MEMOS RE VILLAGE DRIVE EMERGENCY
TO:
FROM:
COPIES:
SUBJECT:
DATE:
I
~
CITY OF CLEARWATER
I nterdepartment Correspondence Sheet
Finance
Max G, Battle, Public Works Director
Elizabeth SV' Haeseker, Asst. City Manager, Lucille Williams
City Cler.k
Merrill Lynch Building, 2485 U.S. Hwy. 19 N.
February 22, 1984
Attached you will find two bills from Public Service and
Traffic Engineering for work performed by City Forces
between 8 p.m, and 11 p,m, on February 16, 1984. The
contractor that open-cut Village Drive was:
Howard Brothers Excavating
1001 Illinois Avenue
Palm Harbor, FL.
Please bill the contractor for this work.
'"
.-~-~" -.... "'.
:l:A3.
f~
FEB S' "'~
JTY cr'
.
'0' .
)'-0
I
TO:
FROM:
COPIES:
CITl OF CLEARWATER
Inteltepartment Correspondence Sheet
Max Battle. Public Works Director
Keith Crawford. Traffic Engineering Director
SUBJECT: Village Drive Emergency
DATE: February 17. 1984
On February 16. 1984. the contractor cutting the road left the trench in such a
condition as to cause personnel from Public Works. Public Service. Police and
Traffic Engineering to respond to an emergency. r believe it would be appropriate
to bill the contractor for the City's expenses. Following is the cost to Traffic
Engineering:
Traffic Signal Technician
Bucket Truck.
Service Shop Superintendent
Director of Traffic Engineering
Sedan .
r(?' ~
-. -,--,....~-, .- ---~....~.._---,---.
'~.'.~~' r<:: ~-~~':f':'~", .-,'
~g:
DMWK
DVM
DAMN
OTHER
FILE
FEB 2 I 1ffi4
i.',
2 HrS @ Overtime Rate
2 Hrs
40 Minutes
1 HI"
1 HI"
$29.50
20.00
6.80
29.00
5;00
$90.30
PUBLIC WORKS DEPT.
-
DTCJ DCC DWJS
D RCS D DJC D R.O.W.
D DGB D lAC 0 Fill.
D J'vVR D CG D P.5.
D RJM DJRL OKAW
J
I
EMERGENCY CALL OUT BY CLEARWATER POLICE DEPARTMENT ON 02/16/84,
AT 8:04 P. M., TO CLOSE OFF STREET (VILLAGE DRIVE).
1~ HOURS LABOR AND 6 BARRICADES----$25.00
PUBLIC WORKS/PUBLIC SERVICE
CITY OF CLEARWATER