDER NO.1 DATE: August 8, 1996 CLIENT: CITY OF CLEARWATER, FLORIDA d/b/a CLEARWATER GAS SYSTEM 400 North Myrtle Avenue Clearwater, Florida 34615 PROJECT: Former Clearwater Manufactured Gas Plant Site The following changes are hereby made to the Professional Services Agreement between the CITY OF CLEARWATER, FLORIDA, d/b/a CLEARWATER GAS SYSTEM ("CGS") and ENVIRONMENTAL CONSULTING & TECHNOLOGY, INC. ("Consultant"), dated as of April 22, 1994 ("the "Agreement"): 1. Article I - Term of Agreement is hereby amended to extend the term of the Agreement for a period of one year from the date of this Change Order. Personnel rates set forth in this Change Order shall remain in effect throughout the extended term of this Agreement. 2. Article II - Scope of Work ("Work") is hereby amended to provide for the implementation of all work described in the Contamination Assessment Plan, Clearwater Manufactured Gas Plant Site, dated November 1995, prepared by Consultant, as amended by that certain letter dated May 3, 1996, from Consultant to Mary Yeargan, Florida Department of Environmental Protection ("FDEP"). The Work further includes the incorporation of FDEP's comments as set forth in that certain letter dated June 25, 1996, from Richard D. Garrity, Ph.D., to Tom Miller which referenced the May 3, 1996, Response to FDEP Comments, Former Clearwater Manufactured Gas Plant, OGC Case No. 93- 0230, Pinellas County - Waste Cleanup. 3. Article III - Compensation is hereby amended to provide that the maximum costs for fees and reimbursable expenses for the services [wlp.clearwaterlchange order 1 .~ [/ / . ',. .'0 ( ;: ) ~. . . I I . . described in paragraph 2 above shall not exceed the sum of Seventy-Three Thousand Ten and 00/100 Dollars ($73,010.00). A summary of the maximum costs for the work described in paragraph 2 above is set forth in that certain letter dated July 30, 1996, from Charles D. Hendry, Ph.D., to William L. Pence, a copy of which is attached hereto as Exhibit A. As of the date of this Change Order, the total cost for ECT's fees and reimbursable expenses for work performed under the Agreement prior to the execution of this Change Order is $99,634.44. The total cost for all Work authorized to be performed under the Agreement, including the additional work described in this Change Order, shall not exceed the sum of One Hundred Seventy-Two Thousand Six Hundred Forty-Four and 44/100 Dollars ($172,644.44). Thus, the total amount of the cost overrun for the work authorized by this Change Order is Fifty Thousand Three Hundred Nine and 94/100 Dollars ($50,309.94). In no event shall such maximum costs be exceeded without authorization from CGS by written approval of the appropriate Change Order. Any fees or reimbursable expenses Consultant incurs in excess of said maximum costs and without written approval of the appropriate Change Order by CGS shall be entirely at Consultant's obligation and expense and CGS shall not be liable for same. 4. Article V - Time for Completion is hereby amended to provide that the Work described in paragraph 2 above shall be initiated within two (2) weeks from the date of this Change Order. Consultant's draft Contamination Assessment Report shall be delivered to the persons identified in Article IV no later than twelve (12) weeks from the date of this Change Order, which in any event shall be no later than October 31, 1996. Monthly status reports shall be prepared by ECT and submitted to FD EP, as described in the May 3, 1996, letter