MUNICIPAL SERVICES/PUBLIC SAFETY/POLICE COMPLEX I I I I I I I I I I I I I I I I I I I I ~ I Agreement Between 0Nner and General Contractor City of Oearwater, Rorida CLEAIM'A TER CnY SERVICES CENTER Municipal Services/Public Safe1y and Police Complex Augustl5,1994 DONNELL CONSULTANTS INCORPORATED In assocIatton with RONE AAO-IIlEClS INCORPORATED I o (). 2 I Ci - D{) (I) I I I I I I I I I I I I I I I I I I I I I AGREEMENT BETWEEN OWNER AND GENERAL CONTRACTOR THIS AGREEMENT made thL?1~ay of August 1994. between the CITY OF CLEARWATER (hereinafter called the "Owner") and CREATIVE/BEERS. a Joint Venture. GENERAL CONTRACTOR (hereinafter called the "GCi. for services In connection with the following described Project: Oearwater City Services Center (Municipal Services/Public Safety and Pollee Complex - See attached exhibit C) . New 70.lXXl GSF City OffIce Building on "Bllgore Site- . Renovations and Code Up-dates to existing City Hall Building . New 83.lXXl GSF Police Headquarters Building on Existing Headquarters Site . Demolition of Existing Pollee Building . New 5CX) Car City Parking Garage on above site The PROJECT MANAGEMENT CONSULTANT/ARCHITECT/ENGINEER (hereinafter called the 'PMC/AE") for the Project Is Donnell Consultants Incorporated in association with Rowe Architects Incorporated, 100 Madison Street. SUite 200. Tampa, Florida 33602. The Owner and the GC agree as set forth below and in more detail on the GC's bid form (attached as exhibit E). for the under noted fixed lump sum amounts. 1) 2) 3) Pre-Construction Fee Construction Stage Fee General Conditions of Contract Lump Sum (Article 7.5 herein shall govern. The breakdown within attached Exhibit E shall not limit Article 7.5 requirements.) Performance and Payment Bond ($ 15.000.lXXl Construction Cost) $15,250 $492,729 $799,877 4) $86,500 TOTAL $ 1.394.356 Deduct Alternates: (The alternates as quoted hereinafter shall be at the Owner's election at the completion of the Preconstructlon Phase services as described herein.) Delete the 83.000 GSF Police Headquarters Building 1) 2) Construction Stage Fee General Conditions of Contract Lump Sum ($ 179,900) ($245,257) 3) (Article 7.5 herein shall govern. The breakdown within attached Exhibit E shall not limit Article 7.5 requirements.) Performance and Payment Bond ($33,195) ($458 ,352) TOTAL DEDUCT Page 1 I I I I I I I I I I I I I I I I I I I I I ARTICLE 1 The DeslQn-Constructlon Team and Extent of AQreement 1. r The GC agrees to fumlsh Its best skill and judgement and to cooperate with the PMC/ AE In furthering the Interests of the Owner. The GC agrees to fumlsh efficient business administration and superintendence and to use Its best efforts to complete the Project in an expeditious and economical manner consistent with the Interests of the Owner. 1.2 The Design-Construction Team: The Owner. the PMC/ AE. and the GC (the "Design- Construction Teamj will work as a team through construction completion. The GC shall direct and manage construction. The PMC/AE will direct and manage design. 1.3 Extent of Agreement: This agreement Is complementary to the Drawings and Specifications, SUpplemental Conditions and the General Conditions of the Contract (A201-1987) and together with them. represent the entire agreement between the Owner and GC and supersedes all prior negotiations. representations or agreements. Where this Agreement Is expressly In conflict with the General Conditions of the Contract. this Agreement will prevail. Where this Agreement Is silent, the General Conditions of the Contract. the SUpplemental Conditions and the requirements of the Drawings and Specifications will prevail. This Agreement may be amended only by written Instrument signed by the Owner. the PMC/ AE and the GC. ARTICLE 2 General Contractor's Basic Services 2.0 The GC's Basic Services under this Agreement Include Preconstructlon Phase Services and Construction Phase Services and General Conditions Lump SUm. 2.1 The Preconstruction Phase: The GC shall: 2.1.1 After receipt of Phase I Bids and prior to commencement of construction. provide ten copies of a Preconstruction Report which shall Include a Guaranteed Maximum Price (GMP) proposal together with a confirmation of scope of the project. The report shall Include a complete discussion and summary of the services provided In accordance with Subparagraphs 2.1.2 through 2.1.8 herein below. an updated project design-construction schedule and a detailed cost estimate supporting the GMP. 2.1.2 Actively participate In an Initial briefing and "partnerlng" meeting established and conducted by the PMC/ AE. Subsequent team meetings shall be scheduled by the PMC/ AE at minimum two week Intervals thereafter throughout the design-construction phases of the project. 2.1.3 Provide Initial broad confirmation of feasibility of the City's preliminary budget for the City Office Building. the Renovation of the existing City Hall. the Police Headquarters Building and the City Parking Garage. 2.1.4 Participate in the development of the Schematic Design by advising on site use and Improvements. selection of materials. building systems and equipment and methods of Project delivery. Provide recommendations on relative feasibility of construction methods. availability of materials and labor. time requirements for procurement. Installation and construction and factors related to cost Including. but not limited to. costs of altematlve designs of structural systems. exterior skin elements. materials. preliminary budgets and possible economies. Page 2 I I I I I I I I I I I I I I I I I I I I I 2.1.5 Provide for the PMC/AE's and the Owner's review and acceptance. a Project Schedule that coordinates and Integrates the GC's services. the PMC/ AE'S services and the Owner's responsibilities with anticipated cOnstruction schedules. The GC shall update this schedule periodically. as required. 2.1.6 Develop a conceptual cost model estimate of the projects four principal buildings to compare with the PMC/AE generated cost plan. ThIs cost model shall be required In two formats: (elemental) format (see exhibit F Included herein) and also typical (trade) format. Meet with PMC/ AE to reconcile any differentials and revise accordingly. Present final estimate for the Owner's approval. 2.1.7 Coordinate Preconstructlon Phase I Contract Documents as outlined In the Approved Schedule by consulting with the Owner and the PMC/ AE regarding Drawings and Specifications as they are being prepared. and recommending alternative solutions whenever design details affect COnstruction feasibility. cost or schedules. 2.1.7.1 Advise on the separation of the Project Into various categories of Work. If separate contracts are to be awarded by the Owner, review the Drawings and Specifications and make recommendations as required to provide that (1) the Work of the separate contractors Is coordinated with that of the Trade Contractors, (2) all requirements for the Project have been assigned to the appropriate separate contract. (3) the likelihood of jurisdictional disputes have been minimized. and (4) proper coordination has been provided for phased COnstruction. 2. 1.7.2 Develop a detailed Project COnstruction Schedule for all four buildings providing for aU major elements such as phasing of Construction and times of commencement and completion required of . each trade Contractor. Develop a plan for the phasing of COnstruction. 2. 1.7.3 Establish a schedule for the purChase or materials and equipment requiring long lead time procurement. and coordinate the schedule with the early preparation of portions of the Contract Documents by the PMC/ AE. expedite and coordinate delivery of these purchases. 2.1.7.4 Prepare for the Owner's and the PMC/ AE's approval a detailed estimate of Construction Cost. as defined In Article 8 herein. for each Design-Construction Phase of the project as shown In the approved Project Schedule (Article 2.1.5). 2.1.7.5 Provide an analysis of the types and quantities of labor required for the Project and review the availability of approprlate categories of labor required for critical phases. Develop bidding packages designed to minimize adverse effects of labor shortages. 2.1.7.6 Make recommendations for pre-quallflcatlon criteria for bidders and develop bidders' Interest In the Project. establish bidding schedules. 2.1.8 Based upon Drawings and Specifications produced by the PMC/ AE. develop a Guaranteed Maximum PrIce proposal. including Project COnstruction Schedule. itemized by Trade Contract, for phases of Work as required by the Owner. . 2.1.8.1 If the GMP proposal and confirmation of scope Is accepted by the PMC/ AE and the Owner. It wHl become an Amendment to this Agreement which will establish the GMP. Contract TIme. and liquidated damages for the Work. 2.1.8.2 If the GMP proposal and confirmation of scope Is not accepted by the PMC/ AE and Owner. the Owner shall so notify the GC In writing. If a scope acceptable to the PMC/ AE and the Owner is not developed. negotiations may be terminated. and the Owner may Initiate negotiations with another firm. Page 3 I I I I I I I I I I I I I I I I I I I I I 2.2 The Construction Phn.c:A, Unless otherwise author2ed by the Owner. all permanent construction for the Work shall be performed under Trade Contracts held by the GC. The GC shall not bid on any of the Trade Contractor Work or perform such Work with Its own forces without the prior written consent of the PMC/ AE. and the Owner. The GC shall: 2.2.1 Administer the construction phase as provided herein and In the Conditions of the Contract. which Indude the following: the 1987 Edition of AlA Document A201 General Conditions of the Contract for Construction. and the SUpplemental Conditions. 2.2.1.1 Terms used In the General Conditions of the Contract shall have the following meanings: .1 "Contractor" means General Contractor (GC) and the terms will be used Interchangeably; .2 "SUbcontractor" means Trade Contractor. and the terms will be used Interchangeably; and, .3 "Contract Sum" means Guaranteed Maximum Price. and the terms will be used Interchangeably. .4 "Architect" or "ArChitect/Engineer" means Project Management Consultant/ ArchltectlEnglneer and the terms will be used Interchangeably. 2.2.2 Commence the Work within 10 days after receipt of the Notice to Proceed from the Owner. 2.2.3 Develop Trade Contractor Interest In the Project and conduct pre-bid conferences with Interested bidders to review the documents and take competitive bids on the Work of the various Trade Contractors: or. If authorized by the Owner In writing. negotiate for the performance of that Work. The GC may require bidders to submit bid bonds or other bid security acceptable to the GC as a prerequisite to bidding on the Work. Analyze and evaluate with the PMC/ AE the results of the various bids and their relationship to budgeted and estimated amounts. and prepare for review with the Owner and PMC/ AE a bid tabulation analysis and such other support data as necessary to properly compare the various bids and their responsiveness to the desired scope of Work. Specifically. review the scope of Work In detail with apparent low and best bidders and attempt to achieve additional savings through negotiation whenever practical. Maintain records of all pre- award Interviews with apparent low bidders. Promptly award and execute Trade Contracts with approved Trade Contractors. Provide copies of fully executed Trade Contracts. Insurance certificates. and.. If required. bonds to the Owner and the PMC/AE. 2.2.4 Manage. schedule and coordinate aU construction Work. Including the Work of the Trade Contractors. and coordinate the Work with the activities and responsibilities of the Owner. PMC/ AE and GC In order to complete the Project In accordance with the Owner's objectives 'of cost. time and quality. Develop and maintain a program. acceptable to the Owner and PMCI AE. to assure quality control of the construction. Supervise the Work of all subcontractors provldlr;'lg Instructions to each when Its Work does not conform to the requirements of the plans and specifications and continue to manage each subcontractor to ensure that corrections are made In a timely manner so as to not affect the efficient progress of the work. Should disagreement occur ~tween the GC and the PMC/ AE over acceptability of Work and conformance with the requirements of the specifications and plans. the Owner shaN be the final judge of performance and acceptability. 2.2.5 Maintain exclusively for this Project a competent fuU-t1me staff at the Project site to coordinate and direct the Work and progress of the Trade Contractors on the Project. AU of the GC on-site management and supervisory personnel shall be consistent with the bid proposal and shall not be removed or replaced without the PMC/ AE and the Owner's consent which shall not be Page 4 I I I I I I I I I I I I I I I I I I I I I unreasonably withheld. On-slte staff to be provided on a full-tIme basis will be identified as an Exhibit attached hereto. The Owner and the PMC/AE shall have the right to direct the GC to remove or replace anyon-site personnel whose performance becomes unsatisfactory to the Owner or PMCI AE. In such event, the GC shall promptly replace such personnel. without consideration of additional compensation for the replacement. The Owner shall not deal directly with the GC's superintendents. shaH not direct the work of the GCls employees. shall not be responsible for the manner In which the work Is performed and shall not be responsible for the safety of the work. 2.2.5.1 EstabUsh on-site organization and lines of authority In order to carry out the overall plans of the Deslgn-Constructlon Team. Identify an on-site staff member to represent the GC. on a daily basis. with authority to negotiate change orders and contract modifications on behalf of the GC. Make available such executive personnel as necessary to execute change orders or other contract modifications on behalf of the GC so as not to delay the progress of the Work. 2.2.6 Establish procedures for coordination among the Owner. PMC/AE. Trade Contractors and GC with respect to all aspects of the Work. Implement such procedures. Incorporate them Into a project resource manual. and distribute manuals to the Design-Construction Team. 2.2.6.1 Require of the various Trade Contractors such Coordination Drawings as may be necessary to properly coordinate the Work among the Trade Contractors. 2.2.6.2 In coordination with the PMC/ AE. establish and Implement procedures for tracking and expediting the process of shop drawings and samples. as required by the General Conditions of the Contract. 2.2.7 Attend weekly Design-Constructlon Team meetings scheduled and conducted by the PMC/ AE. Report on progress of the construction. update of schedule. bidding of phases. any problems needing resolution on any other matters which may affect the goals of the project. 2.2.7.1 Schedule and conduct weekly progress meetings with Trade Contractors to review such matters as job procedures. construction progress. schedule. Shop drawings status and other Information as necessary. Provide prior notice to Owner and PMC/AE of all such meetings. and prepare and distribute minutes. 2.2.8 Review the schedule with the various Trade Contractors and review. or expand. the level of detail to Incorporate specific Trade Contractor Input consistent with the overall completion requirements. Regularly monitoring and update the Project Schedule and various sutrnetworks as construction progresses. Identify potential variances between scheduled and probable completion dates. Review schedule for Work not started. or Incomplete. and make adjustments In the schedule to meet the scheduled completion date. Provide summary reports of each monitoring and document all changes In schedule. Regular schedule updates and reporting shall be Included as part of the weekly project report outlined In SUbparagraph 2.2.16 herein. Display the current Project Schedule In the on-site office; review at progress meetings. 2.2.9 Determine the adequacy of the Trade Contractors' personnel and equipment. and the availability of materials and supplies to meet the schedule. In consultation with the Owner and the PMC/ AE. develop and Implement an action plan for necessary corrective actions when requirements of a Trade Contract or a Trade Contract Schedule are not being met. 2.2.10 Whenever Owner-Fumlshed Contractor-lnstaHed (QFCI) materials or equipment are shipped to the Project site. the GC shall notify the Owner and shaH be responsible for their acceptance. proper storage, and incorporation Into the Work provided the scope of the Owner-Fumlshed Contractor-Installed (OFCI) work Is Included with the Guaranteed Maximum Price. Page 5 I I I I I I I I I I I I I I I I I I I I I 2.2. 11 Develop and maintain an effective system of Project cost control which Is satisfactory to the PMC/ AE and the Owner. Revise and refine the InttIaIIy approved Project Construction budget. Incorporate approved changes as they occur. and develop cash flow reports and forecasts as needed. ldenttfy variances between actual and budgeted or estimated costs and advise Owner and PMC/ AE whenever projected costs exceed budgets or estimates. Cost Control reports shall be Included as part of the project report outlined In Subparagraph 2.2.16 herein. 2.2.12 The GC shaH maintain a system of accounting consistent with generaHy accepted accounting principles. The GC shall preserve aU accounting records for a period of four (4) years after final acceptance of the Work. The Owner shall have access to all such accounting records at any time during the performance of the Work and for a period of four (4) years after final acceptance of the Work. 2.2.13 When requested by the Owner or PMC/AE. promptly prepare and submit estimates of probable cost for changes proposed In the Work Including similar estimates from the Trade Contractors. If directed by the Owner or PMC/ AE. promptly secure formal written Change Order Proposals from such Trade Contractors. 2.2.14 Be responsible for Initiating. maintaining and supervising effective safety programs and require similar programs of the Trade Contractors. The OSHA guidelines shall serve as the basis for the construction safety program. 2.2.14.1 Promptly notify the Owner and the PMC/AE. In writing. upon receMng notice of filing of any charge of no~ompllance from OSHA. or upon receMng notification that a federal or state Inspector shall visit or Is visiting the Project site. 2.2.14.2 At progress meetings with Trade Contractors. conduct a review of job safety and accident prevention. and prepare minutes of such meetings that will be available to the Owner's Representative on request. 2.2.15 Make provisions for Project security acceptable to the PMC/AE and the Owner. to protect the Project site and materials stored off-site against theft. vandalism. fire and accidents. etc. as required by job and location conditions. Moblle equipment and operable equipment at the site. and hazardous parts of new construction subject to mischief. shall be locked or otherwise made Inoperable or protected when unattended. 2.2.16 Record the progress of the Project. Subject written monthly progress reports to the Owner and the PMC/ AE Including Information on the Trade Contractors' Work. the percentage of completion. current estimating. computerized updated monthly Critical Path Method scheduling and project accounting reports. Including Estimated Time to Completion and Estimated Cost to complete. Keep a dally log available to the Owner and the PMC/AE. Report and record such additional Information related to construction as may be requested by the PMC/ AE and the Owner. 2.2. 17 The GC shall be responsible for the removal. encapsulation. transportation and disposal Of any hazardous materlal.lncludlng..wIthout limitation. any asbestos or asbestos-related products as may be required In connection with the Work. Hazardous material. described by federal guidelines brought by the GC or the Trade Contractors shall remain their responsibility for proper disposal. Any hazardous material not specifically shown on the documents shall be considered a concealed condition and may be the responsibility of the GC In a Change Order increasing the Guaranteed MaxImum PrIce for any additional costs Incurred. 2.2.18 The GC shall perform Work for the Project as described In the design documents prepared by the PMC/ AE. Page 6 I I I I I I I I I I I I I I I I I I I I I ARTICLE 3 Additional Services 3.1 Under the mutual agreement of the Owner and the PMC/ AE. and upon written authorization from the Owner. the GC shaU provide additional services which are beyond the scope of the Basic Services described In Article 2 herein. The GC shall be compensated for such additional services a fee to be negotiated by the Owner. PMC/AE and the GC at the time of the additional service request. The PMC/ AE Is not authorized to request the GC to perform additional services. The GC shall not perform and will not be compensated for any additional services unless previously authorized In writing by the Owner and the PMC/ AE. ARTICLE 4 Owner's Responsibilities 4.1 The Owner shall designate a representative to act In Its behalf. This representative. or his/her designee will monitor the progress of the Work. serve as liaison with the GC and the PMC/ AE. receive and process communications and paperwork. and to represent the Owner In the day-to- day conduct of the Project. The GC will be notified In writing of the representative and of his/her designee or any changes thereto. 4.2 The Owner may retain a threshold Inspector. If required by Chapter 553. Florida Statutes. 4.3 The Owner shall review and approve or take other appropriate action on the GC's preconstructlon dellverables within 10 calendar days of receipt. 4.4 During the construction phase. communications shall be made as described in SUbparagraph 4.2.4 of the General Conditions. ARTICLE 5 Schedule 5.1 Preconstructlon Phase 5,1.1 The GC shall submit the lcx:l% Schematic Design Document/Phase I Bid Report and Guaranteed Maximum PrIce Proposal within 10 calendar days after the Schematic Design Documents/Phase I Bids hove been received by the GC. 5.2 The number of days for performance of the Work under the construction phase of this Agreement shall be established in the amendment to this Agreement which makes the final adjustment to the Guaranteed Maximum Price and confirms the scope. 5.3 The Owner shall have the right to occupy. or use. any portion of the Work ahead of schedule. If use or occupancy ahead of schedule affects the Cost of the Project or the schedule for the Work. the use or occupancy will be treated as a Change to the Work In accordance with Article 9. herein. Page 7 I I I I I I I I I I I I I I I I I I I I I ARTICLE 6 Guaranteed Maximum PrIce 6.1 The "Guaranteed Maximum Price" (GMP) Includes Cost of the Work required by the Contract Documents as defined In article 8 herein. and the GC's fee and General Conditions Lump Sum as defined In Paragraph 7.2 herein. The GMPforthe Work as described In Subparagraph 2.2.18. shall be established at the completion of the Schematic DesIgn DocumentslPhase I Bld Documents and receipt of Phase I BIds. The GMP Is subject to modification for changes In the Work as provided In ArtIcle 9. herein. 6.1.1 The CNlner recognizes that the design documents may exceed the Owner's budget. The Owner agrees that the Owner and PMC/ AE will cooperate with the GC In value engineering to ensure that the scope of work Is within the GMP. 6.1.2 If the GMP together with the other cost of the Project exceed the budget established by the Clearwater City commission. the PMC/ AE and the Owner's Project Manager shall make appropriate recommendations for Commission approval. 6.2 The GMP will only Include those taxes In the Cost of the Work which are legally enacted at the time the GMP Is established. 6.3 All cost savings for the GMP shall be returned to the Owner as part of the net aggregate savings established when final accounting Is submitted upon Final Completion of the Work. "Cost Savings" are the net difference obtained by deducting from the GMP. the GC's Fee. the General Conditions Lump Sum. the expended portions of the GC contingency and the actual expenditures representing the Cost of the Work os defined In Article 8. herein. Liquidated damages. If any. are different from. and are not apart of . this calculation. 6.4 By execution of this Agreement. the GC certifies that all factual unit costs supporting the fees specified In this agreement are accurate. complete and current at the time of negotiations; and that any other factual unit costs that may be furnished the PMC/ AE and the Owner In the Mure to support any additional fees that may be authorized will also be accurate and complete. The fees specified In this agreement and any additional fees that may be authorized In the Mure shall be adjusted to exclude any significant sums which the PMC/ AE and the Owner determines the fee was Increased due to Inaccurate. incomplete. or non-current factual unit costs. 6.5 Adjustments to the GMP will be made as described In the Conditions of the Contract. ARTICLE 7 Payments to GC 7.1 In consideration of the performance of the agreement. the Owner agrees to pay the GC. as compensation for Its services os set forth below. 7.1.1. Upon receipt of the Notice to Proceed. the GC shall begin providing the indemnification described In Paragraph 3.18 of the General Conditions of the Contract. The GC aCknowledges that ten dollars ($10.00) has been Included In the fee proposal for preconstruction services for the purpose of providing Indemnification. and Is a part of the fee established for the first phose of preconstructlon services. Page 8 I I I I I I I I I I I I I I I I I I I I I 7.1.2 Upon acceptance of the GMP. the amount established In the GMP Amendment to this Agreement. which Includes GC fee. the General Conditions Lump Sum and the Cost of the Work. shall be paid monthly as described In the General Conditions of the Contract. 7.1.2.1 As required by the Owner, within seven working days from receipt of payment from the Owner. the GC shall pay each Trade Contractor out of the amount paid to the GC on account of such trade Contractor's Work. the amount to which said Trade Contractor Is entitled reflecting the percentage actually retained, If any. from payments to the GC on account of said Trade Contractor's Work. The GC shall. by appropriate agreement with each Trade Contractor. require each Trade Contractor to make payments to Its subcontractors In a similar manner. 7.1.3 If a warrant In payment of an Invoice Is not mailed by the Owner within thirty (30) days after receipt of a proper Invoice and receipt. Inspection and approval of the services. by the PMC/ AE. the Owner sholl pay to the GC. In addition to the amount of the Invoice. Interest at a rate of one percent per month or portion thereof on the unpaid balance thirty days from the expiration of such 30 day period unto such time as the warrant Is mailed to GC. These prOvisions apply only to undisputed amounts for which payment has been authorized. Invoices or pay requests returned to the GC due to preparation errors wHI result In a payment delay. Payment requirements do not start until a property completed pay request Is provided to and approved by the Owner and the PMC/AE. 7.2 Included In the GC's Fee for both Preconstructlon and Construction are the following: 7.2.1 The cost of Its home or branch office employees or consultants not at the Project site. Including the cost of all pension contributions. hospitalization. bonus. vacations. medical Insurance assessments or taxes for such Items as unemployment compensation and social security. payroll Insurance. and taxes attributable to wages and salaries and other company overhead expenses for . sold home office employees. 7.2.2 General operating expenses of the GC's principal and branch offices other than the field office. 7.2.3 Any part of the GC's capital expenses. including interest on the GC capital employed for the Work. 7.2.4 Overhead and profit. or general expenses of any kind. except as may be expressly included in Article 8. herein. as Cost of the Work. 7.2.5 All trovel and per diem costs of GC's employees and consultants. 7.2.6 The cost of estimating services which may be required during the construction phase. 7.2.7 All costs incurred during the guarantee period after construction. 7.3 Adjustments In the fee will be made as follows: 7.3.1 Adjustments due to Changes In the Work shall be made as described In the General and Supplemental Conditions of the Contract. Page 9 I I I I I I I I I I I I I I I I I I I I I 7.3.2 The GC shall not be entitled to any claim for damages on account of hindrances or delays In construction from any cause whatsoever unless occasioned by any act of God. or by any act or omission on the part of the Owner or the PMC/ AE. Such act. hindrance or delay may entitle the GC to an extension of time In which to complete the work. provided that the GC gives notice In wrttIng of the cause of such act, hindrance or delay within ten days after Its occurrence to the Owner and the PMC/ AE. This paragraph shall Include but not be limited to any actions which result In delays In scheduling. substantial changes In scope of work or substantial Increases n the costs of performing the work under this Agreement (See Article 8.3.1 of A201 General Conditions). 