PROPOSAL BY DIAGONAL DATA CORPORATION
Digital Equipment coloration
7650 Courtney Campbell Causeway, Suite 800
Tampa, Florida 33607
,
~DmDDmD
July 28, 1988
Ms. Laura Chase
MIS Director
City of Clearwater
Clearwater, FL 34618-4748
Dear Laura;
Enclosed is Digital Equipment Corporation's proposal for the
wiring of the Fleet Management Facility at 1900 Grand Avenue.
please refer to Section 12.0 of this document regarding
tranceiver cables. Four cables are needed for the Ethernet and
Terminal Server connection. Since this was not available to
Diagonal Data at the time of quotation, this item was not quoted.
Digital can offer these to you as an amendment to this wiring
proposal at an approximate cost of $500.
please let me know if there is any additional information you may
need.
Laura, thank you for your continued interest in Digital.
Regards,
'{) c,
0~
Linda Bonds
Senior Sales Representative
LB/gs
.
--
.
..
.
.
i
.
.
.
.
.
.
.
II
.
.
.
PROPOSAL TO THE
CITY OF CLEARWATER
BY DIAGONAL DATA CORPORATION
SEPTEMBER 2,1988
This document contains proprietary information that is the
property of this organization and is to be considered a
trade secret. This document, not any materials furnished in
conjunction with it, shall not be published, repreduceed,
copied, disclosed, or used for any purpose other than the
review and consideration for this proposal, without the
written approval of Diagonal Data Corporation.
I
I
I
I
I
I
I
I
.
.
I
I
I
.
I
I
.
.
.
I
DIAGONAL
DATA CORPORATION
/
systems and services
for maintenance management
August 31, 1988
Laura Gail Chase
Data processing Manager
CITY OF CLEARWATER
10 South Missouri Avenue
Clearwater, FL 34616-4748
Dear Ms. Chase:
On behalf of Diagonal Data Corporation, I am
submit the final proposal on the hardware
ConTrac fuel system for the City of Clearwater.
GEMS DIVISION
9700 Newton Avenue South
Bloomington. MN 55431
6128848050
TLX 522086
pleased to
upgrade and
We are confident this upgrade will improve both the
analytical capabilities and the response time of the system.
Diagonal Data Corporation is looking forward in working with
the City during the upgrade and fuel system process.
Sincerely,
sC!~
B enda L~~~lies
Account Manager
Enclosures
,
,
,
I
.
I
,
II
,
,
I
,
.
I
I
I
II
,
,
-
.
--
Order No.
CITY OF CLEARWATER
MicroVAX II
Description
\
Qty
====================================================================
Cost
I
DH-630Q5-HAI
I
I
I
I
I
1
1
I
QZ004-C5 I
94171-300
DB-726-R
TU81E-DA
DSRVB-BA
DSVB-AA
DELNI-AA
QZZ06-H5
LA21-BT
QZD04-UZ
QZD04-H5
VT320-BA
LP11-AA
2H3104
_.
MVII-16MG H9642 KDA/TK70 240V
MS630-CA (2) 16MG Memory, KDA50-QA
DSA Disk Controller, TK70/TQ70-296MB
Cartridge, DHQ11-M 8 line multiplex,
CK-DHQ11-AF Cabinet Kit, TK52K-05
5 pack cartridges, CK-DELQ-YF
Cabinet Kit, ZNAAE-C5 DOC/DIAG Kit
unlimited User VMS License
CDC 300 MG Disks, with One (1)
Controller, Wren 4
Cabinet
TU81-Plus, QBus, 60HZ
DS200 DEC423 TRMSV 120V w/License
DS200 RS232 TRMSV 120V w/License
Local Network Interconnect
DecServer 200SPS TK50
BT-Directional Tractor
DecNet-VAX ENDN Lie w/warranty
DecNet-VAX E/N SPS TK50
Terminals
285 LPM Band Printer 64 char.
Kits Cable
1
1
4
1
1
3
1
1
1
9
1
1
16
1
2
1
1$
I
I
I
I
I
I
1
1
1$
1
1$
1
I
1$
I
1$
I
1$
I
1$
1
1$
I
1$
I
1$
1
1$
I
1$
I
1$
1
1$
I
1$
44,600.00
18,900.00
10,650.00
750.00
30,098.00
10,080.00
3,806.00
1,444.00
400.00
2,313.00
1,649.00
895.00
8,720.00
9,645.00
126.00
UPGRADE TOTAL $ 144,076.00
============
,
.,
"\
CITY OF CLEARWATER
CONTRAC FUEL SYSTEM
Hardware & Software Required
Cost
================================================================~===
CONTRAC TOTAL
$ 64,000.00
$ 2,400.00
$ 1,650.00
$ 6,500.00
$ 3,000.00
$ 4,000.00
$ 2,400.00
$ 7,400.00
$ 1,700.00
$ 800.00
$ 12,600.00
$ 12,000.00
$ 118,450.00
------------
------------
8 CPU x $8000 each
.
.
,
,
3 Boards x $800 each
Transaction Printer
Software
Magnetic Cards 2500
Card Encoder
8 Pedestals x $300 each
*4 Tank Level Monitors-TLS without printer x $1850 each
*Interface Tank Level Monitors software (1 time charge)
*Remote Gate Accessing Hardware only-One Site
*12 Sensor probes, Cap and Ring Set x $1050 each
Installation Cost (*items are not included)
CONTRAC FUEL SYSTEM TOTAL-------------------------------$ 118,450.00
HARDWARE TOTAL------------------------------------------$ 144,076.00
SOFTWARE CONVERSION, INSTALLATION AND TRAINING----------$
3,500.00
GRAND TOTAL---------------------------------------------$ 266,026.00
11111111