to Mary Yeargan, following approval of the form of the status reports by CGS. 5. Except as modified herein, all of the terms and provisions of the Agreement shall remain in full force and effect. APPROVALS REQUIRED: BY: eleht ATTEST: [wlp.clearwaterlchange order 1 2 I . . COUNTERSIGNED: BY: Rita Garvey Mayor-Commissioner APPROVED AS TO FORM AND CORRECTNESS: By:9F~ ~ /~ City Attorney [wlp.clearwaterlchange order 1 I CITY OF CLEARWATER, FLORIDA BY: ~h1~a- ElizC\! th M. eptula City Manager ATTEST: 3 I I , ' EXHIBIT A I Environmental Consulting & Technology, Inc. July 30, 1996 P1296-9999 RECEIVED JUL- 3 11996 :l'~"/! i ;:_:., :~~ :':7 .' .... :-."l .-'-'" (-. William L. Pence, Esq. Akerman, Senterfitt & Eidson, P.A. Citrus Tower 255 South Orange Avenue Orlando, Florida 32802 Re: Clearwater Gas System Former Clearwater Manufactured Gas Plant Site Dear Mr. Pence: Pursuant to our meeting on July 30, 1996, Environmental Consulting & Technology, Inc. (ECT) has developed a revised cost estimate for completing the contamination assessment activities in accordance with the recently approved contamination assessment plan (CAP) for the former Clearwater Manufactured Gas Plant (MGP) site. The cost to complete this scope is $73,010.00. The revised cost reflects a decrease in manhour estimates for test trench activities, well inventory efforts, and project management/meetings, A detailed breakdown of this cost estimate is provided in Attachment 1. ECT will maintain all labor rates for completion of the contamination assessment to the rates contained in the original contract dated April 22, 1994. ECT appreciates the opportunity to provide this revised cost estimate to complete the assessment activities at the former Clearwater MGP site. Please call me at (813) 289-9338 if you have any questions or need additional information. Sincerely, SULTING & TECHNOLOGY, INC. 5405 Cypress Cente, Drive Suite 200 Tampa. FL 33609 Charles D. Hendry, Ph.D. Project Manager CDH/baj P. o. Box 20866 Tampa, FL 33622.0866 CC: (813) 289.9338 Mr. Tom Miller, City of Clearwater Mr. J. Terry Neenan, Clearwater Gas System Mr. Miles Ballogg, City of Cleaf\\ :ltcr FAX (813) 289.9388 bj\pro\cdh\mgp\c1ear\L TRl.DOC An Equal 2coorrunitylAffirmative Action Employe, I I Table 1. Cost Summary Table Clearwater Manufactured Gas Plant Contamination Assessment City of Clearwater Description Total Reference $26,492.00 Table 2 $12,570.00 Table 3 $29,750.00 Table 4 $4.193.70 Table 5 $73,010.00 ECT Labor Subcontracted Drilling Subcontracted Laboratory Analyses Other Direct Costs TOTAL: Note: Labor cost held to the original contract rates (April 1994). Source: ECT, 1996. bj\pro\cdh\mgp\clear\T ABLE2 WK4-07/30/96 ~ Table 2. ECT Labor Clearwater Manufactured Gas Plant Contamination Assessment City of Clearwater Task 1: Task 2: Task 3: Task 4: Labor Category Rate Project Meetings Report Management Field Work Preparation Total Hours Total Cost Principal $98.00 /hour N/C N/C N/C N/C 0 $0.00 Staff Engineer/Scientist $78.00 /hour 12 12 24 $1,872.00 Sr. Associate Engineer/Scientist $70.00 /hour N/C N/C 76 198 274 $19,180.00 Sr. Technician $55.00 /hour 24 24 $1,320.00 Technician $45.00 /hour 24 24 $1,080.00 Graphics $40.00 /hour 38 38 $1,520.00 Clerical $40,00 /hour 38 38 $1 ,520.00 TOT AL: $26.492.00 - Notes: N/C = No charge. Labor costs held to the original contract rates (April 1994). Source: ECT, 1996. - bj'.pru\t.:Jh"'llIgp' ck<Jr\T:\BU~2 WJ\..I-U7iJU:\)() I . . I Estimated Well Installation Costs-Subcontracted