7 A Invoices for fees or other compensation for services or expenses shall be submitted in detail sufficient for a proper preaudit and post audit thereof. 7.4.1 Prior to final payment. the GC must provide to the PMC/AE and the Owner. those items listed In Article 9.10.2 of the General Conditions. These Items are conditions precedent to final payment. The Owner may wfthhokj amounts It deems necessary to cover any claims of which it has been notified of trade contractors. materialmen. suppliers. or others from final payment to the GC. (See Article 9.10.2 of A201 General Conditions.) 7.5 Included In the GC's General Conditions Lump SUm shall be the following: Beyond the following cost Items. only trade sub-contractors costs shall be considered and these Inclusive of all necessary Incidentals. labor. materials. equipment. rentals. etc. for the execution of their particular trade. 7.5.1 The cost of Its field employees identified In SUbparagraph 2.25 herein. or their approved replacements. Including the cost of all pension. contributions. hospitalization. bonuses. vacations, medical assessments or taxes for such Items as unemployment compensation. workmen's compensation. and social security. payroll Insurance. and taxes attributable to wages and salaries for said field employees. 7.5. 1. 1 Supervision and Staffing Costs: Project manager. general superintendent; assistant superintendents; project engineer; field englneer(s); watchman or site security services and secretary(s). 7.5.2 Set Up and Mobilization Costs: Layout personnel. transits and survey equipment; architect's temporary office; contractor's temporary offices; servicing all offices; job signs; temporary office supplies and equipment. Cost of equipment such as typewriters. cameras. radios. computers. pagers. copiers. facsimile equipment. dictating units. trollers. vehicles and furniture purchased or rented by the GC. 7.5.3 Temporary Services and Operating Costs: Telephone. fax and long distance; site security; site fencing and protection; safety act provisions; safety and first ald.; electrical power and distribution; toUets; drinking water and Ice; barricades at floor perimeters and openings; street and pedestrian barricades; ladders and stairs; water; project progress meeting and reports. 7.5.4 Trash Removal. etc. Costs: Trash chutes; trash removals and dumpster ch~rges not Included In trade contracts. weekly cleanup; final cleanup and cleaning glass. Interiors and exteriors. 7.5.5 Equipment. etc.. Costs: Protection of permanent elevators for temporary use; personnel vehicles. fuel and associated expenses; miscellaneous equipment rentals; small tools allowance; radio communication equipment. Page 10 I I I I I I I I I I I I I I I I I I I I I 7.5.6 Miscellaneous Costs: Monthly progress photographs; CPM schedule and monitoring; bidding and advertising costs and expenses; as-bullt drawings. 7.5.7 Insurance will be provided as required by the SUpplemental Conditions of the Contract. (See exhibit B.) ARTICLE 8 Cost of the Work 8.1 The term .Cost of the Work. shall mean costs excluding General Conditions costs. Incurred in the Work as described and defined In Paragraph 8.2. below. and paid or Incurred by the GC less any reimbursement for scrap value and cash or trade discounts. subject to Article 10. herein. The term "wages. used herein shall Include the straight time and overtime pay and the cost of associated employee benefits. Employee benefits Include. but are not limited to. unemployment compensation. social security. compensated absences. and other mandatory and customary contributions and fringe benefits Insofar as such costs are based on wages. salaries. or other remuneration paid to employees of the GC. 8.1. 1 Cost of the Work Includes and Is limited to actual expenditure for the following cost Items: 8.2.1 Subject to prior approval by the PMC/AE and the Owner. wages paid for labor in the direct employ of the GC other than those provided under Paragraph 7.2. herein. as a part of the GC's fee In the performance of the Work under applicable collective bargaining agreements. or under a salary or wage schedule agreed upon by the PMC/ AE and the Owner and GC. and Including such welfare or other benefits. If any. as may be payable with respect thereto. 8.2.2 The cost of aH materials. supplies and equipment Incorporated in the Work or stored on site, Including cost of transportation and storage thereof shall be Included In the Cost of the Work. At the Owner's sole discretion. the Owner may make payment for materials. supplies and/or equipment stored off-site. 8.2.3 Payments made by the GC to Trade Contractors for their Work performed pursuant to Trade Contracts with the GC. 8.2.4 Cost of the premiums for all Insurance or bonds Including Trade Contractor bonds which the GC Is required to procure by this Agreement. or other Insurance or bonds subsequently deemed necessary by the GC. and agreed upon by the PMC/AE and the Owner. 8.2.5 Sales. use. gross receipt. or similar taxes related to Work imposed by any govemmental authority and for which the GC Is liable. 8.2.6 Building and operating permit fees. Inspection and filing fees. sewer and water fees. and deposits lost for causes other than the GC's own negligence. If royalties or losses and damages. Including cost of defense. are Incurred which arise from a particular design. process or the product of a particular manufacturer or manufacturers specified by the Owner or PMC/AE. and the GC had no reason to believe there would be Infringement of patent rights. such royalties. losses and damages shaH be paid by the Owner and the GMP shall be adjusted by Change Order to compensate the GC for the Increased costs. If the GC has actual or constructtve knowledge that use of the partiCular design. process or product would Infringe a patent(s) and falls to provide written notice to the Owner before using such design. process or product. then no royalties. losses or damages rising from us of such design, process or product sholl be 0 Cost of the Work. and such shall not be paid by the Owner. but by the GC (See Article 3.7 and 3.17 of A20 1. General Conditions). Page 11 I I I I I I I I I I I I I I I I I I I I I I 8.2.7 Cost of removal and disposal of all debris Including clean-up and trash removal. 8.2.8 Cost Incurred due to an emergency affecting the safety of persons and/or property. 8.2.9 Legal costs reasonably, and property. resulting from prosecution of the Work for the Owner provided, however. that they are not the result of the GC's own negligence or matfeasonce. Legal costs Incurred In connection with disputes solely between the GC and the Owner or Incurred In connection with disputes solely between the GC and Trade Contractors are the responsibility Of the GC and shall not be Included In the Cost of the Work. 8.2.10 All costs directly Incurred In the performance of the Work and not Included In the GC Fee as set forth In Paragraph 7.2. herein. and the General Condition Lump Sum set forth In Paragraph 7.5 herein. ARTICLE 9 Changes In the Work 9.1 The Owner. without Invalidating this Agreement. may order changes In the Work within the general scope of this Agreement consisting of additions. deletions. or other revisions. All changes in the Work shall be authorized as described In the Conditions of the Contract. Except In cases of emergency endangering life or property. the GC sholl allow no Changes In the Work without the prior written approval of the Owner. Notwithstanding anything contained In the Conditions of the Contract to the contrary. the PMC/ AE has no authority to authorize or order any changes in the Work. All changes In the Work must be authorized In writing by the Owner. The GC shall not perform and will not be compensated for any changes In the Work not authorized or ordered In accordance with this section and the conditions of the contract. ARTICLE 10 Discounts 10.1 All quantity discounts shall accrue to the Owner. All trade discounts. rebates and refunds. and all returns from the sole of surplus materials and equipment shall be credited to the Owner. ARTICLE 11 Insurance 11.1 Insurance will be provided as required by the SUpplemental and General Conditions of the Contract. 11.2 The Owner may elect to purchase Insurance under an Owner Controlled Insurance Program. In which case the GC wIH not be required to provide Insurance. but wW provide coordination with the Owner and the Owner's Insurance broker. as required. The Owner wIH Infonn the GC of Its intention regarding Insurance In sufftclent time before the execution of the amendment making the fInol adjustment to the Guaranteed MaxImum Price and confirming the scope. to allow the GC to arrange for Insurance and Include the costs In the final GMP. If necessary. Page 12 I I I I I I I I I I I I I I I I I I I I I ARTICLE 12 Miscellaneous Provisions 12.1 The Owner and GC respectively, bind themselves. their partners. successors. assigns and legal representatives to the other party to this Agreement and to the partners. successors. assigns and legal representatives of such other party with respect to all covenants of this Agreement. Neither Owner nor GC shall assign this Agreement with out the written consent of the other. 12.2 This Agreement shaA be governed by the laws of the State of Florida. 12.2.1 Each of the parties hereto (a) Irrevocably submits Itself to the exclusive jurisdiction of the Circuit Court of the State of Florida. Plnellas County. and the Jurisdiction of the United States District Court for the Middle District of Florida. Tampa Division for the purposes of any suit. action or other proceeding arising out of. or relating to. this agreement; (b) wolves and agrees not to assert against any party hereto. by way of motion. as a defense or otherwise. In any suit. action or other proceeding. (I) any claim that It Is not personally subject to the jurisdiction of the above- named courts for any reason whatsoever or that Its property Is exempt or Immune from set off. execution or attachment. either prior to judgment or In old of execution. for any reason whatsoever; and (II) to the extent permitted by applicable law. any claim that such suit. action or proceeding by any party hereto Is brought In an inconvenient forum or that the venue of such suit. action or proceeding Is Improper or that this agreement or the subject matter hereof may not be enforced In or by such courts. 12.3 The GC agrees that after completion of all Work under this agreement and all Amendments thereto and prior to final payment. It will execute and deliver to the Owner an "Assignment of AntHrust Claims" as shown In the Special Conditions of the Contract. 12.3. 1 The GC also agrees that prior to final payment. It will cause each of its suppliers and Trade Contractors who have furnished services. goods. or materials in comectlon with the performance of this Contract. to execute and deliver to the Owner an "AssIgnment of Anti-Trust Claims' In the same form as specified In Paragraph 12.3 above. 12.4 The GC warrants that It has not employed or retained any company or person (other than a bona fide employee working solely for the GC) to solicit or secure this agreement. and that it has not paid or agreed to pay any person. company. corporation Individual or firm (other than a bona fide employee working solely for the GC) any fee. commission. percentage. gift. or any other consideration contingent upon or resulting from the award or making of this agreement. 12.5 As required by Section 287.058. Florida Statutes. this contract may be unilaterally cancelled by the Owner for refusal by the GC to allow publiC access to all documents. papers. letters. or other material subject to the provisions of Chapter 119 and made or received by the GC In conjunction with the contract to the provisions of Chapter 119 and made or received by the GC in conjunction with the contract. Page 13 I I I I I I I I I I I I I I I I I I I I I 12.6 The parties recognize that the GC Is an Independent contractor. The GC agrees to indemnify. hold harmless and defend the Owner of. from. and against all liability and expense Including reasonable attorney's fees. In connection with any and all claims whatsoever for personal injuries or property damage. Including loss of use. caused by the negAgent or deAberate act or omission of the Ge. Its agents. officers. contractors or employees or anyone else for whose acts the Ge may be liable. ThIs Includes claims made by the employees of the GC against the Owner and the GC hereby wolves Its entitlement. if any. to immunity under SectIon 330.11. Florida Statutes. In any claim or action brought by an employee of the GC against the Owner. Nothing contained herein shall be construed as a waiver of any immunity from or limitation of liability the Owner may hove under the doctrine of sovereign Immunity or Section 768.28. Florida Statutes. 12.7 This Agreement shall be binding upon. and shall Inure to the benefit of the parties hereto and their respective successors and assigns. 12.8 This Agreement shall create no rights or claims whatsoever In any person other than a party hereto. 12.9 If anyone or more of the provisions of this Agreement shall be held to be Invalid. Illegal or unenforceable In any respect. the validity. legality and enforceability of the remaining provisions hereof shall not In any way be affected or Impaired thereby. 12.10 Nothing contained in the Agreement Is Intended or does create an entitlement of property Interest In the GC. 12.11 The GC recognizes that the Owner intends to finance a portion of this project through a bond Issue. At this time. validation of this bond Issue Is anticipated to occur In November. 1994. if the court refuses to validate the bonds or If a referendum Is required to authorize the city to Issue the bonds, the work may be reduced. The guaranteed maximum price shall be reduced In accordance with Article 6 and Article 9 of this Agreement. if the Work Is reduced. Page 14 I I I I I I I I I I I I I I I I I I I I I IN WITNE$ WHEREOF. the parties hove affbced their signatures, effective on the date first written above. CITY OF CLEARWATER -- By ~~~ Eliza th M. D ptula City Managar Rita Garvey Mayor-Commissioner Approved as to form and legal sufficiency: Attest: BY~--. - f, !d~- rOt.. Cynt; E. Ge;,uO~(J' City erk . CREATIVE/BEERS, a Joint Venture ATTEST: I/!~ By t/efl. /kA,oy C. ,Bdhff/l!iA/ Typed Name Title jJ~t1J?f:.1' &ECV77 rE Page 15 MASTER SCHEDULE IN FILE I THE A MER I C A N1 INSTITUTE o IF ARC HIT E C T S I I I I AlA Document A201 I General Conditions of the Contract for Construction I I THIS DOCUMENT HAS IMPORTANT lEGAL COXSEQlEVCES;' CONSULTA TION WITH AN ATTORNEY IS ENCOURAGED rOTH RESPECT TO ITS MODIFICATION I 1987 EDITION TABLE OF ARTICLES I I 1. GENERAL PROVISIONS 8. TIME 2. OWNER 9. PAYMENTS AND COMPLETION I 3. CONTRACTOR 10. PROTECTION OF PERSONS AND PROPERTY I 4. ADMINISTRATION OF THE CONTRACT 11. INSURANCE AND BONDS 5. SUBCONTRACTORS 12. UNCOVERING AND CORRECTION OF WORK I 6. CONSTRUCTION BY OWNER OR BY SEP ARA TE CONTRACTORS 13. MISCELLANEOUS PROVISIONS I 7. CHANGES IN THE WORK 14. TERMINATION OR SUSPENSION OF THE CONTRACT I I This document has been approved and endorsed by the Associated General Contractors of America. Copyright 1911. 1915. 1918. 1925. 19.0-. 1951. 1958, 1961, 1963, 1966. 1967, 1970, 19~6. ~'1987 by The American Institute of Architects. 1735 New York Avenue. N.W., Washington, D.C., 20006. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AlA \'io!ates the copyright laws of the United States and will be subject to legal prosecutions I I AlA DOCUMENT A201 . GENERAL CONDITIONS OF THE CONTRACT FOR CO!,;STRL'CTIO:'-i . FOl'RTEENTH EOIT!O:'-i AIA@ "@1987 THE AMERICAN INSTITUTE OF ARCHITECTS. 17.1'; :'-iE\,(' YORK A\'ENI'E, N.W, \,('ASHI;';C;TO:'-i, D.C. 20006 A201-1987 1 I Acceptance of Nonconforming Work. . . . . '9.6.6,9.9.3,12.3 Acceptance of Work . . . . . . .. 9.6.6,9.8.2,9.9.3,9.10.1,9.10.3 AccesstoWork... ............... 3.16,6.2.1,12.1 Accident Prevention. . . . . . . . . . . . . . . . . . . . . . . . .. 4.2.3, 10 Acts and Omissions 3.2.1,3.2.2,3.3.2,3.12.8,3.18,4.2.3,4.3.2, 4.3.9, 8.3.1, 10.1.4, 10.2.5, 13.4.2, 13.7, 14.1 Addenda ................ .......1.1.1,3.11 Additional Cost, Claims for ......... 4.3.6,4.3.7,4.3.9,6.1.1,10.3 Additional Inspections and Testing. . . . . .. 4.2.6,9.8.2,12.2.1,13.5 Additional Time, Claims for. . . . . . . . . . . .. 4.3.6,4.3.8,4.3.9,8.3.2 ADMINISTRATIONOFTHECONTRACT ... 3.3.3,4,9.4,9.5 Advertisement or Invitation to Bid . . . . . . . . . . . . . . . . . . . . .. 1.1.1 Aesthetic Effect. . . . . . . . . . . . . . . . . . . . . . . . .. 4.2.13,4.5.1 Allowances . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 3.8 All-risklnsurance... ......................11.3.1.1 Applications for Payment 4.2.5,7.3.7,9.2,9.3,9.4,9.5.1,9.6.3, 9.8.3,9.10.1,9.10.3,9.10.4, 11.1.3, 14.2.4 2.4,3.3.3,3.5,3.10.2,3.12.4 through 3.12.8, 3.18.3, 4.2.7,9.3.2,11.3.1.4,13.4.2,13.5 ......... 4.1.4,4.3.2,4.3.4,4.4.4,4.5, 8.3.1,10.1.2,11.3.9,11.3.10 Architect . . . . . . . . . . . . . . . . . .. 4.1 Architect, Definition of. ................. 4.1.1 Architect,ExtentofAuthority..... . 2.4,3.12.6,4.2,4.3.2,4.3.6, 4.4,5.2,6.3,7.1.2,7.2.1,7.3.6,7.4,9.2,9.3.1, 9.4,9.5,9.6.3,9.8.2,9.8.3,9.10.1,9.10.3,12.1,12.2.1, 13.5.1,13.5.2,14.2.2,14.2.4 Architect, Limitations of Authority and Responsibility. 3.3.3,3.12.8, 3.12.11,4.1.2,4.2.1,4.2.2,4.2.3,4.2.6,4.2.7, 4.2.10, 4.2.12, 4.2.13,4.3.2,5.2.1,7.4,9.4.2,9.6.4,9.6.6 Architect's Additional Services and Expenses. ........ 2.4,9.8.2, 11.3.1.1,12.2.1,12.2.4,13.5.2,13.5.3,14.2.4 Architect's Administration ofthe Contract. . . . . . . . .. 4.2,4.3.6, 4.3.7,4.4,9.4,9.5 Architect's Approvals 2.4,3.5.1,3.10.2,3.12.6,3.12.8,3.18.3,4.2.7 Architect's Authority to Reject Work .... 3.5.1,4.2.6,12.1.2,12.2.1 Architect's Copyright . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 1.3 Architect's Decisions. . . 4.2.6,4.2.7,4.2.11,4.2.12,4.2.13, 43.2,4.3.6,4.4.1,4.4.4,4.5,6.3,73.6. "7.3.8, 8.1.3., 8.3.1, 9.2,9.4,9.5.1,9.8.2,9.9.1,10.1.2,135.2,14.2.2,14.2.4 Architect's Inspections. . . . . . . 4.2.2.429.4.3.6,9.4.2,9.8.2, 9.9.2,9.10.1,13.5 Architect's Instructions .. 4.2.6,4.2.7,4.2.8,.'1..:1.-,7.4.1,12.1,13.5.2 Architect's Interpretations. . . . . . . . . . . . . . .. 4.2.11,4.2.12,4.3.7 Architect's On-Site Observations 4.2.2,4.2.5,4.3.6,9.4.2, 9.5.1,9.10.1,13.5 Architect's Project Representative 4.2.10 Architect's Relationship with Contractor. . 1.1.2,3.2.1,3.2.2, 3.3.3,3.5.1,3.7.3,3.11,3.12.8,3.12.11,3.16,3.18, 42.3, 4.2.4, 4.2.6,4.2.12,5.2,6.2.2, "7.3.4, 9.8.2,11.3.7,12.1,13.5 Architect's Relationship with Subcontractors. . 1.1.2,4.2.3,4.2.4, 4.2.6,96.3,9.6.4,11.3.7 9.4.2,9.5.1,9.101 4.2.2,4.2.5,4.2.9,4.36,9.4.2,9.5.1, 9.8.2,99.2'-9.10.1,13.5 Asbestos .. . . . . . . . . . . . . . . . . . . . . . . . 10.1 Attorneys' Fees. . . . . . . . . . . . 3.18.1,9.10.2,10.1.4 Award of Separate Contracts. . . . . . . . . . . . . . . . . . . . . . . . . .. 6.1.1 Award of Subcontracts and Other Contracts for Portions of the Work . . . . . . . . . .. . . . . . . . . . . . . . . . .. 5.2 Basic Definitions . . . . . . . . . . . . . . . . . . . . . . 1.1 Bidding Requirements ................ 1.1.1,1.1.7,5.2.1,11.4.1 Boiler and Machinery Insurance . . . . . . . . . . . . . .. 11.3.2 Bonds,Lien- .......... 9.10.2 Bonds,PerformanceandPayment..... 7.3.6.4,9.10.3,11.3.9,11.4 Approvals . Arbitration Architect's Representations. . . . Architect's Site Visits. . . I I I I INDEX I Building Permit ............,....... . . . . . . . . . 3.7.1 Capitalization....................... 1.4 Certificate of Substantial Completion . . . . . . . . . . . . . . 9.8.2 CertificatesforPayment....... 4.2.5,4.2.9,9.3.3,9.4,9.5,9.6.1, 9.6.6,9.7.1,9.8.3,9.10.1,9.10.3, 13.7, 14.1.1.3, 14.2.4 Certificates of Inspection, Testing or Approval ..... 3.12.11,13.5.4 Certificates ofInsurance ............ 9.3.2,9.10.2,11.1.3 Change Orders. 1.1.1,2.4.1,3.8.2.4,3.11,4.2.8,4.3.3,5.2.3, 7.1,7.2,7.3.2,8.3.1,9.3.1.1,9.10.3,11.3.1.2, 11.3.4, 11.3.9, 12.1.2 Change Orders, Definition of .......................... 7.2.1 Changes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 7.1 CHANGES IN THE WORK .... 3.11,4.2.8,7,8.3.1,9.3.1.1,10.1.3 Claim, Definition of . .. ............................. 4.3.1 Claims and Disputes. . . . . . . . . . . . . . .. 4.3,4.4,4.5,6.2.5,8.3.2, 9.3.1.2, 9.3.3, 9.10.4, 10.1.4 Claims and Timely Assertion of Claims .............. 4.5.6 ClalmsforAdditlonaICost........ 4.3.6,4.3.7,4.3.9,6.1.1,10.3 Claims for Additional Time . .. ..' 4.3.6,4.3.8,4.3.9,8.3.2 Claims for Concealed or Unknown Conditions. . . . . . . . 4.3.6 Claims for Damages. . .3.18,4.3.9,6.1.1,6.2.5, 8.3.2, 9.5.1.2, 10.1.4 Claims Subject to Arbitration. . . . . . . . . . . . . . . .. 4.3.2,4.4.4,4.5.1 Cleaning Up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.15, 6.3 Commencement of Statutory Limitation Period . . 13.7 Commencement of the Work, Conditions Relating to .. ... 2.1.2, 2.2.1,3.2.1,3.2.2,3.7.1,3.10.1,3.12.6,4.3.7,5.2.1, 6.2.2,8.1.2,8.2.2,9.2,11.1.3, 11.3.6, 11.4.1 Commencement of the Work, Definition of . . . . . . . . . .. 8.1.2 Communications Facilitating Contract Administration ... . . . . . . . . . . . . . 3.9.1,4.2.4,5.2.1 Completion, Conditions Relating to . . . . . .. 3.11,3.15,4.2.2,4.2.9, 4.3.2,9.4.2,9.8,9.9.1,9.10, 11.3.5, 12.2.2, 13.7.1 COMPLETION, PAYMENTS AND. . . . . . . . . . . . . . . . . . . . . . . .' 9 Completion, Substantial. . .. . .. 4.2.9,4.3.5.2,8.1.1,8.1.3,8.2.3, 9.8,9.9.1,12.2.2,13.7 Compliance with Laws. 1.3,3.6,3.7,3.13,4.1.1, 10.2.2, 11.1, 11.3,13.1,13.5.1,13.5.2,13.6,14.1.1,14.2.1.3 Concealed or Unknown Conditions. . . . . . . . . . . .. ....... 4.3.6 Conditions of the Contract. . . . . . . . . . . . . . . . .. 1.1.1,1.1.7,6.1.1 Consent, Written. . . . . . . . . . . . . . . . .. 1.3.1,3.12.8,3.14.2,4.1.2, 4.3.4,4.5.5,9.3.2,9.8.2,9.9.1,9.10.2,9.10.3,10.1.2,10.1.3, 11.3.1,11.3.1.4,11.3.11,13.2,13.42 CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS . . . . . . . . . . . . . . . . . . . . . . . . . .. 1.1.4,6 Construction Change Directive, Definition of. . . . . . . . . . . 7.3.1 Construction Change Directives. . .. 1.1.1,4.2.8,7.1,7.3,9.3.1.1 Construction Schedules, Contractor's . . . . . . .. 3.10,6.1.3 Contingent Aissignment of Subcontracts . . . . . . . .. 5.4 Continuing Contract Performance . . . . . . ., 4.3.4 Contract, Definition of . . . . . . . . . . . . . . . . . . .. 1.1.2 CONTRACT ,TERMINATION OR SUSPENSION OF THE . . . . . . . . 4.3.7, 5.4.1.1, 14 Contract Administration . . . . . . . . . . 3.3.3,4,9.4,9.5 Contract Award and Execution, Conditions Relating to . . . . .. 3.7.1, 3.10, 5.2, 9.2, 11.1.3, 11.3.6, 11.4.1 ContractDocuments,The .................. ..1.1,1.2,7 Contract Documents, Copies Furnished and Use of. .. 1.3,2.2.5,5.3 Contract Documents, Definition of . . . . . . . . . . . . . . . . . . . .. 1.1.1 Contract Performance During Arbitration . . . . . . . . . . .. 4.3.4,4.5.3 Contract Sum. . . . . . . . . . . . .. 3.8,4.3.6,4.3.7,4.4.4,5.2.3, 6.1.3,7.2,7.3,9.1,9.7,11.3.1,12.2.4,12.3,14.2.4 Contract Sum, Definition of. . . . . . . . . . . . . . . . . . . . . 9.1 C~ntract Time 4.3.6,4.3.8,4.4.4,72.1.3,7.3, 8.2.1,8.3.1,9.7,12.1.1 Contract Time, Definition of . . . . . . . . . . . . . . .. 8.1.1 I I I I I I I I I I I I I I 2 A201-1987 AlA DOCUMENT A201 " GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION' FOURTEENTH EDITION AIA@ "@1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, NoW, WASHINGTON, D.C. 20006 I I J I I I CONTRACTOR. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . " 3 Contractor, Definition of . . . . . . . . . . . . . . . . . .. 3.1, 6.1.2 Contractor's Bid. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 1.1.1 Contractor's Construction Schedules ............. 3.10,6.1.3 Contractor's Employees. . . . . .. 3.3.2,3.4.2,3.8.1,3.9,3.18,4.2.3, 4.2.6,8.1.2,10.2,10.3,11.1.1,14.2.1.1 Contractor's Liability Insurance. . . . . . . . . . . . . . . . . . . . . " 11.1 Contractor's Relationship with Separate Contractors and Owner's Forces. . . . .. 2.2.6,3.12.5,3.14.2,4.2.4,6, 12.2.5 Contractor's Relationship with Subcontractors . . . . . .. 1.2.4,3.3.2, 3.18.1,3.18.2,5.2,5.3,5.4,9.6.2, 11.3.7, 11.3.8, 14.2.1.2 Contractor's Relationship with the Architect .... 1.1.2,3.2.1,3.2.2, 3.3.3,3.5.1,3.7.3,3.11,3.12.83.16,3.18,4.2.3, 4.2.4,4.2.6, 4.2.12,5.2,6.2.2,7.3.4,9.8.2,11.3.7,12.1,13.5 Contractor's Representations.. 1.2.2,3.5.1,3.12.7,6.2.2,8.2. 1,9.3.3 Contractor's Responsibility for Those Performing the Work. . . . . . . . . . . . . . " 3.3.2,3.18,4.2.3, 10 Contractor's Review of Contract Documents. 1.2.2.3.2,3.7.3 Contractor's Right to Stop the Work ...................... 9.7 Contractor's Right to Terminate the Contract . . . . . . . . . . . . " 14.1 Contractor'sSubmittals ...... 3.10,3.11,3.12,4.2.7,5.2.1,5.2.3, 7.3.6,9.2,9.3.1,9.8.2,9.9.1,9.10.2, 9.10.3, 10.1.2, 11.4.2, 11.4.3 Contractor's Superintendent. . . . . . . . . . . . . . . . . . . . " 3.9,10.2.6 Contractor's Supervision and Construction Procedures. . . . " 1.2.4, 3.3, 3.4, 4.2.3, 8.2.2, 8.2.3, 10 Contractual Liability Insurance. . . . . . . . . . . .. 11.1.1. 7, 11. 2. 1 Coordination and Correlation ............... 1.2.2,1.2.4,3.3.1, 3.10,3.12.7,6.1.3,6.2.] Copies Furnished of Drawings and Specifications. 1.3,2.2.5,3.1] Correction of Work . . . . . . . . . . . . . . . . . .. 2.3,2.4,4.2.],9.8.2, 9.9.1, ]21.2. 12.2, ]3.7.1.3 Cost, Definition of 7.3.6, ]4.3.5 Costs.... 2.4,3.2.],3.7.4,3.8.2,3.15.2,4.3.6,4.3.7, 4.3.8.1,5.2.3, 6.1.1,6.2.3,6.3,7.3.3.3,7.3.6,7.3.7,9.7,9.8.2,9.10.2, ] 1.3.1.2, 11.3.1.3,] 1.3.4,11.3.9, ]2.], ]2.2.], ]2.2.4, ]2.2.5, 13.5, ]4 CUUing and Patching. ...................... 3.14,6.2.6 Damage to Construction of Owner or Separate Contractors 3.14.2, 6.2.4,9.5.1.5, 10.2.1.2, 10.2.5, 10.3, 11.1, 11.3, ]2.2.5 Damage to the Work '" 3.]4.2,9.9.1,10.2.1.2,10.2.5,10.3,11.3 Damages, Claims for.. 3. ]8,4.3.9,6.1.1,6.2.5,8.3.2,9.5.1.2, 10.1.4 Damages for Delay. .. ............. 6.1.1,8.3.3,9.5.1.6,9.7 Date of Commencement of the Work, Definition of . . . . . . . " 8.1.2 Date of Substantial Completion, Definition of. . . . . . . . . . . . " 8.].3 Day, Definition of. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 8.1.4 Decisions of the Architect. 4.2.6,4.2.7,4.2.] 1,4.2.12,4.2.13, 4.3.2,4.3.6,44.],4.4.4,4.5,6.3,7.3.6,7.3.8,8.1.3, 8.3.], 9.2, 9.4,95.],9.8.2,9.9.],101.2, ]3.5.2, ]4.2.2, ]4.2.4 Decisions to Withhold Certification 9.5, 9.7, ] 4.1.1.3 Defective or Nonconforming Work, Acceptance, Rejection and Correction of ...... 2.3,2.4,3.5.],4.2.1, 4.2.6,4.3.5,9.5.2,9.8.2,9.9.],10.2.5,12, ]3.7.1.3 Defective Work, Definition of ...................... 3.5.] Definitions. 1.1,2.1.1,3.],3.5.],3.12.],3.]2.2,3. ]2.3,4.1.1, 4.3.],5.],6.1.2,7.2.],7.3.],7.3.6,8.],9.],9.8.] Delays and Extensions of Time ........ 4.3.1,4.3.8.1,4.3.8.2, 6.1.1,6.2.3,7.2.1,7.3.],7.3.4,7.3.5,7.3.8, 7.3.9,8.1.1,8.3, 10.3.], ]4.1.1.4 Disputes 4.].4,4.3,4.4,4.5,6.2.5,6.3,7.3.8,9.3.1.2 Documents and Samples at the Site. . . . . . . . . 3.] ] Drawings, Definition of . . . . . . . . . . . . . . . . . . . . . . . . 1.1.5 Drawings and Specifications, Use and Ownership of. . ].].], ] .3, 2.2.5, 3.] 1, 5.3 Duty to Review Contract Documents and Field Conditions. . . " 3.2 Effective Date oflnsurance . . . . . . . . . . . . . . . 8.2.2, 11.1.2 I I I I I I I I I I I I I I I Emergencies. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 4.3.7,10.3 Emp]oyees, Contractor's. .. . . . .. 3.3.2,3.4.2,3.8.],3.9,3.]8.1, 3.18.2,4.2.3,4.2.6,8.1.2,10.2,10.3, ]1.1.1, 14.2.1.1 Equipment, Labor, Materials and. . . . . . . . " 1.1.3,1.1.6,3.4,3.5.], 3.8.2,3.]2.3,3.12.7,3.12.11,3.]3,3.15.],4.2.7, 6.2.],7.3.6,9.3.2,9.3.3, 11.3, 12.2.4, 14 Execution and Progress of the Work ....... 1.1.3,1.2.3,3.2,3.4.1, 3.5.1,4.2.2,4.2.3,4.3.4,4.3.8,6.2.2,7.1.3, 7.3.9, 8.2, 8.3, 9.5, 9.9.1, 10.2, 14.2, 14.3 Execution, Correlation and Intent of the Contract Documents. . . . . . . . . . . . . . . . . . . . . . . . .. 1.2,3.7.1 Extensions of Time '" .... 4.3,1,4.3.8,7.2.1.3,8.3,10.3.1 Failure of Payment by Contractor. . . . . . . . . . . . .. 9.5.1.3, 14.2.1.2 Failure of Payment by Owner ................ 4.3.7,9.7,14.1.3 Faulty Work (See Defective or Nonconforming Work) Final Completion and Final Payment ........ 4.2.1,4.2.9,4.3.2, 4.3.5,9.10, ]1.1.2, 11.1.3, 11.3.5, 12.3.], ]3.7 Financial Arrangements, Owner's. . . . . . . . . . . . . . . . . . 2.2.1 Fire and Extended Coverage Insurance . " 11.3 GENERAL PROVISIONS. . . . . . . . . . . . . . .. 1 Governing Law. .. . .. .. .. .. .. 13.1 Guarantees (See Warranty and Warranties) Hazardous Materials. . . . . . . . . . . . . . 10.1,10.2.4 Identification of Contract Documents ................... 1.2.1 Identification of Subcontractors and Suppliers. . . . . . . . . . . " 5.2.1 Indemnification....... 3.17,3.18,9.10.2,10.1.4,11.3.1.2,11.3.7 Information and Services Required of the Owner. . . .. 2.1.2, 2.2, 4.3.4, 6.1.3, 6.1.4, 6.2.6, 9.3.2, 9.6.1, 9.6.4, 9.8.3, 9.9.2, 9.10.3,10.1.4,11.2,11.3,13.5.1,13.5.2 Injury or Damage to Person or Property. . . . . . . . . . . . . " 4.3.9 Inspections. 3.3.3,3.3.4,3.7.1,4.2.2, 4.2.6,4.2.9,4.3.6,9.4.2,9.8.2,99.2,9.10.1, 13.5 Instructions to Bidders . . . . . . . . . . . . . . . . . . .. 1.1.1 Instructions to the Contractor. . .. 3.8.1,4.2.8,5.2.1,7,12.1,13.5.2 ]nsurance. 4.3.9.6.1.1,7.3.6.4,9.3.2,9.8.2,9.9.1,9.10.2,11 Insurance, Boller and Machinery .................... 11.3.2 Insurance, Contractor's liability . . . " 11.1 Insurance, Effective Date of . . . . .. 8.2.2, 11.1.2 Insurance, Loss of Use. ... .. .. " . .. " .. 11.3.3 Insurance, Owner's Liability. . . . . . . . .. 11.2 Insurance, Property. . . . . . . . . . . . . 10.2.5,11.3 Insurance, Stored Materials . . . . . . . . . 9.3.2, 11.3.1.4 INSURANCE AND BONDS . . . . . . . . . 11 Insurance Companies, Consent to Partial Occupancy. .9.9.], ] 1.3.1 ] Insurance Companies, Settlement with. . . . . . . . . . . . ] 1.3.] 0 ]ntentofthe Contract Documents . ............. 1.2.3,3.]2.4, 4.2.6,4.2.7,4.2.]2,4.2.]3,7.4 Interest. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13.6 Interpretation. 1.2.5,1.4,1.5,4.1.1,4.3.],5.],6.1.2,8.1.4 Interpretations, Written.. . . 4.2.]],4.2.]2,4.3.7 Joinder and Consolidation of Claims Required ............. 4.5.6 Judgment on Final Award ................ 4.5.],4.5.4.],4.5.7 Labor and Materials, Equipment. 1.1.3, 1.1.6,3.4,3.5.],3.8.2, 3.]2.2,3.]2.3,3]2.7,3.]2.]],3.]3,3.]5.], 4.2.7,6.2.],7.3.6,9.3.2,9.3.3, ]2.2.4, ]4 Labor Disputes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8.3.1 Laws and Regulations 1.3,3.6,3.7,3. ]3,4.1.1,4.5.5,4.5.7, 99.],10.2.2, ]1.1, ]]3, ]3.], ]3.4, ]35.], ]3.5.2, ]3.6 Liens. 2.] .2,43.2,4.3.5.],8.2.2,9.3.3,9.10.2 limitation on Consolidation or Joinder ................ 4.5.5 Limitations, Statutes of 4.5.4.2, ]2.2.6, ]3.7 Limitations of Authority. 3.3.],4.1.2,4.2.], 4.2.3,4.2.7,4.2.10,5.22,5.24,7.4, ]1.3.]0 I AlA DOCUMENT A201 . GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRCCTIO]\; . FOCRTEENTH EDITION AIA@ . @1987THEAMERICANINSTlTUTEOFARCHITECTS, 1735 NEW YORK AVE]\;l'E. N.W., \1(ASHINGTO:-';, D.C. 20006 - A201-1987 3 I LimitationsofLiability .' 2.3,3.2.1,3.5.1,3.7.3,3.12.8,3.12.11, 3.17,3.18,4.2.6,4.2.7,4.2.12,6.2.2,9.4.2,9.6.4,9.10.4, 10.14,10.2.5,11.12,112.1,11.3.7,13.4.2,13.5.2 Limitations of Time, General ........... 2.2.1,2.2.4,3.2.1,3.7.3, 3.8.2,3.10,312.5,3.15.1,4.2.1,4.2.7,4.2.11,4.3.2, 43.3,4.3.4,4.36,4.3.9,4.5.4.2,5.2.1,5.2.3,62.4,7.3.4,7.4, 8.2,9.5,9.62,9.8,9.9,9.10,11.1.3,11.3.1,11.3.2,11.3.5, 11.3.6,12.2.1,12.2.2,13.5,13.7 Limitations of Time, Specific ... 2.12,2.2.1,2.4,3.10,3.11, 3.15.1,4.2.1,42.11,4.3,4.4,4.5,5.3,5.4,7.3.5,7.3.9,8.2, 9.2,9.3.1,9.3.3,9.4.1,9.6.1,9.7,9.8.2,9.10.2, 11.1.3, 11.3.6, 11.3.10,113.11,12.2.2,12.2.4,12.2.6,13.7,14 Loss of Use Insurance . . . . . 11.3.3 Material Suppliers. . . 13.1,3.12.1,4.2.4,4.2.6,5.2.1, 9.3.1,9.3.1.2,9.3.3,9.4.2,96.5,9.10.4 Materials. Hazardous . . . . . . . . . . . 10.1,10.2.4 Materials. Labor, Equipment and. . . .. 113, 11.6,3.4,3.5.1,3.8.2, 3.12.2,312.3,3.12.7,3.12.11,3.13,3.15.1,4.2.7,621, 73.6,9.3.2,9.3.3, 12.2.4, 14 Means, Methods, Techniques, Sequences and Procedures of Construction .. .. 3.3.1,4.2.3,4.2.7,9.4.2 Minor Changes in the Work. 1.1.1,42.8,43.7,7.1,7.4 MISCELLANEOUS PROVISIONS. . . . . . . . 13 Modifications, Definition of . 1.1.1 Modifications to the Contract 111, 112,3.7.3,3.11, 4.1.2,4.2.1,5.2.3,7,8.3.1,9.7 Mutual Responsibility . . . . . . . . . . . . . . . . 6.2 Noncor:forming Work, Acceptance"'f . . . . 12.3 Nonconforming Work, Rejection and Correction of . . . . 2.3.1, 4.3.5,9.5.2,9.8.2,12,13.7.13 ....... 2.3,2.4,3.21,3.2.2,3.7.3,37.4,3.9,3.12.8, 312.9,3.17,4.3,4.44,4.5,5.2.1,5.3,5.41.1,8.2.2,9.4.1, 9.5.1,96.1,9.7,9.10,10.1.2,1026,111.3,11.3,12.2.2, 12.2.4,13.3,13.5.1,13.5.2,14 Notice, Written 2.3,2.4,3.9,3.12.8,3.12.9,4.3, 4.4.4,4.5,5.2.1,5.3,5.41.1,8.2.2,9.4.1,9.5.1,9.7,9.10, 10.1.2, 10.2.6, 11.1.3, 113, 122.2, 122.4,13.3,13.5.2, 14 Notice of Testing and Inspections. . . .. 13.5.1, 13.5.2 Notice to Proceed. .............. 8.2.2 Notices, Permits, Fees and 22.3,3.7,3.13,7.3.6.4, 10.2.2 Observations, Architect's On-Site 4.2.2,4.2.5, 436. 9.-t.2. 95.1, 9.10.1,13.5 1.2.2,3.2.2 96.6,9.8.1,9.9,11.3.11 4.2.2,4.2.9,4.3.6, 9.4.2, 9.8.2, 9.9.2, 9.10.1 On-Site Observations by the Architect. . . . . . . .. 4.2.2,4.2.5,4.3.6, 9.42,9.5.1,9.10.1,13.5 2.3,3.9,4.3.7,7,8.2.2,11.3.9,12.1, 12.2,13.5.2,14.3.1 OWNER. . . . . 2 Owner, Definition of 2.1 Owner,lnformationandServlcesRequiredotthe. ... 2.12, 2.2,4.3.4,6,9,10.1.4,11.2,11.3,13.5.1,14.1.1.5,14.1.3 Owner's Authority. . . . . . 3.8.1,4.1.3,4.2.9,5.2.1,5.2.4,5.4.1, 7.3.1,8.2.2,93.1,9.3.2,11.4.1,12.2.4,13.5.2,14.2,14.3.1 Owner's Financial Capability. . 2.2.1,14.1.1.5 Owner's Liability Insurance . . . . . . . . . . . . . . .' 11.2 Owner's Loss of Use Insurance. 11.3.3 Owner's Relationship with Subcontractors. . 1.1.2, 5.2.1,5.4.1,96.4 2.4,12.2.4,14.2.2.2 6.3 Notice Observations, Contractor's. . . Occupancy. . On-Site Inspections by the Architect Orders, Written Owner's Right to Carry Out the Work. Owner's Right to Clean Up . ( I I I Owner's Right to Perform Construction and to Award Separate Contracts ........... 6.1 Owner's Rightto Stop the Work ....... 2.3,4.3.7 Owner's Right to Suspend the Work. . 14.3 Owner's Right to Terminate the Cone.:;act 14.2 Ownership and Use of Architect's Drawings, Specifications and Other Documents. . 1.1.1,1.3,2.2.5,5.3 Partial Occupancy or Use 96.6,9.9, 11311 Patching, Cutting and. 3.14,6.2.6 Patents, Royalties and . . . . . . . . 3.17 Payment, Applications for 4.2.5,9.2,9.3,9.4, 9.5.1,9.8.3,9.10.1,9.10.3,9.10.4,14.2.4 Payment, Certificates for ........ .. 4.2.5,4.2.9,9.3.3,9.4,9.5, 9.6.1,9.6.6,9.7.1,9.8.3,9.10.1,9.10.3,13.7, 1411.3,14.2.4 Payment, Failure of. . 4.3.7,9.5.1.3, 9.7,9.10.2,14.1.1.3,14.21.2 42.1,4.2.9,4.3.2,4.3.5,9.10,111.2, 11.1.3,11.3.5,1231 7.3.6.4, 9.10.3,11.3.9,11.4 4.3.4,9.3,96, 9.8.3,9.10.3,13.6,142.3 9, 14 5.4.2,9.5.1.3, 9.6.2, 96.3, 96.4, 11.3.8, 14.2.1.2 .. .. .. .. . 10.1 7.3.6.4, 9.10.3,11.3.9,11.4 Permits, Fees and Notices.. .. 2.2.3,3.7,3.13,7.3.6.4,10.2.2 PERSONS AND PROPERTY, PROTECTION OF 10 Polychlorinated Biphenyl .' 10.1 Product Data, Definition of. . . 3.12.2 Product Data and Samples, Shop Drawings. . .. 3.11,3.12,4.2.7 Progress and Completion 4.2.2,4.3.4,8.2 Progress Payments 4.3.4,9.3, 9.6,9.8.3,9.10.3,13.6,14.2.3 Project, Definition of the. . . . . . 1.1.4 Project Manual, Definition of the 1.1.7 Project '\lanuals 2.2.5 project Representatives 4.2.10 Property Insurance 10.2.5,11.3 PROTECTION OF PERSONS AND PROPERTY. . . . . . . . . 10 Regulations and Laws 1.3,3.6,3.7,3.13,4.11,4.5.5, 45.7,10.22,11.1,113,13.1,13.4,13.5.1,13.5.2,136,1-t Rejection of Work 3.5.1,4.2.6,12.2 Releases of Waivers and Liens .... 9.10.2 Representations. . 12.2,3.5.1, 3.12.~, 6.2.2,8.2.1,9.3.3,9.4.2,9.5.1,9.8.2,9.10.1 2.1.1,3.1.1,39. 4.1.1,4.2.1,4.2.10,5.1.1,5.12,13.2.1 Resolution of Claims and Disputes. 4.4, 4.5 Responsibility for Those Performing the Work. . . . . . 3.3.2, 4.2.3,6.13,6.2, ]0 Retainage . . . . 9.3.1,9.6.2,9.8.3,9.9.1,9.10.2,9.10.3 Review of Contract Documents and Field Conditions by Contractor . . . . Review of Contractor's Submittals by Owner and Architect I I I I Payment, Final . . . . . . . . I Payment Bond, Performance Bond and Payments. Progress I PAYMENTS AND COMPLETION Payments to Subcontractors . PCB..... . Performance Bond and Payment Bond. I I I I I Representatives. . . . I I 1.2.2,3.2,3.7.3,3.12.7 I 3.10.1,3.10.2,311,3.12, 42.7,4.2.9,5.2.1,5.2.3,9.2,9.82 Review of Shop Drawings, Product Data and Samples by Contractor .., 3.]2.5 Rights and Remedies 1.1.2,2.3,2.4,3.5.1,3.15.2, 4.2.6,4.3.6,4.5,5.3,61,6.3,7.3.1,8.3.1,9.5.1, 9.7, 10.2.5. 1O.3,12.2.2,12.2.4,13.4,1-t 3.17 I Royalties and Patents . . I 4 A201-1987 AlA DOCUMENT A201 " GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION" FOURTEENTH EDITION AIA@ "@1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, NW., WASHINGTON, D.C. 20006 , I I I I I Rules and Notices for Arbitration . . . . . . . . . . . . . . . . . . . .. 4.5.2 Safety of Persons and Property. . . . . . . . . . . . . . . . 10.2 Safety Precautions and Programs 4.2.3,4.2.7,10.1 Samples, Definition of . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 3.12.3 Samples, Shop Drawings, Product Data and 3.11,3.12,4.2.7 Samples atthe Site, Documents and . . . . . . . . . . 3.11 Schedule of Values. . . . . . . . . . . . . . . . . . . . . . . . 9.2,93.1 Schedules, Construction . . . . . . . . . . . . . . . . . . . . .. 3.10 Separate Contracts and Contractors . 1.1.4, 3.14.2,4.2.4, 4.5.5,6,11.3.7,12.1.2,12.2.5 Shop Drawings, Definitionof. ................. 3.12.1 Shop Drawings, Product Data and Samples .... 3.11,3.12,4.2.7 Site,Useof. ......... 3.13,6.1.1,6.2.1 Site Inspections. . .1.2.2,3.3.4,4.2.2,4.2.9,4.3.6,9.8.2,9.10.1,13.5 Site Visits, Architect's. 4.2.2,4.2.5,4.2.9,4.3.6, 9.4.2,9.5.1,9.82,9,92,9.10.1,135 Special Inspections and Testing 4.2.6, 12.2.1, 13.5 Specifications, Definition of the. . . . . . . . . . .. 1.1.6 Specifications, The. 1.1.1,1.1.6,1.1.7,1.2.4,1.3,3.11 Statutes of Limitations .................. 4.5.4.2,12.2.6,13.7 StoppingtheWork.. 23,4.3.7,9.7,10.1.2,10.3,141 Stored Materials ........ 6.2.1,9.3.2,10.2.1.2,11.3.1.4, 12.2."i Subcontractor, Definition of. . . . . . . . . . . 5.1. I SUBCONTRACTORS . . . . . . . . . . . . . . . . . . . . . 5 Subcontractors, Work by. . . . . . . . . . . . . . . . .. 1.2.4,3.3.2,3.12.1, 4.2.3, 5.3, 54 Subcontractual Relations. . . . . . . . .. 5.3,5.4,9.3.1.2,9.6.2, 96.3,9.6.4,10.2.1,1137,113.8,14.1.1,14.2.1.2,14.3.2 Submittals 1.3,3.2.3,3.10,3.11,3.12,4.2.7,5.2.1,5.2.3, 7.3.6,9.2,9.3.1,9.8.2.991. 910.2, 910.3,10.1.2,11.1.3 Subrogation, Waivers of . 6.1.1, 11.3.5, 11.3.7 Substantial Completion. "i29. 4.3.5.2, 8.1.1, 8.1.3, 825.9.8,99.1,122.1,12.2.2,137 Substantial Completion, Definition of. . . . . . . . . . . . . . 9.8.1 Substitution of Subcontractors 5.2.3, 5.2.4 Substitution of the Architect. 4.1.3 Substitutions of Materials 3.5.1 Sub-subcontractor, Definition of . . . . . . . . . . . . . . . . . . 5.1.2 Subsurface Conditions. ...... . . . . . . . . . . . . . . . . . . . . .. 4.3.6 Successors and Assigns ........... 13.2 Superintendent. . . . . . . . . . . . . . . . . . . . . . . 3.9,10.2.6 Supervision and Construction Procedures 1.2.4,3.3,3.4, 4.2.3,4.3.4,6.1.3, 62"i. 71.3, 7.3.4, 8.2, 8.3.1,10,12,14 Surety. . . . '" . . 4.4.1. "i.4.4, 5.4.12,9.10.2,9.10.3,14.2.2 Surety, Consent of. . . . . . . . . . . . . . . . . . . . . " 9.9.1,9.10.2,9.10.3 Surveys. . . . . . . . . . . . . . 2.2.2,3.18.3 I I I I I I I I I I I I I I I Suspension by the Owner for Convenience ............ 14.3 Suspension of the Work. . . . . . . . . . . .. 4.3.7,5.4.2,14.1.1.4,14.3 Suspension or Termination of the Contract .. 4.3.7,5.4.1.1,14 Taxes . . . . . . . . . .. 3.6, 7.36.4 Termination by the Contractor ................... 14.1 Termination by the Owner for Cause. . . . . . . . . . 5.4.1.1,14.2 Termination of the Architect ........ 4.1.3 Termination of the Contractor. . . . . . . . . . . . . 14.2.2 TERMINA TlON OR SUSPENSION OF THE CONTRACT . . . . .. 14 Tests and Inspections 3.3.3,4.2.6,4.2.9,9.4.2,12.2.1,13.5 TIME . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 Time, Delays and Extensions of . . . . . . . . . . . .. 4.3.8,7.2.1,8.3 Timc Limits, Specific 2.1.2,2.2.1,2.4,3.10,3.11,3.15.1, "i21, 4.2.11, 4.3, 4.4, 4.5,5.3,5.4,7.3.5,7.3.9,82,9.2,9.3.1, 933,9.4.1,9.6.1,9.7,9.8.2,9.102,11.1.3,11.3.6,11.3.10, 11.3.11, 12.2.2, 12.2.4, 12.2.6, 13.7, 14 Time Limits on Claims. 4.3.2,4.3.3,4.3.6,4.3.9,4.4,4.5 Title to \'\iork . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9.3.2,9.3.3 UNCOVERING AND CORRECTION OF WORK ............. 12 Uncovering of Work .. .. . .. . .. .. .. .. . ..... 12.1 Lnforeseen Conditions.. . . . . . . .. . . . . . . 4.3.6,8.3.1,10.1 L ni t P riccs . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 7.1. 4, 7.3.3.2 l.seofDocuments.......... 1.1.1,1.3,2.2.5,3.12.7,5.3 Use of Site .......... ........ 3.13,6.1.1,6.21 Values, Schedule of . . . . . . . . 9.2, 9.3.1 Waiver of Claims: Final Payment. 4.3.5,4.5.1,9.10.3 \X'aivcr of Claims by the Architect. . . . . . . . . . . . . . . . . . . . .. 13.4.2 Waiver of Claims bv the Contractor. 9.10.4, 11.3.7, 13.4.2 Wah'cr of Claims bv thc Owner. 4.3.5,4.5.1,9.9..3, 9.103, 11.3.3, 11.3.5, 11.3.7, 13.4.2 \X'aiver of Liens. . . . . . . . . . . . . . . . . . . . . 9.10.2 Waivers of Subrogation . 6.1.1,11.3.5,11.3.7 Warranty and Warranties. . . . . . . . . . . . . . . 3.5,4.2.9, 4.55.3,9.33,9.8.2,99.1,12.2.2,13.7.1.3 \X'eathcr Delavs . . . . . . . . . . . . . . . . . . . . . . 4.3.8.2 When Arbitration May Be Demanded . . . . . . . . . . . . . 4.5.4 Work. Definition of . 1.1.3 Writtcn Conscnt . 1.3.1,3.12.8,3.14.2,4.1.2,4.3.4, "i.55, 9..32, 9.8.2, 9.9.1, 9.10.2, 9.103, 10.1.2, 10.1.3, 11.3.1,11.3.1.4,11.3.11,13.2,13.42 \X'ritten Interpretations. . . . . . . . . 4.2.11,4.2.12,4.3.7 Written Notice 2.3,2.4,3.9, .3.128, 312.9, 4.3, 4.4.4, "i5. 5.2.1, 5.3, 5.4.1.1, 8.2.2, 9.4.1, 9.5.1, 97, 9.10,10.1.2, 102.6, 11.1..3, 11.3, 12.2.2, 12.2.4, 13.3, 13.5.2, 14 Written Orders. ........... 2.3,.3.9,4.3.7, 7,8.2.2, 11.3.9, 12.1, 12.2, 135.2, 143.1 I AlA DOCUMENT A201 " GENERAL CONDITIONS OF THE CONTRACT FOR COi'iSTRl'CTIOi'i . FOCRTEENTH EDITION AIA@ . @1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE:o-il'E, :\.W. WASHli'iGTO:o-i, D.C. 20006 A201-1987 5 I I I I GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION ARTICLE 1 GENERAL PROVISIONS 1.1 BASIC DEFINITIONS 1.1.1 THE CONTRACT DOCUMENTS The Contract Documents consist of the Agreement between Owner and Contractor (hereinafter the Agreement), Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, addenda issued prior to execution of the Contract, other documents listed in the Agreement and Modifications issued after execution of the Contract. A Modifi- cation is (1) a written amendment to the Contract signed by both parties, (2) a Change Order, (3) a Construction Change Directive or (4) a written order for a minor change in the Work issued by the Architect. Unless specifically enumerated in the Agreement, the Contract Documents do not include other documents such as bidding requirements (advertisement or invitation to bid, Instructions to Bidders, sample forms, the Contractor's bid or portions of addenda relating to bidding requirements). 1.1.2 THE CONTRACT The Contract Documents form the Contract for Construction. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written or oral. The Con- tract may be amended or modified only by a Modification. The Contract Documents shall not be construed to create a contrac- tual relationship of any kind (1) between the Architect and Con- tractor, (2) between the Owner and a Subcontractor or Sub- subcontractor or (3) between any persons or entities other than the Owner and Contractor. The Architect shall, however, be entitled to performance and enforcement of obligations under the Contract intended to facilitate performance of the Architect's duties. 1.1.3 THE WORK The term "Work" means the construction and services required by the Contract Documents, whether completed or partially completed, and includes all other labor, materials, equipment and services provided or to be provided by the Contractor to fulfill the Contractor's obligations. The Work may constitute the whole or a part of the Project. 1.1.4 THE PROJECT The Project is the total construction of which the Work per- formed under the Contract Documents may be the whole or a part and which may include construction by the Owner or by separate contractors. 1.1.5 THE DRAWINGS The Drawings are the graphic and pictorial portions of the Con- tract Documents, wherever located and whenever issued, showing the design, location and dimensions of the Work, generally including plans, elevations, sections, details, sched- ules and diagrams. 1.1.6 THE SPECIFICATIONS The Specifications are that portion of the Contract Documents consisting of the written requirements for materials, equip- I ment, construction systems, standards and workmanship for the \'{'ork, and performance of related services. 1.1.7 THE PROJECT MANUAL The Project Manual is the volume usually assembled for the Work which may include the bidding requirements, sample forms, Conditions of the Contract and Specifications. I I 1.2 EXECUTION, CORRELATION AND INTENT 1.2.1 The Contract Documents shall be signed by the Owner and Contractor as provided in the Agreement. If either the Owner or Contractor or both do not sign all the Contract Documents, the Architect shall identify such unsigned Docu- ments upon request. 1.2.2 Execution of the Contract by the Contractor is a repre- sentation that the Contractor has visited the site, become famil- iar with local conditions under which the Work is to be per- formed and correlated personal observations with require- ments of the Contract Documents. I I I 1.2.3 The intent of the Contract Documents is to include all items necessary for the proper execution and completion of the Work by the Contractor. The Contract Documents are comple- mentary, and what is required by one shall be as binding as if required by all; performance by the Contractor shall be required only to the extent consistent with the Contract Docu- ments and reasonably inferable from them as being necessary to produce the intended results. 1.2.4 Organization of the Specifications into divisions, sections and articles, and arrangement of Drawings shall not control the Contractor in dividing the Work among Subcontractors or in establishing the extent of Work to be performed by any trade. 1.2.5 Unless otherwise stated in the Contract Documents, words which have well-known technical or construction indus- try meanings are used in the Contract Documents in accord- ance with such recognized meanings. 1.3 OWNERSHIP AND USE OF ARCHITECT'S DRAWINGS, SPECIFICATIONS AND OTHER DOCUMENTS 1.3.1 The Drawings, Specifications and other documents prepared by the Architect are instruments of the Architect's service through which the Work to be executed by the Con- tractor is described. The Contractor may retain one contract record set. Neither the Contractor nor any Subcontractor, Sub- subcontractor or material or equipment supplier shall own or claim a copyright in the Drawings, Specifications and other documents prepared by the Architect, and unless otherwise indicated the Architect shall be deemed the author of them and will retain all common law, statutory and other reserved rights, in addition to the copyright. All copies of them, except the Contractor's record set, shall be returned or suitably accounted for to the Architect, on request, upon completion of the Work. The Drawings, Specifications and other documents prepared by the Architect, and copies thereof furnished to the Contrac- tor, are for use solely with respect to this Project. They are not to be used by the Contractor or any Subcontractor, Sub- subcontractor or material or equipment supplier on other proj- ects or for additions to this Project outside the scope of the I I I I I I I I I I 6 A201-1987 AlA DOCUMENT A201 " GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION' FOURTEENTH EDITION AIA@ . @1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.C. 20006 I I Work without the specific written consent of the Owner and Architect. The Contractor, Subcontractors, Sub-subcontractors and material or equipment suppliers are granted a limited license to use and reproduce applicable portions of the Draw- ings, Specifications and other documents prepared by the Architect appropriate to and for use in the execution of their Work under the Contract Documents. All copies made under this license shall bear the statutory copyright notice, if any, shown on the Drawings, Specifications and other documents prepared by the Architect. Submittal or distribution to meet official regulatory requirements or for other purposes in con- nection with this Project is not to be construed as publication in derogation of the Architect's copyright or other reserved rights. 1.4 CAPITALIZATION 1.4.1 Terms capitalized in these General Conditions include those which are (1) specifically defined, (2) the titles of num- bered articles and identified references to Paragraphs, Subpara- graphs and Clauses in the document or (3) the titles of other documents published by the American Institute of Architects. 1.5 INTERPRETATION 1.5.1 In the interest of brevity the Contract Documents fre- quently omit modifying words such as "all" and "any" and arti- cles such as "the" and "an," but the fact that a modifier or an article is absent from one statement and appears in another is not intended to affect the interpretation of either statement. ~I I I I I ARTICLE 2 I OWNER I 2.1 DEFINITION 2.1.1 The Owner is the person or entity identified as such in the Agreement and is referred to throughout the Contract Documents as if singular in number. The term "Owner" means the Owner or the Owner's authorized representative. 2.1.2 The Owner upon reasonable written request shall furnish to the Contractor in writing information which is necessary and relevant for the Contractor to evaluate, give notice of or enforce mechanic's lien rights. Such information shall include a correct statement of the record legal title to the property on which the Project is located, usually referred to as the site, and the Owner's interest therein at the time of execution of the Agreement and, within five days after any change, information of such change in title, recorded or unrecorded. II I I 2.2 INFORMATION AND SERVICES REQUIRED OF THE OWNER I 2.2.1 The Owner shall, at the request of the Contractor, prior to execution of the Agreement and promptly from time to time thereafter, furnish to the Contractor reasonable evidence that financial arrangements have been made to fulfill the Owner's obligations under the Contract. [Note: Unless such reasonable evidence were furnished on request prior to the execution of the Agreement, the prospectil'e contractor would not be requh-ed to execute the Agreement or to commence the Work.} 2.2.2 The Owner shall furnish surveys describing physical characteristics, legal limitations and utility locations for the site of the Project, and a legal description of the site. 2.2.3 Except for permits and fees which are the responsibility of the Contractor under the Contract Documents, the Owner shall secure and pay for necessary approvals, easements, assess- I I I I ments and charges required for construction, use or occupancy of permanent structures or for permanent changes in existing facilities. 2.2.4 Information or services under the Owner's control shall be furnished by the Owner with reasonable promptness to avoid delay in orderly progress of the Work. 2.2.5 Unless otherwise provided in the Contract Documents, the Contractor will be furnished, free of charge, such copies of Drawings and Project Manuals as are reasonably necessary for execution of the Work. 2.2.6 The foregoing are in addition to other duties and respon- sibilities of the Owner enumerated herein and especially those in respect to Article 6 (Construction by Owner or by Separate Contractors), Article 9 (Payments and Completion) and Article 11 (Insurance and Bonds). 2.3 OWNER'S RIGHT TO STOP THE WORK 2.3.1 If the Contractor fails to correct Work which is not in accordance with the requirements of the Contract Documents as required by Paragraph 12.2 or persistently fails to carry out Work in accordance with the Contract Documents, the Owner, by written order signed personally or by an agent specifically so empowered by the Owner in writing, may order the Contrac- tor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, the right of the Owner to stop the Work shall not give rise to a duty on the part of the Owner to exercise this right for the benefit of the Con- tractor or any other person or entity, except to the extent required by Subparagraph 6.1.3. 2.4 OWNER'S RIGHT TO CARRY OUT THE WORK 2.4.1 If the Contractor defaults or neglects to carry out the \'fork in accordance with the Contract Documents and fails within a seven-day period after receipt of written notice from the Owner to commence and continue correction of such default or neglect with diligence and promptness, the Owner may after such seven-day period give the Contractor a second written notice to correct such deficiencies within a second seven-day period. If the Contractor within such second seven- day period after receipt of such second notice fails to com- mence and continue to correct any deficiencies, the Owner may, without prejudice to other remedies the Owner may have, correct such deficiencies. In such case an appropriate Change Order shall be issued deducting from payments then or thereafter due the Contractor the cost of correcting such defi- ciencies, including compensation for the Architect's additional services and expenses made necessary by such default, neglect or failure. Such action by the Owner and amounts charged to the Contractor are both subject to prior approval of the Archi- tect. If payments then or thereafter due the Contractor are not sufficient to cover such amounts, the Contractor shall pay the difference to the Owner. ARTICLE 3 CONTRACTOR 3.1 DEFINITION 3.1.1 The Contractor is the person or entity identified as such in the Agreement and is referred to throughout the Contract Documents as if singular in number. The term "Contractor" means the Contractor or the Contractor's authorized representative. I 7 AlA DOCUMENT A201 . GENERAL CONDITIONS OF THE CONTRACT FOR COMTRl'CTIO:\ . FOCRTEENTH EDITION AIA@ . @1987 THE AMERICAN INSTlTlTE OF ARCHITECTS, 1735 NEW YORK A\'E:--;CE. X\'i'. WASHINGTON, D.C. 20006 A201-1987 I 3.2 REVIEW OF CONTRACT DOCUMENTS AND FIELD CONDITIONS BY CONTRACTOR 3.2.1 The Contractor shall carefully study and compare the Contract Documents with each other and with information furnished by the Owner pursuant to Subparagraph 2.2.2 and shall at once report to the Architect errors, inconsistencies or omissions discovered, The Contractor shall not be liable to the Owner or Architect for damage resulting from errors, inconsis- tencies or omissions in the Contract Documents unless the Contractor recognized such error, inconsistency or omission and knowingly failed to report it to the Architect. If the Con- tractor performs any construction activity knowing it involves a recognized error. inconsistency or omission in the Contract Documents without such notice to the Architect, the Contrac- tor shall assume appropriate responsibility for such perfor- mance and shall bear an appropriate amount of the attributable costs for correction. 3.2.2 The Contractor shall take field measurements and verify field conditions and shall carefully compare such field mea- surements and conditions and other information known to the Contractor with the Contract Documents before commencing activities, Errors, inconsistencies or omissions discovered shall be reported to the Architect at once. 3.2.3 The Contractor shall perform the Work in accordance with the Contract Documents and submittals approved pur- suant to Paragraph 3.12. 3.3 SUPERVISION AND CONSTRUCTION PROCEDURES 3.3.1 The Contractor shall supervise and direct the Work, using the Contractor's best skill and attention. The Contractor shall be solely responsible for and have control over construc- tion means, methods, techniques, sequences and procedures and for coordinating all portions of the Work under the Cone tract, unless Contract Documents give other specific instruc- tions concerning these matters. 3.3.2 The Contractor shall be responsible to the Owner for acts and omissions of the Contractor's employees, Subcontractors and their agents and emplovees, and other persons performing portions of the Work under a contract with the Contractor. 3.3.3 The Contractor shall not be relieved of obligations to per- form the Work in accordance with the Contract Documents either by activities or duties of the Architect in the Architect's administration of the Contract, or by tests, inspections or approvals required or performed by persons other than the Contractor. 3.3.4 The Contractor shall be responsible for inspection of por- tions of Work already performed under this Contract to deter- mine that such portions are in proper condition to receive sub- sequent Work. 3.4 LABOR AND MATERIALS 3.4.1 Unless otherwise provided in the Contract Documents, the Contractor shall provide and pay for labor, materials, equip- ment, tools, construction equipment and machinery, water, heat, utilities, transportation, and other facilities and services necessary for proper execution and completion of the Work, whether temporary or permanent and whether or not incorpo- rated or to be incorporated in the Work. 3.4.2 The Contractor shall enforce strict discipline and good order anlOng the Contractor's employees and other persons carrying out the Contract. The Contractor shall not permit employment of unfit persons or persons not skilled in tasks assigned to them. I 3.5 WARRANTY 3.5.1 The Contractor warrants to the Owner and Architect that materials and equipment furnished under the Contract will be of good quality and new unless otherwise required or permit- ted by the Contract Documents, that the Work will be free from defects not inherent in the quality required or permitted, and that the Work will conform with the requirements of the Contract Documents. Work not conforming to these require- ments, including substitutions not properly approved and authorized, may be considered defective. The Contractor's warranty excludes remedy for damage or defect caused by abuse, modifications not executed by the Contractor, improper or insufficient maintenance, improper operation, or normal wear and tear under normal usage. If required by the Architect, the Contractor shall furnish satisfactory evidence as to the kind and quality of materials and equipment. I I 3.6 TAXES 3.6.1 The Contractor shall pay sales, consumer, use and similar taxes for the Work or portions thereof provided by the Con- tractor which are legally enacted when bids are received or negotiations concluded, whether or not yet effective or merely scheduled to go into effect. 