Drilling Clearwater Manufactured Gas Plant Contamination Assessment City of Clearwater Table 3. Description Mobilization Install 10 shallow wells wi continuous SPT Install 4 deep wells wi continuous SPT Well development Steamcleaner Rental Site Cleanup-retain and containerize wastes Decontamination of Equipment by Steamcleaning Lined Roll-off Container- Solid/Sludge lOW Collection (Provided by City of Clearwater) Bulk Tank For Liquid lOW Collection (Provided by City of Clearwater) Permits TOT AL: Source: ECT, 1996. Cost/Unit $200.00 lea $433.00 Iwell $1.630.00 Iwell $7.00 Ihr $5.00 Iday $0.00 Iday $7,00 /hr $0.00 Imo $0.00 Imo $50.00 lea No. Total I $200.00 10 $4,330.00 4 $6,520.00 80 $560.00 60 $300.00 0 $0.00 80 $560.00 2 $0.00 2 $0.00 2 $100.00 $12570.00 bj\pro\cdhlmgplclear\ TAB LE2. WI< 4.07'30196 I . ~ Table 4. Subcontracted Laboratory Analysis Clearwater Manufactured Gas Plant Contamination Assessment City of Clearwater Matrix Description EPA Method Soil Purgeables PAH's RC RA Metals ] Cyanide :TOC ITRPH i i Phenols I IDioxin I 80 I 0/8020 8310 7000 series 9011 9060 418.1 8040 8280 Cost I Sampl SIOO.OO leach S150.00 leach $120.00 leach S30.00 leach S50.00 leach $50.00 leach $120.00 leach $775.00 leach I Sample I QA 'I No. :Samples I i I I i i I I I I \ 17 17 17 17 17 17 4 I Subtotal Total 5 5 5 5 5 5 2 I $2,200.00 $3,300.00 $2,640.00 $660.00 $1.1 00.00 $1,100.00 $720.00 $1,550.00 S13,27000 Ground [VOlatile Organic Halocarbons 601 S65.00 leach 4 2 $390.00 Water iVolatile Organic Aromatics , 602 $65.00 leach 15 5 $1,300.00 iBaselNeutral & Acid Extractables 625 $ 170.00 leach 5 3 $1,360.00 IPAH's 8310 $150.00 leach 15 4 $2,850.00 : PhenolslPyridine 8270 $250.00 leach 5 2 $1,750.00 'RCRA Metals 200 series $120.00 leach 15 4 $2,280.00 [Cyanide 9011 $30.00 leach 15 4 $570.00 TRPH 418.1 $50.00 leach 15 4 $950.00 I Iron 236.1 $10.00 leach 15 4 $190.00 \ Carbonate 310.1 $12.00 leach 3 2 $60.00 $10.00 leach 3 I I Magnesium 242.1 2 $50.00 I I Sodium 273.1 $10.00 leach 15 4 $190.00 I Manganese 243.1 $10.00 leach 15 4 $190.00 !Chloride 325.3 $12.00 leach 3 2 $60.00 Alkalinity 310.1 $12.00 leach 3 2 $60.00 I Hardness 130.2 S12.00 leach 3 2 S60.00 Dioxin 8280 S775.00 leach I I $1,550.00 I SI3,860.00 Investigative Purgeables 8010/8020 SIOO.OO leach 6 0 $600.00 Derived ReRA Metals 7000 series S120.00 leach 6 0 S720.00 Wastes TRPH 418.1 $50.00 leach 1 0 $50.00 I Phenols1Pyridine 8270 i S250.00 leach 5 0 $1,250.00 i S2 620 00 I TOTAL: i $29 750.00 Source: ECT. 1996. bjlplOlcdhlmgplclearlT ABLE2 WK4.07/J 0/96 I I ~ .. Table 5. Other Direct Costs Clearwater Manufactured Gas Plant Contamination Assessment City of Clearwater Description CostlUnit No. Total Organic Vapor Analyzer $98.00 Iday 5 $490.00 Surveying Equipment $57.50 Iday 5 $287.50 Roller Tape $11.50 Iday 5 $57.50 Water Level Indicator $11.50 Iday 5 $57.50 Oil/Water Interface Probe $25.00 Iday 3 $75.00 Bailer $17.50 leach 15 $262.50 Hand Auger $11.50 Iday 5 $57.50 Sampling Meters $34.50 Iday 5 $172.50 Sampling Filters $17.50 lfilter 25 $437.50 Sampling Fee $23.00 Iday 5 $115.00 Peristaltic Pump $23.00 Iday 5 $115.00 F ilmlDevelopment $17.25 lrall 2 $34.50 Computer $11.50 /hour 44 $506.00 CADD $28.00 /hour 32 $896.00 Photocopying/binding $0.12 Ipage 3,000 $360.00 Drafting Materials $11.50 Ipraject 1 $11.50 Postage/F ederal Express $200.00 Iproject 1 $200.00 Telephone $0.75 Iminute 30 $22.50 Facsimile $1.19 Ipage 30 $35.70 TOT AL: $4.193.70 Source: ECT, 1996. bj\pro\cdh\mgp\c1ear\T ABLE2. WK4-07 /30/96