3.7 PERMITS, FEES AND NOTICES 3.7.1 Unless otherwise provided in the Contract Documents, the Contractor shall secure and pay for the building permit and other permits and governmental fees, licenses and inspections necessary for proper execution and completion of the Work which are customarily secured after execution of the Contract and which are legally required when bids are received or nego- tiations concluded. Ij I! I I 3.7.2 The Contractor shall comply with and give notices required by laws, ordinances, rules, regulations and lawful orders of public authorities bearing on performance of the Work. 3.7.3 It is not the Contractor's responsibility to ascertain that the Contract Documents are in accordance with applicable laws, statutes, ordinances, building codes, and rules and regula- tions. However, if the Contractor observes that portions of the Contract Documents are at variance therewith, the Contractor shall promptly notify the Architect and Owner in writing, and necessary changes shall be accomplished by appropriate Modification. I I I 3.7.4 If the Contractor performs Work knowing it to be con- trary to laws, statutes, ordinances, building codes, and rules and regulations without such notice to the Architect and Owner, the Contractor shall assume full responsibility for such Work and shall bear the attributable costs. I 3.8 ALLOWANCES 3.8.1 The Contractor shall include in the Contract Sum all allowances stated in the Contract Documents. Items covered by allowances shall be supplied for such amounts and by such persons or entities as the Owner may direct, but the Contractor shall not be required to employ persons or entities against which the Contractor makes reasonable objection. 3.8.2 Unless otherwise provided in the Contract Documents: .1 materials and equipment under an allowance shall be selected promptly by the Owner to avoid delay in the Work; .2 allowances shall cover the cost to the Contractor of materials and equipment delivered at the site and all required taxes, less applicable trade discounts: I I I I 8 A201-1987 AlA DOCUMENT A201 " GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION. FOURTEENTH EDITlO:\ AIA@ "@1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, NW., WASHINGTON, D,C. 20006 I I I I I I I I I I I I I I I .3 Contractor's costs for unloading and handling at the site, labor, installation costs, overhead, profit and other expenses contemplated for stated allowance amounts shall be included in the Contract Sum and not in the allowances; .4 whenever costs are more than or less than allowances, the Contract Sum shall be adjusted accordingly by Change Order. The amount of the Change Order shall reflect (1) the difference between actual costs and the allowances under Clause 3.8.2.2 and (2) changes in Contractor's costs under Clause 3.8.2.3. 3.9 SUPERINTENDENT 3,9.1 The Contractor shall employ a competent superinten- dent and necessary assistants who shall be in attendance at the Project site during performance of the Work. The superinten- dent shall represent the Contractor, and communications given to the superintendent shall be as binding as if given to the Con- tractor. Important communications shall be confirmed in writ- ing. Other communications shall be similarly confirmed on written request in each case. 3.10 CONTRACTOR'S CONSTRUCTION SCHEDULES 3.10.1 The Contractor, promptly after being awarded the Con- tract, shall prepare and submit for the Owner's and Architect's information a Contractor's construction schedule for the Work. The schedule shall not exceed time limits current under the Contract Documents, shall be revised at appropriate intervals as required by the conditions of the Work and Project, shall be related to the entire Project to the extent required by the Con- tract Documents, and shall provide for expeditious and practi- cable execution of the Work. 3.10.2 The Contractor shall prepare tmd keep current, for the Architect's approval, a schedule of submittals which is coordi- nated with the Contractor's construction schedule and allows the Architect reasonable time to review submittals. 3.10.3 The Contractor shall conform to the most recent schedules. 3.11 DOCUMENTS AND SAMPLES AT THE SITE 3.11.1 The Contractor shall maintain at the site for the Owner one record copy of the Drawings, Specifications, addenda, Change Orders and other Modifications, in good order and marked currently to record changes and selections made during construction, and in addition approved Shop Drawings, Prod- uct Data, Samples and similar required submittals. These shall be available to the Architect and shall be delivered to the Archi- tect for submittal to the Owner upon completion of the Work. 3.12 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES 3.12.1 Shop Drawings are drawings, diagrams, schedules and other data speciall y prepared for the Work bv the Contractor or a Subcontractor, Sub-subcontractor, manufacturer, supplier or distributor to illustrate some portion of the \X'ork. 3.12.2 Product Data are illustrations, standard schedules, per- formance charts, instructions, brochures, diagrams and other information furnished bv the Contractor to illustrate materials or equipment for some portion of the Work. 3.12.3 Samples are physical examples which illustrate materials, equipment or workmanship and establish standards by which the Work will be judged. 3.12.4 Shop Drawings, Product Data, Samples and similar sub- mittals are not Contract Documents. The purpose of their sub- mittal is to demonstrate for those portions of the Work for I which submittals are required the way the Contractor proposes to conform to the information given and the design concept expressed in the Contract Documents. Review by the Architect is subject to the limitations of Subparagraph 4.2.7. 3.12.5 The Contractor shall review, approve and submit to the Architect Shop Drawings, Product Data, Samples and similar submittals required by the Contract Documents with reason- able promptness and in such sequence as to cause no delay in the Work or in the activities of the Owner or of separate con- tractors. Submittals made by the Contractor which are not required by the Contract Documents may be returned without action. 3.12.6 The Contractor shall perform no portion of the Work requiring submittal and review of Shop Drawings, Product Data. Samples or similar submittals until the respective submit- tal has been approved by the Architect. Such Work shall be in accordance with approved submittals. 3.12.7 By approving and submitting Shop Drawings, Product Data. Samples and similar submittals, the Contractor represents that the Contractor has determined and verified materials, field measurements and field construction criteria related thereto, or \yill do so, and has checked and coordinated the information contained within such submittals with the requirements of the \X'ork and of the Contract Documents. 3.12.8 The Contractor shall not be relieved of responsibility for deviations from requirements of the Contract Documents bv the Architect's approval of Shop Drawings, Product Data, Samples or similar submittals unless the Contractor has specificalh' informed the Architect in writing of such deviation at the time of submittal and the Architect has given written approval to the specific deviation. The Contractor shall not be relieved of responsibility for errors or omissions in Shop Draw- ings, Product Data, Samples or similar submittals by the Archi- tect's approval thereof. 3.12.9 The Contractor shall direct specific attention, in writing or on resubmitted Shop Drawings, Product Data, Samples or similar submittals, to revisions other than those requested by the Architect on previous submittals. 3.12.10 Informational submittals upon which the Architect is not expected to take responsive action may be so identitled in the Contract Documents. 3.12.11 When professional certification of performance criteria of materials, systems or equipment is required by the Contract Documents, the Architect shall be entitled to rely upon the accuracy and completeness of such calculations and certifi- cations. 3.13 USE OF SITE 3.13.1 The Contractor shall confine operations at the site to areas permitted by law, ordinances, permits and the Contract Documents and shall not unreasonably encumber the site with materials or equipment. 3.14 CUTTING AND PATCHING 3.14.1 The Contractor shall be responsible for cutting, fltting or patching required to complete the Work or to make its parts fit together properly. 3.14.2 The Contractor shall not damage or endanger a portion of the Work or fully or partially completed construction of the Owner or separate contractors by cutting, patching or other- wise altering such construction, or by excavation. The Contrac- tor shall not cut or otherwise alter such construction by the AlA DOCUMENT A201 " GE:--IERAL CONDITIONS OF THE CONTRACT FOR CO~STRLCTION . FOCRTEENTH EDITION AlA@ . @I9R7 THE A\IERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK A\'E~L:E. NW., WASHINGTON, D.C. 20006 A201-1987 9 I Owner or a separate contractor except with written consent of the Owner and of such separate contractor; such consent shall not be unreasonably withheld. The Contractor shall not unrea- sonably withhold from the Owner or a separate contractor the Contractor's consent to cutting or otherwise altering the Work. 3.15 CLEANING UP 3.15.1 The Contractor shall keep the premises and surround- ing area free from accumulation of waste materials or rubbish caused by operations under the Contract. At completion of the Work the Contractor shall remove from and about the Project waste materials, rubbish, the Contractor's tools, construction equipment, machinery and surplus materials. 3.15.2 If the Contractor fails to clean up as provided in the Contract Documents, the Owner may do so and the cost thereof shall be charged to the Contractor. 3.16 ACCESS TO WORK 3.16.1 The Contractor shall provide the Owner and Architect access to the Work in preparation and progress wherever located. 3.17 ROYALTIES AND PATENTS 3.17.1 The Contractor shall pay all royalties and license fees. The Contractor shall defend suits or claims for infringement of patent rights and shall hold the Owner and Architect harmless from loss on account thereof, but shall not be responsible for such defense or loss when a particular design, process or prod- uct of a particular manufacturer or manufacturers is required by the Contract Documents. However, if the Contractor has rea- son to believe that the required design, process or product is an infringement of a patent, the Contractor shall be responsible for such loss unless such information is promptly furnished to the Architect. 3.18 INDEMNIFICATION 3.18.1 To the fullest extent permitted by law, the Contractor shall indemnify and hold harmless the Owner, Architect, Archi- tect's consultants, and agents and employees of any of them from and against claims, damages, losses and expenses, includ- ing but not limited to attorneys' fees, arising out of or resulting from performance of the Work, provided that such claim, dam- age, loss or expense is attributable to bodily injury, sickness, disease or death, or to injury to or destruction of tangible prop- erty (other than the Work itself) including loss of use resulting therefrom, but only to the extent caused in whole or in part by negligent acts or omissions of the Contractor, a Subcontractor, anyone directly or indirectly employed by them or anyone for whose acts they may be liable, regardless of whether or not such claim, damage, loss or expense is caused in part by a party indemnified hereunder. Such obligation shall not be construed to negate, abridge, or reduce other rights or obligations of indemnity which would otherwise exist as to a party or person described in this Paragraph 3.18. 3.18.2 In claims against any person or entity indemnified under this Paragraph 3.18 by an employee of the Contractor, a Subcontractor, anyone directly or indirectly employed by them or anyone for whose acts they may be liable, the indemnifica- tion obligation under this Paragraph 3.18 shall not be limited by a limitation on amount or type of damages, compensation or benefits payable by or for the Contractor or a Subcontractor under workers' or workmen's compensation acts, disability benefit acts or other employee benefit acts. 3.18.3 The obligations of the Contractor under this Paragraph 3.18 shall not extend to the liability of the Architect, the Archi- J tect's consultants, and agents and employees of any of them arising out of (1) the preparation or approval of maps, drawings, opinions, reports, surveys, Change Orders, designs or specifica- tions, or (2) the giving of or the failure to give directions or instructions by the Architect, the Architect's consultants, and agents and employees of any of them provided such giving or failure to give is the primary cause of the injury or damage. ARTICLE 4 ADMINISTRATION OF THE CONTRACT 4.1 ARCHITECT 4.1.1 The Architect is the person lawfully licensed to practice architecture or an entity lawfully practicing architecture iden- tified as such in the Agreement and is referred to throughout the Contract Documents as if singular in number. The term "Architect" means the Architect or the Architect's authorized representative. 4.1.2 Duties, responsibilities and limitations of authority of the Architect as set forth in the Contract Documents shall not be restricted, modified or extended without written consent of the Owner, Contractor and Architect. Consent shall not be unrea- sonably withheld. 4.1.3 In case of termination of employment of the Architect, the Owner shall appoint an architect against whom the Con- tractor makes no reasonable objection and whose status under the Contract Documents shall be that of the former architect. 4.1.4 Disputes arising under Subparagraphs 4.1.2 and 4.1.3 shall be subject to arbitration. 4,2 ARCHITECT'S ADMINISTRATION OF THE CONTRACT 4.2.1 The Architect will provide administration of the Contract as described in the Contract Documents, and will be the Owner's representative (1) during construction, (2) until final payment is due and (3) with the Owner's concurrence, from time to time during the correction period described in Para- graph 12.2. The Architect will advise and consult with the Owner. The Architect will have authority to act on behalf of the Owner only to the extent provided in the Contract Documents, unless otherwise modified by written instrument in accordance with other provisions of the Contract. 4.2.2 The Architect will visit the site at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the completed Work and to determine in general if the Work is being performed in a manner indicat- ing that the Work, when completed, will be in accordance with the Contract Documents. However, the Architect will not be required to make exhaustive or continuous on-site inspections to check quality or quantity of the Work. On the basis of on- site observations as an architect, the Architect will keep the Owner informed of progress of the Work, and will endeavor to guard the Owner against defects and deficiencies in the Work. 4.2.3 The Architect will not have control over or charge of and will not be responsible for construction means, methods, techniques, sequences or procedures, or for safety precautions and programs in connection with the Work, since these are solely the Contractor's responsibility as provided in Paragraph 3.3. The Architect will not be responsible for the Contractor's failure to carry out the Work in accordance with the Contract Documents. The Architect will not have control over or charge of and will not be responsible for acts or omissions of the Con- I I I I I I I I I I I I 10 A201-1987 AlA DOCUMENT A201 " GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION' FOURTEENTH EDITIOK AIA@ . @1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W, WASHINGTON, D.C. 20006 I I I I I I I I I I I I I I I J tractor, Subcontractors, or their agents or employees, or of any other persons performing portions of the Work. 4.2.4 Communications Facilitating Contract Administra- tion. Except as otherwise provided in the Contract Documents or when direct communications have been specially autho- rized, the Owner and Contractor shall endeavor to communi- cate through the Architect. Communications by and with the Architect's consultants shall be through the Architect. Commu- nications by and with Subcontractors and material suppliers shall be through the Contractor. Communications by and with separate contractors shall be through the Owner. 4.2.5 Based on the Architect's observations and evaluations of the Contractor's Applications for Payment, the Architect will review and certify the amounts due the Contractor and will issue Certificates for Payment in such amounts. 4.2.6 The Architect will have authority to reject Work which does not conform to the Contract Documents. Whenever the Architect considers it necessary or advisable for implementa- tion of the intent of the Contract Documents, the Architect will have authority to require additional inspection or testing of the Work in accordance with Subparagraphs 13.5.2 and 13.5.3, whether or not such Work is fabricated, installed or completed. However, neither this authority of the Architect nor a decision made in good faith either to exercise or not to exercise such authority shall give rise to a duty or responsibility of the Archi- tect to the Contractor, Subcontractors, material and equipment suppliers, their agents or employees, or other persons perform- ing portions of the Work. 4.2.7 The Architect will review and approve or take other appropriate action upon the Contractor's submittals such as Shop Drawings, Product Data and Samples, but only for the limited purpose of checking for conformance with information given and the design concept expressed in the Contract Docu- ments. The Architect's action will be taken with such reason- able promptness as to cause no delay in the Work or in the activities of the Owner, Contractor or separate contractors, while allowing sufficient time in the Architect's professional judgment to permit adequate review. Review of such submittals is not conducted for the purpose of determining the accuracy and completeness of other details such as dimensions and quantities, or for substantiating instructions for installation or performance of equipment or systems, all of which remain the responsibility of the Contractor as required by the Contract Documents. The Architect's review of the Contractor's submit- tals shall not relieve the Contractor of the obligations under Paragraphs 3.3,3.5 and 3.12. The Architect's review shall not constitute approval of safety precautions or, unless otherwise specifically stated by the Architect, of any construction means, methods, techniques, sequences or procedures. The Architect's approval of a specific item shall not indicate approval of an assembly of which the item is a component. 4.2.8 The Architect will prepare Change Orders and Construc- tion Change Directives, and may authorize minor changes in the Work as provided in Paragraph 7.4. 4.2.9 The Architect will conduct inspections to determine the date or dates of Substantial Completion and the date of final completion, will receive and forward to the Owner for the Owner's review and records written warranties and related documents required by the Contract and assembled by the Contractor, and will issue a final Certificate for Payment upon compliance with the requirements of the Contract Documents. 4.2.10 If the Owner and Architect agree, the Architect will pro- vide one or more project representatives to assist in carrying I out the Architect's responsibilities at the site. The duties, responsibilities and limitations of authority of such project representatives shall be as set forth in an exhibit to be incorpo- rated in the Contract Documents. 4.2.11 The Architect will interpret and decide matters concern- ing performance under and requirements of the Contract Documents on written request of either the Owner or Contrac- tor. The Architect's response to such requests will be made with reasonable promptness and within any time limits agreed upon. If no agreement is made concerning the time within which interpretations required of the Architect shall be fur- nished in compliance with this Paragraph 4.2, then delay shall not be recognized on account of failure by the Architect to fur- nish such interpretations until 15 days after written request is made for them. 4.2.12 Interpretations and decisions of the Architect will be consistent with the intent of and reasonably inferable from the Contract Documents and will be in writing or in the form of drawings. When making such interpretations and decisions, the Architect will endeavor to secure faithful performance by both Owner and Contractor, will not show partiality to either and will not be liable for results of interpretations or decisions so rendered in good faith. 4.2.13 The Architect's decisions on matters relating to aesthetic effect will be final if consistent with the intent expressed in the Contract Documents. 4.3 CLAIMS AND DISPUTES 4.3.1 Definition. A Claim is a demand or assertion by one of the parties seeking, as a matter of right, adjustment or interpre- tation of Contract terms, payment of money, extension of time or other relief with respect to the terms of the Contract. The term "Claim" also includes other disputes and matters in ques- tion between the Owner and Contractor arising out of or relat- ing to the Contract. Claims must be made by written notice. The responsibility to substantiate Claims shall rest with the party making the Claim. 4.3.2 Decision of Architect. Claims, including those alleging an error or omission by the Architect, shall be referred initially to the Architect for action as provided in Paragraph 4.4. A deci- sion by the Architect, as provided in Subparagraph 4.4.4, shall be required as a condition precedent to arbitration or litigation of a Claim between the Contractor and Owner as to all such matters arising prior to the date final payment is due, regardless of (1) whether such matters relate to execution and progress of the Work or (2) the extent to which the Work has been com- pleted. The decision by the Architect in response to a Claim shall not be a condition precedent to arbitration or litigation in the event (1) the position of Architect is vacant, (2) the Architect has not received evidence or has failed to render a decision within agreed time limits, (3) the Architect has failed to take action required under Subparagraph 4.4.4 within 30 days after the Claim is made, (4) 45 days have passed after the Claim has been referred to the Architect or (5) the Claim relates to a mechanic's lien. 4.3.3 Time Limits on Claims. Claims by either party must be made within 2 I days after occurrence of the event giving rise to such Claim or within 21 days after the claimant first recognizes the condition giving rise to the Claim, whichever is later. Claims must be made by written notice. An additional Claim made after the initial Claim has been implemented by Change Order will not be considered unless submitted in a timely manner. AlA DOCUMENT A201 . GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRL'CTION " FOURTEENTH EDITION AIA@ . @1987 THE A:VIERICAN INSTITUTE OF ARCHITECTS. 1'.15 NEW YORK A\'ENl'E. N.W, WASHINGTON, D.C. 20006 A201.1987 11 I 4.3.4 Continuing Contract Performance. Pending final reso- lution of a Claim including arbitration, unless otherwise agreed in writing the Contractor shall proceed diligently with perfor- mance of the Contract and the Owner shall continue to make payments in accordance with the Contract Documents. 4.3.5 Waiver of Claims: Final Payment. The making of final payment shall constitute a waiver of Claims by the Owner except those arising from: .1 liens, Claims, security interests or encumbrances aris- ing out of the Contract and unsettled; .2 failure of the Work to comply with the requirements of the Contract Documents; or .3 terms of special warranties required by the Contract Documents. 4.3.6 Claims for Concealed or Unknown Conditions. If con- ditions are encountered at the site which are (1) subsurface or otherwise concealed physical conditions which differ materi- ally from those indicated in the Contract Documents or (2) unknown physical conditions of an unusual nature, which dif- fer materially from those ordinarily found to exist and generally recognized as inherent in construction activities of the character provided for in the Contract Documents, then notice by the observing party shall be given to the other party promptly before conditions are disturbed and in no event later than 21 days after first observance of the conditions. The Archi- tect will promptly investigate such conditions and, if they differ materially and cause an increase or decrease in the Contractor's cost of, or time required for, performance of any part of the Work, will recommend an equitable adjustment in the Contract Sum or Contract Time, or both. If the Architect determines that the conditions at the site are not materially different from those indicated in the Contract Documents and that no change in the terms of the Contract is justified, the Architect shall so notify the Owner and Contractor in writing, stating the reasons. Claims by either party in opposition to such determination must be made within 21 days after the Architect has given notice of the decision. If the Owner and Contractor cannot agree on an adjustment in the Contract Sum or Contract Time, the adjustment shall be referred to the Architect for initial deter- mination, subject to further proceedings pursuant to Paragraph 4.4. 4.3.7 Claims for Additional Cost. If the Contractor wishes to make Claim for an increase in the Contract Sum, written notice as provided herein shall be given before proceeding to execute the Work. Prior notice is not required for Claims relating to an emergency endangering life or property arising under Para- graph 10.3. If the Contractor believes additional cost is involved for reasons including but not limited to (1) a written interpretation from the Architect, (2) an order by the Owner to stop the Work where the Contractor was not at fault, (3) a writ- ten order for a minor change in the Work issued by the Archi- tect, (4) failure of payment by the Owner. (5) termination of the Contract by the Owner, (6) Owner's suspension or (7) other reasonable grounds, Claim shall be filed in accordance with the procedure established herein. 4.3.8 Claims for Additional Time 4.3.8.1 If the Contractor wishes to make Claim for an increase in the Contract Time, written notice as provided herein shall be given. The Contractor's Claim shall include an estimate of cost and of probable effect of delay on progress of the Work. In the case of a continuing delay only one Claim is necessary. 4.3.8.2 If adverse weather conditions are the basis for a Claim for additional time, such Claim shall be documented by data I substantiating that weather conditions were abnormal for the period of time and could not have been reasonably anticipated, and that weather conditions had an adverse effect on the scheduled construction. 4.3.9 Injury or Damage to Person or Property. If either party to the Contract suffers injury or damage to person or property because of an act or omission of the other party, of any of the other party's employees or agents, or of others for whose acts such party is legally liable, written notice of such injury or damage, whether or not insured, shall be given to the other party within a reasonable time not exceeding 21 days after first observance. The notice shall provide sufficient detail to enable the other party to investigate the matter. If a Claim for addi- tional cost or time related to this Claim is to be asserted, it shall be filed as provided in Subparagraphs 4.3.7 or 4.3.8. 4.4 RESOLUTION OF CLAIMS AND DISPUTES 4.4.1 The Architect will review Claims and take one or more of the following preliminary actions within ten days of receipt of a Claim: (1) request additional supporting data from the claimant, (2) submit a schedule to the parties indicating when the Archi- tect expects to take action, (3) reject the Claim in whole or in part, stating reasons for rejection, (4) recommend approval of the Claim by the other party or (5) suggest a compromise. The Architect may also, but is not obligated to, notify the surety, if any, of the nature and amount of the Claim. 4.4.2 If a Claim has been resolved, the Architect will prepare or obtain appropriate documentation. 4.4.3 If a Claim has not been resolved, the party making the Claim shall, within ten days after the Architect's preliminary response, take one or more of the following actions: (1) submit additional supporting data requested by the Architect, (2) modify the initial Claim or (3) notify the Architect that the initial Claim stands. 4.4.4 If a Claim has not been resolved after consideration of the foregoing and of further evidence presented by the parties or requested by the Architect, the Architect will notify the parties in writing that the Architect's decision will be made within seven days, which decision shall be final and binding on the parties but subject to arbitration. Upon expiration of such time period, the Architect will render to the parties the Architect's written decision relative to the Claim, including any change in the Contract Sum or Contract Time or both. If there is a surety and there appears to be a possibility of a Contractor's default, the Architect may, but is not obligated to, notify the surety and request the surety's assistance in resolving the controversy. 4.5 ARBITRATION 4.5.1 Controversies and Claims Subject to Arbitration. Any controversy or Claim arising out of or related to the Contract, or the breach thereof, shall be settled by arbitration in accor- dance with the Construction Industry Arbitration Rules of the American Arbitration Association, and judgment upon the award rendered by the arbitrator or arbitrators may be entered in any court having jurisdiction thereof, except controversies or Claims relating to aesthetic effect and except those waived as provided for in Subparagraph 4.3.5. Such controversies or Claims upon which the Architect has given notice and rendered a decision as provided in Subparagraph 4.4.4 shall be subject to arbitration upon written demand of either party. Arbitration may be commenced when 45 days have passed after a Claim has been referred to the Architect as provided in Paragraph 4.3 and no decision has been rendered. 12 A201-1987 AlA DOCUMENT A201 " GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION. FOURTEENTH EDlTIO" AIA@ . @I987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.C. 20006 I I I I I I I I I I I I I I I ~ I I I I I I I I I I I I I I I 4.5.2 Rules and Notices for Arbitration. Claims between the Owner and Contractor not resolved under Paragraph 4.4 shall, if subject to arbitration under Subparagraph 4.5.1, be decided by arbitration in accordance with the Construction Industry Arbitration Rules of the American Arbitration Association cur- rently in effect, unless the parties mutually agree otherwise. Notice of demand for arbitration shall be filed in writing with the other party to the Agreement between the Owner and Con- tractor and with the American Arbitration Association, and a copy shall be filed with the Architect. 4.5.3 Contract Perfonnance During Arbitration. During arbi- tration proceedings, the Owner and Contractor shall comply with Subparagraph 4.3.4. 4.5.4 When Arbitration May Be Demanded. Demand for arbi- tration of any Claim may not be made until the earlier of (1) the date on which the Architect has rendered a final written deci- sion on the Claim, (2) the tenth day after the parties have pre- sented evidence to the Architect or have been given reasonable opportunity to do so, if the Architect has not rendered a final written decision by that date, or (3) any of the five events described in Subparagraph 4.3.2. 4.5.4.1 When a written decision of the Architect states that (1) the decision is final but subject to arbitration and (2) a demand for arbitration of a Claim covered by such decision must be made within 30 days after the date on which the party making the demand receives the final written decision, then failure to demand arbitration within said 30 days' period shall result in the Architect's decision becoming final and binding upon the Owner and Contractor. If the Architect renders a decision after arbitration proceedings have been initiated, such decision may be entered as evidence, but shall not supersede arbitration pro- ceedings unless the decision is acceptable to all parties concerned. 4.5.4.2 A demand for arbitration shall be made within the time limits specified in Subparagraphs 4.5.1 and 4.5.4 and Clause 4.5.4.1 as applicable, and in other cases within a reasonable time after the Claim has arisen, and in no event shall it be made after the date when institution of legal or equitable proceedings based on such Claim would be barred by the applicable statute of limitations as determined pursuant to Paragraph 13.7. 4.5.5 Limitation on Consolidation or Joinder. No arbitration arising out of or relating to the Contract Documents shall include, by consolidation or joinder or in any other manner, the Architect, the Architect's employees or consultants, except by written consent containing specific reference to the Agree- ment and signed by the Architect, Owner, Contractor and any other person or entity sought to be joined. No arbitration shall include, by consolidation or joinder or in any other manner, parties other than the Owner, Contractor, a separate contrac- tor as described in Article 6 and other persons substantially involved in a common question of fact or law whose presence is required if complete relief is to be accorded in arbitration. ]'0;0 person or entity other than the Owner, Contractor or a separate contractor as described in Article 6 shall be included as an orig- inal third party or additional third party to an arbitration whose interest or responsibility is insubstantial. Consent to arbitration involving an additional person or entity shall not constitute consent to arbitration of a dispute not described therein or ~'ith a person or entity not named or described therein. The fore- going agreement to arbitrate and other agreements to arbitrate with an additional person or entity duly consented to by parties to the Agreement shall be specifically enforceable under appli- cable law in any court having jurisdiction thereof, , 4.5.6 Claims and Timely Assertion of Claims. A party who files a notice of demand for arbitration must assert in the demand all Claims then known to that party on which arbitra- tion is permitted to be demanded, When a party fails to include a Claim through oversight, inadvertence or excusable neglect, or when a Claim has matured or been acquired subsequently, the arbitrator or arbitrators may permit amendment. 4.5.7 Judgment on Final Award. The award rendered by the arbitrator or arbitrators shall be final, and judgment may be entered upon it in accordance with applicable law in any court having jurisdiction thereof. ARTICLE 5 SUBCONTRACTORS 5.1 DEFINITIONS 5.1.1 A Subcontractor is a person or entity who has a direct contract with the Contractor to perform a portion of the Work at the site. The term "Subcontractor" is referred to throughout the Contract Documents as if singular in number and means a Subcontractor or an authorized representative of the Subcon- tractor. The term "Subcontractor" does not include a separate contractor or subcontractors of a separate contractor. 5.1.2 A Sub-subcontractor is a person or entity who has a direct or indirect contract with a Subcontractor to perform a portion of the Work at the site. The term "Sub-subcontractor" is referred to throughout the Contract Documents as if singular in number and means a Sub-subcontractor or an authorized representative of the Sub-subcontractor. 5.2 AWARD OF SUBCONTRACTS AND OTHER CONTRACTS FOR PORTIONS OF THE WORK 5.2.1 Cnless otherwise stated in the Contract Documents or the bidding requirements, the Contractor, as soon as prac- ticable after award of the Contract, shall furnish in writing to the Owner through the Architect the names of persons or enti- ties (including those who are to furnish materials or equipment fabricated to a special design) proposed for each principal por- tion of the Work. The Architect will promptly reply to the Con- tractor in writing stating whether or not the Owner or the Architect, after due investigation, has reasonable objection to an\' such proposed person or entity. Failure of the Owner or Architect to reply promptly shall constitute notice of no reason- able objection. 5.2.2 The Contractor shall not contract with a proposed per- son or entity to whom the Owner or Architect has made rea- SOluble and timely objection, The Contractor shall not be required to contract with anyone to whom the Contractor has made reasonable objection. 5.2.3 If the Owner or Architect has reasonable objection to a person or entity proposed by the Contractor, the Contractor shall propose another to whom the Owner or Architect has no reasonable objection. The Contract Sum shall be increased or decreased by the difference in cost occasioned by such ch;mge and an appropriate Change Order shall be issued. However, no increase in the Contract Sum shall be allowed for such change unless the Contractor has acted promptly and responsively in submitting names as required. 5.2.4 The Contractor shall not change a Subcontractor, person or entin' previously selected if the Owner or Architect makes reasonable objection to such change. AlA DOCUMENT A201 . GENERAL C00iDITIONS OF THE CONTRACT FOR CO:\STRl'CTIO:\ . FOURTEENTH EDITION AIA@ "@1987 THE AMERICAN INSTITl'TE OF ARCHITECTS, 1735 NEW YORK An::\u,:, :\"", WASHINGTON, D.C. 20006 A201-1987 13 , 5.3 SUBCONTRACTUAL RELATIONS 5.3.1 By appropriate agreement, written where legally required for validity, the Contractor shall require each Subcontractor, to the extent of the Work to be performed by the Subcontractor, to be bound to the Contractor by terms of the Contract Docu- ments, and to assume toward the Contractor all the obligations and responsibilities which the Contractor, by these Docu- ments, assumes toward the Owner and Architect. Each subcon- tract agreement shall preserve and protect the rights of the Owner and Architect under the Contract Documents with respect to the Work to be performed by the Subcontractor so that subcontracting thereof will not prejudice such rights, and shall allow to the Subcontractor, unless specifically provided otherwise in the subcontract agreement, the benefit of all rights, remedies and redress against the Contractor that the Contractor, by the Contract Documents, has against the Owner. Where appropriate, the Contractor shall require each Subcontractor to enter into similar agreements with Sub-sub- contractors. The Contractor shall make available to each pro- posed Subcontractor, prior to the execution of the subcontract agreement, copies of the Contract Documents to which the Subcontractor will be bound, and, upon written request of the Subcontractor, identify to the Subcontractor terms and condi- tions of the proposed subcontract agreement which may be at variance with the Contract Documents. Subcontractors shall similarly make copies of applicable portions of such documents available to their respective proposed Sub-subcontractors. 5.4 CONTINGENT ASSIGNMENT OF SUBCONTRACTS 5.4.1 Each subcontract agreement for a portion of the Work is assigned by the Contractor to the Owner provided that: .1 assignment is effective only after termination of the Contract by the Owner for cause pursuant to Para- graph 14.2 and only for those subcontract agreements which the Owner accepts by notifying the Subcon- tractor in writing; and .2 assignment is subject to the prior rights of the surety, if any, obligated under bond relating to the Contract. 5,4.2 If the Work has been suspended for more than 30 days, the Subcontractor's compensation shall be equitably adjusted. ARTICLE 6 CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS 6.1 OWNER'S RIGHT TO PERFORM CONSTRUCTION AND TO AWARD SEPARATE CONTRACTS 6.1.1 The Owner reserves the right to perform construction or operations related to the Project with the Owner's own forces, and to award separate contracts in connection with other por- tions of the Project or other construction or operations on the site under Conditions of the Contract identical or substantially similar to these including those portions related to insurance and waiver of subrogation. If the Contractor claims that delay or additional cost is involved because of such action by the Owner, the Contractor shall make such Claim as provided else- where in the Contract Documents. 6.1.2 When separate contracts are awarded for different por- tions of the Project or other construction or operations on the site, the term "Contractor" in the Contract Documents in each case shall mean the Contractor who executes each separate Owner-Contractor Agreement. I 6.1.3 The Owner shall provide for coordination of the activi- ties of the Owner's own forces and of each separate contractor with the Work of the Contractor, who shall cooperate with them. The Contractor shall participate with other separate con- tractors and the Owner in reviewing their construction sched- ules when directed to do so. The Contractor shall make any revisions to the construction schedule and Contract Sum deemed necessary after a joint review and mutual agreement. The construction schedules shall then constitute the schedules to be used by the Contractor, separate contractors and the Owner until subsequently revised. 6.1.4 l'nless otherwise provided in the Contract Documents, when the Owner performs construction or operations related to the Project with the Owner's own forces, the Owner shall be deemed to be subject to the same obligations and to have the same rights which apply to the Contractor under the Condi- tions of the Contract, including, without excluding others, those stated in Article 3, this Article 6 and Articles 10, 1 I and 12. 6.2 MUTUAL RESPONSIBILITY 6.2.1 The Contractor shall afford the Owner and separate con- tractors reasonable opportunity for introduction and storage of their materials and equipment and performance of their activi- ties and shall connect and coordinate the Contractor's con- struction and operations with theirs as required by the Contract Documents, 6.2.2 If part of the Contractor's Work depends for proper execution or results upon construction or operations by the Owner or a separate contractor, the Contractor shall, prior to proceeding with that portion of the Work, promptly report to the Architect apparent discrepancies or defects in such other construction that would render it unsuitable for such proper execution and results. Failure of the Contractor so to report shall constitute an acknowledgment that the Owner's or sepa- rate contractors' completed or partially completed construction is fit and proper to receive the Contractor's Work, except as to defects not then reasonably discoverable. 6.2.3 Costs caused by delays or by improperly timed activities or defective construction shall be borne by the party responsi- ble therefor. 6.2.4 The Contractor shall promptly remedy damage wrong- fully caused by the Contractor to completed or partially com- pleted construction or to property of the Owner or separate contractors as provided in Subparagraph 10.2.5. 6.2.5 Claims and other disputes and matters in question between the Contractor and a separate contractor shall be sub- ject to the provisions of Paragraph 4.3 provided the separate contractor has reciprocal obligations. 6.2.6 The Owner and each separate contractor shall have the same responsibilities for cutting and patching as are described for the Contractor in Paragraph 3.14. 6.3 OWNER'S RIGHT TO CLEAN UP 6.3.1 If a dispute arises among the Contractor, separate con- tractors and the Owner as to the responsibility under their respective contracts for maintaining the premises and surround- ing area free from waste materials and rubbish as described in Paragraph 3.15, the Owner may clean up and allocate the cost among those responsible as the Architect determines to be just. 14 A201-1987 AlA DOCUMENT A201 . GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION" FOURTEENTH EDITION AIA@ "@1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N,W., WASHINGTON, D,C. 20006 ~ I I I I I I I I I I I I I I I -I I I .1 I I I I I I I I I I I I ARTICLE 7 CHANGES IN THE WORK 7.1 CHANGES 7.1.1 Changes in the Work may be accomplished after execu- tion of the Contract, and without invalidating the Contract, by Change Order, Construction Change Directive or order for a minor change in the Work, subject to the limitations stated in this Article 7 and elsewhere in the Contract Documents. 7.1.2 A Change Order shall be based upon agreement among the Owner, Contractor and Architect; a Construction Change Directive requires agreement by the Owner and Architect and mayor may not be agreed to by the Contractor; an order for a minor change in the Work may be issued by the Architect alone. 7.1.3 Changes in the Work shall be performed under appli- cable provisions of the Contract Documents, and the Contrac- tor shall proceed promptly, unless otherwise provided in the Change Order, Construction Change Directive or order for a minor change in the Work. 7.1.4 If unit prices are stated in the Contract Documents or subsequently agreed upon, and if quantities originally con- templated are so changed in a proposed Change Order or Con- struction Change Directive that application of such unit prices to quantities of Work proposed will cause substantial inequity to the Owner or Contractor, the applicable unit prices shall be equitably adjusted. 7.2 CHANGE ORDERS 7.2.1 A Change Order is a written instrument prepared by the Architect and signed by the Owner, Contractor and Architect, stating their agreement upon all of the following: .1 a change in the Work; .2 the amount of the adjustment in the Contract Sum, if any; and .3 the extent of the adjustment in the Contract Time, if any. 7.2.2 Methods used in determining adjustments to the Contract Sum may include those listed in Subparagraph 7.3.3. 7.3 CONSTRUCTION CHANGE DIRECTIVES 7.3.1 A Construction Change Directive is a written order pre- pared by the Architect and signed by the Owner and Architect, directing a change in the Work and stating a proposed basis for adjustment, if any, in the Contract Sum or Contract Time, or both. The Owner may by Construction Change Directive, without invalidating the Contract, order changes in the Work within the general scope of the Contract consisting of addi- tions, deletions or other revisions, the Contract Sum and Con- tract Time being adjusted accordingly. 7.3.2 A Construction Change Directive shall be used in the absence of total agreement on the terms of a Change Order. 7.3.3 If the Construction Change Directive provides for an adjustment to the Contract Sum, the adjustment shall be based on one of the following methods: .1 mutual acceptance of a lump sum properly itemized and supported by sufficient substantiating data to per- mit evaluation; .2 unit prices stated in the Contract Documents or sub- sequently agreed upon; I .3 cost to be determined in a manner agreed upon by the parties and a mutually acceptable fixed or percent- age fee; or .4 as provided in Subparagraph 7.3.6. 7.3.4 Upon receipt of a Construction Change Directive, the Contractor shall promptly proceed with the change in the Work involved and advise the Architect of the Contractor's agreement or disagreement with the method, if any, provided in the Construction Change Directive for determining the pro- posed adjustment in the Contract Sum or Contract Time. 7.3.5 A Construction Change Directive signed by the Contrac- tor indicates the agreement of the Contractor therewith, includ- ing adjustment in Contract Sum and Contract Time or the method for determining them. Such agreement shall be effec- tive immediately and shall be recorded as a Change Order. 7.3.6 If the Contractor does not respond promptly or disagrees with the method for adjustment in the Contract Sum, the method and the adjustment shall be determined by the Archi- tect on the basis of reasonable expenditures and savings of those performing the Work attributable to the change, includ- ing, in case of an increase in the Contract Sum, a reasonable allowance for overhead and profit. In such case, and also under Clause 7.3.3.3, the Contractor shall keep and present, in such form as the Architect may prescribe, an itemized accounting together with appropriate supporting data. Unless otherwise provided in the Contract Documents, costs for the purposes of this Subparagraph 7.3.6 shall be limited to the following: .1 costs of labor, including social security, old age and unemployment insurance, fringe benefits required by agreement or custom, and workers' or workmen's compensation insurance; .2 costs of materials, supplies and equipment, includ- ing cost of transportation, whether incorporated or consumed; .3 rental costs of machinery and equipment, exclusive of hand tools, whether rented from the Contractor or others; .4 costs of premiums for all bonds and insurance, permit fees, and sales, use or similar taxes related to the Work; and .5 additional costs of supervision and field office person- nel directly attributable to the change. 7.3.7 Pending final determination of cost to the Owner, amounts not in dispute may be included in Applications for Payment. The amount of credit to be allowed by the Contrac- tor to the Owner for a deletion or change which results in a net decrease in the Contract Sum shall be actual net cost as con- firmed by the Architect. When both additions and credits covering related Work or substitutions are involved in a change, the allowance for overhead and profit shall be figured on the basis of net increase, if any, with respect to that change. 7.3.8 If the Owner and Contractor do not agree with the adjustment in Contract Time or the method for determining it, the adjustment or the method shall be referred to the Architect for determination. 7.3.9 When the Owner and Contractor agree with the deter- mination made by the Architect concerning the adjustments in the Contract Sum ancl Contract Time, or otherwise reach agree- ment upon the adjustments, such agreement shall be effective immediately and shall be recorded by preparation and execu- tion of an appropriate Change Order. AlA DOCUMENT A201 " GENERAL CONDITIONS OF THE CONTRACT FOR CO:\STRlCTION . FOURTEENTH EDITION AIA@ "@1987 THE AMERICAN INSTITUTE OF ARCHITECTS. 1735 i\EW YORK A\'ENLT :\.\X.. \X.\SHI:"IGTON. D.C. 20006 A201-1987 15 j 7.4 MINOR CHANGES IN THE WORK 7.4.1 The Architect will have authority to order minor changes in the Work not involving adjustment in the Contract Sum or extension of the Contract Time and not inconsistent with the intent of the Contract Documents. Such changes shall be effected by written order and shall be binding on the Owner and Contractor. The Contractor shall carry out such written orders promptly. ARTICLE 8 TIME 8.1 DEFINITIONS 8.1.1 Unless otherwise provided, Contract Time is the period of time, including authorized adjustments, allotted in the Con- tract Documents for Substantial Completion of the Work. 8.1.2 The date of commencement of the Work is the date established in the Agreement. The date shall not be postponed by the failure to act of the Contractor or of persons or entities for whom the Contractor is responsible. 8.1.3 The date of Substantial Completion is the date certified by the Architect in accordance with Paragraph 9.8. 8.1.4 The term "day" as used in the Contract Documents shall mean calendar day unless otherwise specifically defined. 8.2 PROGRESS AND COMPLETION 8.2.1 Time limits stated in the Contract Documents are of the essence of the Contract. By executing the Agreement the Con- tractor confirms that the Contract Time is a reasonable period for performing the Work. 8.2.2 The Contractor shall not knowingly, except by agree- ment or instruction of the Owner in writing, prematurely com- mence operations on the site or elsewhere prior to the effective date of insurance required by Article II to be furnished by the Contractor. The date of commencement of the Work shall not be changed by the effective date of such insurance. Unless the date of commencement is established by a notice to proceed given by the Owner, the Contractor shall notify the Owner in writing not less than five days or other agreed period before commencing the Work to permit the timelv filing of mortgages, mechanic's liens and other security interests. 8.2.3 The Contractor shall proceed expeditioLlslv with ade- quate forces and shall achieve Substantial Completion within the Contract Time. 8.3 DELAYS AND EXTENSIONS OF TIME 8.3.1 If the Contractor is delayed at any time in progress of the Work by an act or neglect of the Owner or Architect, or of an employee of either, or of a separate contractor employed by the Owner, or by changes ordered in the \'fork, or by labor disputes, fire, unusual delay in deliveries, unavoidable casualties or other causes beyond the Contractor's control, or by delay authorized by the Owner pending arbitration, or by other causes which the Architect determines may justify delay, then the Contract Time shall be extended by Change Order for such reasonable time as the Architect may determine. 8.3.2 Claims relating to time shall be made in accordance with applicable provisions of Paragraph 4.3. 8.3.3 This Paragraph 8.3 does not preclude recovery of dam- ages for delay by either party under other provisions of the Contract Documents. I ARTICLE 9 PAYMENTS AND COMPLETION 9.1 CONTRACT SUM 9.1.1 The Contract Sum is stated in the Agreement and, includ- ing authorized adjustments, is the total amount payable by the Owner to the Contractor for performance of the Work under the Comract Documents. 9.2 SCHEDULE OF VALUES 9.2.1 Before the first Application for Payment, the Contractor shall submit to the Architect a schedule of values allocated to various portions of the Work, prepared in such form and sup- ported bv sLlch data to substantiate its accuracy as the Architect may require. This schedule, unless objected to by the Architect, shall be used as a basis for reviewing the Contractor's Applica- tions for Pavment. 9.3 APPLICATIONS FOR PAYMENT 9.3.1 At least ten days before the date established for each progress payment, the Contractor shall submit to the Architect an itemized Application for Payment for operations completed in accordance with the schedule of values. Such application shall be notarized, if required, and supported by such data substantiating the Contractor's right to payment as the Owner or Architect may require, such as copies of requisitions from Subcontractors and material suppliers, and reflecting retainage if provided for elsewhere in the Contract Documents. 9.3.1.1 Such applications may include requests for payment on accoum of changes in the Work which have been properly authorized by Construction Change Directives but not yet included in Change Orders. 9.3.1.2 Such applications may not include requests for pay- mem of ;unounts the Contractor does not intend to pay to a Subcontractor or material supplier because of a dispute or other reason. 9.3.2 Unless otherwise provided in the Contract Documents, payments shall be made on account of materials and equipment delivered and suitably stored at the site for subsequent incor- poration in the Work. If approved in advance by the Owner, payment may similarly be made for materials and equipment suitably stored off the site at a location agreed upon in writing. Payment for materials and equipment stored on or off the site shall be conditioned upon compliance by the Contractor with procedures satisfactory to the Owner to establish the Owner's title to such materials and equipment or otherwise protect the Owner's interest, and shall include applicable insurance, storage and transportation to the site for such materials and equipment stored off the site. 9.3.3 The Contractor warrants that title to all Work covered by an Application for Payment will pass to the Owner no later than the time of payment. The Contractor further warrants that upon submittal of an Application for Payment all Work for which Certificates for Payment have been previously issued and payments received from the Owner shall, to the best of the Contractor's knowledge, information and belief, be free and clear of liens, claims, security interests or encumbrances in favor of the Contractor, Subcontractors, material suppliers, or other persons or entities making a claim by reason of having provided labor, materials and equipment relating to the Work. 9.4 CERTIFICATES FOR PAYMENT 9.4.1 The Architect will, within seven days after receipt of the Contractor's Application for Payment, either issue to the 16 A201-1987 AlA DOCUMENT A201 " GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION. t'CiURTJiENTH EDITION AIA@ "@1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, NW., WASHINGTON, D.C. 20006 I I I Ie I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I Owner a Certificate for Payment, with a copy to the Contrac- tor, for such amount as the Architect determines is properly due, or notify the Contractor and Owner in writing of the Architect's reasons for withholding certification in whole or in part as provided in Subparagraph 9.5.1. 9.4.2 The issuance of a Certificate for Payment will constitute a representation by the Architect to the Owner, based on the Architect's observations at the site and the data comprising the Application for Payment, that the Work has progressed to the point indicated and that, to the best of the Architect's knowl- edge, information and belief, quality of the Work is in accor- dance with the Contract Documents. The foregoing representa- tions are subject to an evaluation of the Work for conformance with the Contract Documents upon Substantial Completion, to results of subsequent tests and inspections, to minor deviations from the Contract Documents correctable prior to completion and to specific qualifications expressed by the Architect. The issuance of a Certificate for Payment will further constitute a representation that the Contractor is entitled to payment in the amount certified. However, the issuance of a Certificate for Pay- ment will not be a representation that the Architect has (1) made exhaustive or continuous on-site inspections to check the quality or quantity of the Work, (2) reviewed construction means, methods, techniques, sequences or procedures, (3) reviewed copies of requisitions received from Subcontractors and material suppliers and other data requested by the Owner to substantiate the Contractor's right to payment or (4) made examination to ascertain how or for what purpose the Contrac- tor has used money previously paid on account of the Contract Sum. 9.5 DECISIONS TO WITHHOLD CERTIFICATION 9.5.1 The Architect may decide not to certify payment and may withhold a Certificate for Payment in whole or in part, to the extent reasonably necessary to protect the Owner, if in the Architect's opinion the representations to the Owner required by Subparagraph 9.4.2 cannot be made. If the Architect is unable to certify payment in the amount of the Application, the Architect will notify the Contractor and Owner as provided in Subparagraph 9.4.1. If the Contractor and Architect cannot agree on a revised amount, the Architect will promptly issue a Certificate for Payment for the amount for which the Architect is able to make such representations to the Owner. The Archi- tect may also decide not to certify payment or, because of subsequently discovered evidence or subsequent observations, may nullify the whole or a part of a Certificate for Payment previously issued, to such extent as may be necessary in the Architect's opinion to protect the Owner from loss because of: .1 defective Work not remedied; .2 third party claims filed or reasonable evidence indicat- ing probable filing of such claims; .3 failure of the Contractor to make payments prop- erly to Subcontractors or for labor, materials or equipment; .4 reasonable evidence that the Work cannot be com- pleted for the unpaid balance of the Contract Sum: .5 damage to the Owner or another contractor: .6 reasonable evidence that the Work will not be com- pleted within the Contract Time, and that the unpaid balance would not be adequate to cover actual or liquidated damages for the anticipated delay; or .7 persistent failure to carry out the Work in accordance with the Contract Documents. I 9.5.2 When the above reasons for withholding certification are removed, certification will be made for amounts previously withheld. 9.6 PROGRESS PAYMENTS 9.6.1 After the Architect has issued a Certificate for Payment, the Owner shall make payment in the manner and within the time provided in the Contract Documents, and shall so notify the Architect. 9.6.2 The Contractor shall promptly pay each Subcontractor, upon receipt of payment from the Owner, out of the amount paid to the Contractor on account of such Subcontractor's por- tion of the Work, the amount to which said Subcontractor is entitled, reflecting percentages actually retained from payments to the Contractor on account of such Subcontractor's portion of the Work. The Contractor shall, by appropriate agreement with each Subcontractor, require each Subcontractor to make payments to Sub-subcontractors in similar manner. 9.6.3 The Architect will, on request, furnish to a Subcontrac- tor, if practicable, information regarding percentages of com- pletion or amounts applied for by the Contractor and action taken thereon by the Architect and Owner on account of por- tions of the Work done by such Subcontractor. 9.6.4 Neither the Owner nor Architect shall have an obligation to pay or to see to the payment of money to a Subcontractor except as may otherwise be required by law. 9.6.5 Payment to material suppliers shall be treated in a manner similar to that provided in Subparagraphs 9.6.2,9.6.3 and 9.6.4. 9.6.6 A Certificate for Payment, a progress payment, or partial or entire use or occupancy of the Project by the Owner shall nor constitute acceptance of Work not in accordance with the Contract Documents. 9.7 FAILURE OF PAYMENT 9.7.1 If the Architect does not issue a Certificate for Payment, through no fault of the Contractor, within seven days after receipt of the Contractor's Application for Payment, or if the Owner does not pay the Contractor within seven days after the date established in the Contract Documents the amount cer- tified by the Architect or awarded by arbitration, then the Con- tractor may, upon seven additional days' written notice to the O",,'ner and Architect, stop the Work until payment of the amount owing has been received. The Contract Time shall be extended appropriately and the Contract Sum shall be increased by the amount of the Contractor's reasonable costs of shut-down, delay and start-up, which shall be accomplished as provided in Article 7. 9.8 SUBSTANTIAL COMPLETION 9.8.1 Substantial Completion is the stage in the progress of the Work when the Work or designated portion thereof is suffi- ciently complete in accordance with the Contract Documents so the Owner can occupv or utilize the Work for its intended use. 9.8.2 \v'hen the Contractor considers that the Work, or a por- tion thereof which the Owner agrees to accept separately, is substantially complete, the Contractor shall prepare and submit to the Architect a comprehensive list of items to be completed or corrected. The Contractor shall proceed promptly to com- plete and correct items on the list. Failure to include an item on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Docu- ments. Upon receipt of the Contractor's list, the Architect will make an inspection to determine whether the Work or desig- AlA DOCUMENT A201 " GENERAL CONDITIONS OF THE CONTRACT FOR CO:';STRCCTION " FOURTEENTH EDITIO:'; AIA@ "@1987 THE AMERICA;'ol INSTITUTE OF ARCHITECTS, 1735 NEW YORK A\'E:-iCE. N.\'C, WASHI:';GTO;'ol. D.C. 20006 A201-1987 17 I nated portion thereof is substantially complete. If the Architect's inspection discloses any item, whether or not included on the Contractor's list, which is not in accordance with the requirements of the Contract Documents, the Contrac- tor shall, before issuance of the Certificate of Substantial Com- pletion, complete or correct such item upon notification by the Architect. The Contractor shall then submit a request for another inspection by the Architect to determine Substantial Completion. When the Work or designated portion thereof is substantially complete, the Architect will prepare a Certificate of Substantial Completion which shall establish the date of Sub- stantial Completion, shall establish responsibilities of the Owner and Contractor for security, maintenance, heat, utilities, damage to the Work and insurance, and shall fix the time within which the Contractor shall finish all items on the list accompanying the Certificate. Warranties required by the Con- tract Documents shall commence on the date of Substantial Completion of the Work or designated portion thereof unless otherwise provided in the Certificate of Substantial Comple- tion. The Certificate of Substantial Completion shall be sub- mitted to the Owner and Contractor for their written accep- tance of responsibilities assigned to them in such Certificate. 9.8.3 Upon Substantial Completion of the Work or designated portion thereof and upon application by the Contractor and certification by the Architect, the Owner shall make payment, reflecting adjustment in retainage, if any, for such Work or por- tion thereof as provided in the Contract Documents. 9.9 PARTIAL OCCUPANCY OR USE 9.9.1 The Owner may occupy or use any completed or par- tially completed portion of the Work at any stage when such portion is designated by separate agreement with the Contrac- tor, provided such occupancy or use is consented to by the insurer as required under Subparagraph 11.3.11 and authorized by public authorities having jurisdiction over the Work. Such partial occupancy or use may commence whether or not the portion is substantially complete, provided the Owner and Contractor have accepted in writing the responsibilities assigned to each of them for payments, retainage if any, secu- rity, maintenance, heat, utilities, damage to the Work and insur- ance, and have agreed in writing concerning the period for cor- rection of the Work and commencement of warranties required by the Contract Documents. When the Contractor considers a portion substantially complete. the Contractor shall prepare and submit a list to the Architect as provided under Subparagraph 9.8.2. Consent of the Contractor to partial occu- pancy or use shall not be unreasonably withheld. The stage of the progress of the Work shall be determined by written agree- ment between the Owner and Contractor or, if no agreement is reached, by decision of the Architect. 9.9,2 Immediately prior to such partial occupancy or use, the Owner, Contractor and Architect shall jointly inspect the area to be occupied or portion of the Work to be used in order to determine and record the condition of the Work. 9.9.3 Unless otherwise agreed upon, partial occupancy or use of a portion or portions of the Work shall not constitute accep- tance of Work not complying with the requirements of the Contract Documents. 9.10 FINAL COMPLETION AND FINAL PAYMENT 9.10.1 Upon receipt of written notice that the Work is ready for final inspection and acceptance and upon receipt of a final Application for Payment, the Architect will promptly make I such inspection and, when the Architect finds the Work accept- able under the Contract Documents and the Contract fully per- formed, the Architect will promptly issue a final Certificate for Payment stating that to the best of the Architect's knowledge, information and belief, and on the basis of the Architect's observations and inspections, the Work has been completed in accordance with terms and conditions of the Contract Docu- ments and that the entire balance found to be due the Contrac- tor and noted in said final Certificate is due and payable. The Architect's final Certificate for Payment will constitute a further representation that conditions listed in Subparagraph 9.10.2 as precedent to the Contractor's being entitled to final payment have been fulft1led. 9.10.2 ;\!either final payment nor any remammg retained percentage shall become due until the Contractor submits to the Architect (1) an affidavit that payrolls, bills for materials and equipment, and other indebtedness connected with the Work for which the Owner or the Owner's property might be responsible or encumbered (less amounts withheld by Owner) have been paid or otherwise satisfied, (2) a certificate evidenc- ing that insurance required by the Contract Documents to remain in force after final payment is currently in effect and will not be cancelled or allowed to expire until at least 30 days' prior written notice has been given to the Owner, (3) a written statement that the Contractor knows of no substantial reason that the insurance will not be renewable to cover the period required by the Contract Documents, (4) consent of surety, if any, to final payment and (5), if required by the Owner, other data establishing payment or satisfaction of obligations, such as receipts, releases and waivers of liens, claims, security interests or encumbrances arising out of the Contract, to the extent and in such form as may be designated by the Owner. If a Subcon- tractor refuses to furnish a release or waiver required by the Owner, the Contractor may furnish a bond satisfactory to the Owner to indemnify the Owner against such lien. If such lien remains unsatisfied after payments are made, the Contractor shall refund to the Owner all money that the Owner may be compelled to pay in discharging such lien, including all costs and reasonable attorneys' fees. 9.10.3 If. after Substantial Completion of the Work, final com- pletion thereof is materially delayed through no fault of the Contractor or by issuance of Change Orders affecting final completion, and the Architect so confirms, the Owner shall, upon application by the Contractor and certification by the Architect, and without terminating the Contract, make payment of the balance due for that portion of the Work fully completed and accepted. If the remaining balance for Work not fully com- pleted or corrected is less than retainage stipulated in the Con- tract Documents, and if bonds have been furnished, the written consent of surety to payment of the balance due for that por- tion of the Work fully completed and accepted shall be submit- ted by the Contractor to the Architect prior to certification of such payment. Such payment shall be made under terms and conditions governing final payment, except that it shall not constitute a waiver of claims. The making of final payment shall constitute a waiver of claims by the Owner as provided in Sub- paragraph 4.3.5. 9.10.4 Acceptance of final payment by the Contractor, a Sub- contractor or material supplier shall constitute a waiver of claims by that payee except those previously made in writing and identified by that payee as unsettled at the time of final Application for Payment. Such waivers shall be in addition to the waiver described in Subparagraph 4.3.5. 18 A201-1987 AlA DOCUMENT A201 . GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION" FOURTEENTH EDITION AIA@ "@1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.C. 20006 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I ARTICLE 10 PROTECTION OF PERSONS AND PROPERTY 10.1 SAFETY PRECAUTIONS AND PROGRAMS 10.1.1 The Contractor shall be responsible for initiating, main- taining and supervising all safety precautions and programs in connection with the performance of the Contract. 10.1.2 In the event the Contractor encounters on the site material reasonably believed to be asbestos or polychlorinated biphenyl (PCB) which has not been rendered harmless, the Contractor shall immediately stop Work in the area affected and report the condition to the Owner and Architect in writing. The Work in the affected area shall not thereafter be resumed except by written agreement of the Owner and Contractor if in fact the material is asbestos or polychlorinated biphenyl (PCB) and has not been rendered harmless. The Work in the affected area shall be resumed in the absence of asbestos or polychlori- nated biphenyl (PCB), or when it has been rendered harmless, by written agreement of the Owner and Contractor, or in accordance with final determination by the Architect on which arbitration has not been demanded, or by arbitration under Article 4. 10.1.3 The Contractor shall not be required pursuant to Article 7 toperform without consent any Work relating to asbestos or polychlorinated biphenyl (PCB). 10.1.4 To the fullest extent permitted by law, the Owner shall indemnify and hold harmless the Contractor, Architect, Archi- tect's consultants and agents and employees of any of them from and against claims, damages, losses and expenses, includ- ing but not limited to attorneys' fees, arising out of or resulting from performance of the Work in the affected area if in fact the material is asbestos or polychlorinated biphenyl (PCB) and has not been rendered harmless, provided that such claim, damage. loss or expense is attributable to bodily injury, sickness, disease or death, or to injury to or destruction of tangible property (other than the Work itself) including loss of use resulting therefrom, but only to the extent caused in whole or in part by negligent acts or omissions of the Owner, anyone directly or indirectly employed by the Owner or anyone for whose acts the Owner may be liable, regardless of whether or not such claim, damage, loss or expense is caused in part by a party indemnified hereunder. Such obligation shall not be construed to negate, abridge, or reduce other rights or obligations of indemnity which would otherwise exist as to a party or person described in this Subparagraph 10.1.4. 10.2 SAFETY OF PERSONS AND PROPERTY 10.2.1 The Contractor shall take reasonable precautions for safety of, and shall provide reasonable protection to prevent damage, injury or loss to: .1 employees on the Work and other persons who may be affected thereby; .2 the Work and materials and equipment to be incorpo- rated therein, whether in storage on or off the site, under care, custody or control of the Contractor or the Contractor's Subcontractors or Sub-subcontrac- tors; and .3 other property at the site or adjacent thereto, such as trees, shrubs, lawns, walks, pavements, roadways, structures and utilities not designated for removal, relo- cation or replacement in the course of construction. I 10.2.2 The Contractor shall give notices and comply with applicable laws, ordinances, rules, regulations and lawful orders of public authorities bearing on safety of persons or property or their protection from damage, injury or loss. 10.2.3 The Contractor shall erect and maintain, as required by existing conditions and performance of the Contract, reason- able safeguards for safety and protection, including posting danger signs and other warnings against hazards, promulgating safety regulations and notifying owners and users of adjacent sites and utilities. 10.2.4 When use or storage of explosives or other hazardous materials or equipment or unusual methods are necessary for execution of the Work, the Contractor shall exercise utmost care and carryon such activities under supervision of properly qualified personnel. 10.2.5 The Contractor shall promptly remedy damage and loss (other than damage or loss insured under property insurance required by the Contract Documents) to property referred to in Clauses 10.2.1.2 and 10.2.1.3 caused in whole or in part by the Contractor, a Subcontractor, a Sub-subcontractor, or anyone directly or indirectly employed by any of them, or by anyone for whose acts they may be liable and for which the Contractor is responsible under Clauses 10.2.1.2 and 10.2.1.3, except damage or loss attributable to acts or omissions of the Owner or Architect or anyone directly or indirectly employed by either of them, or by anyone for whose acts either of them may be liable, and not attributable to the fault or negligence of the Contractor. The foregoing obligations of the Contractor are in addition to the Contractor's obligations under Paragraph 3.18, 10.2.6 The Contractor shall designate a responsible member of the Contractor's organization at the site whose duty shall be the prevention of accidents, This person shall be the Contractor's superintendent unless otherwise designated by the Contractor in writing to the Owner and Architect. 10.2.7 The Contractor shall not load or permit any part of the construction or site to be loaded so as to endanger its safety. 10.3 EMERGENCIES 10.3.1 In an emergency affecting safety of persons or property, the Contractor shall act, at the Contractor's discretion, to pre- vent threatened damage, injury or loss. Additional compensa- tion or extension of time claimed by the Contractor on account of an emergency shall be determined as provided in Paragraph -t.3 and Article 7. ARTICLE 11 INSURANCE AND BONDS 11.1 CONTRACTOR'S LIABILITY INSURANCE 11.1.1 The Contractor shall purchase from and maintain in a company or companies lawfully authorized to do business in the jurisdiction in which the Project is located such insurance as will protect the Contractor from claims set forth below which may arise out of or result from the Contractor's operations under the Contract and for which the Contractor may be legally liable, whether such operations be by the Contractor or by a Subcontractor or by anyone directly or indirectly employed by any of them, or by anyone for whose acts any of them may be liable: .1 claims under workers' or workmen's compensation, disability benefit and other similar employee benefit acts which are applicable to the Work to be performed; AlA DOCUMENT A201 . GENERAL CONDITIONS OF THE CONTRACT FOR CO:-;STRCCTION . FOURTEENTH EDITION AIA@ " (fJ1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK A\'E1'CE. 1'W. WASHINGTON, D.C. 20006 A201.1987 19 I .2 claims for damages because of bodily injury, occupa- tional sickness or disease, or death of the Contractor's employees; .3 claims for damages because of bodily injury, sickness or disease, or death of any person other than the Con- tractor's employees; .4 claims for damages insured by usual personal injury liability coyerage which are sustained (1) by a person as a result of an offense directly or indirectly related to employment of such person by the Contractor, or (2) by another person; .5 claims for damages, other than to the Work itself, because of injury to or destruction of tangible prop- erty, including loss of use resulting therefrom; .6 claims for damages because of bodily injury, death of a person or property damage arising out of owner- ship, maintenance or use of a motor vehicle; and .7 claims involving contractual liability insurance appli- cable to the Contractor's obligations under Paragraph 318. 11.1.2 The insurance required by Subparagraph 11.1.1 shall be written for not less than limits of liability specified in the Con- tract Documents or required by law, whichever coverage is greater. Coverages, whether written on an occurrence or claims-made basis, shall be maintained without interruption from date of commencement of the Work until date of tinal payment and termination of any coverage required to be main- tained after final payment. 11.1.3 Certificates of Insurance acceptable to the Owner shall be filed with the Owner prior to commencement of the Work. These Certificates and the insurance policies required by this Paragraph 11.1 shall contain a provision that coverages afforded under the policies will not be cancelled or allowed to expire until at least 30 days' prior written notice has been given to the Owner. If any of the foregoing insurance coverages are required to remain in force after final payment and are reason- ably available, an additional certificate evidencing continuation of such coverage shall be submitted with the final Application for Payment as required by Subparagraph 9.10.2. Information concerning reduction of coverage shall be furnished by the Contractor with reasonable promptness in accordance with the Contractor's information and belief. 11.2 OWNER'S LIABILITY INSURANCE 11.2.1 The Owner shall be responsible for purchasing and maintaining the Owner's usual liability insurance. Optionally, the Owner may purchase and maintain other insurance for self- protection against claims which may arise from operations under the Contract. The Contractor shall not be responsible for purchasing and maintaining this optional Owner's liability insurance unless specifically required by the Contract Documents. 11.3 PROPERTY INSURANCE 11.3.1 Unless otherwise provided, the Owner shall purchase and maintain, in a company or companies lawfully authorized to do business in the jurisdiction in which the Project is located, property insurance in the amount of the initial Con- tract Sum as well as subsequent modifications thereto for the entire Work at the site on a replacement cost basis \\'ithout vol- untary deductibles. Such property insurance shall be main- tained, unless otherwise provided in the Contract Documents or otherwise agreed in writing by all persons ami entities who are beneficiaries of such insurance, until final payment has been made as provided in Paragraph 9.10 or until no person or entity I other than the Owner has an insurable interest in the property required by this Paragraph 11.3 to be covered, whichever is earlier. This insurance shall include interests of the Owner, the Contractor, Subcontractors and Sub-subcontractors in the \X'ork. 11.3.1.1 Property insurance shall be on an all-risk policy form and shall insure against the perils of fire and extended coverage and physical loss or damage including, without duplication of coverage, theft, vandalism, malicious mischief, collapse, false- \"\'ork, temporary buildings and debris removal including demolition occasioned by enforcement of any applicable legal requirements, and shall cover reasonable compensation for Architect's services and expenses required as a result of such insured loss. Coverage for other perils shall not be required unless otherwise provided in the Contract Documents. 11.3.1.2 If the Owner does not intend to purchase such prop- erty insurance required by the Contract and with all of the coverages in the an10unt described above, the Owner shall so inform the Contractor in writing prior to commencement of the Work. The Contractor may then effect insurance which will protect the interests of the Contractor, Subcontractors and Sub- subcontractors in the Work, and by appropriate Change Order the cost thereof shall be charged to the Owner. If the Contrac- tor is damaged by the failure or neglect of the Owner to pur- chase or maintain insurance as described above, without so notifying the Contractor, then the Owner shall bear all reason- able costs properly attributable thereto. 11.3.1.3 If the property insurance requires minimum deducti- bles and such deductibles are identified in the Contract Docu- ments, the Contractor shall pay costs not covered because of such deductibles. If the Owner or insurer increases the required minimum deductibles above the amounts so identified or if the Owner elects to purchase this insurance with voluntary deduc- tible amounts, the Owner shall be responsible for payment of the additional costs not covered because of such increased or voluntary deductibles. If deductibles are not identified in the Contract Documents, the Owner shall pay costs not covered because of deductibles. 11.3.1.4 Unless otherwise provided in the Contract Docu- ments, this property insurance shall cover portions of the Work stored off the site after written approval of the Owner at the value established in the approval, and also portions of the Work in transit. 11.3.2 Boiler and Machinery Insurance. The Owner shall purchase and maintain boiler and machinery insurance required by the Contract Documents or by law, which shall specificalh' cover such insured objects during installation and until final acceptance by the Owner; this insurance shall include interests of the Owner, Contractor, Subcontractors and Sub- subcontra,ctors in the \X1ork, and the Owner and Contractor shall be named insureds. 11.3.3 LoSs of Use Insurance. The Owner, at the Owner's option, may purchase and maintain such insurance as will insure the Owner against loss of use of the Owner's property due to fire or other hazards, however caused. The Owner waives all rights of action against the Contractor for loss of use of the Owner's property, including consequential losses due to fire or other hazards however caused. 11.3.4 If the Contractor requests in writing that insurance for risks other than those described herein or for other special haz- ards be included in the property insurance policy, the Owner shalL if possible, include such insurance, and the cost thereof shall be charged to the Contractor by appropriate Change Order. 20 A201-1987 AlA DOCUMENT A201 . GENERAL CONDITIONS OF THE CONTRACT FOR CO"STRUCTION . FOURTEENTH EDITIO:o.; AIA@ "@1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, NW., WASHINGTON, D.C. 20006 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 11.3.5 If during the Project construction period the Owner insures properties, real or personal or both, adjoining or adja- cent to the site by property insurance under policies separate from those insuring the Project, or if after final payment prop- erty insurance is to be provided on the completed Project through a policy or policies other than those insuring the Proj- ect during the construction period, the Owner shall waive all rights in accordance with the terms of Subparagraph 11.3.7 for damages caused by fire or other perils covered by this separate property insurance. All separate policies shall provide this waiver of subrogation by endorsement or otherwise. i 11.3.6 Before an exposure to loss may occur, the Owner shall file with the Contractor a copy of each policy that ihcludes insurance coverages required by this Paragraph 11.3. Each policy shall contain all generally applicable conditions, defini- tions, exclusions and endorsements related to this Project. Each policy shall contain a provision that the policy will not be cancelled or allowed to expire until at least 30 days' prior writ- ten notice has been given to the Contractor. 11.3.7 Waivers of Subrogation. The Owner and Contractor waive all rights against (1) each other and any of their subcon- tractors, sub-subcontractors, agents and employees, each of the other, and (2) the Architect, Architect's consultants, separate contractors described in Article 6, if any, and any of their sub- contractors, sub-subcontractors, agents and employees, for damages caused by fire or other perils to the extent covered by property insurance obtained pursuant to this Paragraph 11.3 or other property insurance applicable to the Work, except such rights as they have to proceeds of such insurance held by the Owner as fiduciary. The Owner or Contractor, as appropriate, shall require of the Architect, Architect's consultants, separate contractors described in Article 6, if any, and the subcontrac- tors, sub-subcontractors, agents and employees of any of them, by appropriate agreements, written where legally required for validity, similar waivers each in favor of other parties enum- erated herein, The policies shall provide such waivers of subro- gation by endorsement or otherwise. A waiver of subrogation shall be effective as to a person or entity even though that per- son or entity would otherwise have a duty of indemnification, contractual or otherwise, did not pay the insurance premium directly or indirectly, and whether or not the person or entity had an insurable interest in the property damaged. 11.3.8 A loss insured under Owner's property insurance shall be adjusted by the Owner as fiduciary and made payable to the Owner as fiduciary for the insureds, as their interests may appear, subject to requirements of any applicable mortgagee clause and of Subparagraph 11.3.10. The Contractor shall pav Subcontractors their just shares of insurance proceeds received by the Contractor, and by appropriate agreements, written where legally required for validity, shall require Subcontractors to make payments to their Sub-subcontractors in similar manner. 11.3.9 If required in writing by a party in interest, the Owner as fiduciary shall, upon occurrence of an insured loss, give bond for proper performance of the Owner's duties. The cost of required bonds shall be charged against proceeds received as fiduciary. The Owner shall deposit in a separate account pro- ceeds so received, which the Owner shall distribute in accor- dance with such agreement as the parties in interest may reach, or in accordance with an arbitration award in which case the procedure shall be as provided in Paragraph 4.5. 1f after such loss no other special agreement is made, replacement of dam- aged property shall be covered by appropriate Change Order. I 11.3.10 The Owner as fiduciary shall have power to adjust and settle a loss with insurers unless one of the parties in interest shall object in writing within five days after occurrence of loss to the Owner's exercise of this power; if such objection be made, arbitrators shall be chosen as provided in Paragraph 4.5. The Owner as fiduciary shall, in that case, make settlement with insurers in accordance with directions of such arbitrators. If distribution of insurance proceeds by arbitration is required, the arbitrators will direct such distribution. 11.3.11 Partial occupancy or use in accordance with Paragraph 9.9 shall not commence until the insurance company or com- panies providing property insurance have consented to such partial occupancy or use by endorsement or otherwise. The Owner and the Contractor shall take reasonable steps to obtain consent of the insurance company or companies and shall, \yithout mutual written consent, take no action with respect to partial occupancy or use that would cause cancellation, lapse or reduction of insurance. 11.4 PERFORMANCE BOND AND PAYMENT BOND 11.4.1 The Owner shall have the right to require the Contrac- tor to furnish bonds covering faithful performance of the Con- tract and payment of obligations arising thereunder as stipu- lated in bidding requirements or specifically required in the Contract Documents on the date of execution of the Contract. 11.4.2 Cpon the request of any person or entity appearing to be a potential beneficiary of bonds covering payment of obliga- tions arising under the Contract, the Contractor shall promptly furnish a copy of the bonds or shall permit a copy to be made, ARTICLE 12 UNCOVERING AND CORRECTION OF WORK 12.1 UNCOVERING OF WORK 12.1.1 If a portion of the Work is covered contrary to the Architect's request or to requirements specifically expressed in the Contract Documents, it must, if required in writing by the Architect. be uncovered for the Architect's observation and be replaced at the Contractor's expense without change in the Contract Time. 12.1.2 If a portion of the Work has been covered which the Architect has not specifically requested to observe prior to its being covered, the Architect may request to see such Work and it shall be uncovered by the Contractor. If such Work is in accordance with the Contract Documents, costs of uncover- ing and replacement shall, by appropriate Change Order, be charged to the Owner. If such Work is not in accordance with the Contract Documents, the Contractor shall pay such costs unless the condition was caused by the Owner or a separate contractor in which event the Owner shall be responsible for payment of such costs, 12.2 CORRECTION OF WORK 12.2.1 The Contractor shall promptly correct Work rejected by the Architect or failing to conform to the requirements of the Contract Documents, whether observed before or after Substantial Completion and whether or not fabricated, installed or completed, The Contractor shall bear costs of correcting such rejected Work, including additional testing and inspec- tions and compensation for the Architect's services and expenses made necessary thereby. 12.2.2 If, within one year after the date of Substantial Comple- tion of the \X' ork or designated portion thereof, or after the dite AlA DOCUMENT A201 " GENERAL CONDITIONS OF THE CONTRACT FOR CO;';STRL'CTION " FOljRTEENTH EDITION AIA@ . @1987THEAMERICANINSTITCTEOfARCHITECTS, 1735 NEW YORK AVE;';U, ;';W, WASHINGTON, D.C. 20006 A201-1987 21 I for commencement of warranties established under Sub- paragraph 9.9.1, or by terms of an applicable special warranty required by the Contract Documents, any of the Work is found to be not in accordance with the requirements of the Contract Documents, the Contractor shall correct it promptly after receipt of written notice from the Owner to do so unless the Owner has previously given the Contractor a written accep- tance of such condition. This period of one year shall be extended with respect to portions of Work first performed after Substantial Completion by the period of time between Substan- tial Completion and the actual performance of the Work. This obligation under this Subparagraph 12.2.2 shall survive accep- tance of the Work under the Contract and termination of the Contract. The Owner shall give such notice promptly after dis- covery of the condition. 12.2.3 The Contractor shall remove from the site portions of the Work which are not in accordance with the requirements of the Contract Documents and are neither corrected by the Contractor nor accepted by the Owner. 12.2.4 If the Contractor fails to correct nonconforming Work within a reasonable time, the Owner may correct it in accor- dance with Paragraph 2.4. If the Contractor does not proceed with correction of such nonconforming Work within a reason- able time fixed by written notice from the Architect, the Owner may remove it and store the salvable materials or equipment at the Contractor's expense. If the Contractor does not pay costs of such removal and storage within ten days after written notice, the Owner may upon ten additional days' written notice sell such materials and equipment at auction or at private sale and shall account for the proceeds thereof, after deducting costs and damages that should have been borne by the Con- tractor, including compensation for the Architect's services and expenses made necessary thereby. If such proceeds of sale do not cover costs which the Contractor should have borne, the Contract Sum shall be reduced by the deficiency. If payments then or thereafter due the Contractor are not sufficient to cover such amount, the Contractor shall pay the difference to the Owner. 12.2.5 The Contractor shall bear the cost of correcting destroyed or damaged construction, whether completed or partially completed, of the Owner or separate contractors caused by the Contractor's correction or removal of Work which is not in accordance with the requirements of the Con- tract Documents. 12.2.6 Nothing contained in this Paragraph 12.2 shall be con- strued to establish a period of limitation with respect to other obligations which the Contractor might have under the Con- tract Documents. Establishment of the time period of one year as described in Subparagraph 12.2.2 relates only to the specific obligation of the Contractor to correct the Work, and has no relationship to the time within which the obligation to comply with the Contract Documents may be sought to be enforced, nor to the time within which proceedings may be commenced to establish the Contractor's liability with respect to the Con- tractor's obligations other than specifically to correct the Work. 12.3 ACCEPTANCE OF NONCONFORMING WORK 12.3.1 If the Owner prefers to accept Work which is not in accordance with the requirements of the Contract Documents, the Owner may do so instead of requiring its removal and cor- rection, in which case the Contract Sum will be reduced as appropriate and equitable. Such adjustment shall be effected whether or not final payment has been made. I ARTICLE 13 MISCELLANEOUS PROVISIONS 13.1 GOVERNING LAW 13.1.1 The Contract shall be governed by the law of the place where the Project is located. 13.2 SUCCESSORS AND ASSIGNS 13.2.1 The Owner and Contractor respectively bind them- selves, their partners, successors, assigns and legal representa- tives to the other party hereto and to partners, successors, assigns and legal representatives of such other party in respect to covenants, agreements and obligations contained in the Con- tract Documents. Neither party to the Contract shall assign the Contract as a whole without written consent of the other. If either party attempts to make such an assignment without such consent, that party shall nevertheless remain legally responsible for all obligations under the Contract. 13.3 WRITTEN NOTICE 13.3.1 Written notice shall be deemed to have been duly served if delivered in person to the individual or a member of the firm or entity or to an officer of the corporation for which it was intended, or if delivered at or sent by registered or certified mail to the last business address known to the party giving notice. 13.4 RIGHTS AND REMEDIES 13.4.1 Duties and obligations imposed by the Contract Docu- ments and rights and remedies available thereunder shall be in addition to and not a limitation of duties, obligations, rights and remedies otherwise imposed or available by law. 13.4.2 No action or failure to act by the Owner, Architect or Contractor shall constitute a waiver of a right or duty afforded them under the Contract, nor shall such action or failure to act constitute approval of or acquiescence in a breach thereunder, except as may be specifically agreed in writing. 13.5 TESTS AND INSPECTIONS 13.5.1 Tests, inspections and approvals of portions of the Work required by the Contract Documents or by laws, ordi- nances, rules, regulations or orders of public authorities having jurisdiction shall be made at an appropriate time. Unless other- wise provided, the Contractor shall make arrangements for such tests, inspections and approvals with an independent test- ing laboratory or entity acceptable to the Owner, or with the appropriate public authority, and shall bear all related costs of tests, inspections and approvals. The Contractor shall give the Architect timely notice of when and where tests and inspec- tions are to be made so the Architect may observe such proce- dures. The Owner shall bear costs of tests, inspections or approvals which do not become requirements until after bids are received or negotiations concluded. 13.5.2 If the Architect, Owner or public authorities having jurisdiction determine that portions of the Work require addi- tional testing, inspection or approval not included under Sub- paragraph 13.5.1, the Architect will, upon written authorization from the Owner, instruct the Contractor to make arrangements for such additional testing, inspection or approval by an entity acceptable to the Owner, and the Contractor shall give timely notice to the Architect of when and where tests and inspections are to be made so the Architect may observe such procedures. 22 A201-1987 AlA DOCUMENT A201 . GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION " FOURTEENTH EDIT]ON A]A@ . @]987 THE AMER]CAN ]NSTITUTE OF ARCH]TECTS. ] 735 NEW YORK AVENUE, NW., WASH]NGTON, D.C. 20006 I I I I I I I I I I I I I I I I I I I I The Owner shall bear such costs except as provided in Sub- paragraph 13.5.3. 13.5.3 If such procedures for testing, inspection or approval under Subparagraphs 13.5.1 and 13.5.2 reveal failure of the portions of the Work to comply with requirements established by the Contract Documents, the Contractor shall bear all costs made necessary by such failure including those of repeated procedures and compensation for the Architect's services and expenses. 13.5.4 Required certificates of testing, inspection or approval shall, unless otherwise required by the Contract Documents, be secured by the Contractor and promptly delivered to the Architect. 13.5.5 If the Architect is to observe tests, inspections or approvals required by the Contract Documents, the Architect wiII do so promptly and, where practicable, at the normal place of testing. 13.5.6 Tests or inspections conducted pursuant to the Con- tract Documents shall be made promptly to avoid unreasonable delay in the Work. 13.6 INTEREST 13.6.1 Payments due and unpaid under the Contract Docu- ments shall bear interest from the date payment is due at such rate as the parties may agree upon in writing or, in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located. 13.7 COMMENCEMENT OF STATUTORY LIMIT A TION PERIOD 13.7.1 As between the Owner and Contractor: .1 Before Substantial Completion. As to acts or failures to act occurring prior to the relevant date of Substan- tial Completion, any applicable statute of limitations shall commence to run and any alleged cause of action shall be deemed to have accrued in any and all events not later than such date of Substantial Completion; .2 Between Substantial Completion and Final Certifi- cate for Payment. Ai; to acts or failures to act occur- ring subsequent to the relevant date of Substantial Completion and prior to issuance of the final Certifi- cate for Payment, any applicable statute of limitations shall commence to run and any alleged cause of action shall be deemed to have accrued in any and all events not later than the date of issuance of the final Certificate for Payment; and .3 After Final Certificate for Payment. As to acts or failures to act occurring after the relevant date of issu- ance of the final Certificate for Payment, any appli- cable statute of limitations shall commence to run and any alleged cause of action shall be deemed to have accrued in any and all events not later than the date of any act or failure to act by the Contractor pursuant to any warranty provided under Paragraph 3.5, the date of any correction of the Work or failure to correct the Work by the Contractor under Paragraph 12.2, or the date of actual commission of any other act or failure to perform any duty or obligation by the Contractor or Owner, whichever occurs last. I ARTICLE 14 TERMINATION OR SUSPENSION OF THE CONTRACT 14.1 TERMINATION BY THE CONTRACTOR 14.1.1 The Contractor may terminate the Contract if the Work is stopped for a period of 30 days through no act or fault of the Contractor or a Subcontractor, Sub-subcontractor or their agents or employees or any other persons performing portions of the Work under contract with the Contractor, for any of the following reasons: .1 issuance of an order of a court or other public author- ity having jurisdiction; .2 an act of government, such as a declaration of national emergency, making material unavailable; .3 because the Architect has not issued a Certificate for Payment and has not notified the Contractor of the reason for withholding certification as provided in Subparagraph 9.4.1, or because the Owner has not made payment on a Certificate for Payment within the time stated in the Contract Documents; .4 if repeated suspensions, delays or interruptions by the Owner as described in Paragraph 14.3 constitute in the aggregate more than 100 percent of the total num- ber of days scheduled for completion, or 120 days in any 365-day period, whichever is less; or .5 the Owner has failed to furnish to the Contractor promptly, upon the Contractor's request, reasonable evidence as required by Subparagraph 2.2.1. 14.1.2 If one of the above reasons exists, the Contractor may, upon seven additional days' written notice to the Owner and Architect, terminate the Contract and recover from the Owner payment for Work executed and for proven loss with respect to materials, equipment, tools, and construction equipment and machinery, including reasonable overhead, profit and damages. 14.1.3 If the Work is stopped for a period of 60 days through no act or fault of the Contractor or a Subcontractor or their agents or employees or any other persons performing portions of the Work under contract with the Contractor because the Owner has persistently failed to fulfill the Owner's obligations under the Contract Documents with respect to matters impor- tant to the progress of the Work, the Contractor may, upon seven additional days' written notice to the Owner and the Architect, terminate the Contract and recover from the Owner as provided in Subparagraph 14.1.2. 14.2 TERMINATION BY THE OWNER FOR CAUSE 14.2.1 The Owner may terminate the Contract if the Contractor: .1 persistently or repeatedly refuses or fails to supply enough properly skiIled workers or proper materials; .2 fails to make payment to Subcontractors for materials or labor in accordance with the respective agreements between the Contractor and the Subcontractors; .3 persistently disregards laws, ordinances, or rules, reg- ulations or orders of a public authority having juris- diction; or .4 otherwise is guilty of substantial breach of a provision of the Contract Documents. 14.2.2 When any of the above reasons exist, the Owner, upon certification by the Architect that sufficient cause exists to jus- AlA DOCUMENT A201 " GENERAL CONDITlOr-;S OF THE CONTRACT FOR CONSTRCCTlO;'; . FOURTEENTH EDITION AIA@ "@1987THEAMERICANINSTITCTEOFARCHITECTS, 1735 NEW YORK AVE:O;l'E, :-;.w., WASHINGTON, D.C. 20006 A201-1987 23 I tify such action, may without prejudice to any other rights or remedies of the Owner and after giving the Contractor and the Contractor's surety, if any, seven days' written notice, termi- nate employment of the Contractor and may, subject to any prior rights of the surety: .1 take possession of the site and of all materials, equip- ment, tools, and construction equipment and machin- ery thereon owned by the Contractor; .2 accept assignment of subcontracts pursuant to Para- graph 5.4; and .3 finish the Work by whatever reasonable method the Owner may deem expedient. 14.2.3 When the Owner terminates the Contract for one of the reasons stated in Subparagraph 14.2.1, the Contractor shall not be entitled to receive further payment until the Work is finished. 14.2.4 If the unpaid balance of the Contract Sum exceeds costs of finishing the Work, including compensation for the Archi- tect's services and expenses made necessary thereby, such excess shall be paid to the Contractor. If such costs exceed the unpaid balance, the Contractor shall pay the difference to the I I!) Owner. The amount to be paid to the Contractor or Owner, as the case may be, shall be certified by the Architect, upon appli- cation, and this obligation for payment shall survive termina- tion of the Contract. 14.3 SUSPENSION BY THE OWNER FOR CONVENIENCE 14.3.1 The Owner may, without cause, order the Contractor in writing to suspend, delay or interrupt the Work in whole or in part for such period of time as the Owner may determine. 14.3.2 An adjustment shall be made for increases in the cost of performance of the Contract, including profit on the increased cost of performance, caused by suspension, delay or interrup- tion, No adjustment shall be made to the extent: .1 that performance is, was or would have been so sus- pended, delayed or interrupted by another cause for which the Contractor is responsible; or .2 that an equitable adjustment is made or denied under another provision of this Contract. 14.3.3 Adjustments made in the cost of performance may have a mutually agreed fixed or percentage fee. 24 A201-1987 AlA DOCUMENT A201 . GENERAL CONDlTIO:--;S OF THE CONTRACT FOR CONSTRUCTION' FOlRTEENTH EDITION AIA@ . @1987THEAMERICANINSTITUTEOFARCHITECTS, 1735 NEW YORK AVENUE, N,W" \\.\SIIIr\GTON, D.C. 20006 3/87 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I Agreement Between Owner and General Contractor exhibit A I AlA Document A201 General Conditions of the Contract for Construction - 1987 Edition The attached General Conditions. are hereby Incorporated into this Agreement Between Owner and General Contractor. Exhibit A Page 1 I I I I I I I I I I I I I I I I I I I Agreement Between Owner c)nd General Contractor exhibit B I SUPPLEMENTAL CONDmONS 1.0 GENERAL 1. 1 This Section sets forth modifications and additions to the General Conditions of the Contract for Construction. AlA Document A201. 1987 Edition. 1.2 Where any article Is hereinafter supplemented. the provision of such article shall remain In effect and all supplemental provisions shall be considered as added thereto. Where any article Is amended. voided. deleted. or superseded thereby. provisions of such article not so specifically amended. voided or superseded shall remain In effect. 1.3 Articles. paragraphs and subparagraphs hereinafter referenced in this Section correspond to articles. paragraphs and subparagraphs in the General Conditions (AlA Document A201. 1987 Edition). 1.4 The General Contractor will be held to have examined and made himself familiar with this Document and It shall be binding except as may be added to or modified hereinafter. on all work performed under this Contract. 1.5 AlA Document. A201 "General Conditions of the Contract for Construction." 1987 Edition Is available for review at the Architect's office or for purchase from the AlA office at 5405 Cypress Center Drive. Suite 110. Tampa. Florida 33609. phone: 286-7225. 2.0 GENERAL PROVISIONS ARTICLE 1 2. 1 Paragraph 1. 1.3 shall be supplemented as follows: The term "Fumish" Includes purchase and delivery to Project Site. The term "Install" Includes receMng at Project Site. installing in place and placing in operation or finishing complete for Intended use. The term "Provide" Includes fumishlng and Installing. These definitions are not meant to be used to restrict payment to the Contractor. 2.2 Add the following paragraphs: 1.2.6 The Drawings are Intended to show the general arrangements. design and extent of the work. and are partly diagrammatic: they are not intended to be scaled for roughing-in measurements. or to serve as Shop Drawings. 1.2.7 Should the Drawings disagree In themselves or with the Specifications. the better quality or greater quantity of work or materials shall be provided in accordance with the Architect's Interpretation. 1.2.8 Where a typical or representative detail Is shown on the Drawings. this detail shall constitute the standard In workmanship and materials throughout corresponding parts of the work. Adaptation. however, shall be subject to the approval of the Architect. Exhibit B Page 1 I I I I I I II I I I I I I I I I I I I Agreement Between Owner Cfld General Contractor Exhibit B I I 3.0 ARTICLE 2 OWNER 3.1 Paragraph 2.2.2 Is hereby deleted. 4.0 ARTICLE 3 CONTRACTOR 4.1 Paragraph 3.4.2 shall be supplemented as follows: If the Owner or the Architect have a reasonable objection to any person employed by the Contractor In connection with the work. the Architect shall notify the Contractor In writing stating the specific reasons for the objections. The Contractor shall take appropriate action to remedy such objection to the satisfaction of the Owner or the Architect. 4.2 Paragraph 3.9.1 shall be supplemented as follows: The SUperintendent shall not be removed from the project without the written consent of the Owner. 4.3 Paragraph 3.15.1 shall be supplemented as follows: No waste materials or rubbish shall be burled or burned on the site. 4.4 Add the following paragraph: 3.18.4 The Contractor hereby acknowledges the receipt ofTen Dollars ($10.00) and other good and valuable consideration as part of the Contract Sum from the Owner and acknowledges the receipt of Ten Dollars ($ 10.00) and other good and valuable consideration from the Architect which has been paid to him as specific consideration for the Indemnification provided herein. The Contractor's policy shall provide the "Hold Harmless" rider and It shall be so noted on the Contractor's Certificate of Insurance. 5.0 ADMINISTRATION OF THE CONTRACT ARTICLE 4 5.1 Article 4.5 Arbitration. delete In Its entirety 4.5. 1 through 4.5.7. Article 4.1: Delete the phrase "arbitration or" wherever it appears in 4.3.2. Article 4.4.4: Delete the words "arbitration" and substitute the word "litigation". 6.0 ARTICLE 7 CHANGE IN THE WORK 6. 1 Modify Paragraph 7.3.6 as follows: 7.3.6 In the first sentence. delete the words. "a reasonable allowance for overhead and profit- and substitute "an allowance for overhead and profit- In accordance with Clauses 7.3.10.1 through 7.3.10.6 below.- Exhibit B Page 2 . I I I I I I I r I I I I I I ~I I I I Agreement Between Owner 'l"d General Contractor Exhibit B I I 6.2 Add the following Subparagraph 7.3.10 to 7.3: 7.3.10 In SUbparagraph 7.3.5. the allowance for the combined overhead and profit Included In the total cost to the Owner shall be based on the following schedule: 1. For the Contractor. for Work performed by the Contractor's own forces. a percent of the cost equating to the Construction Fee percentage plus any General Conditions costs which can be directly related thereto and justified as approved by the Owner and the Architect. 2. For the Contractor. for Work performed by the Contractor's Subcontractor. a percent of the amount due the Subcontractor equating to the Construction Fee percentage. 3. For each Subcontractor or Sub-subcontractor Involved. for Work performed by that Subcontractor's or Sub-subcontractor's own forces. fifteen percent of the cost. 4. For each SUbcontractor. for Work performed by the SUbcontractor's Sub- contractors. ten percent of the amount due the SUb-subcontractor. 5. Cost to which overhead and profit Is to be applied shall be determined in accordance with SUbparagraph 7.3.6. 6. In order to facilitate checking of quotations for extras or credits. all proposals, except those so minor that their propriety can be seen by Inspection. each quotation shall be accompanied by a complete itemization of costs including labor. materials. (units ond unit costs) and Including similar breakdowns of all SUbcontracts. Labor and materials shall be itemized In the manner prescribed above. Where major cost Items are SUbcontracts. they shall be itemized also. In no case will a change InvoMng over Sloo be approved without such itemization. 7.0 ARTICLE 8 TIME 7.1 Add the following paragraphs: 8.2.4 The Contractor shall furnish sufficient forces. construction plant and equipment. and shall work such hours as may be necessary to Insure prosecution of the work In accordance with the Contractor's progress schedule and to insure completion of the Work within the construction time. In the event Owner or Architect shall determine that the progress of the Work has fallen behind the progress schedule. the Owner or Architect shall so notify the Contractor In writing and Contractor shall. within the ten (10) days after receipt of such written notice. advise the Architect In writing of the steps and procedures which the Contractor will take to place the progress of the Work back on schedule. Exhibit B Page 3 I I I I I I I I I I I I I I I I I I I Agreement Between Owner crd General Contractor exhibit B I I 8.2. 5 FaUure to complete the project within the time fixed In the Agreement will resutt In substantial Injury to the Owner and damages arising from such failure cannot be calculated with any degree of certainty. therefore If the project is not substantially completed within the time fixed In the Agreement. or within such further time. If any. as shall be aHowed for such substantial completion, the Contractor shall pay to the Owner liquidated damages for such delay the amount set out In the Agreement for each and every calendar day elapSing between the date fixed for substantial completion and the date such substantial completion shall have been fully accomplished. 8.2. 6 Provision for assessment of liquidated damages for delay shall in no manner affect the Owner's right to terminate the Contract as provided In Article 14 or elsewhere In the Contract Documents. The Owner's exercise of the right to terminate shaH not release the Contractor from his obligation to pay said liquidated damages In the amounts set out In the Agreement. 8.0 ARTICLE 9 PAYMENTS AND COMPLETION 8.1 Paragraph 9.3.1 shall be supplemented as follows: The form of Application for Payment shall be AlA Document G702, Application and Certification for Payment. supported by AlA Document G703. Continuation Sheet. 8.2 Add the following paragraph: 9.3.1.3 Until final payment. ten percent (10%) of the total value of all labor. materials and equipment Incorporated Into the Work and of all materials and equipment suitably stored at the site or at some other location approved in writing by the Owner shall be withheld from all progress payment made by the Owner. At fifty percent (50% ) Completion of the project. the Owner may (with the recommendation of the Architect) reduce the retainage to five percent(5%). When specific work actMty Is 100% complete and satisfactory to the Architect, the Owner may reduce the retalnage for that work actMty to zero percent (0%) at the Owqner's discretion. 8.3 Paragraph 9.8.1 shall be supplemented as follows: Issuance of a Certificate of Occupancy by the governmental agency having jurisdiction over the Work does not In Itself constitute SUbstantial Completion. However, a Certificate of Occupancy shall be a prerequisite to Substantial Compl~tion. 8.4 Add the following paragraphs: , 9.8.3.1 In addition to any other retalnage. the Owner may withhold upto three (3) times the value of any uncompleted Work. 9.8.3.2 In addition to any other retalnage. the Owner may withhold an amount equal to the estimated or anticipated liquidated damages that may be assessed. Exhibit B Page 4 I I I I I I I I I I I I I I I I I I I Agreement Between Owner "ld General Contractor exhibit B I I 9.0 ARTICLE 11 INSURANCE 9.1 Article 11.1.2 Is hereby voided In Its entirety and superseded as follows: 11. 1.2 The Insurance required by SUbparagraph 11. 1. 1 shall be written for not less than the following limits or greater If required by law: Worker's Comoensatlon (In accordance with Chapter 440. Florida Statutes) Employer'S Liability $5CXHXXl/S5CXl!m/S5CXl.CXXl Comorehenslve General L1abllltv (Including Premises-Operations; Independent Contractors' Protective; Products and Completed Operations; Broad Form Property Damage) Bodily Injury and Property Damage Single Limit $ 1.CXXl.CXXl Each Occurrence $ 1 .CXXl.CXXl Aggregate Polley must be written on an occurrence basis with the Insurance company having a Best Rating of A7 or above. Contractual L1abllltv Bodily Injury and Property Damage Combined Single Limit $5.CXXl.CXXl Each Occurrence $ S!m.CXXl Aggregate Comorehenslve Automobile L1abllltv Bodily Injury and Property Damage Combined Sl.CXXlJ)')") Each Occurrence .AD Umbrella Uabllltv ~ shall be furnished with excess limits of at least $5.000.000 over primary coverage. 9.2 Add the following paragraphs: 11.1.4 The Owner shall be named as co-Insured with the Contractor in his public liability Insurances. 11. 1.5 The Insurance required by subparagraph 11. 1. 1 shall include contractual liability Insurance applicable to the Contractor's obligations under paragraph 3.18. The form of policy for this coverage shall be "Complete Value." Exhibit B Page 5 I I I I I I I I I I I I I I I I I I I Agreement Between Owner ld General Contractor Exhibit B I 11.1.6 If by the terms of this Insurance any mandatory deductibles are required. or if the Contractor should elect. with the concurrence of the Owner. to increase the mandatory deductlbles amounts or purchase this Insurance with vOluntary deductible amounts, the Contractor shall be responsible for payment of the amount of all deductlbles In the event of a paid claim. If separate Contractors are added as Insureds to be covered by this policy. the separate Contractors shall be responsible for payment of appropriate part of any deductlbles In the event claims are paid on their part of the Project. END OF SECTION Exhibit B Page 6 I I I I I I I I I I I I I I I I I I I Agreement Between Owner ani General Contractor Exhibit C I THE SCOPE AND BUDGET OF THE CLEARWATER CITY SERVICES CENTER IS AS FOLLOWS: 1. City Office Building: A new 70roJ:t gross square foot. two (or three) story office building of commercial grade quality to be constructed on City owned property bounded by Myrtle Avenue. Park Street, East Avenue and Pierce Street In downtown Clearwater. The mechanical. electrical and plumbing systems shall be upgraded to Institutional quality. The Construction Budget including all site work for this portion of the project Is: Construction Budget: (less landscape and Irrigation) 2. Renovation of existing City Hall: SS.D25.cxx> Renovation and Code update to the existing 25.000 :t gross square foot City Hall Building at 112 Osceola Avenue. Work shall Include a new fire exit stair. ADA and other code corrections plus redecoration. Construction Budget (less landscape and irrigation) 3. Police Headquarters Building: ssco.cxx> A new 83.lXXl :t gross square foot three story Police Headquarters Building directly across the street south of the existing Police Building In downtown Clearwater. The site is bordered on the north by Pierce Street. the east by East Avenue. the south by Franklin Street and the west by the existing Clearwater Fire Department Headquarters and Maintenance facility and an existing privately owned day care center. Construction Budget: (includes all site work less landscaping and irrigation) 4. City Parking Garage: $6.639.cxx> A new 50J car City Parking Garage to be constructed on the site of the existing Police Building. The site Is bordered on the east by East Avenue. north by Park Street, south by Pierce Street and the west by the existing Park Street Garage. Construction Budget: Budget for Demolition of Police Building (Including asbestos abatement) $2.500.cxx> S336.cxx> 5. The foregoing budget figures are expressed in 1994 bid dollars and are inclusive of GC's Preconstructlon and Construction fees and General Conditions Lump Sums. but exclusive of landscaping and Irrigation (to be provided directly by the City); furniture. fittings and office equipment; open office systems furniture; owner's management. architectural/engineering fees and expenses. Exhibit C Page 1 I I I I I I I I I I I I I I I I I I I I Agreement Between Owner and General Contractor Exhibit D I PRELIMINARY MASTER SCHEDULE: The attached Preliminary Master Schedule demonstrates an approach to phasing the design and construction of this project to achieve the City's goals of December 1995 move-In of the two new major buildings. Exhibit D Page 1 I I I I I I I I I I I I I I I I I I I I Agreement Between Owner and General Contractor exhibit E I GENERAL CONTRACTOR'S PROPOSAL The attached General Contractor's Proposal Form. Is hereby incorporated into this Agreement Between Owner and General Contractor. Exhibit E Page 1 I I I I I . I ~ I . . I ~ I , I itl Jtl ~~ I \I JlI u }II ~'I . ~I ~ )1 ~: I . '. ]I II I CREATIVE ?A BEERS I CONSTRUCTION FEE PROPOSAL GENERAL CONTRACTOR BASIC SERVICES A Preconstruction Fee $ 15.250.00 B. Construction Fee $ 492.729.00 C. General Conditions Lump Sum $ 799.877.00 '" (see attached breakdown) Will not be considered as per Addenda #1. Item #1. * t' ar ie the given schedule. The new City Hall and Police Dep'a ui/ding will be leted earlier allowing a 5 month sche or constructio the parking garage. D. The following costs will be assumed by the City (contractor shall make arrangements for same). Temporary Electric Start-up Building Permit Tap Fees Sewer Impact Fees Water Meter Transportation Impact Fee Fire Taps & Assembly E. Performance and Payment Bond cost and rate $ 86.500.00 ~ I , il I 'I . -I -~ I - ~I ~I '(1 ~I :1 ~I . Itl ; /I ~I ~I JI ~I \I ~I ~I jI !tl .. ~I If J I Construction Fee Proposal Page 2 F. Delete the appropriate construction phase fees, general conditions lump sum amounts and performance bond cost associated with not building. The Police Headquarter building. Identify all deductive fees and amounts with specific detail to facilitate comparative analysis by the selection committee. Construction Fee Deduct $ 179.900.00 General Conditions Lump Sum Deduct $ 245.257.00 (see attached breakdown) Performance and Payment Bond Deduct $ 33.195.00 OUALIFICA TIONS A Name all key personnel who will be part of the General Contractor Team for this project We have included detailed resumes of our proposed project staff in Section 3. B. Provide separate home office and filed office organization charts. In Section 2 of our proposal, we have provided a specific project organization chart. Section 4 includes the corporate organization charts of Creative/Beers. C. Provide schedule ofIabor burden rates for those personnel who will be part of this team. Payroll FICA Federal Unemployment State Unemployment Sub Total Salaried 7.65% 0.80% 5.40% 13.85% Hourly 7.65% 0.80% 5.40% 13.85% Insurance Health Worker's Compensation Sub Total 2.65% 24.50% 27.15% 2.65% 10.38% 13.03 % Total 41.00% 26.88% D. We acknowledge addenda 1,2, and 3. - - - - - - - - FILE ID - 4028 PROJECT JOB NO - PROJECT NAME - CLEARWATER CITY SERVICE CENTER PROJECT SIZE I SUBUIVISION - A TOTAL PROJECT GRN CONDITIONS .' iii' -;/ , '.' ',-' '.' 'iiI' , iii' J , 4;' lOl' ;;;;, IS' .' .1 ." ." Q' - - - - -- - - - - - EST I MAT E D ETA I L R E P 0 R T ** SUBDIVISION, ITEM CODE SEQUENCE ** I 08/04/94 15:39:50 PAGE - DATE - TINE - CREATIVE CONTRACTORS, INC 620 DllEW STREET CLEARWATER, FLOR1UA 31615 ------------------------------------------------------------------------------------------------- REF S ITEM NO. D SC ELEM CODE GENERAL I A 3 A 4 A 6 A 8 A 10 A 12 A 14 A 15 A 17 A 19 A 20 A 21 A 23 A 25 A 27 A 29 A :11 A :1:1 A 34 A 35 A 38 A 39 A 42 A 44 A 46 A 48 A 50 A 52 A 54 A 56 A 58 A 60 A 62 A 64 A f.5 A GG A 67 A .------------------------------- LAB UNIT MAT/EQP/ TOTAL PRICE SUB UNIT LABOR : TAX & INS INCLUDED TOTAL MAT/:TOT UNIT TOTAL EQUIP/SUB: PRICE PRICE .<' DESCRIPTION UNIT MEAS QUANTITY --------------------------------------------------------------------------------------------------------------------------- REQUIREMENTS SUM~I'\RY OF WORK 100.000 TEMP ELECTRIC MO 100.001 ELECTRIC START UP-OWNER 100.001 ELECTRICAL DISTRIBUTION SUDS 100.002 TEMP WATER/SERVICE MO 100.003 FIELD TOILET U/MO 100.004 FIELD PHONE/FAX MO 100.005 PHONE INSTALLATION MO 100.00G FIELD TRAILER-ARCI/ ONLY MO 100.006 FIELD TRAILER-CONST(2 EA) MO 100.007 TRAILER - SET UP/REMOVAL EA 100.008 CLEANING PARKING GARAGE SQFT 100.008 CONTRACT CLEANING SQFT 100.008 JANITORIAL SUPPLIES MO 100.009 SAFTY/OSI/A SUPPLIES LSUM 100.01 I WArlRANTEE EXPENSE RESURVE LS 100.012 PROJECT SIGN EA 100.013 REPAIRS AND CORRECTIONS LS 100.014 T1lASH HAULING(BALANCE TDS LOAD 100.015 FIEl.D ENGINEEll-BEERS WI{S 100.015 FIELD SUPERVISION- eel WKS 100.015 FIELD SUPERVISION-DEERS WKS 100.016 PROJECT MANAGER-BEERSIOO% MO 100.016 SECRETARY @ SITE WKS 100.017 CASUAL LABOR (CLEAN UP) HRS 100.018 PHOTOGRAPHS MO 100.019 WATER COOLER UMO 100.020 RENTAL SMALL TOOLS-IN WK 100.022 TEMP SAFTY RAILS LSUM 100.023 CRANE-IN STRUCTURE COST 100.024 SITE LAYOUT IN WORK ITEMS 100.025 TESTING - OTHERS 100.027 BLUEPRINTS-SIIOP DWS LS 100.028 CMP SCHEDULING-IN G.C.FEE 100.029 GLASS CLEANING LSUM 100.033 COMPUTEH/SOFTI"ARE/PllINTEH LSUM 100.033 OFFICE SUPPLI ES ~IO 100.034 COMPUTEH SEHVJCES LSUM 100.0:14 THASH CIIUTES LSU~1 - 34 450.000 S 15,300 S -150.000 lfi,300 34 90.000 S 3,060 S 90.000 3,060 102 85.000 S 8,670 S 85.000 fl,G70 18 450.000 S 8,100 S .150.000 8,100 I 750.000 S 750 s 750.000 750'- I H 125.000 S 2.250 S 125.000 2,2fiO 36 175.000 S 6, :lOO s 175.000 [,,300 3 125.000 550.000 S 375 1,650 S 728.6()7 2, (81) 1()2,00O .020 S 3,240 S .020 :1,2') 0 178,000 . 150 S 2/;,700 S .150 2G,700 18 40.000 M 720 M 42.778 770 J 1500.000 S 1,500 S1500.000 1,500 I 15,000 S 15,000 s 15,000 (!i.OOO 4 50.000 600.000 M 200 2, 400 M 71 :1. 500 2,8fi.) I 1500.000 1500.000 M 1,500 1,500 M3750.000 3,750 1.., 30 375.000 S 11,2fiO S 375.000 11,2fiO 76 825.000 li2,700 1179.7:'0 8 ~l , lj Ii I 78 875.000 1;8,250 12fil.2fi6 97, fi!)H 76 1340.000 101,840 1916.197 ] 45, G31 18 4500.000 556.000 S 8 I ,000 10,00H Sfi991.000 125,8:38 76 425.000 32,300 1)07.750 46, 189 5,000 8.000 S 40,000 S H.OOO '10,000 18 200.000 S 3,600 S 200.000 3,600 34 65.000 S 2,210 S 65.000 2,210 2 2!i00.000 3500.000 M 5,000 7,000 ~17:120. 000 l'I.G-IO- 2000.000 S 2,000 S2000.000 2,000 1 5000.000 S 5,000 S5000.000 5,000 I 6000.000 S 6,000 S6000.000 f..000 18 90.000 ~I I. fi20 ~1 %.27H I ,7:3:1 I 5100.000 S :, . Ion S:'IOO.OOO :, . J 00 2 2fiO.000 500.000 E fiOO 1,000 F 857.fiOO I , '( I :1 - - .' .' 'Iiii' 'Ii' - - - - - - - . ii' '.1 'ilil l~; '.1 '.1 '.J '.;jJ leil '.' - - - - - - .' e' 'II' ..' ... ..,- FILE ID - PROJECT JOB NO PROJECT NAME PIWJECT SIZE SUBDIVISION 4028 EST I M ATE D ETA I L R E P 0 R 'I' ** SUBDIVISION, ITEM CODE SEQUENCE ** - - - CLEARWATER CITY SERVICE CENTER 1 - A TOTAL PROJECT GEN CONDITIONS CREATIVE CONTRACTORS, 620 DI~EW STI{EET CLEARWATER, FLORIDA 34615 - PAGE - 2 DATE - 08/04/94 TIME - 15:39:~0 INC f' t". ,.. -----------------------------------------------------------------------------------------------~------------------------------------ REF S ITEM NO. D SC ELEM CODE DESCRIPTION UNIT ~1EAS QUANT!TY LAB UNIT MAT/EQP/ TOTAL PRICE SUB UNIT LABOR : TAX & INS INCLUDED TOTAL MAT/:TOT UNIT TOTAL EQUIP/SUB: PRICE PUICE (' ------------------------------------------------------------------------------------------------------------------------------------ GENERAL REQUIREMENTS SUMMARY OF WORI< 69 A 100.035 PED DARnICADES LSU~I 2 2000.000 2000.000 ~l 4,000 4,000 ~I~OOO. 000 10,000 71 A 100.036 TEMP STAIRS/LADDERS LSUM 2 500.000 s 1,000 S 500.000 1,000 73 A 100.037 SITE FENCEINC;/GATES LFT 5,000 1.500 ~1 7,500 ~l 1.605 8,025 75 A 100.038 SITE SECURITY - LIGHTING EA 3 500.000 s 1,500 S 500.000 1,500 77 A 100.039 FUEL/OlL ~I() 18 200.000 S 3,600 S 200.000 3,600 78 A 100.039 PICK UP TIWCJ{ - BEEnS NO 18 375.000 E G,750 E 375.000 6,750 79 A 100.040 SMALL TOOLS/EQUIP LSUM 1 4000.000 S 4,000 S4000.000 4,000 ,- 82 A 100.042 BIDDING & ADVERTISING LSU~l 1 500.000 S 500 s 500.000 500 83 A 100.043 AS BUILT DWGS LSUM 1 2000.000 S 2,000 S2000.000 2,000 85 A 100.300 WATCHMAN -NONE SEC slmv MO 18 225.000 S 4,050 S 225.000 '1,050 86 A 100.310 FURNITUI{E/ECWI P 3 TRAILER LSUN 1 75.000 9800.000 s 75 9,800 S9907.000 9.907 87 A 100.310 LAYOUT PEHSONEL - BLDGS CWHIl 120 75.000 S 9,000 s 75.000 9,000 89 A 100.500 MAT'L/PEHS HOISTING-TRADE PACI< 90 A 100.550 r{ADIOS LSUM 3200.000 S 3,200 S:I200.000 3,200 91 A 100.700 DRUG TESTING LSUM 1750.000 S 1,750 S1750.000 I .750 92 A 100.900 EMPLOYE/SUBS PARI{'G-OWNEH ---- -.-- ** TOTAL SUMMARY OF WOHK :3 5 7 , 7 '10 24,7'10 M 7 G :1 . 87 7 i.. 7.7 :d) I,: :~ III . () H Il ,- ,. INSURANCE 93 A 169.000 BOND COST - SEE PROPOSAL 94 A 169.001 BUILDERS RISK INSUR-OWNER 95 A 169.002 LIABILITY INSURANCE MILL 15 2400.000 S 36',000 S2400.000 36,000 ** TOTAL INSUHANCE 36,000 S 3(j,000 *** TOTAL GENERAL rm(~U I I{EMENTS 357,740 24,740 M 7!HI.877 7,7:'0 E - 254,088 S **** TOTAL TOTAL PllOJ ECT GEN CONDITIONS 357,740 24,740 M 799,877 7,750 E 254,088 S .. - .. '~' "" - - " 'I ',;j I-,} j_'~1 I,,' 1_", ,_,j '-' .~, '1;' r; l.; ....., ..' .. - - - - - FILE 10 - 4028 PHOJECT Jon NO - PHOJECT NAME - CLEAHWATER CITY SERVICE CENTEH PROJECT SIZE 1 SUBDIVISION - A TOTAL PROJECT GEN CONDITIONS G ENE R A L - - - CON T R ACT 0 R SUM MAR Y 0 F ** SUBDIVISION, ITEM CODE SEQUENCE ** - I~') I.,.:", '..;/ '.J . , -' , -' - .. ..1. ., -' .. EST I MAT E PAGE - DATE TIME INC - - I 08/04/94 15:39:50 - CREATIVE CONTHACTORS, 620 DREW STREET CLEARWATEH, VLORIDA 34015 ------------------------------------------------------------------------------------------------------------------------------------ Labor Labor burden & Total labor ~laterinl Sales tax & Total material SlIhcon t "He t Equipment Equipment surcharge Other expenses Gross cost Gross receipts tax Overhead Fee "lIilder's risk insurance General contractor's bond SlIbcont.ract bond Toto I bid - SUflDIVISION TOT 43.00 7.00 357,740 153,8213 24,740 I ,731 511,568 2G,471 251,088 7,750 799,1377 799,877 ,- \", - - - - - - - - -- ... ..., .., .., '.J 'tiJ 'eJ 'aJ '.J '.J '.... .' '.J .... e' .J - eJ ..J - eJ - - - - - - - - FILE ID - 4028 PROJECT JOB NO - PROJECT NAME - CLEARWATER CITY SERVICE CENTER PROJECT SIZE 1 SUBDIVISION - B DEDUCT GEN CONDITIONS - POLICE IIEAJ)(~.nLG - PAGE - 1 DATE - 08/04/94 T HIE - 1 5 : 3 9 : 5 0 INC ~. EST I M A T-E 0 ETA I L R E P 0 R T ** SUBDIVISION, ITEM CODE SEQUENCE ** - o CREATIVE CONTRACTORS, 620 DREI~ STREET CLEARWATER, FLORIDA 34615 REF S ITEM NO. D SC ELEM CODE ------------------------------------------------------------------------------------------------------------------------------------ UNIT ~IEAS QUANTI TY : TAX & INS INCLUDED TOTAL MAT/:TOT liNIT TOTAL E(~UIP/SUB: PIHCE PRICE n DESCRIPTION LAn UNIT MAT/EQP/ TOTAL PRICE SliO UNIT LAOOR ------------------------------------------------------------------------------------------------------------------------------------ GENEHAL nE(~U I flEMENTS SUMMAI~Y OF wOlm 100.000 TEMP ELECTRIC 100.001 ELECTRIC START liP-OWNER 100.002 TEMP WATER/SERVICE 100.003 FIELD TOILET 100.004 FIELD PIIONE/FAX 100.005 PI/ONE INSTALLATION 100.006 FIELD TRAILER-CONST 100.007 TRAILER - SET UP/REMOVAL 100.008 CONTRACT CLEANING/GLASS C 100.009 SAFTY /OSIIA RE(UOFFlCE SPL 100.011 WARRANTEE EXPENSE RESURVE 100.012 PROJECT SIGN 100.013 REPAIRS AND CORRECTIONS 100.014 TIlASI/ HAULING 100.015 FIELD ENGINEER-OEERS 100.015 FIELD SUPERVISION -OEERS 100.016 PROJECT MANAGER-OEms 100.016 SECRETARY @ SITE 100.017 CASUAL LABOH (CLEAN liP) 100.018 AEIlIAL "I/OTOGRAPHS 100.019 WATER COOLEH 100.020 RENTAL ,SMALL TOOLS-IN WK 100.022 TEMP SAFTY I~AILS-IN CONC 100.023 CRANE-IN STIlUCTliRE COST 100.024 SITE WORK -IN WORK ITEMS 100.025 TESTING - OTHERS 100.027 nLUEPrnNTS- SIIOP DWGS 100.028 CMI' SCIIEDULING-IN G.C.FEE 100.029 GLASS CLEANING 100.034 TRASH CHUTES 100.035 PED DARRICADES 100.036 TEMP STAIRS/LADDERS 100.037 SITE FENCEING/GATES 100.038 SITE SECURITY - LIGHTING 100.040 SMALL TOOLS/EQUIP 100.041 PIIOFESSIONA/. 1'1I0TOS 100.043 AS BUILT DWGS 100.310 LAYOUT PEHSONE/. - IlLDGS 2 Ii 5 B 7 II 9 0 II B 13 0 16 B 18 II 22 II 24 II 26 B 28 0 30 D 32 0 36 0 37 II 40 II ,II 1\ 43 II 45 0 47 II 49 B 51 0 53 H 55 II 57 B 59 B 61 B 63 B 68 0 70 B 72 II 74 II 76 B HO II R I II 84 II 88 B - MO 15- 100.000 S 1,500-S 100.000 1,500- MO 15- 75.000 S I , 125-8 75.000 1,125- U/NO 20 55.000 S 1, 100 8 55.000 1,100 NO 15- 175.000 S 2,625-8 175.000 2,625- ,- EA 1- 125.000 550.000 S 125- 550-S 729.000 729- SQFT 83,000- . 150 S 12,450-S .150 12,450- I.S 1- 5000.000 S 5,000-S5000.000 5,000- EA 1- 50.000 600.000 M 50- 600-~1 714.000 714- LS 1- 250.000 350.000 ~I 250- 350-M 733.000 733- LOAD 20- 375.000 S 7,500-S 375.000 7,500- WI\S 13- 825.000 10,725- 1] 79 . 71;9 15,337- WI(S 65-1340.000 87,100- 1916.200 124,553- MO 3-4500.000 50.000 S ]3,500- 150-S6485.000 19, '155- ~-' \~I(S 13- 425.000 5,525- 607.769 7,901- IIIlS 2,000- 7.000 S 14,OOO-s 7.000 !'I.OOO- MO 15- 65.000 S 975-8 65.000 975- LS 1- 500.000 S 500-S 500.000 500- -, LSUM 1- 2500.000 S 2.500-S2500.000 2,500- LSUN 1- 200.000 500.000 E 200- 500-I-: 786.000 786- LSUM 1-1500.000 1500.000 ~I 1,500- 1,500-M3750.000 3,75U- LSliM 1- 500.000 S 500-s 500.000 500- LFT 2,000- 1.500 M 3,000-1"1 1.605 3,210- EA 1- 500.000 S 500-S 500.000 500- L8IJf"1 1- 1500.000 S I. :,OO-S 1500.000 I, :'00- ~IO 15- 100.000 S I. :,oo-s 100.000 I. :'00- L:>liN 1- 200.000 ~J 2 0 0 - ~I 214.000 "~ I ,I - CWIIH :J 2- 75.000 S --~-----____)J_JilQ- S 7;'.000 2 ,ICL(J_- ------------------- FILE ID - 4028 EST I MAT E D ETA I L R E P 0 R T PAGE _ 2 PROJECT JOB NO - ** SUBDIVISION, ITEM CODE SEQUENCE ** DATE _ 08/04/94 PROJECT NAME - CLEARWATER CITY SERVICE CENTER TIME _ ]5:19:50 PROJECT SIZE 1 CREATIVE CONTRACTORS, INe SUBDIVISION - B DEDUCT GEN CONDITIONS - POLICE IIEAD(~. BLG 620 DI?Ew STllEET CLEARWATER, FLORIDA 346]5 .' .... 'III' '.' I., ~iJ .~, l~" f~~ 1~1 l~, f~1 '~I .1 '.') I., .1 '.~J .' .. ------------------------------------------------------------------------------------------------------------------------------------ REF S ITEM NO. D SC ELEM CODE DESCIU PTION UNIT ~IEAS (~UANT I TY LAB UNIT NAT/EQP/ TOTAL I'R r n: SUB UN]T LAIlOR : TAX .... 11\'S I \CI.I'l>FD TOTAL MAT/;TOT UNIT TOTAL EqUIP/SUB: PlilCE 1'lnCI-: r ------------------------------------------------------------------------------------------------------------------------------------ GENERAL REQUIREMENTS SUMMARY OF IWHK * * TOTAL SUMMARY OF WOlll( ]18,975- :"G50-~' :')00-1-: 511 , 17:' - S L :1lJ, K:;.- 9G B INSURANCE ]69.002 LIABILITY INSURANCE ** TOTAL INSURANCE ~1] LL fi- 2400.000 S ] 'LJ.~()J~-:-S 21 0 () . 0 0 0 1 'I, '101l-S 1-\ ,100- I'I,~OU.~ *** TOTAL GENERAL REQUIREMENTS 118,975- 5 , r;:;O-~1 :,(JO - F fl8,57fJ-s 2.1 fi , 2!) 7- ** * * TOTAL DEDUCT GEN CONDITIONS - POLICE IIEADQ. BLG 118,975- 5,650-N 500-E G8,575-S 245,2:;7- - - ~'.. ;,t'"' " - iii .. '. - rILE ID - PIWJECT JOB NO PHOJECT NAME PIWJECT SIZE SUBDIVISION '.' '.' - 4028 '.' - I.' 1.' - '.' l.' - I.' - 1;"/ - 4.1 '.1 - 'ii J 'Iii J - '. J '.' - G ENE HAL t.- / I., - CON T R ACT 0 R SUM MAR Y 0 F ** SUBDIVISION, ITEM CODE SEQUENCE ** CLEARWATER CITY SERVICE CENTER 1 - B DEDUCT GEN CONDITIONS - POLICE HEADQ,BLG '.' I., I :. .. -' -' -', - - - - - - - ESTI~1ATE PAGE - 1 DATE - 08/04 /~J.1 TINE - 15:39:50 INC -------------------------------~---------------------------------------------------------------------------------------------------- CREATIVE CONTRACTORS, 620 DHEW STUEET CLEAllIvATEU, FLOH!DA 34615 Labor Labor burden & Total labor ~lat.el'ial Snles tax & "otnl material Subcontract Equipment Equipment surcharge Other '"xpenses Or'oss cost Gross receipts tax Overlwad Fpp Blli Ider" s risle i nSllrnnce Gene r'lll e:on t "ae 1.0 r 's hond Subr:on I. rue: t bond SUBDIVISION TOT <13.00 7.00 Total hid 118,975- 5 I, 161- 5,G50- :l9Ii- 170,1:lfj- ("" Ii, ()'lli- (;H,:,7:,- [,()()- 2'15.2S7- - 245,257- '.., - I I I I I I I I I I I I I I I I I I I - Agreement Between Onwer Cfld General Contractor exhibit F I I ELEMENTAL COST MODEL FORMAT A. The GC's submissions shall provide a detailed Elemental Cost Estimate of each of the four components of the project In accordance with the following Elemental Cost Summary format collected on a matrix form Identifying total budget costs (see attached). B. Each Ge'S Cost Model shall Include and identify a 7.5% (minimum) design and pricing allowance for each of the four buildings to provide for detailing expected to Occur from the schematic design stage through design development. construction documentation and construction completion/hand-over stages. C. All estimated costs In the Elemental Cost Summaries shall be expressed in 1. Total dollar amounts 2. In dollars per square foot of gross building area and 3. Percentage of total costs. by element. D. Supporting approximate quantities and unit prices shall be provided for each element as back-up material for the PMC/ AE and Owner's reviews. E. The content of each element and sub-elements totals shall Include the estimate of each sub-trade's work "In-place" bid cost to the GC. The GC's general conditions of contract. construction fees. overheads and profrt shall be Identified as one separate all-lnclusive Item. H. For clarification purposes the following Is a guide to content of each elemental category: 1. Demolition - all demolitions. removals of material disposed of off site 2. Substructure a. Foundations - concrete supply - concrete placing (Including equipment) - formworl< (Including equipment) - rebar (Including equipment) - excavation - backfill with stockpiled material b. Basement excavation - excavation - backfill with stockpiled material c. Special conditions - anything that Is not typically associated with normal COnstruction procedures. examples: dewatering, removal of contaminated materials, drilled piers. etc.. Exhibit F Page 1 I I I I I I I I I I I I I I I I I I I Agreement Between Onwer Td General Contractor Exhibit F I 3. Structure a. Slab on grade (lowest floor) - concrete supply - concrete placing and finishing - concrete pumping equipment (or crane equipment) - formwork - rebar b. Framed structure (steel. concrete or composite) - concrete supply - concrete placing and finishing - concrete pumping equipment (or crane equipment) - formwork (Including equipment) - rebar (Including equipment) - structural steel fabricated. erected - metal deck - roof deck - fireproofing - miscellaneous metal 4. Exterior Skin a. Roof - roof membrane - Insulation - flashing/counter flashing - skylights - gutters and down spouts b. Walls below grade - concrete supply - concrete placing - concrete pumping equipment - formwork - rebar - waterproofing - waterstop and key way joints - perimeter drainage c. Walls above grade - back up to exterior skin. block, stud and drywall etc., (up to final "paint finish") - exterior skin (precast. stone. brick. stucco, metal. etc.) d. Windows - exterior glazing. frames and caulking - punched windows. frames and caulking e. Exterior doors - doors. frames. caulking and hardware Exhibit F Page 2 I I I I I I I I I I I I I I I I I I I Agreement Between Onwer cild General Contractor Exhibit F I I f. Soffits and projections - building overhangs. canopies and other items that are not included in the above category 5. Partitions a. Fixed partitions - masonry. metal studs and gypsum wallboard, glazing and frames (complete ready for final finish) - borrowed lights b. Movable partitions - complete Including overhead support c. Interior doors - leafs. Including frames. wood or metal including. paint or stain finish - hardware. Installed 6. Vertical Movement a. Stairs - metal or concrete risers and landings - railings and wall rails b. Elevators - complete c. Escalators - complete 7. Interior finishes a. floor finishes - stone. marble. ceramic tile. carpet. vinyl composition tile. paint. sealer, etc. - bases b. Ceiling finishes - perforated metal. plaster. gypsum wallboard, lay-in-acoustical tile, etc. - paint finishes to the above (as applicable) c. Wall Finishes - stone. wood paneling. acoustical wall panels, ceramic tile, plaster, fabrics. paint etc. - interior window sills 8. Fittings and Equipment a. Fittings and fixtures - railings and wall rolls - mHlwork and cabinet work - toilet partitions - washroom accessories - miscellaneous Items Exhibit F Page 3 I I I I I I I I I I I I I I I I I I I -- Agreement Between Onwer Td General Contractor exhibit F I b. Equipment - window washing equipment - council chambers wood work. seating, dais, etc.. - council chamber sound system. video system etc. 9. Mechanical a. Plumbing b. Fire Protection c. HV AC - ductwork. Insulation and equipment d. Controls 10. Electrical a. Primary SWitchgear b. Secondary SWitchgear and distribution system c. Ught fixtures and installation d. Special systems 11. Detail and Pricing Allowance a. Allowance of 7-1/2% minimum 12. General Conditions. COnstruction Fees. Overhead and Profit a. All Ge'S general conditions of contract. site supervisory and executive stoff. temporary offices. temporary utilities and other cost, performance bonds. Insurances/overhead and profit Exhibit F Page 4 I I I I I I I I I I I I I I I I I I I Agreement Between Owner and ,neral Contractor Exhibit F Clearwater City SeNices Center I Elemental Cost Summary ~:l;;!ill_;:::!;:~:::::::M~::::::~~~i:fl;~~;:i:;!::!:::II:::::)1::l1::*~::; :~i~ll_:;;*:::;!::::~:::::::::':!:::;:::::m::::::::::!i!::::::::::::::::::::;::!:::::::; (a) Foundattons (b) Basement excavations (c) Special concltlons ':::::I::_:!:i:::;~::::~::::::::::::::':~:I~~:::::::::::!;]:~~::~::~::::::::::r::::ii':::!::::::::::~::!:~::: (a) Slab on grade (b) Framed structure ::::::li:litm::II::::::::::::::::::i:::::::!:i::!!:::':::::::;:!:':::~::::::i:::;:!::::::::::'::!::~:i::::::: (a) Roof finish (b) Walls below grade (c) Walls above grade (d) Windows (e) Exterior doors (f) Soffits and projections ::::I::!ftt~IJlmlgl:::!:~::!:::::::::!:!!!:':!I~:i::::::;: (a) Fixed partitions (b) Movable Partitions (c) Interior doors :::!:Z!:;.~I:illl!:::i:iiiiti:iii!:!:!!:i:t!i!!!iJ::::: (a) Floor finishes (b) Ceiling finishes (c) Wall finishes :.:j'li:_im:;_:::'::::Ii: '::::}l:j_::!:!!:!~:~:::::::::::::::~~::::i:::::::::::!i:i::::!I::::::::::::::::@i:::i:::::::::: (a) Plumbing (b) Are protection (c) HVAC